Loading...
HomeMy WebLinkAbout18 WTR FAC CIP 6103/8 02-05-01AGENDA R E 'O RT 4,oo - ~5 NO. 18 02-05-01 MEETING DATE TO' FROM' SUBJECT: FEBRUARY 5, 2001 WILLIAM A. HUSTON, CITY MANAGER PUBLIC WORKS DEPARTMENT/WATER SERVICES DIVISION AWARD OF CONTRACT FOR THE CONSTRUCTION OF MAIN STREET WATER FACILITIES IMPROVEMENTS (CIP Nos. 6103 and 6108) SUMMARY Award of this contract will provide for demolition of the existing buildings and construction of a new 2.2 million gallon buried concrete reservoir, booster pump station, chlorination facilities, equipping of Well No. 4, emergency generator, electrical, instrumentation and control equipment. New site buildings and amenities, including a fountain, benches, raised planters, brick pavers and. decorative concrete will be constructed to match the architectural character of the Downtown Historic District. The project also includes the construction of two public parking lots, one of which is to be constructed on top of the below grade 2.2 million-gallon reservoir. Sidewalks, curbs and gutters aroUnd the entire site will be reconstructed. The water facilities will be secured from the public areas with the construction of decorative walls and gates. RECOMMENDATION It is recommended that the City Council award the construction contract'for the Main Street Water Facilities Improvements to SSC Construction, Inc. of Corona, California in the amount of $6,216,641.00 and authorize the Mayor and City Clerk to execute the contract documents on behalf of the City. FISCAL IMPACT With contingencies, construction management, inspection and other engineering services, the total cost of this project is $7,454,340. The mid-year budget will appropriate .funds that were programmed for FY 01/02 in addition to funds currently budgeted. The following table summarizes the remaining work' Construction .............................................................................. $6,216,641 Construction Contingency (10%) .............................................. $ 621,664 Additional Design Services ........................................................ $ 93,700 Construction Management, Inspection and Testing ................... $ 522,335 TOTAL ....................................................................................... $7,454,340 Award of Contract for the Construction of Main Street Water Facilities Improvements February 5, 2001 Page 2 BACKGROUND Bids for the Main Street Water Facilities Improvements were opened on December 19, 2000. There were six (6) bids received and the results are as follows- SSC Construction, Inc, Corona .................................................. $6,216,64t ARB, Inc., Lake Forest .............................................................. $6,484,748 Schuler Engineering Corp, Corona ........................................... $6,576,000 Olsson Constructors, Orange .................................................... $6,847,000 Americon Constructors, Inc., San Marcos ................................. $6,939,000 Marco-Z Technology Co, Cypress ............................................. $7,282,500 The Iow bid for the project is approximately 5.5% below the engineer's estimate of $6,580,500. The references and State Contractor's License for SSC Construction, Inc., have been checked and are appropriate for this project. The project was budgeted as a Water Capital Improvement Program Project within the current Fiscal Year. Although this project is budgeted as two separate projects, CIP No. 6103 and CIP No. 6108, it is being awarded as one. This project will complete the construction of the Wellhead Facilities for the new on-site well (CIP No. 6103) that was drilled during FY 99/00. The construction of the Main Street Facilities Improvements is a key project in the overall Water Capital Improvement Program. This site is the major water production center for the entire City system. Groundwater produced and treated at the site is stored and then pumped into the distribution, system to provide water Citywide. The following is the anticipated schedule for the project' Award Contract .......................................................................... 02-12-01 Commence Construction ............................................................ 04-01-01 Complete Construction ................................................................ 07-01-02 Tim D. Serlet Director of Public Works/City Engineer TDS:ccg:Award of cont. for const of main St facilities imp.doc Attachment l .. ! .