HomeMy WebLinkAboutCC RES 83-33
RESOLUTION NO. 83-33
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR
MOULTON PARKWAY/IRVINE CENTER DRIVE AND MYFORD ROAD
FAU PROJECT M-M032(O04)
WHEREAS, it is the intention of the City Council of the City of Tustin,
California to construct certain street improvements and appurtenant work on
Moulton Parkway/Irvine Center Drive and Myford Road, designated as FAU
Project M-M032(004), and;
WHEREAS, the City Engineer has presented plans and specifications for
the construction of said work;
NOW THEREFORE, BE IT RESOLVED that the plans and specifications
presented by the City Engineer be and are hereby approved as the plans and
specifications for:
MOULTON PARKWAY/IRVINE CENTER DRIVE AND MYFORD ROAD FAU PROJECT M-~032(004)
BE IT FURTHER RESOLVED that the City' Clerk is hereby authorized and
directed to advertise as required by law for the r. eceipt of sealed bids or
specifications which said advertisement shall be substantially in the
following words and figures to-wit:
"NOTICE TO CONTRACTORS"
SEALED PROPOSALS wi 11 be received at the office of the City Clerk,
Tustin City Hall, 300 Centennial Way, Tustin, California, until 10 a.m. on
· ,,
the 15th day of June, 1983, at which time they will be publicly opened and
read, for performing work as follows:
CONSTRUCTION OF 4 LANE ROADWAY FACILITY, MYFORD ROAD
OVERHEAD, PETERS CANYON WASH OVERCROSSING, SANTA
ANA/SANTA FE REINFORCED CONCRETE BOX EXTENSION,
REINFORCED CONCRETE PIPE STORM DRAIN, TRAFFIC SIGNAL AND
PAVEMENT STRIPING BE.TWEEN RED HILL AVENUE AND CULVER
DRIVE.
Bids are required for the entire 'work described herein:
A-1
]9.
19
9.7
ITEM NO.
·
2.
3.
4.
5..
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
UNIT
Lin. Ft.
Each
Ton
Ton
Acre
Ton
Lin. Ft.
Cu. Yd.
Lin. Ft.
Lin. Ft.
Ton
Each
Lin. Ft.
Each
Lin. Ft.
Lin. Ft.
Sq. Ft.
Sq. Ft.
Each
Lin. Ft.
Lin Ft.
Lin. Ft.
Lin. Ft.
Lin. Ft.
Each
Each
Each
Each
BLANK
Each
Lin. Ft.
Sq. Ft.
Lin. Ft.
Sq. Ft.
Lin. Ft.
Lin. Ft.
Lin. Ft.
Lin. Ft.
'Lin. Ft.
Lin. Ft.
Lin. Ft.
Lin. Ft.
Lin. Ft.
SCHEDULE OF WORK ITEMS
QUANTITY DESCRIPTION
4,319
1
17,608
51,747
47.9
44,119
654
475.6
1,005
5,810
7,422
1
1,240
5
300
5,420
3
480
7,250
5
254
5O
8,213
400
225
7
6
3
1
1
7,431
1,315
1,340
8OO
1,374
431
1 76
15
242
796
114
1,294
392
Sawcu t AC Pavement
Remove Existing Power Pole
Construct AC Pavement
Construct Aggregate Base
Clearing and Grubbing.
Construct Aggregate Subbase
Construct Drainage Ditch
Construct Concrete Curb
Install 6-Foot Chain Line Fence
Clear and Scrape 12 Ft. Wide Dirt Roadway
Construct . 10 ' Thick Rubberized Asphalt
Concrete Wearing Course
Construct AC Overside Drain
Construct AC Berm
Construct Chain Link Gate
Remove Existing Railroad Tracks, (Including
Timbers and Ballast Within Limits of Street
Right of Way
Relocate Existing 10" ACP Irrigation Line
and Valves
Remove 8 "x8" Barricade Post
·
Construct Driveway Type
Remove Existing Gravel
Relocate, Adjust to Grade, and Construct
Concrete Pad for Existing Fire Hydrant
Furnish and Construct 12" CMP (14 Gauge)
Remove Existing Retaining Wall
Remove Existing Chain Link Fence
Remove Existing Concrete Curb and Gutter
Remove Existing Concrete Curb
Adjust Manhole t~o Grade
Adjust Water Valve Cover to Grade
Install Chain Link Gate
Relocate Existing Blow-off Valve
Relocate Cable TV Ha~old
Construct Chain Link Fence
Construct Sidewalk
Construct PVC Sleeve
Remove Existing Concrete Sidewalk
Construct 18" RCP
Construct 24" RCP
Construct 30" RCP
Construct 18" CMP
Construct 24" CMP
Construct 60" RCP
Install Only 96" RCP
Construct 84" RCP
Construct 96" RCP
A-2
~ ITEM NO. UNIT
45. Lin. Ft.
46. Each
47. Each
48. Each
49. Each
50. Each
51. Each
52. Each
53. Lump Sum
54. Lump Sum
55. Lump Sum
56. Each
5 7. Lump Sum
58. Lump Sum
]9~ 59. Lin. Ft.
] ~ 60. Lump Sum
61. Ton
15 62.
Lump Sum
16 63.
64.
17
66.
18 67.
68.
19 69.
70.
71.
21 72.
Lin. Ft.
Each
Each
Lump Sum
Lin. Ft.
Each
Each
Each
Each
Lump Sum
22
23
24
73.
74'.
75.
76.
77.
Lump Sum
Lin. Ft.
Each
Each
Lump Sum
25 .TS.
Lump Sum
26
79.
Lump Sum
27
28
Lump Sum
Lump sum'
SCHEDULE OF WORK ITEMS (Continued)
QUANTITY DESCRIPTION
_
153
15
2
3
3
5
1
i
ls
ls
is
3
is
1s
430
is'
8,315
is
102
4
1
ls
31
1
1
4
4
is
1s
63
1
5
is
1s
1s
Construct 8 ' xl 2 ' RCB
Construct Inlet Type V
Construct Inlet Type O.S.
Construct Channel Entry Structure
Construct Local Depression
Construct J.S. Type II
Construct Channel Entry Structure
Join Existing 60" RCP with Concrete Collar
Sheeting, Shoring, and Bracing
Remove Existing Channel Entry Structure
Remove Existing RCP Culvert and Rip-rap
Remove Existing CMP Culvert
Remove Existing Outlet Structure from 60"
RCP
Remove Existing Outlet Structure from
8'x12 ' RCB
Construct Double 11 ' x12 ' Reinforced
Concrete Box
Construct Warped Wing Wall Transition
St ru ctu~re
Construct Rock Slope Protection, 1/4 Ton, ....
3' Thick '
Remove Existing Transition Structure and
Rock SIope Protection
Construct 21" RCP
Construct J.S. Type V
Remove Existing Drain Box
Construct Transition Structure
Construct 42" RCP
Construct J.S. Type III
Contract J.S. Type I
Remove Existing Catch Basin/Side Drain and
Seal Inlet to RCB
Construct Reinforced Concrete Collar
Remove Existing Reinforced Concrete Box
Structure
Relocate Existing Rock Slope Protection
Construct 27" RCP
Construct C.B. No. 1
Construct 8" Brick and Mortar Seal
Construct Peters Canyon Channel
Overcrossing (FO6)
Construct Atchison, Topeka and Santa Fe
Overhead
Remove Existing Striping or Paint .Striping
and Install Raised Reflective Markers Per
Plan '
Is.. Paint Pavement Markings
Is Remove, Relocate, and Install Signs
A-3
10
12
15
17
18
19
20
21
ITEM NO. UNIT
_ _ _
82. Lin. Ft.
83. Lump Sum
84. Lump Sum
85. Cu. Yd.
86. Ton
SCHEDULE OF WORK ITEMS
(Continued)
QUANTITY
460
is
Is
70,942
158,275
DESCRIPTION
Remove Existing AC Berm
Install Traffic Signal'at Harvard
Replace Loop Detectors at Culver Drive
R oa dwa y Exca va t i on
Import, Borrow
A-4
19
20
27
The foregoing quantities are approxmiate only, being given as a basis
for the comparison of bids, and the City of Tustin does not, expressly or by
implication, agree that the actual amount of work will correspond therewith,
but reserves the right to increase or decrease the amount of any class or
portion of the wor~k, or to omit portions of the work as may be deemed
necessary or advisable by the Engineer.
Plans, specifications and proposal forms to be used for bidding on this
project can only be obtained by prospective bidders at the office of the City
Clerk, Tustin City Hall, 300 Centennial Way, Tustin, California, 92680, Upon
payment of $15.00 per set, which amount shall be non-refundable.
Plans and specifications 'will.'be mailed out upon payment of $6.00 per
set, which amount shall be non-refundable.
In conformance with Section 37931' of the Government Code, all bids shall
be presented under sealed cover on the proposal form provided and accompanied
by one of the following forms of bidder's security:
a · Cash
b. Cashier's check made payable to the City of Tustin.
c. Certified check made payable to the City of Tustin.
d. Bidder's bond executeld by an accredited surety insurer,
made payable to the City of Tustin.
The security shall be in an amount e~al to at. least ten percent (104)
of the amount of the bid. A bid shall not be. considered unless one of the
forms of bidder's security is enclosed therewith.
A Security Bond for payment of labor and materials will be required in
the amount of .fifty percent (504) of the estimated total contract price and a
Faithful Performance Bond in the amount of one hundred percent (1004) of the
estimated total contract price in the form attached to the contract
documents. Said bonds shall be issued by a Surety Company rated Grade A or
better and Class IX or better by the latest edition of Best's Key Rating
Guide. '
City of Tustin reserves the right to reject any or all bids, and/or
waive any informality on a bid. No bidder may withdraw his bid for a period
of thirty (30) days after the date set for the opening thereof.
The Contract will be awarded to the lowest qualified bidder.
Provisions of the State Contract Act are not applicable, and prospective
bidders will not be required to be prequalified. ..
Ail work to be done under the direct supervision of the City Engineer,
City of Tustin.
Ail work to be paid for at the uni~ prices bid from appropriated monies.
:.
A-5
4
]0
Pursuant to California Government Code Section 4590, the contractor will
be entitled to post approved securities with the City or an approved
financial institution in order to have the City release funds retained by the
City to insure performance of the contract.
Federal Requirements and Federal minimum wages shall apply to this
project. Attention is directed to decision No. CA81-5154 of the Secretary of
Labor. Not less than said minimum wages shall be paid to workers employed on
this project.
Federal requirements for this project require that the Contractor shall
perform work with his own organization which equals not less than 50 percent
(504) of the total contract price. Ten percent Minority Business Enterprise
(MBE) participation is required.
Minimum wage rates for this project as predetermined by the Secretary of
Labor are set forth in the special provisions. If there is a difference
between the minimum wage rates predetermined by the Secretary of Labor and
the prevailing wage rates determined by the State for similar classifications
of labor, the Contractor and his subcontractors shall pay not less than the
higher wage rate.
Pursuant to Section 1773 of the Labor Code, the general prevailing rate
of wages in the county in which the work is to be done has been determined
and the department has listed these wage, rates in the Department of
Transportation publication entitled Equipment Rental Rates and General
·
Prevailing Wage Rates, dated February, 1977.
PASSED AND ADOPTED by the City Council of the City of Tustin,
California, this 18th day of April , 1983.
-- _
Ma yor
City Clerk
Advertise in the Register:
18, 1983
2.5, 1983
A-6
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
MARY E. WYNN, City Clerk and ex-officio Clerk of the City Council of the City of
Tustin, California, ~loes hereby certify that the whole number of the members of
the City Council of the City of Tustin is five; that the above and foregoing
Resolution No. 83-33 was duly and regularly introduced, passed and adopted at a
regular meeting 'of 't'he City Council held on the 18th day'of Apr_il, _1983, by the
fol 1 owing vote:
AYES · COUNC ILPERSONS'
NOES · COUNCILPERSONS-
ABSENT' COUNC ILPERSONS'
Hoesterey, Kennedy, E~dgar, Sal tarell i
None · .
Greinke
City of Tusti n, Cal