HomeMy WebLinkAboutCC RES 753RESOLUTION NO. 753 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN APPROVING PLANS AND SPECIFICATIONS FOR THE IMPROVEMENT OF PROSPECT AVENUE BETWEEN FIRST STREET AND FOURTH STREET, AND AUTHORIZING AND DIRECTING THE CITY CLERK TO ADVERTISE FOR BIDS. WHEREAS, it 'is the intention of the City Council of the City of Tustln to make certain improvements on Prospect Avenue; and WHEREAS, the City Engineer has presented plans and specifications for the proposed improvements of Prospect Avenue, between First Street and Fourth Street NOW THEREFORE, be it resolved that the plans and specifications presented by the City Engineer be and are hereby approved as the plans and specifications for the improvement of Prospect Avenue between Fi. rst Street and Fourth Street. BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to advertise as required by law for the receipt of sealed bids or proposals for the doing of the work specified in the aforesaid plans and specifications, which said advertisement shall be substantially in the following words and figures, to-wit: "NOTICE INVITING SEALED PROPOSALS" In pursuance of a resolution of the City Council of the City of Tustin, Orange County, California, adopted dlrecting.this notice, NOTICE IS HEREBY GIVEN that sealed proposals will be received at the Tustin City Hall, 135 West Third Street, Tustln, California, until 5:00 P.M. on the 4th day of January, 1965, to be opened at 7:30 P.M. and resd aloud in the Council Chambers, at the Tustin Youth Center, 600 West Sixth Street for construction of city streets in accordance with the specifications therefore, to which special reference is made, as follows: In the City of Tustin, on Prospect Avenue between First Street and Fourth Street, to be graded and paved with asphaltic coucrete on a~gregate base, to construct concrete curb and gutter, and storm drain.. herein. Bids are required for the entire work described Item No. I Clearing and Grubbing Item No. 2 50 cubic yards Roadway excavation Item No. .3 180 tons Agregate base Item No. 4 190 tons Asphalt concrete Item No. 5 12 cubic yars Class B concrete (curbs, etc) Item No. 6 4 cubic yards Class A concrete (minor structures) Item No. 7-0.5 tons Liquid asphalt (SC-250 prime coat) Item No. 8 2.0 tons Asphalt emulsion (seal coat and paint binder) Item No. 9 70 linear feet 24" Reinforced concrete pipe (Class III i Item No. l0 864 linear feet 30" Reinforced concrete pipe (Class III i The foregoing quantities are approximate only, being given as a basis for the comparlson of bids, and the City Of Tustin does not, expressly or by impl~cation, agree that the actual amount of work will correspond therewith, but reserves the righ~t to increase or decrease the amount of any class or portion of the work, or to omit oortions of the work, as may be deemed n. ecessary or advisable by the Engineer. Plans, specifications, and proposal forms to be used for bidding on this project can only be obtained at the Tustin City Hall, Tusti~, California, No bid will be considered unless it is made on a blank form furnished by the City Clerk of Tustin, California, and is made in accordance with the. provisions of the Standard Specifications and Special Provisions. Each bidder must be licensed and. also preq.ualified as required by law. The City of Tustln reserves the right to reject any or all bids. Abbreviations used in the schedule of predetermined wage rates in conjunction with employer payments listed in the right hand column are identifled as follows: ph per hour phw per hour worked phw/p per hour worked or paid Employer payments other than those itemized below, as defined in Section 177~.1 of the Labor Code, are to be paid in accordance with the terms of the collective bargaining agreement applicable to the type or classification of the workmen or mechanlcs employed on the project. Overtime, Sunday, and Holidays--not less than one and one-half (l-l/2) times the basic hourly rate plus applicable employer payments. The holidays upon which such rates shall be paid. shall be all holidays recognized, in. the collective bargaining agreement applicable to the psrtlcular craft, classification or type of workman employed on the project. Copies of all collective bargaining agreements relating to the work as set forth in the aforementioned Labor Code are on file and available for inspection in the office of the Department of Industrial Relations, Division of Labor Statistics and Research. Attention is directed to Section 7-1.01G of the Standard Specifications providing for the employment of apprentices on the work. 'Every such apprentice· shall be paid the standard wage paid to apprentices under the regulations of the trade at which he is employed. Information relative to employment of apprentices shall be obtained from the Director of the Department of Industrial Relations, who is the Administrative Officer of the California Apprenticeship Council. Pursuant to the provisions of Section 17~0 of the Labor Code of the State of California, the City Council of the City of Tustln has ascertained the general prevailing rate of wages and employer payments for health and welfare and pension and similar purposes in which the work is to be done to be as follows: Basic rate Employer payments for oer hour Classification H and.~.w Pension 4.81 15~ phw/p 15~ phw/p 4.62" 15~ phw/p 15~ phw/p 3-71 12~ phw/p 10~ phw/p 4.62 4.81 4.10 4.13 4.18 4.26 4.48 15~ phw/p 15~ phw/p Asphalt or crushing plant engineer Asphalt plant fireman Asphalt raker and ironer Boxman or mixer box operator (concrete or asphalt plant) Concrete or asphalt spreading, Mechanical tamping or finishing machine operator Driver of dump truck (less than 4 yards water level) Drlver of dump truck (4 yards but less than 8 yards water level) Driver of dump truck (8 yards but less than 12 yards water level) Driver ~f dump truck (12 yards but less than 16 yards water level) Driver of dump truck (16 yards or more water level) Engineer, oiler and signalman Equipment greaser Fine grader (Highway and Street paving) 12~ phw/p 10¢ phw/p 4.27 Fireman 15¢ phw/p 15¢ phw/p 3.50 Flagman 12~ phw/p 10¢ phw/p 4.81 Heavy duty repairman 15~ phw/p 15¢ phw/p 4.03 Heavy duty repairman's helper 15¢ phw/p 15~ phw/p 3.50 Laborer (general or construction) 12½¢ phw/p 10¢ phw/p 4.91 Motor patrol operator (any type or size) 15~ phw/p Tractor operator (Bulldozer, tamper, scraper, and push tractor) Water truck driver (under 2500 gals) Water truck driver (2500 gals to 4000 gal) Water truck driver (4000 gals and over ) phw/p pnw/w 1~ phw/p 15~ phw/p 15¢ phw/p 15~ phw/p 15¢ phw/p 15¢ phw/p 15~g phw/p 15¢ phw/p 4.0 3 15¢ phw/p 15¢PhW/p 4.51 15~ phw/p 15~ phw/p 3.60 15¢ phw/p 15¢ phw/p 15¢ phw/p 15~ phw/p 15¢ phw/p 15¢ phw/p 4.81 4.16 4.28 4.40 15¢ pnw/p 15~ pnw/p 15¢ phw/p By order of the City Council of the City of Tustin, California. Dated this 7th day of December, 1964. Cle~of~City of ustin,~ornia That the City Council of the City of Tustin has ascertained and does hereby determine that the general prevailing rate of wages and employer payments in the locality of the City of Tustin, California, for each craft or type of workman needed to execute the work hereinabove specified is as set forth in the form of notice hereinabove set forth, and. said notice shall contain said schedule of wages to be paid to the workman in said work. PASSED AND ADOPTED by the City Council of the of Tustln, Cal...,~fornia, this 7th day of December, 1964. City MAYOR 44 ATTEST: CITY ~K STATE OF CALIFORNIA) COUNTY OF ORANGE ) CITY OF TUSTIN ) SS I, Ruth C. Poe, City Clerk of the City of Tustln, do hereby certify that the foregoing Resolution was duly pas~.ed and adopted by the City Coun2i~l of the ~ity of Tustin at its regular meeting held on the 7th day of December, 1964, by the following vote, to-wit:~ AYES: TRUSTEES :. ~.. Mack, Kl~_inEel_~ofer, NOES :' TRUSTEES: None C9co, Miller, ..... Ring ABSENT: TRUSTEES CITY CLERK RESOLUTION iVO. 753 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIP•I APPROVING PLAiVS AND SPECIFICATIONS FOR THE IMPROVEI~'~P!T OF PROSPECT AVFrtiUE BETGJEEiV FIRST STREET AND FOURTH STREET, AiVD AUTHORIZING AND DIRECTING TiI/' CITY CLERi( TO ADVERTISE FOR BIDS 4TcI~LREAS, it is the intention of the City Council of the City of Tustiq to make certain improvements on Prospect Avenues and 6VHEREAS, the City Engineer has presented plans and specifications for the proposed improvements of Prospect Avenue, between First Street and Fourth Street NOTn~ THL'REFORE, be it resolved that the plans and specifications pre:~ented by the City Engineer bo and are hereby approved as the plans and specifications for the improvement of Prospect Avenue between First Street azzd Fourth Street, BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and diracted to advertise as required by law for the receipt of sealed bids or prcposals for the doing of the work specified in the aforesaid plans and specifications, which said advertisement shall be substantially in the following Yaods and figures, to-wits 'NOTICE INVITING SEALED PROPOSALS°' In pursuance of a resolution of the City Council of the City of Tustin, Orange County, California, adopted directing this notice, NOTICE IS HEREBY GIVEid that sealed proposals will be received at the Tustin City Hall, 135 G1est Third Street, Tustin, California, until 5x00 o`clock P.PI., on the 4th day of January , 196`x, to be opened at 7x30 o°clock P.r;. and read aloud in the Council Chambers, at the Tustin Youth Center, 600 ~dest Sixth Street for construction of city street in accordance with the specifications therefore, to which special reference is made, as followss In the City of Tustin, on Prospect Avenue between First Street and Fourth Street, to be graded and paved with asphaltic concrete on aggregate base, to construct concrete curb and gutter, and storm drain. Bids are required for the entire work described herein. 1. CITY ENGIi~IEER~ S ESTPiATE Item No. 1 Clearing and Grubbing Item No. 2 50 cubic yards Roadway excavation Item 210. 3 180 tons Aggregate base Item No. 4 190 tons Asphalt concrete Item No. 5 12 cubic yards Class B concrete {curbs, etc) Item No. 6 4 cubic yards Class A concrete (minor structures) Item No. 7-0.5 tons Liquid asphalt (SC-250 prime coat) Item No. 8 2.0 tons Asphalt emulsion (seal coat and paint binder) Item No. 9 70 linear feet 24°' Reinforced concrete pipe (Class IZI) Item I4o. 10 864 linear feet 30~ Reinforced concrete pipe (Class III) The foregoing quantities are approximate only, being given as a basis for the comparison of bids, and the City of Tustin does not, expressly or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work, or to omit portions of the work, as may be deemed necessary or advisable by the Engineer. Plans, specifications, and proposal forms to be used for bidding on this project can only be obtained at the Tustin City Hall, Tustin, California. Ito bid will be considered unless it is made on a blank form furnished by the City Clerk of Tustin, California, and is made in accordance urith the provisions of the Standard Specifications and Special Provisions. Each bidder must be licensed and also prequalified as required by law. The City of Tustin reserves the right to reject any or all bids. Abbreviations used in the schedule of predetermined wage rates in conjunction with employer payments listed in the right hand column are `.dentified as followse ph per hour phw per hour worked phw~p per hour worked or paid ~Sriployer payments other than those itemized below, as defined in Section 1773.1 of the Labor Code; are to be paid in accordance with the terms of the collective bargaining agreement applicable to the type or classification of the workmen or mechanics employed on the project. Overtime, Sundays, and Holidays--not less than one and one-half (1-1~2) times the basic hourly rate plus applicable employer payments. The holidays upon which such rates shall be paid shall be all holiday's recognized in the collective bargaining agreement applicable to the particular craft, classification or type of workman employed on the project. Copies of all collective bargaining agreements relating to the work as set forth in the aforementioned Labor Code are on file and available for inspection in the office of the Department of Industrial Relations, Division of Labor Statistics and Research. 2. Attention is directed to Section 7-1.O1G of the Standard Specifications providing for the employment of apprentices on the work. Every such apprentice shall be paid the standard wage paid to apprentices under the regulations of the trade at which he is employed. Information relative to employment of apprentices shall be obtained from the Director of the Department of Industrial Relations° who is the !administrative Officer of the Oalifornia Apprenticeship Council. Pursuant to the provisions of Section 1770 of the Labor Code of the State of California° the City Council of the City of Tustin has ascertained the general prevailing rate of wages and employer payments for health and welfare and pension and similar purposes in which the work is to be done to be as followse Basic rate per hour Classification Employer payments for H and `r1 Pension 4.81 Asphalt or crushing plant engineer 15¢ phw p 15¢ phw/p 4.62 Asphalt plant fireman 15¢ phw/p 15¢ phw/p 3.71 Asphalt raker and ironer 123¢ phw/p 10¢ phw/p 4.62 Boxman or mixer box operator (concrete or asphalt plant) 15¢ phw/p 15¢ phw/p 4.81 Concrete or asphalt spreading, mechanical tamping or finishing ' machine operator 1$¢ phw/p 15¢ phw/p 4.10 Driver of dump truck (less than 4 yards water level) 15¢ phw/p 15¢ phw/p 4.13 Driver of dump truck (4 yards but less than 8 yards water level) 15¢ phw/p 15¢ phw/p 4.18 Driver of dump truck (8 yards but less than 12 yards water level) 15¢. phw/p 15¢ phw/p 4.26 Driver of dump truck (12 ands but less than 16 yards water level) 15¢ phw/p 15¢ phw/p 4.48 Driver of dump truck (16 yards or more el) l t 15¢ phw/p 15¢ phw/p 4.03 ev wa er Engineer° oiler and signalman 15¢ phw/p 15¢ phw/p 4.51 Equipment greaser 15¢ phw/p 1$¢ phw/p 3.60 Fine grader (Highway and street paving) 122¢ phw/p 10¢ phw/p 4.27 Fireman 15¢ phw/p 15¢ phw/p 3.50 Flagman 122¢ phw/p 10¢ phw/p 4.81 4 Heavy duty repairman h l d t i ° 15¢ 15¢ phw/p hw/ 15¢ 15¢ phw/p hw/p .03 per rman s e u y repa Heavy p p p 3.50 Laborer (general or construction) 123¢ phw/p 10¢ phw/p 4.91 rotor patrol operator (any type or size) 15¢ phw/p 15¢ phw/p 4.81 Tractor operator (Bulldozer, tamper, scraper, and push tractor) 15¢ phw/p 15¢ phw/p 4.16 T~dater truck driver (under 2500 gals) 15¢ phw/p 15¢ phw/p 4.28 Water truck driver (2$00 gals to 4000 gal) 15¢ phw/p 15¢ phw/p 4.40 4Jater truck driver (4000 gals and over) 15¢ phw/p 1$¢ phw/p 3• ~~ ~i By order of the City Council of the City of Tustin, California. Dated this 7th day of December ~ , 19 64 Clerk o the City of Tustin, California That the City Council of the City of Tustin has ascertained and does hereby determine that the general prevailing rate of wages and employer payments in the locality of the City of Tustin, California, for each craft or type of worlanan needed to execute the work hereinabove specified is as set forth in the form of notice hereinabove set forth, and said notice shall contain said schedule of wages to be paid to the workman in said work. PASSED AND ADOPTED by the City Council of the City of Tustin, California, this 7th day of December , 19 64 tiayor ATTEST City Cler STATE OF CALIFORNIA ) COUidTY OF ORAiVGE ) CTTY OF TUSTIN ) SS I, Ruth C. Poe City Clerk of the City of Tustin, do hereby certify that the foregoing Resolution was duly passed and adopted by the City Council of the City of Tustin at its regular meeting held on the 7th day of December , 19 64 by the following vote, to-wits AYES, TRUSTEES Mack, Klingelhofer, Coco, Miller, Ein~ NOES, TRUSTEES None ABSENT, TRUSTEES None ~~ ~ ~ ~~ City Clerk !w i ~; CITY OF TUSTIN ORANGE COUNTY, CALIFORNIA SPECIAL PROVISIONS FOR CONSTRUCTION ON PROSPECT AVENUE BET4JEEN FIRST STREET AND FOURTH STREET, IN THE CITY OF TUSTIN, CALIFORNIA SECTION 1. SPECIFICATIONS The work embraced herein shall be done in accordance with the Standard Specifications of the State of California, Department of Public 4dorks, Division of Highways, dated January 1960, insofar as the same may apply and in accordance with the following special provisions. Whenever in the Standard Specifications the following terms are used, they shall be understood to mean and refer to the followings Department of Public Plorks or Division of Highways-- THE TUSTIN CITY COUNCIL. Director of Public 'vlorks--THE TUSTIN CITY ENGINEER Engineer--THE TUSTIid CITY ENGINEER, acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties entrusted to them. Laboratory--THE DESIGNATED LABORATORY authorized by the City of Tustin to test materials and work involved in the contract. State--THE CITY OF TUSTIN Other terms appearing in the Standard Specifications, the General Provisions, and these Special Provisions, shall have the intent and meaning specified in Section 1, Definitions and Terms, of the Standard Specifications. In case of conflict between the Standard Specifications and these Special Provisions, these Special Provisions shall take precedence over and be used in lieu of the conflicting portions. SECTION 2. PROPOSAL REGUINII°IENTS AND COAIDITIOIdS The bidders° attention is directed to the provisions in Section 2 of the Standard Specifications for the requirements and conditions which he must observe in the preparation of the proposal form and the submission bid. The form of Bidder's Hond mentioned in the third paragraph in Section 2-1.07 of the Standard Specifications will be found following the signature page of the proposal annexed hereto. 5• SECTION 3. A~ AND ERECUTION OF CODITRACT The bidders, attention is directed to the provisions in Section 3 of the Standard Specifications for the requirements and conditions concerning award and execution of contract. The successful bidder, simultaneously with the execution of the agreement will be required to furnish a labor and materialmen bond in an amount equal to fifty percent (50~) of the contract price, and a faithful performance bond in an amount oqual to fifty percent (50~) of the contract prices said bonds shall be secured from a surety company satisfactory to the Tustin City Council. SECTIOiJ 4. BEGINNING OF WORK. TIME OF COMPLETION AND LI~?UIDATED ~DAPIAGES Attention is directed to the provisions in Section 8-1.03 ''Beginning of Work" to Section 8-1.06 '~Timo of Completion', and to Section 8-1.07 'Liquidated Damages` of the Standard Specifications and these Special Provisions. The contractcr shall begin work within 15 days after receiving notice that the contract has been approved by the City Attorney appointed and authorized to represent the City of Tustin, and shall diligently prosecute the same to completion beforo tk:e expiration of twenty-five (25) working days from date of starting work. Tho contractor shall pay to the City of Tustin the sum of Ten (10) Dollars per day for each and every calendar day°s delay in finishing the work in excess of the numbor cf working days prescribed herein. SECTION 5. GENERAL 5-1.Oi LEGAL RELATIONS AND RESPOidSIBILITY - Reference is made to Section 7 of the Sta;idard Specifications. Tho provisions in Section 7-1.OlA of the Standard Specifications are supe~•seded by the following: Eight hours of labor constitutes a legal day°s work. The contractor shall forfeit, as a penalty to the City of Tustin, Ten Dollars ($10.00) for each workman employed in the execution of the Contract by him or arty subcontractor order him for each day during which any arorkman is required or permitted to work more than eight (8) hours in violation of the provisions of the labor code, and in particular, Sections 18-10 to 18-1$ inclusive, except upon compensation for all hours worked in excess of eight (8) hours per day at not less than one and one-half (1) times the basic rate of pay as provided in Section 18-15. 5-1.02 HIGHi~lAY CONSTRUCTIOiJ EQUIPN:ENT - Attention is directed to Sections 7-1.01 a^.:i 7--1.02 of tLe Standard Specifications. 5-1.03 PREVAILIi1G 41AG~S _ Pursuant to the provisions of Section 1770 of the Labor Code of the State of California, the City of Tustin has ascertained the general p:°evailirg rate cf wages and employer payments for health and welfare, pension, and similar purposes applicable to the work to be done. These rates are set forth in the attached Notice Inviting Sealed Proposals which is a part of thls contract. 6. • i 5.104 PAYMENT - Partial payments shall be in accordance with the provisions in Section 9-1.06 of the Standard Specifications. Ten percent (10~) of each partial estimate shall be retained by the City as specified in Section 9-1.06 of the Standard Specifications. Final payment shall be in accordance with the provisions in Section 9-1.07 of the Standard Specifications. SECTION 6. FORCE ACCOUNT PAYMEtiT 6-1.01 COST OF LABOR - Attention is directed to the provisions in Section 9-1.03A (1-b) of the Standard Specifications. The percentage to be applied to the actual wages paid, as defined in Section 9-1.03A (3) of the Standard Speclfications will be 16 percent. 62.01 EQUIPMENT RENTAL RATES - Attention is directed to the provisions i.n Section 9-1.03A (3) of the Standard Specifications. The equipment rental rates to be paid will be based on the average rental rates of rental agencies serving the area as specified in Section 9-1.03A (3) of the Standard Specifications. SECTION 7. SUBCONTRACTING '~-1.01 SUBLETTING OR ASSIGNING THE CONTRACT -Attention is directed to the provisions in Section 8-1.01 ani Section 8-1.02 of the Standard Specifications and these Special Provisions. No portion of the contract shall be sublet, assigned or otherwise disposed of except with the written consent of the City Engineer. Requests for permission to sublet, assign or otherwise dispose of any portion of the contract shall be in writing and accompanied by a showing that the organization which will perform the work is particularly experienced and equipped for such work. The contractor shall give assurance that the wages paid for labor as required by these Special Provisions shall apply to labor performed on all work sublet, assigned or other- wise disposed of in any way. Written consent to sublet, assign or otherwise dispose of any portion of the contract shall not be construed to relieve the Contractor of any responsibility for the fulfillment of the Contract. SECTION 8. MATERIALS 8-1.01 GENERAL -Attention is directed to the provisions in Section 6 and Section 20-2 of the Standard Specifications. All materials required to complete the work under this contract shall be furnished by the contractor. SECTION 9. DESCRIPTION OF WORK The work to be done consists, in general, of excavating, grading and placing asphalt concrete on aggregate base, constructing concrete curb and gutter and construoting storm drain, all as shown on the plans. SECTION 10. COD]STRIICTION DETAILS 10-1.01 MAINTAINING TRAFFIC -Attention is directed to Sections 7-1.08 and 7-1.09 of the Standard Specifications and these Special Provisions. 7. .. Section 10 - Construction Details (contd) In connection with the above sections of the Standard Specifications, the Contractor is hereby notified that all stop signs and street signs9 and all warning lights9 signsy barricades, flagmen9 or other devices necessary to provide for the safety and convenience of public traffic shall be furnished and maintained by the Contractor at his own expense. No compensation for extra work will be allowed for work performed as noted in Section 7-1.08 of the Standard Specifications. 10-1.02 OBSTRUCTIOPdS - P.ttention is directed to Sections 8-1.10 and 15 of the Standard Specifications. 10-1.03 CLEARING AiID GRUBBIPIG - Clearing and grubbing shall conform to the provisions in Section 16 of the Standard Specifications. 10-1.04 I,JATERISdG _ Furnishing and applying water shall conform to the provisions in Section 19 of the Standard Specifications and these Special Provisions. Full compensation for furnishing and applying water shall be considered as included in other items of work and no additional compensation shall be allowed therefor. 10-1.05 EARTHGJORIC - Earthwork shall conform to the provisions in Section 19 of the Standard Specifications and these Special Provisions. The provisions of Section 19-$.02 of the Standard Specifications are superseded by the followings After excavation has been made to subgrade and prior to the placing aggregate base, the original ground shall be compacted to a relative compaction of not less than 90 percent for a depth of not less than 0.5 feet. The contract price paid per cubic yard for roadway excavation shall include full compensation for disposal of surplus excavation, as above specified. 10-1.06 FINISHING ROADIdAY _ Finishing roadway shall conform to the provisions in Section 22 of the Standard Specifications. 10-1.07 AGGREGATE BASE -Class 2 Aggregate Base shall conform to the provisions in Section 26 of the Standard Specifications and these Special Provisions. At least 75 percent, by weight, of the material retained on the No. 4 sieve shall be crushed as determined by Test Method No. Calif. 205. Aggregate Base material shall be spread upon prepared sub-grade by means of approved spreading devices which will deposit a uniform winrow or layer, and after spreading as above specified9 the material shall be shaped to the requirements of Section 26 of the Standard Specifications. A motor grader may be used for the aforementioned shaping. 8. 10-1.08 ASPHALT CONCRETE - Asphalt concrete shall be Type B and shall conform to the provisions in Section 39 of the Standard Specifications and these Special Provisions. The penetration range of paving asphalt shall be determined by the Engineer. The amount of asphalt binder to be mixed with the mineral aggregate shall be between 3 percent and 7 percent by weight, of the dry mineral aggregate. The exact amount of asphalt binder to be mixed with the mineral aggregate shall be determined by the Engineer. The requirements of the ninth paragraph in Section 39-3.04A of the Standard Specifications will not apply. 10-1.09 CONCRETE CURBS, ETC. _ Portland cement concrete curbs, local depressions, driveways, sidewalks and cross-gutters shall conform to the pro- visions in Section 73 of the Standard Specifications. 10-1.10 REMOVING CONCRETE - Removing concrete shall conform to the provisions in Section 15_3 of the Standard Specifications and these Special Provisions. Concrete removed shall be disposed of outside the highway right of way ,_ in accordance with the provisions in Section 7-1.13 of the Standard Specifications, 10.1.11 CONCRETE STRUCTURES _ Portland cement concrete structures shall conform to the provisions in Section 51 of the Standard Specifications and these Special Provisions. All concrete structures shall be considered minor structures. ivIiscellaneous iron and steel shall conform to the provisions in Section 70 of the Standard Specifications, except full compensation for furnishing and placing said .miscellaneous iron and steel shall be considered as included in the price paid per cubic yard for concrete structures. 10-1.12 REINFORCED CONCRETE PIPE - Reinforced concrete pipe shall conform to the provisions in Section 65 of the Standard Specifications and these Special Provisions. The length of painted stripes required in Section 65-1.02 of the Standard Specifications for marking pipe with elliptical reinforcing need not be Hill length provided the stripes are at least 12 inches long at each end of the pipe section. F1i11 compensation for all necessary structure excavation and backfill shall be considered as included in the contract price paid per lineal foot for Reinforced Concrete Pipe and no additional compensation will be allowed therefor, 9. 10-1.13 LIQUID ASPHALTS - Liquid asphalts shall conform to the provisions in Section 93 of the Standard Specifications and these Special Provisions. In lieu of the provisions in Section 93-1.01 of the Standard Specifications. the following shall applyo Liquid asphalts shall consist of materials conforming to the following classifications. bdhen tested in accordance with the standard methods of tests of AASHO and ASTI;, the grades of liquid asphalt shall conform to the require- ments specified in the tables set Forth below. (1) Slow curing products designated by the letters SC, shall consist of natural crude oils or residual oils from crude asphaltic petroleum. Specification Designation Test Nlethod SC-250 Tests on Residue from Distillation Float Test at 122° F., Sec. AASHOT 50 25-110 He tane X lane E uiv. ~ Nlax.l AASHOT 102 5 Asphalt Residue of 100 Pen Min AASHOT 56 60 Ductility of Asphalt Residue at 77° F. cm. Min. AASAOT 1 100 Solubility in CC1, I4in AASHOT 45 99.5 1Normal spot test and glass plate test repeated at end of 24 hour period will not be required, In lieu of the application temperatures of liquid asphalts shown in Section 93-1.03 of the Standard Specifications, the following shall applys Pug Mill Mixing Temperature Distributor Grade of of Aggregate Application Temperature Liquid Asphalt Maximum F. P'"iinimum oF. P4aximum °F. _25 0 0 In lieu of the average weights and volumes of liquid asphalt shown in Section 93-1.04 of the Standard Specifications, the following shall apply: Gallons Barrels per Pounds Grade of per ton Ton at 60°F. per Gaol. Liquid Asphalt at 60 F. (42 U.S. Gals.) at 60 F. 250 249 5.93 8.03 Conversion Table 1 in Section 93-1.04 of the Standard Specifications shall be used for converting volumes of liquid asphalt products. 10. :. ~~ ~ i PROPOSAL.TO THE CITY OF TUSTIN, CALIFORNIA FOR CONSTRUCTION OF PROSPECT AVENUE IN THE CITY OF TUSTIN, CALIFORNIA, BET[dEEN FIRST STREET AND FOURTH STREET piame of Bidder Business Address Place of Residence LOCATIOIQ The work to be done and referred to herein is in the City of Tustin, _ California, on Prospect Avenue between First Street and Fourth Street, to be constructed in accordance with the Special Provisions and contract annexed hereto, and also in accordance with the Standard Specifications of the State of California, Department of Public Works, Division of Highways, dated January, 1960. The work to be done is shown upon a set of plans entitled `Plan and Profile for the Improvement of Prospect Avenue between First Street and Fourth Street in the City of Tustin, Orange County, California." TO THE CITY OF TUSTIP~i The undersigned, as bidder, declares that the only persons or parties interested in this proposal as principals are those named herein9 that this proposal is made without collusion with any other person, firm or corporationy that he has carefully examined the location of the proposed work, the annexed proposed form of contract, and the plans therein referred tog and he proposes, and agrees if this proposal is accepted, that he will contract with the City of Tustin, in the form of the copy of the contract annexed hereto, to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials specified in the con- tract, in the manner and time therein prescribed, and according to the requirements of the Engineer as therein. set forth, and that he will take full payment therefor the following unit prices, to-wit: 11. Item Approximate Item with unit price written ~ Unit Total i quantity in words Lump I 1 I Sum Clearing and Grubbing ~ ~ 1 lump sum ; 2 50 Cubic yards roadway ~ j excavation at per j cubic and ~ 3 ~ 180 Tons aggregate base i I at per ton 4 i 190 Tons asphalt concrete ~ I ' at per ton ( 5 i 12 I Cubic yards Class B I Concrete (curbs, etc.) at per cubic yard I I j 6 4 Cubic yards Class A ~ Concrete (minor structures) i at per cubic .yard i 7 0.5 Tons liquid asphalt (SC-2$0 prime coat) at I per ton 8 i 2.0 I Tons asphalt emulsion f { (seal coat and paint binder) , I I at per ton 9 70 i Linear feet 240° reinforced ! concrete pipe (Class III) at i linear foot 10 864 Linear feet 30" reinforced ~ concrete pipe (Class III) at per linear foot In case of a prevail. s, 12. If this proposal shall be accepted and the undo:signed shall fail to contract as aforesaid and to give the two horde in the amounts to be determined as aforesaid, with surety satisfactory to the City of Tustin, within eight days, not including'Sundays and legal holldays, after the bidder has received notice Prom the Tustin City Attorney that the contract has been awarded, the City of Tustin may, at its option, determine that the bidder has abandoned the gorttract, and thereupon this proposal and the acceptance thereof shall be null and void, and the forefeiture of such security accompanying this proposal shall operate and the same shall be the property of the City of Tustin. Accompanying this proposal is (NOTICE; Insert the words °iCash ($ )", "Cashier°s Check", in the amount equal to at least ten percent °iCertified Check°, or ''Bidder°s Bond', as the case may be of the total bid.) The names of all persons interested in the foregoing proposal as principals are as follows: INB'ORTANT NOTICE: If the bidder or other interested person is a corporation, state legal name of corporation, also names of the president, secretary, treasurer, and manager thereof; if a co-partnership, state true name of firm, also names of all individual co-partners composing firm; if the bidder or other interested person 1s an individual, state first and last names in full. , Licensed in accordance with an act providing for the registration of Contractors, License No. SIGN HERE• Signature of Bidder NOTE: If the bidder is a corporation, the legal name of the corporation shall be set forth above, together with the slgnature of the officer or officers authorized to sign contracts on behalf of the corporation; if the bidder is a co-partnership, the true name of the firm shall be set forth above, together with the signature of the partner or partners authorized to sign contracts on behalf of the co-partnership; and if the bidder is an individual, his signature shall be placed above. If signature is by an agent other than an officer of a corporation or a member of a co-partnership, a Power of Attorney moat be on file with the City of Tustin prior to the opening of bids or submitted with the bid; otherwise, the bid will be disregarded as irregular and unauthorized. Business Address Place of Residence Dated , 19~ 13. BIDDE$' S BOiQD City of Tustin State of California KN041 ALL PEEN BY THESE PRESENTS, That as FRINCIPAL9 and as Suretyy are held and firmly bound unto the City of Tustin9 hereinafter called the City, in the penal sum of TEPI PERCENT (10%) OF THE TOTAL AMOUNT OF THE BID of the Principal above named9 submitted by said Principal to the City of Tustin for the work described below, for the payment of which sum is lawful money of the United States, well and truly to be made, we bind ourselves9 our heirs, executors9 administrators and successors9 jointly and severally, firmly by these presents. In no case shall the liability of the surety hereunder exceed the sum of THE CONDITION OF THIS OBLIGATIOid IS SUCH That whereas the Principal has submitted the above-mentioned bid to the City of Tustin for certain construction specifically described as follows, for which bids are to be opened at California, on Insert name of City where Insert date of bid opening) Bids will be opened) (Copy here the exact description of work, including the location, as it appears on the proposal) 14. • • BIDDER°S HOND (Contd) PIO!dy THEREFORE, if the aforesaid Principal is awarded the contracts and within the time and manner required under the specifications, after the prescribed forms are presented to him for signature, enters into a written contract° in the prescribed form in accordance with the bid, and files the two bonds with the Citys one to guarantee faithful performance and the other to guarantee payment for labor and materially as required by laws then this obligation shall be null and void9 otherwises it shall remain in full force and virtue. In the event suit is brought upon this bond by the Obligee and judgment is recovereds the surety shall pay all costs incurred by the Obligeo in such suits including a reasonable attorney°s fee to be fixed by the court. N ~~ZTiVESS v]HEREOF we have hereunto set our hands and seals on this day of A.D. 19 (Seal) (Seal) _(Seal) Principal (Seal) (Seal) _ ___(Seal) Surety Address VOTEo Signatures of those executing for the surety must be properly .acknowledged. 15. CITY OF TUSTIN ORANGE COUNTY, CALIFORNIA CONTRACT FOR CONSTRUCTION OF PROSPECT AVENUE BETV7EEN FIRST STREET AND FOURTH STREET THIS AGREEtIENT, made and concluded, in duplicate, this day of , one thousand nine hundred and sixty- , between the City o£ Tustin, California, party of the first part, and Contractor, party of the second part. ARTICLE L --Witnesseth, That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the said party of the first part, and under the conditions expressed in the two bonds, bearing even date. with these presents, and hereunto annexed, the said party of the second part agrees with said party of the first part, at his own proper cost and expense, to do all the work and furnish all the materials, except such as are mentioned in the specifi- cations to be furnished by said party of the first part necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the said party of the first part, in accordance with the Special Provisions hereto annexed and also in accordance with the Standard Specifications of the State of California, Department of Public ~lorks, Division of Highways, dated January, 1960, which said Special Provisions and Standard Specifications are hereby specially referred to and by such reference made a part hereof. The work to be done is shown upon a set of plans entitled "Plan and Profile for the Improvement of Prospect Avenue between First Street and Fourth Street, in the City of Tustin, Orange County, California", which said set of plans is hereby made a part of this contract, 16. ARTICLE .II.--P.nd the said Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement9 and also for all loss or damage, arising out of the nature of the work aforesaid, or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City of Tustin, and for all risks of every description connected with the workg also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the plans and specifications, and the requirements of the Engineer under them9 to-wits Item Approxi- mate ~ Item with unit price written 4~uant.it in words Unit Total 1 Lump Clearing and Grubbing sum ~ lump sum 2 50 Cubic yards roadway excavation ~ at Per cubic yard 3 180 Tons aggregate base at per ton 4 190 Tons asphalt concrete at per ton 5 12 Cubic yards Class B Concrete (curbs, etc.,) at per cubic yard 6 4 Cubic yards Class A Concrete (minor structures) at er cubic yard 7 0.5 Tons liquid asphalt (SC_2$0 prime coat) at per ton 8 2.0 Tons asphalt emulsion (seal coat and paint binder) at per ton 9 ~0 Linear feet 24" reinforced concrete pipe (Class III) at per linear foot 10 864 Linear feet 30" reinforced concrete pipe (Class III) at Per linear foot TOTAL 17. t • ARTICLE III.-- The said party of the first part hereby promises and agrees with the said Contractor to employs and does hereby employ the said Contractor to provide the materials and to do the work according to the terms and conditions herein contained and referred tog for the prices aforesaids and hereby contracts to pay the same at the time, in the manner and upon the conditions above set forthg and the said parties for themselves, their heirss executors, administrators, successors, and assigns do hereby agree to the full performance of the covenants herein contained. ARTICLE IV.-_It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid or proposal of said Contractors then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. In blitness 4dhereofs the parties to these presents have hereunto set their hands the year and the date first above written, THE CITY OF TUSTIN Contract and Bond Approved City Attorney By P4ayor of City of Tustin Attest°_ Clerk of City of Tustin Date 18.