Loading...
HomeMy WebLinkAbout11 ADV FOR BIDS/ANNUAL PAVEMENT & SIDEWALK PROJ (CIP 7001 & 402-6235) 12-01-09Agenda Item 11 ~ Reviewed: AGENDA REPORT City Manager ~:i Finance Director MEETING DATE: DECEMBER 1, 2009 TO: WILLIAM A. HUSTON, CITY MANAGER FROM: DOUGLAS S. STACK, ACTING DIRECTOR OF PUBLIC WORKS/CITY ENGINEER SUBJECT: APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE FOR BIDS FOR THE ANNUAL MAJOR PAVEMENT MAINTENANCE CIP NO. 7001 AND THE ANNUAL SIDEWALK REPAIR PROJECT NO. 402-6235 SUMMARY The plans and specifications for the Annual Major Pavement Maintenance CIP No. 7001 and the Annual Sidewalk Repair Project No. 402-6235 have been prepared and the projects are now ready to be bid. RECOMMENDATION It is recommended that the City Council adopt Resolution No. 09-67 to: 1) Approve the plans and specifications for the Annual Major Pavement Maintenance Project CIP 7001, and the Annual Sidewalk Repair Project No. 402-6235; and 2) Authorize and direct the City Clerk to advertise for bids. FISCAL IMPACT The Fiscal Year 2009-2010 Capital Improvement Program (CIP) Budget provides $1,120,000 for the Annual Major Pavement Maintenance CIP No. 7001 and the Public Works Department/Engineering Division Operating Budget provides $200,000 for the Annual Sidewalk Repair Project No. 402-6235. DISCUSSION The FY 2009-2010 Annual Major Pavement Maintenance Project consists of asphalt concrete repair, asphalt concrete overlay, slurry sealing, crack routing and sealing, and traffic striping and markings. This year's street maintenance cycle is for streets within Zone 5 of the City's Pavement Management System. Zone 5 (see attached) is generally bounded by Browning Avenue on the west, the north City limits, the I-5 Freeway to the south, and Jamboree Road to the east. Additionally, this year's project also includes pavement repairs in the Walnut Park community west of Red Hill Avenue between Mitchell Avenue and Walnut Avenue. The FY 2009-2010 Annual Sidewalk Repair Project focuses on removal and replacement of damaged sidewalk to correct tripping hazards at numerous locations throughout the City based on an annual field survey conducted by the Engineering Division. The field survey identifies and evaluates locations where tree roots are causing sidewalk and curb and gutter damage. Under the project, some of these trees will be removed and replaced with trees of the same species, or with a species more suitable to the parkway area. This project also provides improvements throughout the City to comply with the Americans with Disabilities Act (ADA). These locations are typically requested by citizens or are identified by City staff to provide for completion of missing segments of sidewalk and curb ramps to improve pedestrian access. Annual Major Pavement Maintenance Project and Annual Sidewalk Repair Project December 1, 2009 Page 2 Both projects are part of the City's on-going Maintenance of Effort (MOE) obligation to maintain eligibility for Measure M funding. The tentative schedule for construction of the project is as follows: Authorization to Advertise for Bids .................................................... 12/01/2009 First Legal Advertisement ............................................................... 12/10/2009 Second Legal Advertisement ........................................................... 12/17/2009 Bid Opening ................................................................................ 01/12/2010 Award of Contract ........................................................................ 02/02/2010 Start Construction ......................................................................... 03/01/2010 Complete Construction .................................................................. 05/28/2010 These projects are Categorically Exempt under California Environmental Quality Act (CEQA) requirements. Notices of Exemption have been prepared for the projects, and will be recorded with the County of Orange following City Council approval of the plans. ~. Stack rector of Public Works/City Engineer Attachments: Resolution No. 09-67 Location Map A% pt,0 d~C1 Dana R. Kasdan Engineering Services Manager S:\City Council Items\2009 Council ItemsWpproval of P&S Major Maint (CIP 7001) & SW Repair FY09-10 & Reso 09-67.docx RESOLUTION NO. 09-67 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA APPROVING PLANS AND SPECIFICATIONS FOR THE ANNUAL MAJOR PAVEMENT MAINTENANCE CIP NO. 7001 AND THE ANNUAL SIDEWALK REPAIR PROJECT NO. 402-6235 AND AUTHORIZING ADVERTISEMENT FOR BIDS WHEREAS, it is the intention of the City Council of the City of Tustin, California to contract for the construction of the Annual Major Pavement Maintenance Project, FY 2009-2010 (CIP No. 7001) and the Annual Sidewalk Repair Project No. 402-6235; and WHEREAS, the City Engineer has presented plans and specifications for the construction of said work; and WHEREAS, these projects are categorically exempt from the requirements of the California Environmental Quality Act; Class I, Section 15301: Existing Facilities. NOW, THEREFORE, BE IT RESOLVED that the plans and specifications presented by the City Engineer are hereby approved as the plans and specifications for: Annual Major Pavement Maintenance CIP No. 7001 and Annual Sidewalk Repair Project No. 402-6235 BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to advertise as required by law for the receipt of sealed bids or proposals for the performance of the work specified in the aforesaid plans and specifications; PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 1 Sc day of December 2009. Doug Davert, Mayor ATTEST: City Clerk W J U N O 2 ~ J .~~` - ~ ~. J ,8 spa ~ ~~_3 a~~xi ~. ~ - f- - ~~--______ _w3ap __-_ -_ -_ r..,_ ~ .m,~~.r ~ _ L' ~ Y ~' ~ 4 ` #,.' r .. ~ ~ o i ~ .d. . l ~ r t "°`*. ~ a ~ ;~ ~ ~ ~' ~ W ~. ,~ ~ ~ e•~ ~ ~ ., /" b ~ ~ /: r ° ~, "~ C I ~" ~ ~.9 ~ .. ~~ ~ 1 ~ ~. 7 , . .~ ~,` ~ ` J ,. t: ~' l3 i ,~~ ~~ 7 ~ ~4. TM f~ ~ ,~ ~, 3 .~,-1`.~ ;rig '4'' ~ ~ dr ~ f. ~ ~ t 4 ~ f ~ ~ ~~~ Z O U „ ~~ _ '~ 4+f~~f ~ ~@ ~ ~. .', ® 3 ~;9g './'~3 ~ 333 ~3 ,. 4 ''*~. i. ' ~a~3i i3! ~I :~~ ~ `~r w„ r~~ --ate.-~k~s' _ r~,, A,,,< C ._~ ~,.~ .. ~~' - - ~~', ~ l~i~~t' "" ~~~ I I ~ ~ ~~,. - '~ '~V'' _] N I I Idl I 'l~~ ~~ ~i T. r J ~; ,~6~ L1~~1" 2~ ~ I ~.r-,...,,rte i~- 11 I,,-!~~I I ?y,~ i I a,a r, 'r / .. ,r I ~~ I~ ~°1 1 ~ ~ 7 ~ ~= d I ~P!~~Hha ~'~' ~ ~ s~ l ,f1 :. -. C~ ll ~ I ~~~ ~~~ ~I ~~ ~ ~~u~]lili i ~ ~~~I ~~ J !T ODD ( ~ '' / u/ r= ~ " o ~~1-.I~' ~. - "w`~ I 1-~t ~~e,6~,~• ~ ~I I I ~ ~ ~+~ ~ ~~ - r~~..a~ ~' ~ V~.~ o~ ~, 01 .1~ ~ ~~~~0 ~~~~ 3 ,t.~I ~J~ I ICI ~I II _111 ~ „N ~,~„I ~ T..y J ~ ~ ?~,M, ~+ mom' `~ .3 O ..~ / .~ ~~ ~` ~Ir~~ ,~° iC~~ r ~ Ir ~ I f , I i~ ~;;I~I ~I I g II ~~` ~ I al~~t~ ~~I~ _`°. ; ~ J ~ ~ ~ .~ o I~_ S`~~~~ :. 9.. ~ ] .~~ li-_1/ lei J~~",„"l ,-a-~r=~`~'°}~ ~!~~vA - g''F / d 1 d, ~ ~ ~ ~ -~~ i;i :i ~s ~ ~ ~ IzI~~ ~ -F.Ia~I ~ 111 ~~~ ~~~ ~~r ~_ ~r ~ ~,.~„ ~ ~`:f ~I ~'~~ u.~ ~~,. ~!~ ... ,~ ,:~~:,., „'f , .. ~