Loading...
HomeMy WebLinkAbout04 GP Conformity (Legacy)ITEM #4 i Report to the '• Planning Commission DATE: APRIL 22, 2008 SUBJECT: FISCAL YEAR 2008/2009 TUSTIN LEGACY PUBLIC INFRASTRUCTURE GENERAL PLAN CONFORMITY DETERMINATION APPLICANT: CITY OF TUSTIN PROPERTY OWNER: CITY OF TUSTIN LOCATION: TUSTIN LEGACY ZONING: SPECIFIC PLAN NO. 1 ENVIRONMENTAL DETERMINATION: THAT GENERAL PLAN CONFORMITY DETERMINATIONS REQUIRED BY GOVERNMENT CODE SECTION 65401 ARE NOT "PROJECTS" REQUIRING ENVIRONMENTAL REVIEW PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT REQUEST: GENERAL PLAN CONFORMITY FINDING FOR PUBLIC INFRASTRUCTURE AT TUSTIN LEGACY RECOMMENDATION That the Planning Commission adopt Resolution No. 4089 determining that the public infrastructure at Tustin Legacy to be planned, initiated, or constructed during the 2008/2009 fiscal year is in conformance with the Tustin General Plan. BACKGROUND Section 65401 of the California Government Code (Planning and Zoning Law) provides that a list of the proposed public works recommended for planning, initiation, or construction during the ensuing fiscal year shall be submitted to the Planning Commission for a determination of conformity with the adopted General Plan. Planning Commission Report General Plan Conformity Determination April 22, 2008 Page 2 Attached to this report is a needs list of all public infrastructure proposed at Tustin Legacy through buildout. This infrastructure is required for the ongoing development of the former Marine Corps Air Station — Tustin. All of the proposed improvements listed on the needs list are identified in the Tustin General Plan or are consistent with the goals and policies of the Tustin General Plan. Therefore, the public infrastructure at Tustin Legacy to be planned, initiated, or constructed during the 2008/2009 fiscal year is in conformance with the Tustin General Plan. Scott Reekstin Senior Planner Attachments: A. Tustin Legacy Public Infrastructure Needs List B. Resolution No. 4089 pereport\GPC-Tustin Legacy Public Infrastructure.doc. ATTACHMENT A TUSTIN LEGACY PUBLIC INFRASTRUCTURE NEEDS LIST TUSTIN LEGACY FAIR SHARE ANALYSIS PUBLIC INFRASTRUCTURE NEEDS UST THROUGH WXDOUT 61 Moffatt / Harvard U rads (incorporated into Item 16, Reach 199 62 Tustkn Ranch 1 Ram New 83 Tustin Ranch -1 Walnut tu rade 64 Ed / Ram New 65 65interconnect Shade Marble Mountain i Harvard (incorporated into Item 11 Reach 158 3 tem 85 onnecbr / Nath L New85 :EaW* Interkwnnect S tem Nota costs are I ad Into the varknus traffics nal65onuole No►a peas an into a» vatous trattic budgets) 6T— tro Note costs are I into the "aria» traft signal budiptaf i Traffic Mitigation - Santa Ana / Irvine Agreements J E 19 - TLm t ATM$ Fea P ant 8 RedWN / Ed I$.- •-68 68 Tustkn Ranch J Walnut. F 19 - TwBn Addition tra Items 8 JG 9 Invina Conbibu#on / - Irvine 7 1 Van Ksm►et - F 23 - Irvkke 71 Jambo se Allot Harvard i rs M. IrAw i9 — / Warner - Figure 2g. Irvift 74 7 earranca t Von Karmen Improvements 1 kqo itarrt 3 152 eerrancaJ Intersection ts Pkltanald T 76 RamMtM / sMw -Y Ame a AmsMean army s 79 Drainage IMPrOVOntents mn Channel from Rakoed Track to Edffww 81 nvon Channel from Edinger to C11V limn (Incorporated knb Item 79 Reach 504 eters nyonChannel rwn C11V limn to Rara "— EFan here 8 Backbone Storm GrainOverall Valencia Anna 82 82 Backbone Stam Dnekt OveraN inletted Intekn Stam Drab Connektlon Warne R3CCD 400,111cm-loam 83 unman to a8rnmele Pump Station 84 86 DeMMW 86 Bamanea Channel Detention Baain / S Flelds at Radha / Warne 87 so 8amnca Channel - Rahl to south of Tustin Ranch Not Irvkne CIP P ISOMIS Ana Santa ahannei mbankmant i Into Item 13 Reach 89 Water 01,1111HY/Mittgation imPrrOvements Sswum Treatment FwAW Phase 1 Backbone F 89 Selenium Treatment Fscft Phase 2 Backbone F 90 90 Wow Ouaw Tresimat S s Phase 1 Bactkbone FscN Www Treatment 3 tame Phase 2 Saftoke Faces 91 92 —ResourcesAgency 93 94 93A Relaxcp M Im rni -Paten Ca i RNlroad to Edinger M AmprovementsPaten Can / Ed to C LknN Resokkroa 6SM M Im -Pete Can / lima fo 8amnncs Resources Im mets - Meatsr Remaw-Anonmr—MIm sten / Dry Utilities Electrk 96 9 98 Badkbotke Phase 1 Backbone + for Cha - Refunds Backbone Phase 1 Backbone + Cortracior Char - Reftm Backbone Phase 1 Backbone Back + Cortracbn C Backbone Phase 1 bo w +Contractor Char - Refunds ATTACHMENT B RESOLUTION NO. 4089 RESOLUTION NO. 4089 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF TUSTIN DETERMINING THAT THE PUBLIC INFRASTRUCTURE AT TUSTIN LEGACY TO BE PLANNED, INITIATED, AND CONSTRUCTED DURING THE 2008/2009 FISCAL YEAR CONFORMS WITH THE TUSTIN GENERAL PLAN. The Planning Commission does hereby resolve as follows: The Planning Commission finds and determines as follows: A. That public infrastructure is being planned, initiated, and constructed at Tustin Legacy to accommodate the ongoing development of the former Marine Corps Air Station - Tustin. B. That all of the proposed improvements listed on the Tustin Legacy Public Infrastructure Needs List are identified in the Tustin General Plan or are consistent with the goals and policies of the Tustin General Plan. C. That California Government Code Section 65401 provides that a list of the proposed public works recommended for planning, initiation, or construction during the ensuing fiscal year shall be submitted to the Planning Commission for a determination of conformity with the adopted General Plan. D. That general plan conformity determinations required by Government Code Section 65401 are not "projects" requiring environmental review pursuant to the California Environmental Quality Act. II. The Planning Commission hereby determines that the public infrastructure at Tustin Legacy to be planned, initiated, or constructed during the 2008/2009 fiscal year is in conformance with the Tustin General Plan. PASSED AND ADOPTED by the Planning Commission of the City of Tustin at a regular meeting held on the 22nd day of April, 2008. JOHN NIELSEN Chairperson ELIZABETH A. BINSACK Planning Commission Secretary Resolution 4089 April 22, 2008 Page 2 STATE OF CALIFORNIA ) COUNTY OF ORANGE ) CITY OF TUSTIN ) I, ELIZABETH A. BINSACK, the undersigned, hereby certify that I am the Planning Commission Secretary of the Planning Commission of the City of Tustin, California; that Resolution No. 4089 was duly passed and adopted at a regular meeting of the Tustin Planning Commission, held on the 22nd day of April, 2008. ELIZABETH A. BINSACK Planning Commission Secretary