Loading...
HomeMy WebLinkAbout11 ADV FOR BIDS CIP 7194 11-17-09Agenda Item 11 ~ t Reviewed: AGENDA REPORT City Manager Finance Director MEETING DATE: NOVEMBER 17, 2009 TO: WILLIAM A. HUSTON, CITY MANAGER FROM: DOUGLAS S. STACK, ACTING DIRECTOR OF PUBLIC WORKS/CITY ENGINEER SUBJECT: APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE FOR BIDS FOR THE JAMBOREE ROAD REHABILITATION CIP NO. 7194 SUMMARY The plans and specifications for the Jamboree Road Rehabilitation CIP No. 7194 have been prepared and the project is now ready to be bid. Construction of the project is partially funded with American Reinvestment and Recovery Act of 2009 (ARRA) federal stimulus funds. RECOMMENDATION It is recommended that the City Council adopt Resolution No. 09-62 approving the plans and specifications for the Jamboree Road Rehabilitation CIP No. 7194, and authorizing and directing the City Clerk to advertise for bids. FISCAL IMPACT The Fiscal Year 2009-2010 Capital Improvement Program Budget provides funding for the Jamboree Road Rehabilitation (CIP No. 7194). Construction of the project is partially funded with American Reinvestment & Recovery Act of 2009 federal stimulus funds in the amount of $813,324. The remainder of the construction funds will be provided by a combination of State Proposition 1 B, Orange County Proposition 42 City Aid Program (OCCAP), and State Proposition 42 funds. The engineer's construction estimate for the contract portion of the work to be bid is $2.4 million. DISCUSSION The proposed pavement rehabilitation on Jamboree Road consists of excavation of deteriorated pavement; construction of a new asphalt concrete base course with an asphalt rubber hot mix (ARHM) wearing surface; removal and replacement of damaged curb & gutter and sidewalks; replacement of existing curb ramps to be in compliance with the current federal Americans with Disabilities Act (ADA) requirements; replacement of traffic signal detector loops; replacement of striping and pavement markings; and adjustment of manhole rims and valve boxes to grade. The tentative schedule for construction of the project is as follows: Authorization to Advertise for Bids .................................................... 11 /17/2009 First Legal Advertisement ............................................................... 11/19/2009 Second Legal Advertisement ........................................................... 11 /26/2009 Bid Opening ................................................................................ 01/07/2010 Award of Contract ........................................................................ 02/02/2010 03/2 Start Construction ......................................................................... Complete Construction .................................................................. 06/14/2010 Jamboree Road Rehabilitation CIP No. 7194 November 17, 2009 Page 2 ENVIRONMENTAL DOCUMENTATION Since this project involves the replacement and repair of existing facilities with minor modifications, it is Categorically Exempt under California Environmental Quality Act (CEQA) requirements. A Notice of Exemption has been recorded with the County of Orange. Additionally, as a result of federal funding, the project has been reviewed by Caltrans Local Programs and was determined to be Categorically Excluded under the National Environmental Policy Act (NEPA) requirements. ~s S. Stack Director of Public Works/City Engineer Attachments: Resolution No. 09-62 Location Map Q'/ Dana R. Kasdan Engineering Services Manager S:\City Council Items\2009 Council Items\Approval of P&S Jamboree Rehab (CIP 7194) & Reso 09-62.docx RESOLUTION NO. 09-62 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA APPROVING PLANS AND SPECIFICATIONS FOR THE JAMBOREE ROAD REHABILITATION BETWEEN 2,750 FEET NORTH OF TUSTIN RANCH ROAD AND NORTH CITY LIMITS (CIP NO. 7194) AND AUTHORIZING ADVERTISEMENT FOR BIDS WHEREAS, it is the intention of the City Council of the City of Tustin, California to contract for the construction of the Jamboree Road Rehabilitation between 2,750 feet north of Tustin Ranch Road and north City Limits (CIP No. 7194); and WHEREAS, the City Engineer has presented plans and specifications for the construction of said work; and WHEREAS, this project is categorically exempt from the requirements of the California Environmental Quality Act; Class I, Section 15301: Existing Facilities; and WHEREAS, this project has been determined to be categorically excluded from the National Environmental Policy Act (NEPA); NOW, THEREFORE, BE IT RESOLVED that the plans and specifications presented by the City Engineer are hereby approved as the plans and specifications for: Jamboree Road Rehabilitation between 2,750 feet north of Tustin Ranch Road and north City Limits (CIP No. 7194) BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to advertise as required by law for the receipt of sealed bids or proposals for the performance of the work specified in the aforesaid plans and specifications; PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 17th day of November 2009. Doug Davert, Mayor ATTEST: City Clerk 0 U W// (`_._ J/ CITY OF OlLI~X.l ~ ~ CITY OF Tf/STlN / o ~ Z \\ ~/ ~~~~ ~~ i ~, Q~~`/E ~S ~: ~~~ , I •~ of , 5~~~ o { ',~ a ~~rf W .^ .~ ~,~{ Qom ~ Z J W ~ Q ~ ~ V ~ ~ •• v a ~~ ~m r-; ,r !\_il ~ `~~ 0 ~~4 ~~ Q-~PO ~~ ~~~ Q~O~ z f- o / ~ U - W ~ 7 ~ Q ' O U 0 ~ / ~ _J ~o ~ 1 / R~A~ ~ ~ ~vc'~`~ RP~Gt\ // - T r 0 Z a U ~_ J } F- U 2 H O z 0 Z a 0 Q O S V Z Q Z H F- O S f- O Z w W a N z w 3 w m Z 0 a H J m Q W 0 a 0 w W 0 m Q w g Q z U w O a