HomeMy WebLinkAboutCC RES 75-52
RESOLUTION NO. 73-52
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF TUSTIN, CALIFORNIA, APPROVING
PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION
OF STORM DRAIN IMPROVEMENTS ON BRYAN AVENUE
AND MAIN STREET FROM 100' EAST OF UTT DRIVE
TO 400' WEST OF CENTENNIAL WAY AND DIRECTING
THE CITY CLERK TO ADVERTISE FOR BIDS.
WHEREAS, it is the intention of the City Council of the
City of Tustin, California to construct storm drain improvements
· on Bryan Avenue and Main Street from 100' east of Utt Drive to
400' west of Centennial Way, and
WHEREAS, the City Engineer has presented plans and
specifications for the construction of said work at this
location,
,.
NOW, THEREFORE, BE IT RESOLVED that the plans and
specifications presented by the City Engineer be and are hereby
approved as the plans and specifications for the construction
of storm drain improvements on Bryan Avenue and Main Street
from.100' east of Utt Drive to 400' west of Centennial Way.
BE IT FURTHER RESOLVED that the City Clerk is hereby
authorized and directed to advertise as required by law for
the receipt of sealed bids or proposals for the doing of the
work specified in the aforesaid plans and specifications which
said advertisement shall be substantially in the following words
and. figures, to-wit: .
"NOTICE TO CONTRACTORS"
SEALED PROPOSALS will be received at t_he office of the
~ustin Calif-
City Clerk, Tustin City Hall, 300 Centennial Way, . ,
ornia, until 11 o'clock A.M. on the 2nd day of September', 19 75,
at which time they wil-1 be publicly 'opened and read, for performing
work as follows
Construction of storm drain improvements on Bryan Avenue
and Main Street from 100' east of Utt D'ive to 400' west of
Centennial Way. .
Bids are required for the entire work deScribed herein-
A-1
- 322
SCHEDULE OF WORK ITEMS
ITEM NO.
QUANTITY
DESCRIPTION OF WORK
·
3560 Lin. Ft'
.
Sawcut Asphalt or Concrete
·
1108 Lin. Ft.
54" RCP 1000D
·
1288 Lin. Ft.
~8" RCP 1000D
·
·
352 Lin. Ft.
24 Lin. Ft.
42" RCP 1000D
36" RCP 1000D
·
56 Lin. Ft.
27" RCP 1000D
·
53 Lin. Ft.
24" RCP 1100D
®
·
140 Lin. Ft.
53 Lin..Ft...
18" RCP 1500D
18" RCP 2500D
10'
67 Lin. Ft.
15" RCP 1500D
..
11.
12.
4 each
2 each
Junction Structure Type II
· .
Junction Structure Type III
13.
14.
2 each
3 each
Junction Structure Type IV
Catch Basin Type OS
15.
2 each
Catch Basin Type OL L=7'
16.
1 each
Catch Basin Type OL L=10'
17.
1 each
Catch Basin Type OL L=14'
18.
4 each
Concrete Collars
19.
7 e ach
Brick & Mortar Plugs
20.
22.
4 each
250 Lin. Ft.
460 Sq. Ft.
Remodel Sanitary Sewer Lateral
Type A-2 Curb & Gutter
4" Thick PCC Sidewalk
23.
2153 Tons
Deep Lift Asphalt Concrete Pavement
24.
160 Tons
Variable Thickness AC Pavement Overlay
A-2
,. 323
· .. · o.
· ·
, ' '£he fo~'egoin,~ quantities a~'e app~'o,~.in:aL~ o:~ly, being given
.ns a ba,;is for t]~.c co,npariso,~ Of bids,' and the C~ty of Tustin: docs
not, expressly or by implication, aqrcc that t~%e actual amount of
~4ork %~ill correspond therc~ith, but reserves tile right to increase
or decrease the amount bf any class o~£ poraion-of the %~'ork, or to
omit portions of t. he %-~ork as may be dce~..ad necessary or advisable
by the Engineer. . . .
Plans, specifications,, and proposal forms to be' used for'
bidding on this project can only be obtained by prospective bidders
C~ty Clerk's office Tustin City Hall, Tustin .Californi.a. - .
· 2Ca ~onformancc %~it~ Section 37931 of the Government Code, all
'bids shall be presented under' scaled cove_~ on the proposal form-
provided and accompanied by one of the fol!o%~ing forms of bidder's'
security:
__a. Cash. . - .
b. Cast~ier's check made payable %0 ~he City of Tustin. -' '
C. Cc:r_tified check made payable to the City of Tustin.
·
d. Bidder's bond executed by an accredited sur~y insurer,
- ~nade payable to %he .City of Tustin. - - .:-
·
~he security shall be in an amount e~ual~ %0 at least ten percen~.
(10%) of the amount of %he bid. A bid shall not be considered ,
unless one of the forms-of bidder's security is enclosed, therex,,ith.
·
A..Sure~y Dond for payment of labor and materials %~ill be '
, required in the a~,ount of fifty percent (50°.
., -~) of the es%Created total
contract price and a Faithful Performance Bond in the amount of
one. hundred percent (100%) of the est,.mated total contract price ' '
· in' the form attached to the cont'r~ct d.o.cu.~:ent$. Said bonds shall be
issued by a company having a ratiqg of A+?=A or better.' '
. . .
dity of Tusti'n reserves %he right %o 'reject any or all bids,
and/or %4aivc any informality 'on a bid. 1;o bidder may %~ithdra:.~
his bid for a period of thirty (30) days after the dat~ se~ for
.opening ~hereof. ' "'
·
·
· Th~ contract w~ll be a%earded to the !o~-~es% qualified bidder.
" Provision's of %he State Contract Act are not applicable, and
prospective bidders %~ill not be require~ to.be prequalified. '
·
' All %~or~' to be done under the di~ect supervision of the City
l~.n Uinecr, .
,
All':,~ork to.. be paid for at the..U~it pric.~s bid from appropriate
monies. '- .
Said City of Tustin, pursuant ko the LabOr Code .of the State
of.California, ha'; ascertained and dctcr;ninc~ that thc general
prev~ili)3g rate of l~ox}rly and per dic]a wages in t]~e locality in
%;))lc)) tl~c said work ))crcin dc,;cri))cd i-; to b'~ pcrfor}ncd, for cacl~
craft or type of %-/or]~{~a]~ ok' ].acc]2a)3j.c not,lcd %0 c×ccutc t)%e
and also t}~c ge)%cral l>revaili~3g rate fo- lcg~ml ]]olid;~ys and ovcr-
~imo'%lo):); for. cecil Cra£t or tyl~e o.£ wor)~),,a,% ~,r mecl~;xnic, to be as
324
·
·
.;{ndicated in Resolution .-75~-!7-_.~r~_~cvio~sly publis}]ed in a
paper of general circulatio'n, and on file in 't)~e of. lice of
City Clark. ·
·
tl:e
Employer
defined in
accordance
.applicable
employed on
·
paymen ts
Section 1773.1
%qitl] .tl~c terms
to the type or
the project.
·
other than those itemized therein, as
of tt~e Labor Code, are to be paid in
of the collective bargaining agreement
classification of the %~'orkmen or mechanj
·
bargaining
agreements
Copies of all collective
relating to
f.-role and available for inspection
of Industrial Relations~ Division
work as set forth in the aforementioned Labor Code are on
in the office of the Department
of Labor Statistics and' Researc:~,
.e
BY ORDER OF THE CITY COO.~CIL C
T}IE CITY OF TUSTIN, C~LIFOP~NiA
~u s.ti n has
prevailing
the City of
needed to execute the work
in Resolution 75-17.
' PASSED
California,
Ci.~y Cl'&rk o~ the City
. T'ustin, California
ATTEST:
ALSO RESOLVED that the City
ascertained and does hereby determine
rat'e of wages and employer payments in
Tustin, California, for each craft or
herein above specified
AND.ADOPTED this 4th day of August, 1975.
·
·
Council of %he City of
that the general
%he locality of
type of %.~orkman
is ak set 'forth
City of T, mstin,
........ /__, ' 19_~_'.
325
STATE OF CALIFOP~NIA)
COUNTY. OF O mANGF )SS
CITY OF TUSTIN )
RUTH C. POE, City Clerk and ex-officio Clerk of the City
Council of the City of Tustin, California, does hereby
certify that the whole n~.~ber of the mc?.~ers of the City
Council of the City of Tustin is five; that the above and
foregoing Resolution Xo. 75-52 teas duly and regularly
introduced, read, passed 'and a~D-ted at a regular meeting
Of mhe City Council held on theL _4_t~ ..... _day of ~ugust_..
19 75, by the following vote:
AYES: coUNcI I~.~IEN
NOES:
ABSENT - COUNCI I24EN
C:i-~y~-Clerk,~ty of Tustin, Ca'm-Zfcrnia