Loading...
HomeMy WebLinkAbout08 ADOPT ENERGY EFFICIENCY AND CONSERVATION STRATEGY 01-19-10Agenda Item 8 ~ Reviewed' ±.i`v AGENDA REPORT City Manager ~ ~r.. r Finance Director MEETING DATE: JANUARY 19, 2010 TO: WILLIAM A. HUSTON, CITY MANAGER FROM: DOUGLAS S. STACK, ACTING DIRECTOR OF PUBLIC WORKS/CITY ENGINEER SUBJECT: ADOPTION OF AN ENERGY EFFICIENCY AND CONSERVATION STRATEGY SUMMARY In order to be eligible to receive grant funding under the Energy Efficiency and Conservation Block Grant (EECBG) Program, all entities receiving direct formula grants from the U.S. Department of Energy are required to develop an Energy Efficiency and Conservation Strategy (EEGs). The EECS identifies strategies to achieve the purposes of the EECBG program. The City of Tustin's total eligible grant allocation is $677,300. Presently, the application process has secured $30,000 of the allocation to develop our Energy Efficiency and Conservation Strategy (EECS) attached for City Council consideration. RECOMMENDATION It is recommended that the City Council adopt Resolution No. 10-14 adopting the Energy Efficiency and Conservation Strategy and authorizing acceptance and execution of the EECBG upon award by the U.S. Department of Energy. FISCAL IMPACT Failure to approve the recommended action will result in forfeiture of the remaining federal grant funding in the amount of $647,300. BACKGROUND The American Recovery and Reinvestment Act (ARRA) of 2009, appropriates $2.7 billion in funding for the Department of Energy (DOE) to issue/award formula-based grants to states, U.S. territories, units of local government, and Indian tribes under the Energy Efficiency and Conservation Block Grant (EECBG) Program. The purpose of the EECBG Program is to assist eligible entities in creating and implementing strategies to reduce fossil fuel emissions, reduce total energy use and improve energy efficiency. As a stipulation of grant funding eligibility, each entity is required to develop an Energy Efficiency and Conservation Strategy (EECS). Adoption of an Energy Efficiency and Conservation Strategy January 19, 2010 Page 2 DISCUSSION The City of Tustin is eligible for the allocation of $677,300, in Energy Efficiency and Conservation Block Grant (EECBG) funds. Of the $677,300, the City has encumbered $30,000 for its preparation of the Energy Efficiency and Conservation Strategy (EEGs). The five City facilities that were initially identified, inventoried and evaluated to reduce total energy use and improve energy efficiency were Civic Center, Columbus Tustin Gym, Senior Center, Youth Center and Field Services Yard. During the process of developing the City's EECS several conservation projects were reviewed including lighting retrofits, control systems for lighting and heating ventilation and air conditioning (HVAC), water conservation (flush valves, waterless urinals, & faucet aerators) and solar (photovoltaic) projects. Many of the projects examined produce long- term savings and several have already been incorporated into normal maintenance activities to reduce energy costs and improve energy efficiency. The recommended EECS identifies the following two priority projects for further consideration and full utilization of available EECBG funding: 1. Photovoltaic Installation at Columbus Tustin Gymnasium 2. Tustin Energy Efficiency Building Permit Fee Rebate Program The photovoltaic installation at Columbus Tustin Gymnasium will be a project designed to generate the energy demand of the facility from solar at an estimated cost of $567,000. In addition, staff will further apply for a rebate via the California Solar Initiative (CSI) that will potentially allow for the city to receive a governmental incentive rebate for every kilowatt- hour generated in excess of demand. The current incentive rebate is equal to $0.32 per kilowatt-hour. The Tustin Energy Efficiency Building Permit Fee Rebate Program will be further developed in cooperation with the Community Development Department to help offset plan check fees, permit fees and inspection costs related to qualified improvements for: • New solar panels or Photovoltaic system Installation (avg. $550 each permit) • New tankless water heating system Installation (avg. $50 each permit) • Energy efficient air conditioning and ventilation systems upgrade - overthe counter permit -one inspection (avg. $50 each permit) • Energy efficient furnace upgrade -over the counter permit -one inspection (avg. $50 each permit) In order to maintain EECBG funding eligibility, staff is recommending the adoption of Resolution No. ,10-14 as presented. • S. Stack irector of Public Works/City Engineer ~~,,~~jj ;1 so .Churchill Field Services Manager Attachment(s): Energy Efficiency and Conservation Strategy -January 2010 RESOLUTION NO. 10-14 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA ADOPTING THE ENERGY EFFICIENCY AND CONSERVATION STRATEGY AND AUTHORIZING ACCEPTANCE AND EXECUTION OF THE ENERGY EFFICIENCY and CONSERVATION BLOCK GRANT (EECBG) UPON AWARD BY THE U.S. DEPARTMENT OF ENERGY WHEREAS, the City Council of the City of Tustin, California has acknowledged that the U.S. Department of Energy released its Funding Opportunity Announcement ("FOA") for approximately $2.7 Billion in estimated formula grants under the Energy Efficiency and Conservation Block Grant (EECBG) Program of the American Recovery and Reinvestment Act of 2009; and WHEREAS, the City of Tustin has been allocated $677,300 for a direct formula grant from the EECBG Program; and WHEREAS, the City of Tustin is required to submit its EECS by application to the U.S Department of Energy by January 25, 2010; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Tustin, California does declare that the above recitals are all true and correct; and hereby supports and authorizes the City Manager and/or appropriate personnel to submit a grant application and Energy Efficiency and Conservation Strategy to the Department of Energy's EECBG program and; supports and authorizes the EECBG activities including the preparation of the Energy Efficiency and Conservation Strategy, Photovoltaic Installation at the Columbus Tustin Gymnasium, and the creation and implementation of the Tustin Energy Efficiency Building Permit Fee Rebate Program; and authorizes the City Manager or designee to accept and implement the grant, if awarded, and to execute all necessary grant contracts, documents, progress reports, invoices and extension requests. PASSED and ADOPTED by the City Council of the City of Tustin, California on the 19tH day of January 2010. Jerry Amante, Mayor ATTEST: Pamela Stoker, City Clerk TUSTII~ City of Tustin Energy Efficiency and Conservation Strategy January 12, 2010 Prepared By: IMPACT Industrial Services 200 South Meridian Street, Suite 420 Indianapolis, IN 46225 BUILDING; OUR FUTUR( HONORIfJG OUR PA57 TABLE OF CONTENTS. PAGE 1. EXECUTIVE SUMMARY 1 2. METHODOLOGY 2 3. ENERGY METRICS 4 4. BUILDING PROFILES 5 5. ECM DESCRIPTIONS 'I s B. PERMIT FEE REBATE PROGRAM Z4 7. ENERGY & CARBON FOOTPRINT FORECAST 25 $. ECM SLOPING WORKSHEETS 2$ 9. ROOFING REPLACEMENT PLAN 5O LIST OF APPENDICES A SOLAR PROPOSAL B LIGHTING INVENTORY C ROOFING REPLACEMENT $c REPAIR PLAN D MAJOR EQUIPMENT INVENTORY 1. EXECUTIVE SUMMARY The American Recovery and Reinvestment Act (ARRA) of 2009, appropriates $2.7 billion in funding for the Department of Energy (DOE) to issue/award formula-based grants to states, U.S. territories, units of local government, and Indian tribes under the Energy Efficiency and Conservation Block Grant (EECBG) Program. The purpose of the EECBG Program is to assist eligible entities in creating and implementing strategies to reduce fossil fuel emissions, reduce total energy use and improve energy efficiency. As a stipulation of grant funding eligibility, each entity is required to develop an energy efficiency and conservation strategy (EEGs). The City of Tustin has been awarded an allocation of $677,300, in Energy Efficiency and Conservation Block Grant (EECBG) funds. To qualify for the release of the funds, the City has engaged IMPACT Industrial Services to assess the targeted buildings and develop the EECS. The five City facilities that were initially identified, inventoried and evaluated to reduce total energy use and improve energy efficiency include the Civic Center, Columbus Tustin Gym, Senior Center, Youth Center and Field Services Yard. During the process of developing the City's EECS several conservation projects were reviewed and included lighting retrofits, control systems for lighting and heating ventilation and air conditioning (HVAC), water conservation (flush valves, waterless urinals, & faucet aerators) and solar (photovoltaic) projects. Many of the projects examined produce long-term savings and several have already been incorporated into normal maintenance activities to reduce energy costs and improve energy efficiency. The recommended EECS identifies the following two priority projects for further consideration and full utilization of EECBG grant funding: 1. Photovoltaic Installation at Columbus Tustin Gymnasium (CT Gym) 2. Tustin Energy Efficiency Building Permit Fee Rebate Program The current utility spends for these buildings have been calculated to be $368,000 annually, including electricity, natural gas, and water. The projects identified as part of effort can reduce this annual expenditure by 17%. A summary of all projects is presented below. Additional detail on the makeup of the utility consumption and the identified project savings (including carbon footprint) are provided within this document. Prioritized Project List No. Priority Building Description nnua Electricity Savings nnua Natural Gas Savings nnua Water Savings FirstCOSt Annual Savings Simple Payback 1 2010 T ym Solar Photovo lta ics 163,013 - - $2-81, SS9 .23,829 11.8 2 2011 uy ar Li htin Retrofits 28110 - - 28,110 4,006 70 P3 2011 ive enter Li htin Retrofits 183179 - - 183,179 24,110 7.6 4 2010 m Li htin R trofit 33 254 33 254 4 972 6.7 5 2011 enior enter Li htin Relrofts 41 659 41 5 S 8 4 7.1 P6 2010 Youth Center Li htin Relrofts 9291 9 291 1 700 5.5 P7 2012 Ci Yard DDC Controls Economizer Re-Commission DCV 7 197 198 17 369 $i 221 14.2 P8 2011 Civic Center DDC Controls Economizer Re-Commission DCV 104667 131 $106571 $13,874 7.7 P9 2013 Civic Center Ma'or RTU Re lacement End of Life Consideration 43 025 0 $355 000 $5 663 62.7 10 2013 iv~c enter D ontrollers - parto Bldg Rennovatans 8605 23 - 149,000 1,150 129.8 201 ym ontro s, conomizer e- ommission, 13313 158 - ,1 12 2011 enior enter ontrols/Demon ontro Ventilation 22689 141 - 30,600 3,355 9.1 P73 2012 outh enter D ontro s, conomizer e- ommission, D 7563 151 - 20,158 1,555 13.0 4 enior enter en ing isers 1560 - - 15 2010 ivic enter ending Misers 1 461 - - 300 192 1.6 1 dy ar star once rvahon of ets, nna s aucets - - 255 2,39 .1 17 2011 rvic enter star onservation oilets nna s Faucets - 1 099 14 320 2 0 2 .1 18 2012 m star onservation oilets ri na s aucets - 53 3192 98 32.4 P19 2010 Senior Center Water Con se rvalion Toilets Urinals & Faucets 27g $2968 $514 5.8 P20 2010 Youth Center Water Conservation Toilets Urinals & Faucets 122 $1299 $224 5.8 TOTAL 888,588 801 1,809 $1,311,085 $97,193 13.5 City of Tustin Energy Efficiency Conservation Strategy 1 1/12/2010 2. METHODOLOGY The City of Tustin is eligible for the allocation of $677,300, in Energy Efficiency and Conservation Block Grant (EECBG) funds. IMPACT Industrial Services has been engaged to develop an Energy Efficiency and Conservation Strategy (EEGs) for five municipal buildings owned by the City. This plan will identify potential energy conservation projects and provide the City of Tustin with a budget and forecast for implementation. The five City facilities that were identified, inventoried and evaluated to reduce total energy use and improve energy efficiency were: • Civic Center • Columbus Tustin Gym • Senior Center • Youth Center • Field Services Yard This EECS report provides a system level survey of the buildings' structure, process, and equipment, and identifies areas for savings. Basic information is obtained regarding energy usage and utility issues, and a visual inspection is performed during the walk-through of the facility to determine if there are operational savings opportunities. The scope of this work includes: • Review of energy bills from the previous 12 months. • Interview of site personnel • Breakdown of utility use within the property by major system. • Compare facilities energy use index (EUI) against industry standard or peer groups. • Development of a list of Energy Conservation Measures (ECM) for each of the major energy-consuming systems, envelope, HVAC, lighting, power, and process. • Develop a prioritized plan and forecast of the impact of the identified ECMs. The findings are presented in this EECS report, to facilitate decision making resulting in a prioritized action plan as part of a comprehensive energy management plan. The EECS is a reconciliation of a "top down" analysis of utility bills with a "bottoms up" evaluation of major systems' components and their operations. Major equipment specification and operational profile data is gathered to develop system level estimates of utility usage that can be then adjusted for actual annualized utility use. The load factor concept utilized throughout this energy analysis is simply the ratio of average actual consumption to the maximum potential consumption at full load. Load factor provides a methodology to account for variance in operational profiles as system loads vary due to actual throughput requirements (such as customer orders). Electrical usage of lighting systems within the buildings are estimated by means of the actual system inventory by fixture type and known hours of operation. For those instances where a detailed lighting count is not feasible, lighting densities (in Watts /square foot) may be sampled for representative areas and then extrapolated across the entire building space. City of Tustin Energy Efficiency Conservation Strategy 2 1/12!2010 The energy consumption associated with HVAC equipment is bounded by weather dependent use that is evident on utility bills, typically correlated to weather variables such as heating or cooling degree days. Such correlations are easily observed in the seasonal variance in natural gas usage due to winter heating loads. Such profiles allow for the evaluation of statistical dependence on weather, leading to well defined breakouts of "base load" operations such as kitchen usage. This total system usage may then be allocated across individual equipment by size and functionality within the system. A similar analysis may often be performed for the space cooling related consumption on the facility electrical usage. With the lighting and HVAC systems modeled, the remaining loads are estimated from nameplate data, staff interviews, and observation. As with all major systems, these incrementally built up models are then normalized to meet the boundaries set by actual energy usage documented on the utility billings. Construction costs for the recommended ECMs are developed from contractor quotes, RS Means estimates, and benchmark experience. While individual projects' final costs and savings may vary from the results presented in this report, it is anticipated that the level of accuracy across the entire portfolio of projects will exceed a schematic budget estimate level. City of Tustin Energy EfFciency Conservation Strategy 3 1/12/2010 3. ENERGY METRICS A summary of purchased utilities for each building is provided in the table below. Annual consumption and purchases are based on utility bills covering the time frame of September 2008 through October 2009. Annual Utility Expenditures Location Size Electric Natural Gas Water CityYard 20,703 27,655 2,290 2,232 Civic Center 60,844 $201,371 $13,050 $8,916 CT Gym 18,728 36,386 1,097 1,074 Senior Center 17,580 47,678 2,586 4,088 Youth Center 6,000 17,188 1,087 1,410 Subtotal 123 855 $330 279 $20 109 $17 720 Total 7 Energy consumption for the same time period is presented below. Annual Utility Consumption Location Size Electric, kWh Natural Gas, therms Water, hcf EUI, kBtu/sf City Yard 20,703 194,040 2,323 722 43.2 Civic Center 60,844 1,529,928 17,528 1,747 114.6 CT Gym 18,728 243,363 1,055 117 50.0 Senior Cente 17,580 338,695 2,263 1,222 78.6 Youth Center 6,000 93,960 957 266 69.4 Total 123 855 2 399 986 24 126 4 074 85.6 The energy use index (EUI) is based on the total annual energy (electrical and fossil fuel) usage per square foot for each building. When normalized for the geographic area and local weather conditions, this may then be used for comparison to other peer facilities as an evaluation of the building performance. The average unit rates for utilities calculated from the billing statements are presented below. These rates are used for estimating the cost savings from the projects identified as part of this initiative. Average Utility Rates Location Electric, $IkWh a Gas, $/therm Water, $Ihcf City Yard 0.143 0.99 1.84 Civic Center 0.132 0.74 1.84 CT Gym 0.150 1.04 1.84 Senior Cente 0.141 1.14 1.84 Youth Center 0.183 1 .14 1.84 Note that the water rate used is based on the top tier consumption rate charged by the local utility; not the (higher) average unit rate calculated from the bills. City of Tustin Energy Efficiency Conservation Strategy 4 1/12/2010 4. BUILDING PROFILES Site Utility Summaries for the buildings included in this strategic plan are provided on the following pages. For each facility, key energy and performance benchmarks are captured from utility billing information provided by the City managers and from observations during the building assessments. Key mechanical systems and end users are identified and operation implications noted. City of Tustin Energy Efficiency Conservation Strategy 5 1 /12/2010 Facilit Name: City of Tustin Civic Center Address 300 Centennial Wa + Tustin, CA 92780 _ " -, - Year Buiit: 1991 ~. .{ Gross Area ft2 : 60844 ~ Po ulation: 218 ~ ~-~ - SIC Code: 9199 Classification: Office /Civic Center OwnedlLeased: Owned Facility Description The Tustin Civic Center houses the community's police department, detention center, city hall, and community center. The property is occupied from approximately 7:30 AM throgh 5:30 PM, Monday through Friday. Mechanical System Description Lighting System Description (4) Multizone VAV RTUs with hot water reheat and inlet guide Illumination is provided by means of a combination of linear (T12, vanes. (10) Constant Volume RTUs serving ancilliary areas. T8) and "U Tube" fluorescent fixtures. Various outdoor and high Controls are a mix of pneumatic, thermostat, and timers. Hot ceiling lighting (metal halide, high pressure sodium) present an water provided by a boiler located on the roof with no apparent opportunity for induction and/or LED lighting. Occupancy sensors hot water reset. are not widely used. Miscellaneous Systems Chilled Water Production ^ Data Center ^ Kitchen /Cafeteria Compressed Air ^ Elevators ~ Laundry Steam Generation ^ Waste Incineration ^ Swimming Pool Hot Water Generation ^ 24/7 Operations 0 Refrigerated Storage ^ ^ ^ ^ ECM Potential Description Annual Electricity Savings kWh Annual Natural Gas Savings (therms Annual Water Savings hcf First Cost Annual Savings Simple Payback C02 Reduction, Tonnes Lighting Retrofits 183,179 - - $183,179 $24,110 7.6 58 DDC Controls, VSDs, DCV 104,667 131 - $106,571 $13,874 7.7 34 Ma~or RTU Re lacement End of Life 43,025 0 - $355,000 $5,663 62.7 14 DDC VAV Controllers 8,605 23 - $149,000 $1,150 129.6 3 PD Vendin Misers 1,461 - - $300 $192 1.6 0.5 - - 1,099 $14,320 $2,022 7.1 - TOTAL 340,938 154 1,099 $808,370 $47,011 17.2 109 City of Tustin Energy Efficiency Conservation Strategy 6 1!12/2010 Electricity Usage 160,000 350 140,000 300 ,~ lzo,ooo 2so Y 9 100,000 200 ~ 80,000 ~ 150 60,000 40,000 100 20,000 50 0 0 ~ vp ~ cA ~~ ~~ V ~ Oc Oe fie" pG 1J PJ ' L.IkWh +C00 Annual Usage: 1,529,928 kWh Rate: E0.131kWh Fossil Fuel Usage 2,000 350 1,800 300 7,600 E 1 q00 250 t 1,200 200 m 1,000 j 800 150 ~ fi00 100 400 200 50 0 0 A~ o~ t' ~' ~p°j Sf' A°' o°' Vi C c Qe O PJ Fe PQ ~J Wtherms +HDD Electrical Consumption Brcakdown~ Other 10.0% Plug Load 20.7% DHW ~5.2Yo HVAC~ 42.4% Lighting 21.7% Annual Cost: E207,377 Tonnes COt. 488 Natural Gas Consumption Breakdown Other 12.7% 1 I HVAC I 44.8% DHW 42.5 Annual Cost: 573,050 Tonnes COt, 95 700 600 500 s m 400 3 ~ 300 n 3 zoo loo 0 ~o$ `pro 8' e~ cd% i8' ,o' cA°' J~A°j ~ QSP ~o°' P° O¢ ~a ke xy9 PQ eye ~J ~ pJ Se O o Water Annual Usage: 75th Percentile 50th Percentile Existing 0 20 40 60 80 100 120 140 ketu/sf/yr katulsh. 115 City of Tustin Energy Effciencv Conservation Stratecty EneBY Spend Breakdown By Utility Natural Gas water 6% 2% r~ Electricity 92% Energy Intensity By End Use (kBtu / sfi_ DHW Other 15% 11% ` Lighting 16% HVA~ 43% ~ ug Load 15% Tonnes CO„ 581 7 1 /12/2010 lal Usage: 17,528 therms Rate: 50.74 (therm Water Consumption 2,415 hcf Rate: E2.28 /hcf Energy Use Index (EUI) Facilit Name: City of Tustin Field Services Yard -~" ;"~.fi;~!-'~' ~ '~ Address 1472 Service Road ` Tustin, CA 92780 , - : ;F ., Year Built: 1978 ';. ~y + ~ - Gross Area ft2 : 20,703 ~ ~~ y~ + Po ulation: 52 "~"-° -~ ~ SIC Code: 9199 Classification: Office - OwnedlLeased: Owned ," Facility Description The Field Services Yard serves as the central administration and staging for the public works department.The property is occupied from approximately 6:30 AM through 4:00 PM, Monday through Friday. Mechanical System Description The field services buildings use constant volume, single zone rooftop units. The units are currently operated on commercial 7 day programmable thermostats. The Trane equipment has functioning economizers but the carrier unit does not. The unit serving the pole barn also does not contain an economizer. 20.5 Tons of cooling total. Domestic hot water provided by gas fired hot water heaters. Lighting System Description The property was undergoing a lighting retrofit at the time of the building survey. T12 fixtures were being converted to 32 Watt T8 lighting. Opportunity still exists relamp to 28 W units as well as for conversion of outdoor lighting to LED or induction fixtures. Miscellaneous Systems Chilled Water Production ^ Data Center ^ Kitchen /Cafeteria ^ Compressed Air ^ Elevators ^ Laundry ^ Steam Generation ^ Waste Incineration ^ Swimming Pool ^ Hot Water Generation ^ 24/7 Operations ^ Refrigerated Storage ^ ECM Potential Description Annual Electricity Savings (kWh) Annual Natural Gas Savings (therms) Annual Water Savings (hcf) First Cost Annual Savings Simple Payback C02 Reduction, Tonnes Li htin Retrofits 28,110 - - $28,110 $4,006 7.0 9 DDC Controls, Re-Commission, DCV 7,197 198 - $17,369 $1,221 14.2 3 Water Conservation - - 255 $2,390 $470 5.1 - TOTAL 35,307 198 255 $47,869 $5,697 8.4 12 City of Tustin Energy Efficiency Conservation Strategy 8 1/12/2010 Electricity Usage " ^^^ 350 300 250 200 150 loo 50 0 Annual Usage: 194,040 kWh Rate: 50.14 /kWh Fossil Fuel Usage 800 350 700 300 600 E 250 ;, Boo i 200 m a0o 150 ~ 300 N ~ 200 100 100 ~ ~ 50 ~ 0 0 A~ ~' A°j ~ f~ ~ 8' b ~ ~ A°' O p Qe Fe ~~ pQ , Pa Hherms ~HDD Annual Usage: 2,323 therms Rate: E0.99 /therm Water Consumption 180 160 140 `G 120 E m 100 9 ~ 80 3 ~ 40 20 0 Nov-08 lan-09 Mar-09 May-09 lul-09 Sep-09 ^ Water Annual Usage: 722 hcf Rate: 53.09Ihcf Energy Use Index lEUI) 75th Percentile 50th Pe¢en[ile Existing 0 10 20 30 40 50 GO 70 kBtu/sf/yr katulsf: 43 Electrical Consumption Breakdown) Plug Load 40.5% HVAC_ -"" 29.0% Lighting 30.5% Annual Cost: 527,655 Tonnes COr: 62 Natural Gas Consumption Breakdown OHW 16% s HVAC - 85% Annual Cost: 52,290 Tonnes COa. 13 Energy Spend Breakdown By Utility Natural Gas Water 7% 7% .~ Electricity 86% Water Annual Cost: 52,232 Total Utility Annual Cost: 532,176 Energy Intensity By End Use (kBtu / sf) DHW 4/ Lighting 22% HVAC 44% .,. Plug load 30% Tonnes COa, 74 City of Tustin Energy Efficiency Conservation Strategy 9 1 /12/2010 Facilit Name: Columbus Tustin Gym Address 17522 Beneta Wa --, Tustin, CA 92780 t ;~ Year Built: 1994 - • ~ •° ~._. - Gross Area ft2 : 18728 - C l b `T s Po ulation: 4 o um us u tin Park r, : -~ R ~- SIC Code: 9199 _ Gymnasium ~ ~ Classification: Recreation Center ~``"' ~'~ ~~ Owned/Leased: Owned Facility Description The Columbus Tustin Activity Center is located on the northwest corner of Columbus Tustin Park near the intersection of Beneta Way and Prospect Avenue. The facility provide gymnasium and classroom space for various recreational activities. The property is occupied from approximately 10:00 AM throgh 10:00 PM, Monday through Friday and from noon until 6:00 PM on weekends. Mechanical System Description The Gym utilizes multiple constant volume roof top units that are controlled with mercury bulb thermostats and 12 hour wind up timers. All units have economizers; however, none are in operation and require some damper repairs or modification to remove obstructions from the intakes. 57 Tons of cooling total. Domestic hot water provided by gas fired hot water heaters. Lighting System Description Illumination is predominately provided by means of a combination of linear (T12) and "U Tube" fluorescent fixtures. Various outdoor lighting (high pressure sodium) present an opportunity for induction and/or LED lighting. Metal halide fixtures are used in high ceiling applications and are candidates for multi-lamp fluorescent fixtures. Occupancy sensors are not widely used. Mlacellaneous Systems Chilled Water Production ^ Data Center ^ Kitchen /Cafeteria ^ Compressed Air ^ Elevators ^ Laundry ^ Steam Generation ^ Waste Incineration ^ Swimming Pool ^ Hot Water Generation ^ 24/7 Operations ^ Refrigerated Storage ^ ECM Potential Description Annual Electricity Savings kWh Annual Natural Gas Savings (therms Annual Water Savings hcf) First Cost Annual Savings Simple Payback Coe Reduction, Tonnes Solar Photovoltaics 163,013 - - $281,559 $23,829 11.8 52 Li htin Retrofits 33,254 - - $33,254 $4,972 6.7 11 DDC Controls, Re-Commission, DCV 13,313 158 - $30,668 $2,155 14.2 5 Water Conservation - - 53.48571 $3,192 $98 32.4 - TOTAL 209,580 158 53 $348,673 $31,054 11.2 67 City of Tustin Energy Efficiency Conservation Strategy 10 1 /12/2010 40,000 350 35,000 300 3 3D,ooo zso ;, zs,ooo m zoo ~ zo,ooo t 15 000 1so , 10,000 100 5,000 30 0 0 ~A¢ uA~ `o~' ~c4' ~ ¢ O ¢ F PQ lJ pJ rikWh +LDD Annual Usage: 243,363 kWh Rate: 50.15 /kWh Fossil Fuel Usage 800 350 700 300 '" 600 E d 500 250 r 200 u 400 m ~ 15D ~ 300 l7 200 100 100 ~ 50 O~A1i O¢¢A°j ~¢,¢A°' PQio°' ,J ,t'F' PJ ,O°' '~. Itherms ~-HDD Annual Usage: 1,055 therms Rate: 51.09 /therm Water Consumption 30 25 i 20 u I iB I 3 10 s o _ _ ', PQ ~a ~J l pJ y¢ ~4~ ~°,~O¢¢A~ ~a O°j F¢~A" ¢~cS~ c0' ~o°' co°' J\A°, ~A' ~o°I SF, O Water Annual Usage: 117 hcf Rate: 59.18 Ihcf 75th Percentile 50th Percentile Existing D 10 20 30 40 50 60 70 kBtu/sf/yr ketu/sf: 50 Electrical Consumption Breakdown, Plug Load 12.5% HVAC ~~....\Lighting 53.8% 33.7% Annual Cost: 538,388 Tonnes COx; 77 Natural Gas Consumption Breakdown DHW 1.1% HVAC I 98.9% Annual Cost 51,146 Tonnes COt, 6 Energy Spend Breakdown By Utility Natural Gas Water 3Yo 3% Electricity 94% Water Annual Cost: 51,074 Total Ut1lity Annual Cost: 538,807 Energy Intensity 8y End Use (ketu / sf) DHW 0% I fighting 30% HVAC 59% _ ug Load 11% Tonnes COt; 83 City of Tustin Energy Efficiency Conservation Strategy 11 1/12/2010 Electricity Usage Energy Use Index lEUI) Facilit Name: Tustin Senior Center i .. Address 200 South C Street Tustin, CA 92780 >., Year Built: 1989 _ Gross Area ft2 : 17580 Po ulation: 15 SIC Code: 9199 Classification: Senior Center OwnedlLeased: Owned ~ Facility Description As part of the City of Tustin Parks & Recreation Services Department, the Tustin Area Senior Center's mission in "Making a Difference" is to provide for a day recreational setting, opportunities to learn, socialize and obtain assistance with human service needs. The facility provides meeting and classroom space for various recreational activities. The property is occupied from approximately 8:00 AM through 5:00 PM, Monday through Friday. Mechanical System Description The senior center uses multiple constant volume rooftop units (many to be replaced). Two of the units utilize an electronic zoning system. Unit occupancy control is provided by 12 hour wind up timers and mechanical mercury bulb thermostats. The new carrier unit uses a 7 day programmable thermostat for temperature control and occupancy. 58.5 Tons of cooling total. Domestic hot water provided by gas fired hot water heaters. Lighting System Description Illumination is predominately provided by means of a combination of linear (T12) fluorescent fixtures. Various outdoor lighting (high pressure sodium) present an opportunity for induction and/or LED lighting. Occupancy sensors are not widely used. Miscellaneous Systems Chilled Water Production ^ Data Center ^ Kitchen /Cafeteria 0 Compressed Air ^ Elevators ^ Laundry ^ Steam Generation ^ Waste Incineration ^ Swimming Pool ^ Hot Water Generation ^ 24/7 Operations ^ Refrigerated Storage ^ ECM Potential Description Annual Electricity Savings (kWh) Annual Natural Gas Savings (therms) Annual Water Savings (hcf) First Cost Annual Savings Simple Payback C02 Reduction, Tonnes Li htin Retrofits 41,659 - - $41,659 $5,864 7.1 13 DDC Controls, Re-Commission, DCV 22,689 141 - $30,600 $3,355 9.1 8 Vending Misers 1,560 - - $200 $220 0.9 0.5 Water Conservation - - 279 $2,968 $514 5.8 - TOTAL 65,908 141 279 $75,427 $9,953 7.6 22 City of Tustin Energy Efficiency Conservation Strategy 12 1/12/2010 Electricity Usage 40,000 350 35,000 300 30,000 250 u 25,000 ^~ 200 j 20,000 x• 150 15,000 10,000 100 5,000 50 0 0 ro 0 pb ~eU F¢ PQ~~ ~JC P~6 ~j !+kWh ~CDD Annual Usage: 338,695 kWh Ra[e: 50.14 /kWh 700 600 - 500 E Y $ 400 u m '~ 300 ~ 200 100 0 o``Aa ~e o~ Fe°~' Annual Usage Fossil Fuel Usage 350 300 250 200 150 100 50 - 0 PQ`s ~°°~ P'°'~ Wtherms ~HDD 2,283 therms Rate: 51.14 (therm Water Consumption Annual Usage: 1,222 hcf Rate: 53.34 Ihcf Energy Use Index lEUl) 75th Percentile 50th Percentile Existing 0 20 40 60 kgtu/sf/yr kBtulsf: 74 80 Electrical Consumption ereakdownj Plug Load 39.9 HVAC 46.6% , Lighting 13.5% Annual Cost: 547,870 Tonnes COs; 108 Natural Gas Consumption Breakdawnj Other 20 HVAC 41% DHW 39% Annual Cost: 52,588 Tonnes COx; 12 Energy Spend Breakdown By Utility Natural Gas Water 6% 1% i .Electricity 88% Water Annual Cost: $4,088 Total Utility Annual Cost: 554,352 Energy Intensity ay End Use Other DHW 3% 6% Lighting ,. 11% HVAC 46% -. Plug Load 34% Tonnes COx, 120 City of Tustin Energy Efficiency Conservation Strategy 13 1/12/2010 Facilit Name: Tustin Youth Center Address 14722 New ort Avenue Tustin, CA 92780 Year Built: 1997 „1 Gross Area ft2 : 6,000 ~ _ Po ulation: 2 -'' SIC Code: 9199 Classification: Childcare - ~-- Owned/Leased: Owned Facility Description The Tustin Family & Youth Center is a 6,000 square foot facility designed to serve the specialized needs of the residents of southwest Tustin. The Center provides a full range of family and youth-oriented social, educational and recreational programs, and serves as a resource/referral center for families in need, youth-at-risk, and for individuals seeking self-improvement and vocational opportunities.The property is occupied from approximately 8:00 AM through 5:00 PM, Monday through Friday. Mechanical System Description The youth center HVAC equipment consists of 3 carrier rooftop units controlled by 7 day programmable stats. The economizers do not operate on these units as the dampers are in poor shape. Occupancy varies in this facility with class room schedules. 7.5 Tons of cooling total. Domestic hot water provided by gas fired hot water heaters. Lighting System Description Illumination is predominately provided by means of a combination of linear (32 W T8) fluorescent fixtures. Various outdoor lighting (high pressure sodium) present an opportunity for induction and/or LED lighting. Occupancy sensors are not widely used. Miscellaneous Systems Chilled Water Production ^ Data Center ^ Kitchen /Cafeteria ~ Compressed Air ^ Elevators ^ Laundry ^ Steam Generation ^ Waste Incineration ^ Swimming Pool ^ Hot Water Generation ^ 24/7 Operations ^ Refrigerated Storage ^ ECM Potential Description Annual Electricity Savings (kWh) Annual Natural Gas Savings (therms) Annual Water Savings (hcf) First Cost Annual Savings Simple Payback Cot Reduction, Tonnes Li htin Retrofits 9,291 - - $9,291 $1,700 5.5 3 DDC Controls, Re-Commission, DCV 7,563 151 - $20,158 $1,555 13.0 3 Water Conservation - - 121.6 $1,299 $224 5.8 - TOTAL 16,854 151 122 $30,747 $3,478 8.8 6 City of Tustin Energy Efficiency Conservation Strategy 14 1/12/2010 Electricity Usage 14,000 350 12,000 300 10,000 250 8,000 200 Z' 6,000 150 4,000 W 100 2,000 50 0 0 O~ O¢ t¢ pQ lJ pJ nkWh COD Annual Usage: 93,980 kWh Rate: 50.18 /kWh Electrical Consumption Breakdown] Plug Load 17.1% ~ ~ Lighting ' HVAC ~ 15.8% 67.2% Annual Cos[: 517,188 Tonnes COa; 30 Fossil Fuel Usage 350 350 300 300 E 250 250 `u r 200 200 d eo „ 150 150 loo loo 5 I y' ~ 0 - - 0 0 ~A ` C ~ 1 Oo Q¢ ,J Q¢ pQ p`s ' u[herms =HDD Annual Usage: 957 therms Rate: 51.14 /therm Water Consumption 70 60 50 'G L ~i 40 a w 30 3 zo to 0 Nov-08 Ian-09 Mar-09 May-09 lul-09 Sep-09 p Water Annual Usage: 288 hcf Rate: E5.30 /hcf Energy Use Index lEUl) I 75th Percentile 50th Percentile Existing 60 Natural Gas Consumption Breakdown's DHW 21Yo HVAC 79% Annual Cost: 51,087 Tonnes COa. 5 Energy Spend Breakdown By Utility Natural Gas Water 6% 7% V ~` Electricity 87% Water Annual Cost: 51,410 Total Utlllly Annual Cost: 519,885 Energy Intensity By End Use (kBtu/sf) DHW 5% Lighting 12% plug LOad~i~ 13% '' HVAC 70% Tonnes COx_ 35 City of Tustin Energy Efficiency Conservation Strategy 15 1/12/2010 _I F _.___;_.. ___. I 0 20 ketu/Sf/yr 0 8' katWsf: 69 5. ECM DESCRIPTIONS The general system findings and energy conservation measures (ECM) recommended within the EECS are presented below. Building specific ECM Scoping Worksheets are provided in Section 8 of this report. 5.'I SOLAR PHOTOVOLTAICS As fossil fuel prices continue to grow and install prices drop, renewable energy sources continue to be a growing contributor to the country's energy supply. Incentives from utilities and state and federal sources also drive down these first costs and can provide both positive cash flow and environmental impacts throughout the life of the equipment. The Role of Renewable Energy in the Nation's Energy Supply, 2008 Total = 99 305 OuadnlGOn Btu Petroleum 37% ~ Renewabb - ~ G~ 2a% ' ,y Ener9Y ~% _ ~ F ~ N dear Total = 7.301 QUad0lllOn Btu Coal u 23Mo ~ Electric Power ,_ s°io Nate S-~.~..:.-_~:.-..,~~~~._,•~_~~..~'~ aueronypppiMentrwn0ing Source Ene•yy vtc~malan ~omn sVdLOn ~ HvrirneQb frroryY Consumption arM E.bclnMY Prenm~noY $19e5aC5 7008. iaEk t u 5 Energy Gonwmptwn Cy Energy Source. 700s30081Ju1y 70091 sai A review of such opportunities was performed for the City buildings. The CT Gym has been identified as an excellent candidate for solar generated electricity. The pitch, open area, and orientation of this roof allows for up to 106 kW of fixed solar arrays to be installed. The economic climate within California is also a significant contributor to the viability of this project; rebates in excess of $258,000 are available for this installation. In addition, staff can also apply for a rebate via the California Solar Initiative (CSI) that will potentially allow for the City to receive a governmental incentive rebate for every kilowatt-hour generated in excess of demand. The current incentive rebate is currently equal to $0.32 per kilowatt-hour. This project can provide a positive cash flow scenario throughout its 25 year lifespan, creating potential monies to be used in the implementation of other energy conservation or sustainable projects. Appendix A includes the solar proposal and economic forecast provided by Garland Energy for the City of Tustin. City of Tustin Energy Efficiency Conservation Strategy 16 1 /12/2010 5.Z LIGHTING UPGRADES The majority of the buildings at the City of Tustin have been upgraded to T8 linear fluorescent lamps and electronic ballasts. T12 linear fluorescent fixtures with magnetic ballasts and incandescent lamps are found sporadically throughout the campus. There are many fluorescent exit signs are in use (some are just paper signs). Motion sensors are not used with any frequency. The following is an overview of current lighting technology that will be recommended at the buildings. Compact Fluorescent Lamps Compact fluorescent lamps (CFCs) are now in the mainstream with excellent color rendering, new coating technologies and less mercury to dispose of once the lamp is replaced. Additional benefits include: • Besides saving energy, these lamps are instant on and last 8,000 to 25,000 hours, depending on the lamp specified (compared to the A lamps currently used that last 1,000 hours). • CFCs come in a wide variety of shapes and colors (referred to as color temperature in degrees Kelvin). Color temperatures are available from a very warm 2,700 K, which is the same as incandescent lamps, to a very blue 5,100 K. Replace any existing incandescent lamps with CFCs. T12 Linear Fluorescent Conversions to T8 with Electronic Ballasts Any remaining T12 linear fluorescent lamps with magnetic ballasts should be converted to a T8 system with electronic ballasts. Magnetic ballasts operate at 60Hz (cycles per second), the frequency of the AC voltage they run on. About 25% of the population is sensitive to magnetic ballast flicker and hum and actually can become physically ill, with symptoms such as headaches, nausea, itching and burning eyes, tension, eye fatigue, and general fatigue. Operating at 60Hz, magnetic ballasts may cause a stroboscopic effect with any machinery which has parts, such as pulleys or gears, running at speeds that are a multiple of 60Hz. The stroboscopic effect will cause the machine to appear motionless, which could be a hazard. Electronic ballasts work on high frequency, around 25,000 Hz, which eliminates bothersome flicker and hum and improves the work or classroom environment. Lumen depreciation is the amount lumen output is decreased over the life of the lamp. A major advantage of converting to high efficiency T8 lamp systems is they only lose 5% to 10% of light output (lumen depreciation) over their life expectancy compared to a T12's typical 30% lumen deprecation. As a result, normal failures will tend to be close together for future re-tamping purposes. Replace any T12 lamps and magnetic ballasts with newer T8, 25 Watt lamps and electronic ballasts. Lamp Lumen Maintenance ,~. ,~„ ------- ,um-- - - ~ ,,,XO~~ ,o, iE b0% _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ ~~ M.W X~W InN d a~ _ - - bM 10% 0 'MM 1W~] IIrCPJ 3WLp 1~AW 1g00 a...~., ~,.. City of Tustin Energy Efficiency Conservation Strategy 17 1/12/2010 Fifth Generation Linear Fluorescent Lamps Fifth generation reduced-wattage T8 lamps are designed for fluorescent luminaire retrofits where standard 32 W/T8 lamps would provide more light than is needed. These lamps are available in 25, 28 and 30 W models and, in a majority of the cases, can replace the original 32 W lamps with 24% lower energy consumption than standard 32W/T8, but lumens are reduced only 6% Replace current T8 lamps with reduced wattage Fifth Generation lamps (the existing ballasts do not need to be replaced). These replacements should be part of a group re-tamping when the current T8's light output has depreciated to unacceptable levels or when maintenance is starting to replace multiple lamps. Lighting Occupancy Sensors There were very few lighting occupancy sensors throughout the City buildings. Suitable spaces include restrooms, conference rooms, and private offices. Utilize dual technology occupancy sensors that respond to both movement and noise (infrared and ultrasonic) be installed so there is little chance of accidentally turning the lights off in occupied spaces. The figure at right demonstrates the dual technology occupancy sensor functionality. Exit Signs Upgrade exit signs not using LED technology to LED. Exterior and High Ceiling Lamps Continue to replace high pressure sodium, mercury vapor, and metal halide lamps induction lamps (with LED fixtures as an alternative). The energy savings from using the induction fixture is greater than 50% but the leading advantage in an application such as this is the 15 year maintenance free operation. For indoor applications, multi-lamp linear fluorescents may also be considered. Lighting Run Hours used for Analysis Civic Center: Based on a run time of 12 hours per day for 250 days per year, except for Police Department (24/7). • City Yard: Based on a run time of 12 hours per day for 250 days per year. Youth Center: Based on a run time of 12 hours per day for 250 days per year. • Senior Center: Based on a run time of 11 hours per day for 250 days per year. • CT Gym: Based on a run time of 13 hours per day for 250 days per year and 7 hours per day for 104 days per year. The following table defines the recommended project tasks and benefits. City of Tustin Energy Efficiency Conservation Strategy 18 1!12/2010 • tienws p:ehlrnnrrt s~L~ces • PAosl rrxx{.rrrsm sensor approacn • Mace sountl acGvatfon prevents ughU; Out Ca1tlAlOn Lighting Retrofit Project Descriptions & Benefits Lighting Project Number Lighting Project Existing Proposed Benefits Any Fluorescent lumnaires w ith Relartp and clean existing lumnaires using new high Energy savings, Maintenance savings on longer life L1.2 T8 to ligh Hficiency or existing electronic ballasts and 4'78 efFlCiency 28W or 25W TS lanes and existing equipment, krproved or rreintained light levels and "Super" T8 32W lamps electronic ballasts and fixture. appearance, New lighting components w %h w arranties. Energy savings, Maintenance savings on longer 1%e 712 to T8 Lamp and Any Fluorescent luminaires w %h Retrofit and clean existing luminaires using new high equipment, hproved or rreintained light levels, Inproved L7.3 Ballast magnetic ballasts and T121amps efficiency electronic ballasts and new T8 lamps color rendering and lumen depreciation and better space (2',3',4',8' or u-bents) aesthetic appearance, New lighting components w %h warranties. Retrofit and clean existing luminaires using new high Energy savings, Maintenance savings on longer Irfe Any Fluorescent luminaires w%h efficiency electronic ba%asts and new 28w or 25w equipment, hproved or maintained light levels, Improved L7.4 712 to TS Retrofit Octane rregnetic ballasts and more than T8 lamps. Delarrp the fixture from 3 or 4lanps down cobr rendering and Lumen depreciation and better space two 4'712 lamps to 2larrps w %h a customized specular reflector k% aesthetic appearance, New lighting components w %h w %h new brackets and lamp sockets. warranties, Brand new "Internal guts" Retrof% and clean existing luminaires using new high Energy savings, Maintenance savings on longer I%e Any Fluorescent luminaires w %h efficiency electronic ballasts and new TB lamps and equipment, hrproved or maintained light levels, Improved Lt.B 712 to T8 Conversion Kit rtegnetic ballasts and 712 lamps ba%ast and conversion k% w ith new brackets and cobr rendering and lumen depreciation and better space (2',3',4',8' or u-bents) lane sockets. aesthetic appearance, New lighting fixture and components w %h w arranties. Retrof% or replace w %h fixtures having electronic Energy Savings, Maintenance savings on longer Irfe L2.0 CFL Hardwire Incandescent Hxtures balasts and hardwired CFL lamps (compact equipment, Longer life lamps (100,000 hours versus 1500 fluorescent lartps) hours), New %ghting components w ith w arranties, New fixtures. Retrofit w %h screw-in replacerrent CFL lamps Energy Savings, Maintenance savings on longer Irfe L2.2 CFL Screw-in Incandescent Fxtures (compact fluorescent lanes) equipment, Longer life lanes (10,000 hours versus 1500 hours). New dual technology with passive infrared and Energy savings by reducing the run time of light fixtures L3.0 WS sensor Standard toggle w all sw %ch u%rasonic w all sw itch w ith occupancy detection and h, hen there is no occupancy. autorretic shutoff after a preset timeout Standard toggle w all sw %ch w %h ~`' dual technology w %h passive infrared and Energy savings by reducing the run time of light fixtures L3.1 CS sensor w a% or part%ion obstructions u%rasonic ceiling sensor w %h occupancy detection when there is no occupancy. and autorretic shutoff after a preset timeout Energy Savings, Maintenance savings on longer life L4.0 Ex% Signs F~c% signs w %h incandescent lamps Replace w %h new L®ex% signs w %h battery backup equipment, Longer life lanes (100.000 hours versus 1500 hours). Replace w%h new high efficiency hduction fixtures Energy savings, trproved or maintained light levels, HQ Metal Halide or Figh Ressure having generators, phosphorus lamps, and an Improved cobr rendering and lumen depreciation and L8.7 New hduction Fxture Sodium Fxtures electromagnetic inducer and custonized specular better space aesthetic appearance, Maintenance savings reflector, power cord w hip, and mounting hardware. °n bnger Irfe equipment, Longer life lanes (100,000 hours versus 1500 hours), New lighting com The following table provides a project savings analysis and the buildings involved. Pricing assumes outside labor for replacing fixtures, new ballasts, etc. and no outside labor for screw in lamps. Lighting Retrofit Summary - By Retrofit Lighting Project ID Building Retrofit Quantity Estimated kWh Savings L1.2 Ciry Yard, Civic Center, Youth Center 831 66,039 L1.3 Civic Center, Senior Center, CT Gym 609 96,386 L1.4 cr Gym 30 12,744 L1.9 City Yard 4 1,136 L2.0 Civic Center 22 6 360 L2.2 Ciry Yard, Civic Center, Senior Center 108 14 806 L3.0 City Yard, Civic Center, Youth Center, Senior Center, CT Gym 92 0 L3.1 City Yard, Civic Center, Youth Center, CT Gym 42 0 L4.0 City Yard, Civic Center, Youth Center, Senior Center 66 7,166 L6.1 City Yard, Civic Center, Youth Center, Senior Center, CT Gym 179 90,856 Total 1,983 295,492 City of Tustin Energy Efficiency Conservation Strategy 19 1 /12/2010 Lighting Retrofit Summary - By Building Building Estimated kWh Savin s Estimated Cost Savin s Estimated Cost Simple Payback in Years City Yard 28,110 $4,006 $28,815 7.2 Civic Center 183179 $24 110 $147 523 6.1 CT G 33 254 $4 972 $62 988 12.7 Senior Center 41,659 $5,864 $25,141 4.3 Youth Center 9,291 $1,700 $7,558 4.4 Tafal 295,492 $40,652 $272,025 6.7 Energy savings associated with the occupancy sensors are reflected in reduced run time hours for the other energy conservation measures. A more detailed lighting inventory for each building is provided in Appendix C. 5.3 HVAC AND BUILDING AUTOMATION OPPORTUNITIES General Recommendation -DDC Based Controls Continue to convert HVAC controls from rudimentary (pneumatic, thermostatic, and timer) based controls to direct digital (DDC) controls to provide the capability for dynamic control strategies. A campus-wide energy and environmental standard should be set by senior administration and enforced by the facilities staff. Occupied and un-occupied set points and hours of operation should be defined and implemented through the Apogee system. Space conditions should be set to satisfy and industry standard, such as the ASHRAE comfort zone definition (depicted) or the Fanger comfort model. The level (maximum deviation and duration) of night and weekend set back strategies should be evaluated for each building on a trial and error basis to balance the greatest savings opportunity with optimal recovery time from this "reset" state. „ r f ,M ~Y 6 s ~~ .~ k yt' ~° ,. ff ,,, ~ ~ if "' W \ ~ T ~ i Y:la'tF SliM4kF Q I5 !U ~ W r, en i i - e~ an !a n w T !. OPEIUIty[ IEYP[M*IMIF. "f Demand Control Ventilation (DCV) can reduce the cost of operating an HVAC system by matching the (unconditioned) outdoor air intake to the actual needs of the space. ASHRAE standard 62.1 allows for the use of Carbon Dioxide (C02) sensors to evaluate the space need and then to reset the outside air dampers using a building's automation system. We recommend that sensors be installed and programming put in place to implement this strategy. Re-commissioning of the dampers and actuators are recommended. As part of the building assessments, a thorough review of the existing mechanical systems was performed to evaluate the ECM opportunities at each building. An overview of the findings and recommendations are presented below. Civic Center The Civic Center area consists of 4 VAV roof top DX units. The VAV units have fixed discharge air set points and dry bulb economizers that appear inoperable. The dampers look to be in fair shape. The supply fans contain inlet guide vanes as a form of fan capacity control. City of Tustin Energy Efficiency Conservation Strategy 20 1/12/2010 A boiler is used to provide heating to the exterior zones and appears to run continuous. The boiler has a fixed set point of 140 degrees and no apparent OSA lock out. Potential VAV System ECM Opportunities: • Discharge Air Reset From return air temp or VAV terminal load(Zone control required) • VFDs for supply fans and static control. • Differential temp economizer enable with OSA Lock out. Demand Control Ventilation • Global and Holiday scheduling. • Zone control at each VAV box to implement and provide digital control to zones. Provide occupancy sensors for each zone. Allowing zones to be controlled by occupied, standby and unoccupied set point. Also data terminal load information can be provided to accurately control the static control algorithm as well as the Discharge air control. • OSA reset for boiler loop temperature set point • Energize Boiler based on demand driven by Terminal load of VAV units and OSA temperature. The civic center also utilizes single zone constant volume package units to serve some areas of the complex. These units are generally controlled with mercury bulb mechanical thermostats or electronic non-programmable equipment (no scheduling capabilities). Twelve hour wind up timers are also deployed for simple schedule control. The economizers did not appear to function efficiently as we tested the operations on a day in which mechanical cooling was not required. Potential Single Zone ECM Opportunities: • DDC unitary control for event scheduling or occupancy based control. • Retro-commission economizer operations. • Demand control ventilation on units that serve area that vary in occupancy. (Council chambers and community center. Citv Yard /Field Services The field services buildings use constant volume, single zone rooftop units. The units are currently operated on commercial 7 day programmable thermostats. The Trane equipment has functioning economizers but the carrier unit does not. The unit serving the pole barn also does not contain an economizer. Potential ECM Opportunities: • DDC unitary control for event scheduling or occupancy based control. • Retro-commission economizer operations. CT Gym The Gym utilizes multiple constant volume roof top units that are controlled with mercury bulb thermostats and 12 hour wind up timers. All units have economizers; however, none are in operation and require some damper repairs or modification to remove obstructions from the intakes. Potential ECM Opportunities: • DDC unitary control for event scheduling or occupancy based control. • Retro-commission economizer operations. (repair economizers) • Demand Control Ventilation • Occupancy sensors and standby, occupied and unoccupied set points. City of Tustin Energy Efficiency Conservation Strategy 21 1 /12/2010 Youth Center The youth center HVAC equipment consists of 3 carrier rooftop units controlled by 7 day programmable stats. The economizers do not operate on these units as the dampers are in poor shape. Occupancy varies in this facility with class room schedules. Potential ECM Opportunities: • DDC unitary control for event scheduling or occupancy based control. • Retro-commission economizer operations. (repair economizers) • Demand Control Ventilation • Occupancy sensors and standby, occupied and unoccupied set points. Senior Center The senior center uses multiple constant volume rooftop units. Two of the units utilize an electronic zoning system. One of the zoning system units has no scheduling mechanism for the unoccupied operation. Unit occupancy control is provided by 12 hour wind up timers and mechanical mercury bulb thermostats. The new carrier unit uses a 7 day programmable thermostat for temperature control and occupancy. These units have been slated for replacement. Potential ECM Opportunities: • DDC unitary control for event scheduling or occupancy based control. • Demand Control Ventilation • Occupancy sensors and standby, occupied and unoccupied set points. Appendix D provides an inventory of the major mechanical equipment serving the buildings addressed within this report. 5.4 VENDING MACHINE LOAD CONTROLLERS Vending machines are located within several buildings in the City portfolio. These units operate continuously, regardless of occupancy or need. Load managing devices are available that use a passive infrared occupancy sensor to turn off the vending machine when the surrounding area is unoccupied and turn it back on when the area is reoccupied. The load manager also monitors the ambient temperature while the vending machine is off, and it powers up the machine when required to ensure that the beverages stay cold. In addition, the load manager monitors electrical current used by the vending machine so that it is not shut off while the compressor is running to prevent a high head pressure start from occurring. This process reduces maintenance costs and extends the life of the vending machine by significantly reducing the number of compressor cycles. Typical energy savings have been documented to be in the range of 35% - 45% of energy use. These controls have been deployed in several areas to date; the remaining units (serving the Police Department and Senior Center) should also be controlled. 5.5 WATER CONSERVATION California is in its third year of serious drought. The Governor has declared a statewide emergency due to water shortages and economic impacts. Given these circumstances, a responsible Energy Efficiency and Conservation Strategy should address potential water savings opportunities. City of Tustin Energy Efficiency Conservation Strategy 22 1l12I2010 The City of Tustin has deployed (and will deploy more units in early 2010) low flow toilets and urinals (including waterless fixtures) throughout the buildings included in this study. The City standard for these fixtures include 1.5 gallon per flush (gpf) toilets and waterless urinals (0 gpf). The impact of these changes is included in the EECS forecasts. In addition to these changes, water usage may be reduced at the restroom faucets. These units were observed to presently use aerators rated for flows of 2.0 - 2.2 gpm flows. These aerators may be easily replaced (without changing the entire faucet) with 0.5 gpm units that still provide adequate flow and pressure to rinse hands. In addition to the capital projects outlined above, consideration should be given to the ongoing maintenance of the irrigation systems serving the landscaping around the buildings. Damaged sprinkler heads and mis-programmed controllers can also result in excessive water use by these systems, often with no benefit as the surplus water is runoff to drain. Water Wise Consulting, Inc has provided a report (not included within this document) that provides fixture inventories and analysis for several City buildings, including the Civic Center, and CT Gym. The remaining buildings were surveyed as part of the audit activity to support this strategic plan. 5.6 DESK HEATERS While not included as part of the capital project forecast, the City should deploy a program to eliminate the use of personal heaters throughout. These existing units use a combination of convection and conduction in an inefficient matter and can pose a fire risk if left unattended. Instead, personal radiant heating panels are available that provide comfort and consume a tenth of the energy. As an illustration, Project 21 includes the savings potential from the replacement of 10 of such units. City of Tustin Energy Efficiency Conservation Strategy 23 1 /12/2010 6. PERMIT FEE REBATE PROGRAM To encourage awareness and energy efficiency throughout the City, the Tustin Energy Efficiency Building Permit Fee Rebate Program will be developed in cooperation with the Community Development Department to help offset plan check fees, permit fees and inspection costs related to qualified improvements for: • New solar panels or photovoltaic system Installation (avg. $550 each permit) • New tankless water heating system Installation (avg. $50 each permit) • Energy efficient air conditioning and ventilation systems upgrade -over the counter permit -one inspection (avg. $50 each permit) • Energy efficient furnace upgrade -over the counter permit -one inspection (avg. $50 each permit) These fees will be reimbursed to the homeowner at the completion of the qualified project. Recheck of plans, re-inspections, overtime inspections, and other fees not customary to common plan check, research or inspections are not waived. While this public outreach plan does not directly affect the energy consumption or carbon footprint associated with the City buildings, it does incentivize the community to consider energy efficient alternatives when performing upgrades or replacements to their property. City of Tustin Energy Efficiency Conservation Strategy 24 1 /12/2010 7. ENERGY AND CARBON FOOTPRINT FORECAST 7.1 ENERGY IMPACT A prioritized list of the projects identified as part of this initiative is presented in the table below. Additional detail for each project can be found in Sections 5 and 8 of this report. Prioritized Project List -Energy Impact No. Priority Building Description onus Electricity Savings onus Natural Gas Savings onus Water Savirgs FrstCoat Annual Savings Simple Payback 1 2010 T m Solar Photovo lta ics 163013 - - 281,559 23,829 11.8 2 2011 ity ar Li htin Retrofits 28110 - - 28,110 4,006 7.0 P3 2011 iv is Center Li htin Retrof is 183179 - - 183,119 24,110 7.6 4 2010 m Li htin Retrofits 33 254 33 254 4 972 6.7 5 2011 enior enter Li htin Retrofits 41 659 41 59 5 864 7.1 P6 2010 Youth Center Li htin Retrofits 9291 9 291 1 700 5.5 P7 2012 Ci Yard DDC Controls Economizer Re-Commission DCV 7197 198 $17369 $ 1221 14.2 P8 2011 Civic Center DDC Controls Economizer Re-Commission DCV 104667 131 $106571 $ 13874 7.7 P9 2013 Civic Center Ma'or RTU Re lacement End of Life Consideration 43025 0 $355000 $ 5663 62.7 10 2013 ivro enter ontro tars -AS part o 81dg Re ono vations 8605 23 - 149,000 1,150 129.6 11 m ontro s, conom¢er e- ommission, 13313 158 - ,1 12 2011 enior enter ontros Daman onlro anti shoo 22689 141 - 30,600 3,355 9.1 P13 2012 out enter DD ontrols, Economizer Re- ommission, V 7563 151 - 20,158 1,555 13.0 14 enior enter en ing isers 1 560 - - 15 2010 ivro enter PD Vending Misers 1 461 - - 00 192 1.6 ity ar star onservatron of ets, nnas aucets - - 255 2, 70 5.1 17 2011 ivic enter Water once rvation Toilets Urinals Faucets 1099 14320 2022 7.1 18 2012 T m Water Conservation Toilets Urinals & Faucets 53 3 192 98 32.4 P19 2010 Senior Center Water Conservation Toilets Urinals & Faucets 279 $2968 $514 5.8 P20 2010 Youth Center Water Conservation Toilets, Urinals & Faucets 122 $1,299 $224 5.8 TOTAL 888588 801 1809 $1,311,085 $97,193 13.5 7.2 CARBON FOOTPRINT The Carbon Footprint is the carbon consumption impact of an organization. It represents the total amount of greenhouse gas (GHG) produced to directly and indirectly support the organization's activities. A complete and comprehensive organizational CF includes three types of emissions: • Direct Emissions -From on-site consumption of energy, such as boilers, space conditioning systems, furnaces, owned vehicles and equipment, etc. • Indirect Purchased Electricity Emissions -Purchased electricity consumed at the facility. • Indirect Operational Emissions -Caused or influenced as a consequence of the activities of the organization. These may occur from sources not owned or controlled by the organization. Examples include faculty, staff and student commuting, air transportation, research, production, purchasing, waste streams, contractor-owned vehicles, outsourced activities and events. City of Tustin Enerov Efficiency Conservation Strateov 25 1/12/2010 According to the international standard Green House Gas Protocol, the hierarchy for reporting and taking action on GHG emissions is to: • Measure and report climate-impacting emissions • Reduce or eliminate GHG emissions by reducing or eliminating carbon consumption • Replace, if possible, fossil fuel energy sources with renewable energy sources • Neutralize unavoidable GHG emissions Source Energv Carbon Footprint As mentioned above, a complete carbon footprint would include all activities, such as employees driving to and from work (some may take the less carbon intensive public transportation), the amount and type of fuel used by vehicles and lawn equipment, the amount of solid waste sent to landfills, etc. For this assessment, only the total annual electricity and natural gas consumption is utilized to develop a Source Energy Carbon Footprint, the quantity of carbon that was generated to produce and deliver the energy from all sources used by the City buildings in a year. The values used to calculate the Ibs C02 per kWh are different for each state and depend in large measure on the electrical generation mix in that state (e.g. coal, nuclear, natural gas, hydro, waste to energy, etc.). • Based on the EPA's eGrid tables, the average California electric delivery is equal to 700.4 Ibs C02/mWh. • The (Department of Energy's) Energy Information Agency stipulates a conversion of 121 Ibs C02/therm for natural gas. The table below identifies the Source Energy Carbon Footprint reductions for the ECMs recommended in this strategic plan. Carbon Footprint Impact No. Priority Building Description nnua Electricity Savings nnua Natural Gas Savings nnua Water Savings C02 Reduction, Tonnea P1 2010 T ym Solar Photovolta ics 163,013 - - 52 P2 2011 ity Yard Li htin Retrofits 28,110 - - 9 P3 2011 rvis enter Li htin Retrof is 183,179 - - 58 P4 2010 CT G m Li htin Retrofits 33 254 11 5 2011 enior enter Li htin Retrofits 41 659 13 P6 2010 Youth Center Li htin Retrofts 9 291 3 P7 2012 Ci Yard DDC Controls Economizer Re-Commission DCV 7 197 198 3 P8 2011 Civic Center DDC Controls Economizer Re-Commission DCV 104 667 131 34 P9 2013 Civic Center Ma~or RTU Re lacement End of Life Consideration 43 025 0 14 P10 2013 Civic Center DDC VAV Controllers - As part of Bldg Rennovations 8,605 23 - 3 P11 2012 CT m DDC Controls, Economizer Re-Commission, D V 13,313 158 - 5 P12 2011 enior enter DD ontrols /Demand ontrol Ventilation 22 689 141 - 8 13 2012 Youth enter DD ontrols, conomizer e- ommisslan, 7 563 151 - 3 P14 2010 Senior enter Vendin Misers 1,560 - - 0.5 15 2010 ivic enter P en ing isers 1 461 - - 0.5 P18 2010 Cit Yard Water on servatbn Toilets, Urinals Faucets - - 255 - P17 2011 Civic Center Water Conservation Toilets Urinals & Faucets 1 099 P18 2012 CT G m Water Conservation Toilets Urinals Faucets 53 P19 2010 Senior Center Water Conservation Toilets Urinals & Faucets 279 P20 2010 Youth Center Water Conservation Toilets Urinals & Faucets 122 TOTAL 868,586 801 1,809 217 City of Tustin Energv Efficiency Conservation Strategy 26 1 /12/2010 7.3 ADDITIONAL KEY PERFORMANCE INDICATORS Additional key performance indicator (KPI) forecasts are presented below and are based on the project priorities recommended within this plan. KEY PERFORMANCE INDICATORS City of Tustin Program Target Roadmap F$380 368 $3g0 - ~ Total Run Rate Reduction .=$340 85320 317 312 305 305 N ~ S300 ~ . ,r$2g0 17% ~5zgo 6$240 Eszzo s5zoo m1o zou zolz zo13 zo14 ^ t d ^ s Project Status Reduction from Initial Baseline Comdeted $100 Coretru<tian a P $~ $64 $64 ~ € $60 $52 557 Pending Approval $40 In Dev _... _. $20 Rejected ~ 50 $20 $40 $60 $80 $100 2010 2011 2012 2013 2014 Value otldmUfed pgMS h invmlmy Project Savings By Category Capital Commitments Refrigeration 1,000 9 Ve riling 'o ~ 5pq 349 390 HVAC 6g 0 Water Year 2010 2011 2012 2013 2014 Lighting CNller Greenhouse Gas Reductions (Tons) zso Renewables 200 Boiler/ Steam 1~ 100 Electrical 50 $ 0 $10 $20 $30 $40 $50 2010 2011 2012 2013 2014 Vdie ofldaitlfled pg ects ninvntaY ^ veaM Cumnulati~e City of Tustin Energy Efficiency Conservation Strategy 27 1 /12/2010 8. ECM SLOPING WORKSHEETS The following ECM Scoping Worksheets provide a concise summary of each ECM identified, including: • Proiect Objective and Rationale -Concise description of the project goals and reasoning. Intended to provide a brief summary of the project. • Proiect Economics -Project execution costs derived from vendor quotes, RS Means pricing, and benchmark cost estimates. Also includes estimated incentives and tax implications, as applicable. • Greenhouse Gas Impact -Carbon Dioxide reductions, in Tonnes, associated with the corresponding energy reductions (kWh of electricity and therm of natural gas). Conversion factors are pulled from recent EPA filings. • Associated Energv and Water Savings -Estimated utility savings using standardized savings models and industry accepted methodologies. • Financial Impact -Forecasted cost savings derived from the associated energy and water savings, monetized with the historical energy rates provided in Section 3. • Timing of Key Activities -Schematic estimates for timing of major milestones associated with the development, implementation, and project completion. • Primary Contacts /Distribution -Identification of primary project sponsors and those impacted by implementation activity. Reserved for future communications. Additional detail and background for these projects are located in Section 5, where system level descriptions and recommendations are made. City of Tustin Energv Efficiency Conservation Stratepv 28 1 /12!2010 711111V City of Tustin, CA Project No.: P-1 Project Scoping Worksheet Date: 1/8/10 Rev: 1 Project Name: Solar Photovoltaics Internal Budget ID: ~ Location : ~ CT Gym ~ System :~ Renewables ~ Budget Affected :~ Utilities ~ Objective: a 106 kW photovoltaic array on the CT Gym roof to offset electrical consumption by the facility. Rationale: T e con Iguratlon an orientation o t e CT Gym roo creates an optima scenario or t e p acement o p otovo talcs. T e economic climate within California is also a significant contributor to the viability of this project; rebates in excess of $258,000 are available for this installation. In addition, staff can also apply for a rebate via the California Solar Initiative (CSI) that will potentially allow for the city to receive a governmental incentive rebate for every kilowatt-hour generated in excess of demand. The current incentive rebate is current) a ual to 0.32 er kilowatt-hour. Preliminary Financial Impact: Projected Cost $: 529,784 Energy Savings $: 23,829 Simple Payback: 11.8 Yrs Scope Development $: 10,000 O&M Savings $: - Rebates /Incentives $: 258,225 Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 23,829 Total Projected Cost: 281,559 New Service Costs $: - Reduction Information Energy Utilization (Gigajoules) 587 Greenhouse Gas (C02) 52 TOnneS Electricity (kWh): 163,013 Natural Gas jmmBtus): - Water (hcf) - Key Activities Timing: Tenative Start Date 2010 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 4 Weeks 4 Weeks 8 Weeks 8 Weeks 4 Weeks 28 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other -_ Budgeted I Unbudgeted System Upgrade x System Replacement Other Other Project Nature Over $2,500,000 $250,000 - $2,500,000 x Capital Project Under $250,000 Other Other Minor Project I System Replacement ~MPNCT grVOllSTft~AL SERVgCES City of Tustin Energy Efficiency Conservation Strategy 29 1/12/2010 City of Tustin, CA Project No.: P-2 Pro ect Sco In Worksheet Date: 1/8/10 Rev: 1 Lighting Retrofits Location : ~ City Yard ~ System : ~ Lighting ~ Budget Affected :~ Utilities Description: Objective: duce energy consumption associated with the building lighting by replacing existing 32 W (T8) lamps with fifth generation 25 W and 28 lamps. Ballast replacements are not necessary. Replace all non-dimmable incandescents with CFLs. Additionally, convert all/remaining t signs to LED illumination. Finally, evaluate all outdoor lighting for LED or induction applications. This can be accomplished by means o group relamping or phased in as existing lamp inventory burns out. Rationale: Next generation lighting such as reduced-wattage T8 Lamps are designed to replace the old 34W/T12 lamps in fluorescent luminaire retrofits where standard 32 W/T8 lamps would provide more light than is needed. They are available in 25 W and 28 W models and, in a majority of the cases, can replace the original 32 W lamps without noticeable effect. Advantages include 24% lower energy consumption and longer life. Preliminary Financial Impact: Projected Cost $: 25,299 Energy Savings $: 4,006 Simple Payback: 7.0 Yrs Scope Development $: 2,811 O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 4,006 Total Projected Cost: 28,110 New Service Costs $: - Reduction Information Energy Utilization (Gigajoules) 101 Greenhouse Gas (C02) 9 Tonnes Electricity (kWhj: 28,110 Natural Gas (mmatusj: - Water (hcf) - Key Activities Timing: Tenative Start Date 2011 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 2 Weeks 2 Weeks 4 Weeks 2 Weeks 2 Weeks 12 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000-$2,500,000 Minor Project System Replacement System Upgrade x System Replacement Capital Project Under $250,000 x ,~~~ Other Other Other Other urousrw~a SERVICES City of Tustin Energy Efficiency Conservation Strategy 30 1 /12/2010 V City of Tustin, CA Project Scoping Worksheet Lighting Retrofits Location :I Civic Center Description: Objective: Lighting Project No.: P3 Date: 1/8/10 Rev: 1 Internal BudgetlD: Budget Affected : Utilities Reduce energy consumption associated with the building lighting by replacing existing 32 W (T8) lamps with fifth generation 25 W and 28 W lamps. Ballast replacements are not necessary. Replace all non-dimmable incandescents with CFLs. Additionally, convert all/remaining exit signs to LED illumination. Finally, evaluate all outdoor lighting for LED or induction applications. This can be accomplished by means o a group relamping or phased in as existing lamp inventory burns out. Rationale: Next generation lighting such as reduced-wattage T8 Lamps are designed to replace the old 34W/T12 lamps in fluorescent luminaire retrofits where standard 32 W/T8 lamps would provide more light than is needed. They are available in 25 W and 28 W models and, in a majority of the cases, can replace the original 32 W lamps without noticeable effect. Advantages include 24% lower energy consumption and longer life. Preliminary Financial Impact: Projected Cost $: 164,861 Energy Savings $: 24,110 Simple Payback: 7.6 Yrs Scope Development $: 18,318 0&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 24,110 Total Projected Cost: 183,179 New Service Costs $: - Reduction Inform ation Energy Utilization (Gigajoules) 660 Greenhouse Gas (C02) 58 TOnneS Electricity (kWh): 183,179 Natural Gas (mmBtus): - Water (hcf) - Key Activities Timing: Tenative Start Date 2011 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 2 Weeks 2 Weeks 4 Weeks 2 Weeks 2 Weeks 12 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000 - $2,500,000 Minor Project System Replacement System Upgrade x System Replacement Capital Project Under $250,000 x ,~~~ Other Other Other Other RtiIOUSTRRAL SERVtiCES City of Tustin Energy Efficiency Conservation Strategy 31 1!12/2010 111111V City of Tustin, CA Project No.: P-4 Project Scoping Worksheet Date: 1/s/1o Rev: 1 Project Name: Lighting Retrofits Internal Budget ID: Location : ~ CT Gym ~ System : ~ Lighting ~ Budget Affected :~ Utilities Objective: Reduce energy consumption associated with the building lighting by replacing existing 32 W (T8) lamps with fifth generation 25 W and 28 W lamps. Ballast replacements are not necessary. Replace all non-dimmable incandescents with CFLs. Additionally, convert all/remaining exit signs to LED illumination. Finally, evaluate all outdoor lighting for LED or induction applications. This can be accomplished by means o a group relamping or phased in as existing lamp inventory burns out. Rationale: Next generation lighting such as reduced-wattage T8 Lamps are designed to replace the old 34W/T12 lamps in fluorescent luminaire retrofits where standard 32 W/T8 lamps would provide more light than is needed. They are available in 25 W and 28 W models and, in a majority of the cases, can replace the original 32 W lamps without noticeable effect. Advantages include 24% lower energy consumption and longer life. Preliminary Financial Impact: Projected Cost $: 29,928 Energy Savings $: 4,972 Simple Payback: 6.7 Yrs Scope Development $: 3,325 0&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 4,972 Total Projected Cost: 33,254 New Service Costs $: - Reduction Information Energy Utilization (Gigajoules) 120 Greenhouse Gas (C02) 11 TOnneS Electricity (kWh): 33,254 Natural Gas (mm8[us): - Water (hcf) - Key Activities Timing: Tenative S tart Date 2010 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 2 Weeks 2 Weeks 4 Weeks 2 Weeks 2 Weeks 12 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000 - $2,500,000 Minor Project System Replacement System Upgrade x System Replacement Capital Project Under $250,000 x ,~~~ Other Other Other Other gIVOIJSTR/AL SERVgCES City of Tustin Energy Efficiency Conservation Strategy 32 1 /12/2010 ®~ City of Tustin, CA Project No.: P-5 ^~ Project Scoping Worksheet Date: 1/a/1o Rev: 1 Project Name: I Lighting Retrofits I Internal Budget ID:I Location : Senior Center System : Lighting Budget Affected : Utilities Description: Objective: Reduce energy consumption associated with the building lighting by replacing existing 32 W (T8) lamps with fifth generation 25 W and 28 W lamps. Ballast replacements are not necessary. Replace all non-dimmable incandescents with CFIs. Additionally, convert all/remaining exit signs to LED illumination. Finally, evaluate all outdoor lighting for LED or induction applications. This can be accomplished by means o a group relamping or phased in as existing lamp inventory burns out. Rationale: Next generation lighting such as reduced-wattage T8 Lamps are designed to replace the old 34W/T12 lamps in fluorescent luminaire retrofits where standard 32 W/T8 lamps would provide more light than is needed. They are available in 25 W and 28 W models and, in a majority of the cases, can replace the original 32 W lamps without noticeable effect. Advantages include 24% lower energy consumption and longer life. Preliminary Financial Impact: Projected Cost $: 37,493 Energy Savings $: 5,864 Simple Payback: 7.1 Yrs Scope Development $: 4,166 O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 5,864 Total Projected Cost: 41,659 New Service Costs $: - Reduction Information Energy Utilization (Gigajoules) 150 Greenhouse Gas (C02) 13 Tonnes Electricity (kWh): 41,659 Natural Gas (mmetus): - Water (hcf) - Key Activities Timing: Tenative Start Date 2011 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 2 Weeks 2 Weeks 4 Weeks 2 Weeks 2 Weeks 12 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000-$2,500,000 Minor Project System Replacement System Upgrade x System Replacement Capital Project Under $250,000 x ,~~~ Other Other Other Other UMIOl/STRRAI_ SERVRCES City of Tustin Enerav Efficiency Conservation Strateov 33 1 /12/2010 Ilhli\ City of Tustin, CA Project No.: P-6 Project Scoping Worksheet Date: 1/a/1o Rev: 1 Project Name: Lighting Retrofits Internal Budget ID: Location : Youth Center System : lighting Budget Affected : Utilities Project Description: Objective: Reduce energy consumption associated with the building lighting by replacing existing 32 W (T8) lamps with fifth generation 25 W and 28 W lamps. Ballast replacements are not necessary. Replace all non-dimmable incandescents with CFLs. Additionally, convert all/remaining exit signs to LED illumination. Finally, evaluate all outdoor lighting for LED or induction applications. This can be accomplished by means o a group relamping or phased in as existing lamp inventory burns out. Rationale: Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000 - $2,500,000 Minor Project System Replacement System Upgrade x System Replacement Capital Project Under $250,000 x ~MPNCT Other Other Other Other ~N~llSTR~AL SERVICES Next generation lighting such as reduced-wattage T8 Lamps are designed to replace the old 34W/T12 lamps in fluorescent luminaire retrofits where standard 32 W/T8 lamps would provide more light than is needed. They are available in 25 W and 28 W models and, in a majority of the cases, can replace the original 32 W lamps without noticeable effect. Advantages include 24% lower energy consumption and longer life. Preliminary Financial Impact: Projected Cost $: 8,361 Energy Savings $: 1,700 Simple Payback: 5.5 Yrs Scope Development $: 929 O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 1,700 Total Projected Cost: 9,291 New Service Costs $: - Reduction Information Energy Utilization (Gigajoules) 33 Greenhouse Gas (C02) 3 Tonnes Electricity (kWh): 9,291 Natural Gas(mmBtus): - Water(hcf) - Key Activities Timing: Tenative Start Date 2010 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 2 Weeks 2 Weeks 4 Weeks 2 Weeks 2 Weeks 12 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other City of Tustin Energy Efficiency Conservation Strategy 34 1/12/2010 l~i.li~ J P g Clty Of TUStIn, CA Pro ect Sco In Worksheet Project No.: Date: 1/8/10 P-7 Rev: 1 Project Name: DDC Controls, Economizer Re-Commission, DCV Internal Budget ID: Location : City Yard System : HVAC Budget Affected : Utilities Project Description: Objective: Provide DDC based controls for all HVAC equipment to allow for optimal scheduling and set point configurations. Recommission the outside air dampers and add C02 controls to optimize the economizer operations. Rationale: Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000-$2,500,000 Minor Project System Replacement System Upgrade x System Replacement Capital Project Under $250,000 x Other Other Other Other ,~~~ ~NOIJSTfi~AL SEfi~~~CES The existing outside air dampers use dry bulb economizers that are not fully operational for most units. This results in wasted energy as more unconditioned outdoor air is brought in than is required. The existing programmable thermostats do not provide the ability to dynamically control the equipment that direct digital control (DDC) provides. Preliminary Financial Impact: Projected Cost $: 15,632 Energy Savings $: 1,221 Simple Payback: 14.2 Yrs Scope Development $: 1,737 O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 1,221 Total Projected Cost: 17,369 New Service Costs $: - Reduction Information Energy Utilization (Gigajoules) 47 Greenhouse Gas (C02) 3 TOnneS Electricity (kWh): 7,197 Natural Gas (mmBtus): 20 Water (hcf) - Key Activities Timing: Tenative S tart Date 2012 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 2 Weeks 2 Weeks 4 Weeks 4 Weeks 4 Weeks 16 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other City of Tustin Energy Efficiency Conservation Strategy 35 1/12/2010 ri~\~~V ProectNo.: P-8 City of Tustin, CA i Project Scoping Worksheet Date: 1/a/1o Rev: 1 Project Name: DDC Controls, Economizer Re-Commission, DCV Internal Budget ID: Location : Civic Center System : HVAC Budget Affected : Utilities Project Description: Objective: Provide DDC based controls for all HVAC equipment to allow for optimal scheduling and set point configurations. Recommission the outside air dampers and add C02 controls to optimize the economizer operations. Replace existing inlet guide vane operations with variable speed drive control. Rationale: The existing outside air dampers use dry bulb economizers that are not fully operational for most units. This results in wasted energy as more unconditioned outdoor air is brought in than is required. While inlet guide vanes do vary the supply air flow and provide some energy reduction, variable speed drives provide greater savings and less reliance on mechanical linkages that may fail. Finally, upgrades to DDC will allow for optimal control, including dynamic scheduling and greater response to outdoor conditions. Preliminary Financial Impact: Projected Cost $: 95,913 Energy Savings $: 13,874 Simple Payback: 7.7 Yrs Scope Development $: 10,657 O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 13,874 Total Projected Cost: 106,571 New Service Costs $: - Reduction Information Energy Utilization (Gigajoules) 391 Greenhouse Gas (C02) 34 Tonnes Electricity (kWh): 104,667 Natural Gas (mm8tus): 13 Water (hcf) - Key Activities Timing: Tenative Start Date 2011 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 2 Weeks 2 Weeks 4 Weeks 4 Weeks 4 Weeks 16 Weeks Dlstributlon Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000-$2,500,000 System Upgrade x System Replacement Capital Project Under $250,000 x Other Other Other Other Minor Project ~ System Replacement ~MP~CT ~MOl15TR~AL SEfZV~CC-S Citv of Tustin Energy Efficiency Conservation Strategy 36 1/12/2010 lu City of Tustin, CA Project Scoping Worksheet Project Name: ~ Major RTU Replacement (End of Life Consideration) Location : ~ Civic Center Description: Objective: HVAC Project No.: P-9 Date: 1/8/10 Rev: 1 ernalBudgetlD• udl?et Affected : Utilities Replace rooftop units serving the building in a planned fashion to minimize impact to the occupants of the space served. Rationale: The rooftop units serving the civic center are operating at the end of their rated useful life. As equipment ages, operations and maintenance costs increase as components fail and are no longer supported by the manufacturer. Advances in technology, coupled with minimum efficiency mandates from the government also provide energy savings opportunities. Preliminary Financial Impact: Projected Cost $: 350,000 Energy Savings $: 5,663 Simple Payback: 62.7 Yrs Scope Development $: 5,000 O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 5,663 Total Projected Cost: 355,000 New Service Costs $: - Reduction Inform ation Energy Utilization (Gigajoules) 155 Greenhouse Gas (C02) 14 TOnneS Electricity (kWh): 43,025 Natural Gas (mmBtus): - Water (hcf) - Key Activities Timing: Tenative Start Date 2013 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration talks) 2 Weeks 4 Weeks 8 Weeks 4 Weeks 4 Weeks 22 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other r. Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000-$2,SOO,000x Minor Project System Replacement System Upgrade x System Replacement Capital Project Under $250,000 ~MP~CT Other Other Other Other Rtill[>1lJSTRgAL SERVRCES City of Tustin Enerav Efficiency Conservation Strateav 37 1 /12/2010 ru,lw City of Tustin, CA Project No.: P-10 Project Scoping Worksheet Date: 1/8/10 Rev: 1 Project Name: DDC VAV Controllers - As part of Bldg Rennovations Internal Budget ID: Location : Civic Center System : HVAC Budget Affected : Utilities Project Description: Objective: part of future building renovations, replace all pneumatically controlled VAV boxes with direct digital controlled (DDC) boxes to :imize air temperature and flow to the zone. Rationale: DDC boxes allow for greater control of the space conditions through occupancy based control and dynamic supply air temperature resets. Preliminary Financial Impact: Projected Cost $: 139,000 Energy Savings $: 1,150 Simple Payback: 129.6 Yrs Scope Development $: 10,000 O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 1,150 Total Projected Cost: 149,000 New Service Costs $: - Reduction Infor mation Energy Utilization (Gigajoules) 33 Greenhouse Gas (C02) 3 Tonnes Electricity (kWhj: 8,605 Natural Gas (mmBtus-: 2 Water (hcf) - Key Activities Timing: Tenative Start Date 2013 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 2 Weeks 4 Weeks 8 Weeks 4 Weeks 8 Weeks 26 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Budgeted I Unbudgeted System Upgrade x System Replacement Other Other Project Nature Over $2,500,000 $250,000-$2,500,000 Capital Project Under $250,000 X Other Other Minor Project ~ System Replacement ~MP~CT ~IVOI/STR~A< SE~i~~~CES Citv of Tustin Enerav Efficiencv Conservation Strateov 38 1 /12/2010 City of Tustin, CA Project Scoping Worksheet Project Name: DDC Controls, Economizer Re-Commission, DCV Internal Budget ID: Project Description: Objective: Provide DDC based controls for all HVAC equipment to allow for optimal scheduling and set point configurations. Recommission the outside air dampers and add C02 controls to optimize the economizer operations. Rationale: The existing outside air dampers use dry bulb economizers that are not fully operational for most units. This results in wasted energy as more unconditioned outdoor air is brought in than is required. Finally, upgrades to DDC will allow for optimal control, including dynamic scheduling and greater response to outdoor conditions. Preliminary Financial Impact: Projected Cost $: 27,601 Energy Savings $: 2,155 Simple Payback: 14.2 Yrs Scope Development $: 3,067 O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 2,155 Total Projected Cost: 30,668 New Service Costs $: - Reduction Inform ation Energy Utilization (Gigajoules) 65 Greenhouse Gas (C02) 5 TOnnes Electricity (kWh): 13,313 Natural Gas (mmBtus): 16 Water (hcf) - Key Activities Timing: Tenative Start Date 2012 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 2 Weeks 2 Weeks 4 Weeks 4 Weeks 4 Weeks 16 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Project Nature System Upgrade x System Replacement Capital Project Under $250,000 x ,~~~~ Other Other Other Other g1VIOlJSTRRAI_ SER~gCES Tu. l rv City of Tustin, CA Project No.: P-12 Project Scoping Worksheet Date: 1/8/lo Rev: 1 Project Name: DDC Controls /Demand Control Ventilation Internal Budget ID: Location : Senior Center System : HVAC Budget Affected : Utilities Project Description: Objective: (Provide DDC based controls for all HVAC equipment to allow for optimal scheduling and set point configurations. Add C02 controls to optimize the economizer operations. Rationale: The existing outside air dampers use dry bulb economizers that are not fully operational for most units. This results in wasted energy as more unconditioned outdoor air is brought in than is required. Finally, upgrades to DDC will allow for optimal control, including dynamic scheduling and greater response to outdoor conditions. Preliminary Financial Impact: Projected Cost $: 27,540 Energy Savings $: 3,355 Simple Payback: 9.1 Yrs Scope Development $: 3,060 O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 3,355 Total Projected Cost: 30,600 New Service Costs $: - Reduction Information Energy Utilization (Gigajoules) 97 Greenhouse Gas jC02) 8 TOnneS Electricity (kWh): 22,689 Natural Gas (mmetus): 14 Water (hcfJ - Key Activities Timing: Tenative Start Date 2011 Prelim Scope Development Final Scope Development C.A.N. Approval Engineering Installation Total Duration (Wks) 2 Weeks 2 Weeks 4 Weeks 4 Weeks 4 Weeks 16 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000 - $2,500,000 System Upgrade x System Replacement Capital Project Under $250,000 x Other Other Other Other Minor Project ~ System Replacement ~M~~CT u.rousrn~~~ SEfi~~CES City of Tustin Energy Efficiency Conservation trategy 40 1/12/2010 lli,ii~ J p g City of Tustin, CA • Pro ect Sco in Worksheet Project No.: Date: 1/8/10 P-13 Rev: 1 Project Name: DDC Controls, Economizer Re-Commission, DCV Internal Budget tD: Location : Youth Center System : HVAC Budget Affected : Utilities Project Description: Objective: Provide DDC based controls for all HVAC equipment to allow for optimal scheduling and set point configurations. Recommission the outside air dampers and add C02 controls to optimize the economizer operations. Rationale: Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000-$2,500,000 Minor Project System Replacement System Upgrade x System Replacement Capital Project Under $250,000 x Other Other Other OtF?Pr ,~~~~ 71V l7lJSTRyAL SE(ZV/CES The existing outside air dampers use dry bulb economizers that are not fully operational for most units. This results in wasted energy as more unconditioned outdoor air is brought in than is required. Finally, upgrades to DDC will allow for optimal control, including dynamic scheduling and greater response to outdoor conditions. Preliminary Financial Impact: Projected Cost $: 18,142 Energy Savings $: 1,555 Simple Payback: 13.0 Yrs Scope Development $: 2,016 O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 1,555 Total Projected Cost: 20,158 New Service Costs $: - Reduction Information Energy Utilization (Gigajoules) 43 Greenhouse Gas (C02) 3 TOnneS Electricity (kWh): 7,563 Natural Gas (mmBtus): 15 Water (hcf) - Key Activities Timing: Tenative S tart D ate 2012 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 2 Weeks 2 Weeks 4 Weeks 4 Weeks 4 Weeks 16 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other City of Tustin Energy Efficiency Conservation Strategy 41 1!12/2010 It City of Tustin, CA Project No.: P-14 Project Scoping Worksheet Date: 1/a/1o Rev: 1 Project Name: Vending Misers Internal Budget ID: Location : Senior Center System : Vending Budget Affected : Utilities Project Description: Objective: VendingMiser brand load controllers to the vending machines serving the Senior Center. I Rationale: Vending machine load controllers add occupancy based controls to turn off lights and allow the upper portion of the storage chamber to drift up in temperature, but maintain cold temperatures at the bottom 1/3 of the machine. If someone walks up to the machine, the lights will come on and the drink retrieved will be cold. Preliminary Financial Impact: Projected Cost $: 200 Energy Savings $: 220 Simple Payback: 0.9 Yrs Scope Development $: - O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 220 Total Projected Cost: 200 New Service Costs $: - Reduction Information Energy Utilization (Gigajoules) 6 Greenhouse Gas (C02) 0 TOnneS Electricity (kWh): 1,560 Natural Gas (mmBtus): - Water (hcf) - Key Activities Timing: Tenative Start Date 2010 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 1 Weeks 2 Weeks 1 Weeks 4 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000 - $2,500,000 System Upgrade x System Replacement Capital Project Under $250,000 x Other Other Other Other Minor Project ~ System Replacement ~M~NCT gNOIJSTRgAL SERrRCES City of Tustin Energy Efficiency Conservation Strateav 42 1 /12/2010 City of Tustin, CA Project No.: P-15 Ilhll\ J p g Pro ect Sco in Worksheet Date: 1/8/10 Rev: 1 Project Name: PD Vending Misers Internal Budget ID: Location : Civic Center System : Vending Budget Affected : Utilities Objective: Add VendingMiser brand load controllers to the snack and soft drink machines serving the police department break area. Rationale: Vending machine load controllers add occupancy based controls to turn off lights and allow the upper portion of the storage chamber to drift up in temperature, but maintain cold temperatures at the bottom 1/3 of the machine. If someone walks up to the machine, the lights will come on and the drink retrieved will be cold. Preliminary Financial Impact: Projected Cost $: 300 Energy Savings $: 192 Simple Payback: 1.6 Yrs Scope Development $: - O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 192 Total Projected Cost: 300 New Service Costs $: - Reduction Information Energy Utilization (Gigajoules) 5 Greenhouse Gas (C02) 0 Tonnes Electricity (kwhj: 1,461 Natural Gas (mmetusj: - Water (hcf) - Key Activities Timing: Tenative Start Date 2010 Prelim Scope Development Final Scope Development C.A.H. Approval Engineering Installation Tatal Duration (Wks) 1 Weeks 2 Weeks 1 Weeks 4 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000 - $2,500,000 Minor Project System Replacement System Upgrade x System Replacement Capital Project Under $250,000 x ,~~~ Other Other Other Other gIVOl1STRHAL SERVHCES City of Tustin Energy Efficiency Conservation Strategy 43 1 /12/2010 TI~.IIN City of Tustin, CA Project No.: P-16 Project Scoping Worksheet Date: 1/8/10 Rev: 1 Project Name: Water Conservation (Toilets, Urinals & Faucets) Internal Budget ID: Location : City Yard System : Water Budget Affected : Utilities Objective: Continue the city's practice of replacing toilets and urinals with low or no flow units. Additionally, convert all faucets to low flow (0.5 gpm use by replacing the aerator (without replacing the entire fixture). Rationale: As water resource continue to become scarce, water conservation becomes more critical and economically viable. The City of Tustin has experienced success with the installation on waterless urinal in other buildings. Additional savings can be achieved through reduced flow faucets and toilets as well. Preliminary Financial Impact: Projected Cost $: 2,390 Energy Savings $: 470 Simple Payback: 5.1 Yrs Scope Development $: - O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 470 Total Projected Cost: 2,390 New Service Costs $: - Reduction Information Energy Utilization (Gigajoules) - Greenhouse Gas (C02) - Electricity (kWh): - Natural Gas (mmBtus): - Water (hcf) 255 Key Activities Timing: Tenative Start D ate 2010 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 1 Weeks 2 Weeks 4 Weeks 1 Weeks 2 Weeks 30 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Project Nature Budgeted i Unbudgeted ~ Over $2,500,000 i$250,000 - $2,500,000 ~ Minor Project ~ System Replacement System Upgrade x I System Replacement I Capital Project I Under $250,000 x I ^~~~ Other Other Other Other UVIDI/STfi~AL SERVICES City of Tustin Energy Efficiency Conservation Strategy 44 1 /12/2010 CItY Of TUStll1, CA Project No.: P-17 Project Scoping Worksheet Date: 1/8/10 Rev: 1 Project Name: Water Conservation (Toilets, Urinals & Faucets) Internal Budget ID: Location : Civic Center System : Water Budget Affected : Utilities Project Description: Objective: Continue the city's practice of replacing toilets and urinals with low or no flow units. Additionally, convert all faucets to low flow (0.5 gpm use by replacing the aerator (without replacing the entire fixture). Rationale: As water resource continue to become scarce, water conservation becomes more critical and economically viable. The City of Tustin has experienced success with the installation on waterless urinal in other buildings. Additional savings can be achieved through reduced flow faucets and toilets as well. Preliminary Financial Impact: Projected Cost $: 14,320 Energy Savings $: 2,022 Simple Payback: 7.1 Yrs Scope Development $: - O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 2,022 Total Projected Cost: 14,320 New Service Costs $: - Reduction Inform ation Energy Utilization (Gigajoules) - Greenhouse Gas (C02) - Electricity (kWh): - Natural Gas (mmBtus): - Water (hcf) 1,099 Key Activities Timing: Tenative Start D ate 2010 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 1 Weeks 2 Weeks 4 Weeks 1 Weeks 2 Weeks 30 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000 - $2,500,000 Minor Project System Replacement System Upgrade x System Replacement Capital Project Under $250,000 x ,~~~ Other Other Other Other OYOUSTiR~AL SERVgCES City of Tustin Energy Efficiency Conservation Strategy 45 1 /12/2010 lu~lrv Clty Of TUStIn, CA Project No.: P-18 Project Scoping Worksheet Date: 1/8/1o Rev: 1 Project Name: Water Conservation (Toilets, Urinals & Faucets) Internal Budget ID: Location : CT Gym System : Water Budget Affected : Utilities Objective: Continue the city's practice of replacing toilets and urinals with low or no flow units. Additionally, convert all faucets to low flow (0.5 use by replacing the aerator (without replacing the entire fixture). Rationale: As water resource continue to become scarce, water conservation becomes more critical and economically viable. The City of Tustin has experienced success with the installation on waterless urinal in other buildings. Additional savings can be achieved through reduced flow faucets and toilets as well. The high payback associated with this project indicates that it should be considered as part of ongoing building renovations. Preliminary Financial Impact: Projected Cost $: 3,192 Energy Savings $: 98 Simple Payback: 32.4 Yrs Scope Development $: - O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 98 Total Projected Cost: 3,192 New Service Costs $: - Reduction Information Energy Utilization (Gigajoules) - Greenhouse Gas (C02) - Electricity (kWh): - Natural Gas (mmBtus): - Water (hcf) 53 Key Activities Timing: Tenative Start Date 2010 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 1 Weeks 2 Weeks 4 Weeks 1 Weeks 2 Weeks 30 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000 - $2,500,000 System Upgrade x System Replacement Capital Project Under $250,000 x Other Other Other Other Minor Project i System Replacement ,~~~~ ~H/OIJSTR~AI_ SERVICES City of Tustin Energy Efficiency Conservation Strategy 46 1 /12/2010 l u,liv City of Tustin, CA Project No.: P-19 Project Scoping Worksheet Date: 1/8/10 Rev: 1 Project Name: Water Conservation (Toilets, Urinals & Faucets) Internal Budget ID: Location : Senior Center System : Water Budget Affected : Utilities Objective: Continue the city's practice of replacing toilets and urinals with low or no flow units. Additionally, convert all faucets to low flow (0.5 use by replacing the aerator (without replacing the entire fixture). Rationale: As water resource continue to become scarce, water conservation becomes more critical and economically viable. The City of Tustin has experienced success with the installation on waterless urinal in other buildings. Additional savings can be achieved through reduced flow faucets and toilets as well. Preliminary Financial Impact: Projected Cost $: 2,968 Energy Savings $: 514 Simple Payback: 5.8 Yrs Scope Development $: - 0&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 514 Total Projected Cost: 2,968 New Service Costs $: - Reduction Inform ation Energy Utilization (Gigajoules) - Greenhouse Gas (C02) - Electricity (kWh): - Natural Gas (mmBtus): - Water (hcfl 279 Key Activities Timing: Tenative Start D ate 2010 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 1 Weeks 2 Weeks 4 Weeks 1 Weeks 2 Weeks 30 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000-$2,500,000 Minor Project System Replacement System Upgrade x System Replacement Capital Project Under $250,000 x ,~~~ Other Other Other Other gtiarSTRRAI SERVRCES City of Tustin Energy Efficiency Conservation Strategy 47 1 /12/2010 1 U~IIV Clty Of TUStIn, CA Project No.: P-20 Project Scoping Worksheet Date: 1/8/10 Rev: 1 Project Name: Water Conservation (Toilets, Urinals & Faucets) Internal Budget ID: Location : Youth Center System : Water Budget Affected : Utilities Objective: (Continue the city's practice of replacing toilets and urinals with low or no flow units. Additionally, convert all faucets to low flow (0.5 use by replacing the aerator (without replacing the entire fixture). Rationale: As water resource continue to become scarce, water conservation becomes more critical and economically viable. The City of Tustin has experienced success with the installation on waterless urinal in other buildings. Additional savings can be achieved through reduced flow faucets and toilets as well. Preliminary Financial Impact: Projected Cost $: 1,299 Energy Savings $: 224 Simple Payback: 5.8 Yrs Scope Development $: - 0&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 224 Total Projected Cost: 1,299 New Service Costs $: - Reduction Information Energy Utilization (Gigajoules) - Greenhouse Gas (C02) - Electricity (kWh): - Natural Gas (mmBtus): - Water (hcf) 122 Key Activities Timing: Tenative St art D ate 2010 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 1 Weeks 2 Weeks 4 Weeks 1 Weeks 2 Weeks 10 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ Facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Project Nature Budgeted Unbudgeted Over $2,500,000 $250,000 - $2,500,000 System Upgrade x System Replacement Capital Project Under $250,000 x Other Other Other Other Minor Project ~ System Replacement ~MPNCT ~1VOl15TR~Al.. SERVICES City of Tustin Energy Efficiency Conservation Strategy 48 1 /12/2010 lii.ii` City of Tustin, CA Project No.: P-21 Project Scoping Worksheet Date: 1/8/10 Rev: 1 Objective: Desk Heaters Replacement /Removal - 30 Units Replace existing convective desk heaters with radiant heat panels. Rationale: The radiant heating panels draw less than 1/10th the current than that of their convective counterparts. Use of a radiant heat source saves energy by heating the objects as opposed to the air itself, providing equivalent heat at a reduced operating cost. Preliminary Financial Impact: Projected Cost $: 600 Energy Savings $: 815 Simple Payback: 0.7 Yrs Scope Development $: - O&M Savings $: - Rebates /Incentives $: - Service Contract $: - Tax Credit $: - Avoided Repairs $: - Other $: - Total Projected Savings $: 815 Total Projected Cost: 600 New Service Costs $: - Reduction Inform ation Energy Utilization (Gigajoules) 22 Greenhouse Gas (C02) 2 TOnneS Electricity (kWh): 6,192 Natural Gas (mmBtus): - Water (hcf) - Key Activities Timing: Tenative Start Date 2020 Prelim Scope Development Final Scope Development C.A.R. Approval Engineering Installation Total Duration (Wks) 1 Weeks 1 Weeks 2 Weeks 1 Weeks 5 Weeks Distribution Building Management Engineering City Planning ~ Account Director ~ Program Manager Finance Manager ~ facility Manager ~ Project Engineer Energy Engineer ~ Chief Engineer ~ Energy Engineer Other ~ Project Manager ~ Other Other ~ Other ~ Other Other ~ Other ~ Other Budgeted Sys[em Upgrade Other Unbudgeted x System Replacement Other Project Nature Over $2,500,000 $250,000 - $2,500,000 Capital Project Under $250,000 x Other Other Minor Project ~ System Replacement ~M~~CT ~IMO~./STR~AI. SERVICES City of Tustin Energy Efficiency Conservation Strategy 49 1/12/2010 9. ROOFING REPLACEMENT PLAN Several City buildings have roofing systems that are at (or nearing) the end of their rated useful life, resulting increased maintenance and water leaks. Garland Roofing has provided an assessment and recommendations for several of the buildings addressed by this plan. A summary is provided below; additional detail for each roof is located in Appendix C. Roofing Replacement Summary Building Square Footage (Roofl Estimated kWh Savings atura as Savings, Total Savings Cost CivicCenter-City Hall 20,000 9,000 -64 1,137 275,000 Civic Center- Police Dept 19,000 8,550 -61 1 ,080 265,000 CivicCenter- Community Cente 6,000 2,700 -19 72 100,000 Cit Yard 48,200 21,690 -155 2,939 714,000 CT G 14 500 6 525 -47 927 230 000 TOTAL 107 700 48 465 -346 $8 555 $1 584 000 Note that natural gas savings is represented as a negative number as the reduced heat gain penalizes the heating function. ENERGY STAR® labeled roof products can save money and greenhouse gasses by reducing building HVAC energy use associated with removing solar heat gain. These "cool roofs" work by reflecting more of the sun's energy back into the atmosphere, keeping the building cooler and reducing HVAC operations. Savings are developed from the ENERGY STAR roofing calculator (located at http://www.roofcalc.com/default.aspx). The roofing calculator estimates annual energy savings for typical building types with non-metallic-surfaced roofs using typical weather conditions. These estimates were derived based on simulations run with the DOE-2.1 E model using cooling and heating degree-days. Actual savings will differ based on building design, building operation, cooling and heating equipment, and local weather. Because these replacements are driven by end-of-life issues, they are not included in the energy forecasting. However, the energy savings associated (albeit minor) with these projects are provided for informational purposes. City of Tustin Energy Efficiency Conservation Strategy 50 1 /12/2010 APPENDIX A: SOLAR PROPOSAL City of Tustin Energy Efficiency Conservation Strategy 51 1 /12/2010 City of Tustin CT Gvm -17522 Beneta Wav, 92780 Avg Monthly Use (kWh) 20,496 Avg Monthly Cost ($) $2,996 Av . Monthl Rate $/kWh $0.146 System Size (DC-kW) 105.84 System Size (AC-kW) 90.25 Modules (STP 210) 504 Space Needed (sq. ft.) Space Available (sq. ft.) Annual Output (kWh) Avg. Monthly Output (kWh) Percent Coverage Total System Cost (Gross) SCE Rebate (GowStep 5 - $.321kWh) System Cost (Net) Federal Income Tax Credit (30%) Net Investment After Tax Credit 5-Year Depreciation Tax Savings (@ 28.8% Tax Rate) Net Investment Amount: Residual Monthly Elec Usage (KwH) Residual Monthly Elec Cost* Residual Annual Elec Usage (kWh) Residual Annual Elec Cost Monthly Savings Monthly Savings Rate Annual Savings, first year Cumulative Savings, 8 years Payback Period (years) Added Value to Property ($20:$1) Gross Price per DC watt Gross Price per AC watt Lifetime cost per kWh 7,978 8,000 163,013 13, 584 66% $539,784 ($258,225) $281,559 $0 $281,559 $0 $281,559 6,912 $1,010.37 82,942 $12,124.41 $1,985.75 66.3% $23,829 $243,603 9.2 $476,581 $5.10 $5.98 $0.0576 `Note: Residual Cost based on kWh charges and does not include demand charges if any System size based on available space, set to minimize utility bill. Power output estimates provided by Clean Power Research, Napa, CA Power outputs for zip code 92780, array mounted South, 15 degrees pitch ~1 Garland Energy Systems, fnc ~ Fixed-Array - 210 watts Environmental Impact Annually 165,507 Ibs of CO2 eliminated 175 Ibs of SO2 eliminated 243 Ibs of NO eliminated 25-Year Total 25 acres of trees planted 15 cars taken off road 382,986 Ibs of coal not burned City of Tustin Energy Efficiency Conservation Strategy 52 1 /12/2010 APPENDIX B: LIGHTING SURVEY City of Tustin Energy Efficiency Conservation Strategy 53 1 /12/2010 N N N N N N N N N N N N N N N N N N N N N N N N O N O O ~ 01 ~ ~ ~ ~ N N N N N N N N N N N N N N N N N N N N N N N N UJ J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J N cD W N ~ ~ W N W N W W N ~ V N ~ V ~ ~D W W W M W ~ r W ~ O N ~ W A V 0 N ~ N ~ N W N W W O O W ~ V O O (O N W ( O t0 ~ A ~ ~ V ~ ~ ~ N M (O V ~ <O N ~ N O O O O M M N ~ f ") r a 0 (V O W ' O (V ~y W O O O M ~ O W ~ tO N O~ W 0 a t 0 O O> ~ N N M t D O~ ~ ~ ~ V ~ ~ W W O N a D M 1~ M N N N V O ~ W 7J W W M GO W V V (O a M 0 W ~ W W W ~ ~ W f7 ~. M 7 M M N ~ ~ M N r ~ W I~ c0 N M r W M M D) M M N M tll ~l C ~> R V W .- W W M N W ~Y W ~ W O N ~ W O W tp M W W W N N V W ~ N N ~ e- ~ e- ~ ~D I~ n W O W W W t0 M W O N Imo N - W 00 W W D M W m p V O O O W ~ 01 A O m N M p N I~ W W N n W W W N O O (D M M W H O V O W ~ W 7 O ~ O V fD N W O W O W O t0 n ~ ~ ~O p W W W M N ~ 00 m (D N ~ M W l0 N ~ W M N W W M ~ N O) t0 ~ ~.., W (O W (p W M 01 M ~ E 7 n W W M ~ a [O M . O Y' ~ M W M O O O ~ W O H O N W N W W f0 V 01 M m ~ N I~ N W ~ (O W O ~ O ~ W ~ W M W y~ r I~ W r O O N W M I~ M M N N N N nj O M ~ ~ ~ W m = M ~ M N M ~ N N 1~ N W 3 Y O L ~' ~ C O W O ~ W ~ W ~ W Y O W O W O ~ W V 0 ~ 0 V 0 ~ W V' O ~ W ~ W V O V W a O ~ N NW W ~ O ~ O O 7 W V O t p i~ O 0 W 0 O 0 0 O 0 0 O 0 0 O 0 0 O 0 ~ ~ W T (O ~t O M V O M O O W N ~ O OJ O f O I~ O 0 O N u ~ O 0 0 W 0 0 W 0 0 N 0 W f~ 0 N ~ 0 (O I~ tp O I W O O O O O N O W r O 0 O O 0 O V 0 M O 0 N V 0 M ~}_ ~ N N N N ~ M ~- N N N M N N N M N W ~ V V V V ~ ~ N N ~ ~ W u'! ~ ~ ~ M W N W ~ ~ O M W Y ~ O N M N M ~ L ~ ++ {p~ t0 7 t0 7 W 7 t0 Y cD ~ (O V' t0 Y W V W V W N W N c0 N t0 V W Y W V f0 ~ (D d' W ~' W Y W 7 W V t0 V W Y ~[1 Y N N O O O O W W O W O W N S O W W V W 7 W V ~O W W Y f0 W (O W W W W t0 W < W N W Y ~O V t0 O ~O V (O ~ (O ? W Y S ? W ~O ~O V ~O V h 0 ~O 7 ~ ~ LL C O ~ ~ ~ ~ 3 ~ ~ ~ ~ 3 ~ ~ ~ ~ 3 3 ~ ~ ~ ~ ~ ~ ~ N W W 3 ~ ~ ~ ~ 3 3 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ 3 ~ N 3 ~ N ~ N ~ N ~ N .« C Y1 N a0 ~ N W LL~ N ~ ~ N aD LL7 N W ~ N W N N o0 ~ N W In N 00 ~ N 00 N N OO ~ N ap ~ N ap LL~ N a0 LL) N a0 N N 00 ~ N ap ~ N aO ~ N ~ h N a0 N N ap ~ N ap ~ N ap W r _ Z Z ~ ~ 0 `o w ~ va N ~ W Z ~ W Z C o L ? E to N op N N a0 ~ N a0 ~ N ap ~ N oD ~ N ap LL) N a0 ~ N ~ ~ N a0 ~ N 00 ~ N 00 h N 00 N N a0 ~ N W ~ N W N N a0 N N ap ~ N ap W I- = ~ N 00 W ~ - W ~ W F- W t- d ° F- H H H F- F- I- F- F- F- H ' F H H H H F- F- F F l- F- F <o W W J ~ o C c N ~ c c O U U Q H F- ` I- F- ~ F- F f- I- H F F F- F- I- v I- 7 H 7 F- 7 F- (O ~ F- <O » t0 t0 » t0 - Y J Y J Y J Y J Y J Y J Y J Y J 4 J `i J ? J Y J Y J Y J Y J Y J Y J Y J Y J Y J V J Y J Y J ? N ~ ~ O C ~ ~ ~ O U U ~ C C Y J i J Y J J Y J Y J Y J Y J Y J V J ~ J a J Y J J J J J y J N q J N N N N y •. N N N N N N N N N ~-- ~ ~-- N N N N N N N N N N N J C~ N y ~ m V > > - O N N N M N (h f`7 l`7 th N ~- N N N N N N N J ~ J J J J w d g d g W g d g Q. g d g d g d g a g d g d g d g d g d g d, g d g d g d g d g d g d g d g d g N ~ O ~ ~ " ~/7 ~ UJ ~ C ~ J ~ C ~ C ~ ~ ~ V ~ ~ g a g d g d g ~ g d. g d g d g d g a g a g d g d g d g d g d g ~- g d g N ~ d g N ~ N ~ N ~ N ~ W W W W W W W W W W W W W W W W W W W W W W W g ~ ~ j W W W W W W W W W W W W W W W W W W g W g g g g O d' a' d' K a' ~' d' R 2 2' d' 2 d' d' Q' ~ 2 R' ~' 2 2' d' ~' W XX > d' Q: d' d' ~ 2' 2 ~ ~ a' Q' ~' ~' K Q: d' 2 ~ W ~ W W W W ~ ~ W ~ ~ ~ ~ ~ ~ s` `1 O l N O M ~ ~ p rn W 1~ O~ Y O~ W O O ~ N W O T W ~ n N n p N ~ 0 ~ Y T N O V T V O~ W M W N W W O N n p ~ M W (O O ~ O n n N ~ O 0 V I 0 V 0 0 0 W p> p W M M p O ~ 0 0 .- 0 0 .- `-' O 1~ W W W ~ 0 d' V O O ~ W W O W ~ O ~ ~ ~ 01 O ~ p p ~ O W W f O N W O Y 7 M W 0 0 ~ 0 1~ 0 0 N ~ 0 ~ O ~ 0 ~ 0 N O 0 N ~ ^ ~ W W ~ O M M a M r ~ M W W 1~ ~ ~ ~ M N M M ~ iO W 1~ W W M IA N tV W ~ '7 ~ N M ~ ~ ~ ~ ~ ~ N ~ ~ 7 ~ ~ N ~ ~ ~ n r N N X W C~ ~ ~~~ W d O O o W 0 o W 0 o 7 0 o V 0 o V 0 0 W 0 0 W 0 0 a 0 0 0 V 0 0 V 0 0 V 0 0 W 0 0 7 0 0 W 0 0 V 0 0 V 0 0 V 0 0 d' 0 0 W 0 o V 0 o V 0 o W 0 o V 0 o V 0 W I~ 0 O W 0 o O 0 0 O 0 0 O 0 0 O 0 0 O 0 0 W 0 o N 0 o N 0 o N 0 o W 0 o N 0 W I~ 0 O O 0 O N 0 O W 0 O W 0 O N 0 W I~ 0 O O 0 O f~ 0 O N 0 O O 0 O N 0 W I~ 0 O 0 0 O 0 0 O N 0 O N 0 o N 'j~ _ ~ .-- M M M ~ ~ ~ M M M r- M .- M M M M ~ M M ~ M M W '- 'Q V ? V V ~ M M M ~ M W O M .-- .-- M W V W M t0 M W Y ~O M M M } W 3~ ~ (O In (O UJ W l(J W YJ W LL'J cO W W ~ W ~ W i[J N M N M N M W N W h W u') W u'~ W u) W ~0 W O W ~ W N ~O ~ W ~O W N O ~} ~ .- O O O ~ ~ rn N O N r N O N W W tO W W W HO W CO ~ ~O W N W CO W U] W (D ~O N M W ~ W V1 W ~ c0 N W ~O t0 i0 W ~ ~D O N W W ~ W N W N ~O N C ._ LL N ~ . % W J J J C~ (7 C7 L N w'~ x N W F_' W F' W F~ W H W H W F_ W F_' W ~ °O F W ~' W F' W I- W I- W ~ W F- W H W I- W H W ~ W F- m H W F.- W F' F J C Q ~ O ~ O ~ O p M ~ S ~ 0 W n. ~ ~ ~ o W F~ W F' W H W H W H W H W F~ W F~ m F~ W F- W F, m H m H W H W ~ W I- W F' W F, ~ J W ~ ~ J ~ J F. J F. J 1i O ~l W J N J N J N J N J N J N J N J N J N J •- J ~- J r. J N J N J N J N J N J N J N J N J N J N J N ~ N v ~ Q. ~ 2 F = ~ 2 ~ ~ _ xx ~ ~ ~ ~ a j J N J ( V J N J M J N J t? J M J M J M J N J ~ J N J N J N J N J N J N J N ~ N J M ~ N ~ N ~ N ~ N C i7 'f C N N u, ~ cn p 7 X N V X N V X N (n - p fn ~ (n ~ a X N (n ' ~ (n ~ In ~ '7 X N fn - ~ V X N V X N R X N V X N (n - ~ V X N V X N (n - p 7 X N N X = X ~ ~ SS S SS S J 7 ~ O 10 N > > O ~ N ~ 7 X 7 X ' 7 X - v X N 7 X ~ v X V X N v X N Y X N (n - 7 (n V 7 X ~ 7 X ~ 7 X ~ v~ - ~ V X ~ V X ~ (n - p N X v X N N X N X fV X N X ~ N W fn fn (/J ~ ~ ~ ~ e N N N N N N W J J J n M ~ 7 .- N aO ~ 00 V ~ (WO N N N N N N M W ~ V W O~ ~O ~ N ~ M N 7 N N ~ ~0 •- ~ N N ~ ~ V V N ~ ~ ~ Y <O ~ W ~ ~ M M a a V ~ a v m -o -o -o v v v a v v v v v ~ v ~ v ~ -o ~ a v -o ~ v v v v v v v ~ v v v v v v v « C « C « C « C « C « C « C :: C « C a: C m C m C m C ~ C ~ C ~ C ~ C d C ~ C m C « C « C « C « C Z ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ U U U U U U U V V U U U V U U U U U U U U U U U C ~ ° ~` ~.' i ~.' i U V U U U U ~ ~ U U ~ U U i~ U ~. U U ?..' U iU iU U U .? U .? U .? U ? U ? U ? U ? U ? U ? V ? U ? U ? U ? U z U ? U > U ? U > U > U > U ? U ? U ? U ? _ '9 i~ t~ i~ ~ U ~ U U U ~ U U U ~ ~ c~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i~ ~ ~ _ ~ c~ _ i~ _ ~ _ ~ ~ i~ ~ ~ m N N N N N N N N N N M M M M M M M M M M f ") M M M M M M M M M M M M M C') (? O O O O N N N N O O ~ ~ ~- •-- ~-^ ~ ~ ~ C) C) M M (,~ ~ ~ ~ ~ r ~ J ~ ~ ~ ~ J 7 J 7 J R J N J N J N J N J J J J J t JO t JO t JO f JO (JO f JO fJD J J J J I W J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J N ~ C ' (O ~ O (O M M M 7 ~ aOp OD W ~ ~0 M 7 fp N O t0 7 t0 7 ~ 7 0 O O H N O O O O N ~ O f~ OO ? O O N u~'i N 7 7 O OD M O M 7 O < W <O N ~ M N M ~ O W (0 O ~ O O 1~ O (O ^ ~' N N 7 N N ~O N N N O N M aO ~ N "? (O ~ V7 x (70 j N ~ ~ ~ ~ ~ ~ ~ O Ia I~ n M 0 4'l 0 1~ ~ N 7 N ~ N I~ r O ~ ~ M ~ ~ M O O ~ O r O M CD r 7 N ~ O ~... M N N (O M ~ ~ N O ~ ~ N N 1~ ~ N ~ O r N N r ~ I~ (D Y7 M 1~ n tD p N (, j ~ 0 0 0 ~ r c p M ~ to 0 N (D ~- W (O ~ M ( D N N N ~ y O ~ n M m ~ N M M O N N ~ ~ M N . -- .- N 7 M A N ~O ~ •- ~ ~ ( O ~ M N N O ~ N N N N O C ' l0 O ~ O M ~ W N a70 ~ N M 7 (O N O O V (O 7 0 ? p G O ap (70 N O W N O a0 (O N O N N 7 7 (O 0 aO M 7 fD V W (O O N W O (O N ~ O N 7 N N M N h N O O N M O M N M (O 7 ~D 7 ~ f /J •- ~O W 7 O' M ~ M N O ~ O ~ 1~ I~ M ~ O N O 1~ 7 N V N '- ~ r 1~ o N ago ~ y O o ~ M O o N ~ (D r M r ~ v N CA v O O ~ (O ~ N f O M_ ~ N O ~ 0 O N N I~ < N N O M N M N n ~ ~ 7 t O ~ O~ M I~ r N ~ O ~ N ~ O O O ~ f~ (O M ~ ~ ~ N ~ ~ e D (O N ~ f 1 M f D N Y N Y N O ~ = u 1 O n M a O M N ~ M m N N ~ e D N N 7 M ~ N ~ O M r O M N O ~ O N N 3 ~ Y M O TT. ~ R ~ 0 o 7 o o o N n o r o M v 7 o 1~ o o o r o o o 0 0 0 0 0 0 W 0 0 0 0 0 0 7 0 0 ~0 0 0 0 0 0 <0 r 0 0 0 0 N 0 0 0 0 7 0 0 0 N 0 o 00 0 o OO 0 o a0 0 o 0 o 0 N 0 CO n 0 O 0 m 0 m r 0 o n 0 m 0 o M 0 <o 0 o a0 0 o 00 0 o aD 0 ~o 0 o 0 o 0 o 0 o 0 0 0 0 M 0 0 0 0 ° 0 } = O N C ') O O ~ N O O O O O ~ D7 M M N W ~ M O 0 ~ C ') ~ LL~ N t •1 M O N W ~ W a p O D aO ~ ap M 7 7 7 M O O ~ m Uy~ 7 O wti ~p K ' ~ O (O c p f0 (p (O O (O (p t0 O t0 O tD O ~O O t0 O fD M V M V 7 (O M Y' 7 (O 7 t0 M V 7 t0 M V 7 ~O 7 f0 7 ~ 7 V 7 V 7 Y 7 Y 7 V 7 `S N N N N M V M V M V M V M V a 0 M N N N O M N V Q> '- O r- N V O O O O ~ O e0 O 00 O 00 O V O A O N M V M V M ? M V u. ~ 3 c a '° V 3 in 3 ~n 3 ~n ~ ~n ~ ~n 3 ~n ~ ~n 3 ~n ~ ~ ~ N m e > m e > m ~ > m e i m ~ _> m ~ > m e > 3 W Z 3 W Z ~ W Z W ~ 3 2 w Z ~ ~ ' C N W N W N W N ap N ap N OD N 00 N 00 N W N a0 ~ ~ 3 ~ ~ 3 u"i 3 u'! ~ ~ ~ ~ ~ O ~ ~ ~n v~ cn cn rn rn v~ ~ ~ ~ ~ N ~ ~ ~ O Z Z Z Z v~ o o rn Ur ~ o` Vi C o '« W z W z E O U7 > C o ' C o ~ ~ ~ ~ d F- F- 1- F- F- F- I- H I- I- ~ N ~ N N ~ N N N ~ N (V A N N N ~ ~ ~ ~ ~ ~ ~ ~ N N N N N N 4D N ~[1 N ~O N J W W W J W J (n M M J (n O y C . U C C U > W " U > U lO N ~O N ll1 N N ~ v v Y Y 7 J ~ J Y Y Y a O ~ ro I ~ <o 0o F- ~ O ro H O co H 0o H ~ ~ ~O ~O j ~O ~0 X0 00 00 00 ao ~ O OD W 00 ~ w d' w Q' w 2' V ~ > o N c ~ m N ~ a o te. o '.: Q C Z V S OD ap ~ ~ ry ~. J th n J M d J M d J M d M d M d J M d J M d J M d J M d F- J F- J ~ J M F- -~ F J M J M ~ J J M ~ J J M J M N M " N O 1- N O F- N ~ H N O 1 N M f N ~ V H J - F- J - F- J ~ J N H J F- J F- J J N U U O O O O M ~( y N ~ O O > N v C ~ ~ ~ ~ C - C ~ U > 'p U > p O '«~ U C O C - >> > C - ~ F- J N H J N F- J N J N LL . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ N ~ N f/J i 7 X N (/J 7 X 7 X N fn - 7 X N (n - 7 X 7 X F J J J J - J ~ J ~ J . (n ~ U) N ~ 7 X N (n N f/7 N (/7 U - M W J W J W J 7 M LL U ~ U ~ U w U u) ~ d U o N C - C - J B ~ O ' o N o N (n ' (n ' V7 7 X ~+ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 7 N 7 N N 7 N 7 N N 7 7 7 7 7 7 H ~ ~ ~ O O G C .- ~ 7 ~ < V= W ~ W ~ W ~ W ~ W ~ W ~ W ~ W ~ W ~ W ~ N tV N (V N (V N N N N N N fV N H X W H X W X W w U 4D 0O ~ O N N N N N N N ~ ~ 7 Y M ~ D I~ 7 N (0 7 7 M 7 M 0 0 0 1~ N W (O O 0 O 7 ~ O 0 ~ o 0 0 0 N 0 W a p O N 7 O O ~ O O N tO M 7 0 7 O I~ N 7 ~ 0 O 7 n I~ M N O O M O ~ W 00 r 7 ~ f~ O O 7 r ~ 7 O O n °O O a D W N ~ n O o o o o 1~ O N n ~ 0 a D 0 W 0 O N ~ lO ~ a 0 ao O N v~ O ~ O ~ ~ M O/ a ~ ~ ~ N ~ M V f~ N N N N m ~ ~ N _ O 7 V M " M N N ~ ~ ~ 00 N N N t0 N i0 7 O f~ 7 ~ 7 ~ N 7 ~ O N 1~ 7 7 ~ M ` ~O t 0 N M M O ~ 7 00 ~ ~n ~ . ~ o ~ ° N t 0 0 M t J ~ N ~ O M ~ 7 ~ ~ ~ M M M N _ x W C T L 'n ~ ~ 0 0 0 0 0 0 0 VJ 0 (0 0 (O 0 O 0 t0 0 0 0 0 0 O 0 O 0 O 0 O 0 O 0 0 0 O 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 O 0 ~O 0 t0 0 f0 0 O 0 O 0 O 0 O 0 O 0 O ~ 0 t0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 M 0 0 0 0 0 0 ' d ~ W } ~ M M O O 00 M OD ~ O ~ ~ M ~ ~ M M M O ~ M O ~ M ~ N M M O O O M ~ 7 0 0 0 W 0 ~ OnD O O 0 M 7 7 7 M M 3 °' ~k3 N O ~0 O ~ O ~ e0 N O ~ O ~ O 'n O ~ O u'1 O O O O O 7 0 a0 W W 0 a0 7 0 OD 070 W a0 n a0 n O r O r~ O n ap r- ap n N vl N vl O ro N rn 0 ao 0 ao 0 m 01 m 7 ~- 7 ~- 7 .- N f~ ~ i0 1~ ~O n O O O O ONI W O N W - ~ O ONi N ONi N O W O ap O aO N Of C a LL ~ ~ ~ ~ ~ ~ ~ ~ N N . N . X W m J J J > Z U ~ C) ~ C 7 ~ U ~ N Y Q Xa LL V W ~ J a0 ~ J ap ~ J W ~ J W ~ J W ~ J CD ~ J W ~ J a0 ~ _ 1 Op ~ J ~ v ~ v O ~ ~ ~ ~ Y 3V Y ~ v ~V Y ~ v ~V I ~ ~ » N N » N N » N N > N ~ Y ~ Y ~ Y 0 q J 3 ~ ~ Y ~ ~ N 3 r 3 n n 0>O 7 E ° 7 ~ O M O M Q o 2 o S o 2 ~ = (n a = UN N '~ ~ = ~ ~ ~ = ~ a 2 = ~ ~ v ~ v ~ ~ ° J Y 01 W C i7 a C M V X M V X M V X M V X M V X M V X M V X M V X M V X M V X J N ~ J N v1 J M 7 J N (l7 J ~ 7 J V 7 J N (n J M V J N U J Y 7 J V 7 N X N X N llyy X N ff~~ X N ryry X N N X N N X N ` ~ J N J N ~ N 7 J N U J N (n J N fn !/7 M X N F X N H X N F 2 U V Z S 10 n S 10 n 0 O ~ 0 F- S 0 F' S U I-' S ~ O O ~ O N = ~ ~ O ~ ~ a 0 In 0 ~ J N U J N (n J N (n N 7 N N N N N N N N N N N N V 7 X ~ X X ~ X ~ X X N v v v X v v v N 7 7 7 N ~ ~ 2 N N ~ 7 7 X ~'Q N N N N N N X W X W X W C ' ~ O ~ ~ ~ > ~ O 10 ~ J J J J J J O r O In U ~ ~ ~ c0 ~ ~ M M ~ 7 7 0 N N N ~ N ~ a0 0 0 M a0 0 7 ~ ~ ~ ~ M 7 N Q ~- N N e7- 7 ~ e7- ~ N 7 7 u7 u7 ? r, ~ ^ N N N (^ CO'1 ~ ~ N N N d ~ N N N N N N N ~ ~ N N N ~ N N « « ~ N N N d N N N Y N N N N N N N d N N N N Y N N N N N N N N N N N N N N N E E E E Z ~ U c U ~ U ~ U c U c U c U c U c U c U c U c U c U ~ U c U c U c U c U c U ~ U c U c U c U c U c U c U c U c U c U c U c U c U ~ U c U c U ~ U c U c U c U c U c U c U c U c U c U c U c U c U c U c U c U c U c U c U C7 ~ ~ ~ rn 5 't u > o > 0 > 0 ~> 0 > 0 > 0 > 0 > 0 > 0 > 0 > 0 > 0 > 0 > 0 > 0 > 0 ~S 0 'S 0 > 0 > 0 > 0 ~5 0 .~ 0 > 0 > 0 > 0 ~S 0 '5 0 .~ 0 .~ 0 > 0 > 0 > 0 ~S 0 ~S 0 > 0 > 0 > 0 > 0 ~S 0 > 0 ~5 0 .~ 0 .~ 0 > 0 > 0 > 0 ~S 0 "S 0 > o > v `> o > o > H U H U H U H U '~ U U U U U U V U U U V V U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U to M M M t" 1 t") M M O O '- V ~ ~ M t h f ") M M M M M M M M M M M M M O N N N O O ~ N N N N N N N N N N N t V (V O O O ~ ~ W J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J ~ N OI C c0 ~ N N N ~7 CO V V fN') N O ~ ~ O ~ M ^ ~ ~ ~ M a0 CD C V aO V M ~ ~ 00 00 t0 ~ e0 O N f~ O0 tO N I~ CO O N V (O N M N M p tD 0) p M V <0 a0 0 O7 O ~) p ~ ~ O W M N N M ~ O O O r CV~j ~ O ~ O N M O ~ V Cni O ~ m ap 0 O ~ ~ 0 d' O) ~ CO ap O M ^ aD O) V cD 1 eO 0 0 N N 00i QMi M Obi OMi f~ ~ ~ ~ ~ a O ° ~(i ~ 0 0 0 ~ f d fA M N M O) m N O N M M E M ~O C,.~ ~ M ~O m e- T u'i N O N N p ~O d' N ~ ~ e0 r ~ ~ ~0 ~ ~[i QO M V M AO M (D O 1~ ~ W ~ N N ~ N M ~ OJ NO N O N N " O N ~ ap N r N N Ol C d (A ~ ~ O O 7 N O N ~ N 7 N ~ M O 0 0 0 7 ~ 1~ O 7 7 ~ O O O N ~ 1~ M O O) ~ W ~ ~ 1~ M O O 7 h O 0 O QMj ~ ap ~ ~ ~ T O N W V O c0 ap Y 7 M N N n p O O~ C O ui CD ~ CO OO ~ 0 0 0 N ~ O O) ~ O O a M ~ O Y O (D N I~ ~O O ~O r p p pip O ~O N CD a 0 N ~ O CO V f 0 0 0 O ONI O» Y' V f _ ~ M M ~ O) N N C O N M Cy 1~ O ~ ~ ~ ~ ~ N ~ N N N N O) V' ~ .- 1~ ~ r t0 M N ~ N M tD ~ ~ N N M O N N 3 N N Y .+ ~" T L O ~ N o O o N rn 0 o 0 o 0 o 0 o O o O o O o CO ao ' CO 00 v fD ao N r v (O ,o t0 rn O o ap rn O o O o (O rn O o O o ° 0 cO 0 O 0 O 0 O O o N ~n 7 o N ~n 7 o V o O o O <o ° CO rn ° O o N u~ ° O ~o O 0 +' O } ~ W .- N N O M O M p M O .- a0 ~ 0 ~ 0 ~ u 1 ~ ~O ~ ~ ~ W ~ ! ~ ap 0 (O N CD N N (O N CO N Q I~ N O N O N W N O V T ~ M N m ~ M N M N N M 1~ ~ ~ O ~ N M O) ~ ~ 1~ c0 O V ~ _ w d uN~ V i« r ~p 'k ~ O ~ t0 ~ CO ~ 7 ~ M O N M V' O O O N N O Y O V M •I' M a M V M V M V M ? M 7 M V N N M Y W M M V M d' N N M V M V N O O O O O O V O (O O f0 O O O O O O O Y O O O CO p CO p t0 O fD 0 fD 0 (O N 0 0 0 0 CO ~3LL c o ~ d t t c w ~ ~ ~ ~ ~ 3 ~ ~ ~ ~ ~ ~ 3 ~ ~ ~ O c > ~n > ~n > ~n > - W O O ~ U p O Z ~ > U ~ > U ~ > >~n ~ ~ ~ ~ > ~ ~i ~ ~ u~ ~i ~n 0 ~ ~ .n ~ > 'n > ~n W Z z o ~ p O (n ~ ~ N ao ~ N ro ~ N co ~ N oo ~ N m ~ N m h N ro ~ CV w ~ N ao ~ N ao ~ N ao in N oo ~ N oo W Z Z Ui p O ~, ~ W z d N N N J J N o Vl y c W W N N ~ N N N ~ N N N ~ N N J ~ N N ~ N N N W O M M O M O y) W F' - H ~" H F- H H H F- ~- F- F ~'"' W O N C C ~ m ao ao ~ ~ o0 0o a c d d U O Z Z °O ro ~ ao °p ao S ao ao w °O ao ~ w oo ~ oo °D eo W ~ K ~ ~ N c d z ~ Y Y Y Y Y Y ~ v v `T Y J `T J W ~ c d o C d U o d c ~ J ~ J F- J N F J H J ~ C d ~ 2 c ~ c ~ ~ J J f- ~ J ~ J ~ ~ J ~ J ~ J ~ J J ~ J J H J ~ J H J U O ~ O ~ O ~ C d ~ c ° J M J M J C~ 1 J c' 1 J M J N J N J M J M J M J M M f `~ (~ U ~ d M ~ M ~ M V ~ J N ~ N (n N ~ (n U (n ~ C d ~ ~ ~ U = ~ U = N d' N ~ N fn N V N V N (n N 7 N V ~ N V N ~ ~ N d' (n N < N 7 U W LL U LL ~ LL U ~ (n (n ~ j a ~ a ~ a ~ a ~ a ~ a ~ a ~ ~ ~2 a ~ ri. ~ a ~ a ~ a ~ p W ~ ~ U ~ d ~ - LL x N x N x N 7 M N - v ~ U F; a -o x N x N - v x N x N - ~ x N x N - v x N M - ~ x N - v x N x N J 3 v g g g g g g g g g g g g g J ~ O o .N ~ N X J V c ~ c 2 E W c ~ R' ~' LL' LL' ~' ~' 2' a' ~' 2 Q-' Q' LL' ~ W c0 ~ N X ~`+ O a i O v O v Y O) N CO C O M O> ~ O N M ~ D ? N 1~ O V N 1~ (O ~ O O O N M n O O V N N I N N pp O 1~ W ~ ~ M ~ ~ r ~ u7 ~O M ~ ~ ~ M f~ eD eO N N CO M Y m M •- M M W ~ ~"' •- ~p (O O I~ '- r O n ~ O tO u'i C O O ~ 0 0 N M p N M ~p V ? N I~ Y Y O ~ M O r O Cp O 0 M 4'i M X0 ~ CO 0 V d' N .-- 7 O 0 0 0 f O t p O ~ a M m ~ N V M (V N ~ I~ Ch N ~ (V O) r- N M .- ~ iO Y M ~ e0 ~ ~ O ~ CV ~O N ~O aD M ~ M ~ ~ O ~O CO ~ N fp x_ W c T L y~~ O 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CO 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 CO O O d d j~ = ro ~- op ~- (O M (O M t0 M t0 M ap ~- ap ~ O V O V O N O N CO ~ O N O N eD ~ O N aO ~ W ~-- W ~-- (D N O N W r- 0 N 0 N 00 ~ r aO O N tp N W ~ O V N M N M N M N M N M N M N M e0 ~- CO ~- a0 ~ N M N M W ~ h cO O Y } W 3d :7 lL N . % W W W W W W W W W C7 C7 (~ U' U` U` C7 U' d „ o ~c ' ~ ~ ~ > O 0 O 0 ~ O 0 F = = n ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ J a U o H O o H W eo ro ao eo ro D ao au m m m ao m J a (7 0 1- C7 0 F- C7 0 I- 2 x ~ !L O O Y O Y O Y J N J N J N ° y g ~ a S o Y o Y o v o ~ o Y 0 v 0 Y 0 Y 0 Y o v J N v M o Y o Y ° i O i ~ n o M o M ' o M ' = = d 2 F J F J F- J H J H J ~-- J F; J F' J F' J F- J F' J V- J I~ J ~ I~ 2 = _ ~ ~~ c iz c J Y J 4 J Y N N U ~y U ry J N U ~ U ~ U ~ ~ 0 ~ 0 J N v J N v J N t J N v J N v J N cg J N v J N v J ~ v J N v U - M J ~ J N v J ~ cn J N v J N v x N _ ~ ~O ~O Q ~O n Q ~O tO U F- U 1- >> 7 M V~ M d' M d' M V M V N (n N V M V C7 ~T (`~ V (`~ V (`~ 7 M a >( N ~ U H U F- U H ~ O " a y~ .x v X N a X N a X N v7 < ~ ~ ~ U ~ U o 7 o r o n X N X N n - X N X N - A X N X N 7 - p X N $ ~ X N ' ~ X N X N F - X ~ U ~ U o 1~ x N x N x N x N x N a x N x N x N x N x N x N x N - X ~ tn 3 tn 3 v~ ' '- W - J J J W >J > > J > W J ~ J ~ > J 7 N ~ N CO N N ~ ~ ~ ~ Oj ~ N ~ ~ ~ O) V ~ 01 N N ~O ~ ~ N ~ ~ ~ ~ ~ QO ~ tO N M fO N ~ N M N ~ N ~ ~ ~ N V Q7 N f0 M N t0~ C r d E ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~, ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ a~ ~ a~ a? J a a~ f- R 7- E T E T E T E E ~. E T E E E E E E T E ° d ° d ° d ° d ° d c d c d c d c d c d c d c d c d c d c d ~ d c d c d c d c d c d c d c d c d c d c d ~ d c d c d c d c d ~ d c d c d c d c d c d c d c d c d c d 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U C H H H F- F- I- 1- F- F- F- F- I- I- O ._ O ._ O ._ O ._ O ._ O ._ O ._ O ._ O ._ O .- O .- O .- O ._ O .- O ._ O ._ O ._ O ._ O ._ O ._ O ._ O ._ O .- ~ ~ L > t > « ~ L > = > _ > _ > L > L > L > L ~ L ~ L > L > L ~ L_. > L. > ~ .3 U U U U U U U U U U U U U c d c d c d c d c d C d c d C d C d C d C d C d C d C d C d C d C d C d C d C d C d C d C d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m ~ ~ U N ~ y ~ W ~ U ~ U U U W ~ y U U U U U U } } } } } } } } } } } } } } } } } } APPENDIX C: ROOFING REPLACEMENT & REPAIR PLAN City of Tustin Energy Efficiency Conservation Strategy 57 1/12/2010 City of Tustin !Facility Name: City Hall --- Flat Square Footage: 20,000 Estimated Cost of Solution Chosen: $275,000.00 J Recommended Action Year: Year 1: 2009 Solution: Option 2 V Option 3 Expected Life: 30 Years Cost Estimate: 5275,000.00 This option would require tearing the roof off down to the deck. A red rosin paper is loose laid which is covered by a type II base sheet. This is nailed according to FM regulations. Then, two plies of Type IV plies are mopped in type III asphalt, shingle fashion directly to the insulation. The two ply is covered with one ply of a high performance modified asphalt smooth sheet. The angles, projectings, and critical areas will receive an extra ply of protection. Then the entire system will be covered with a mineral surface cap sheet. The quality of the angles, which will get the majority of the abuse, varies widely from each manufacturer. Most modifieds will be affected by sun. When a mineral surfaced modified membrane is used, that mineral surface is intended to provide UV protection although it is nominal. recommend a UV resistant compound such as one that incorporates SBS, SIS and ES rubbers in the compound. These materials work together as they age to keep the membrane soft and flexible. SBS, which is the common polymer in the generic modified sheets hardens as it ages and the material becomes brittle. SIS softens in the same way old Scotch tape softens and turns to goo as it ages .These two materials blended together significantly improves the long term weathering characteristics of the membrane by providing outstanding UV and heat aging resistance. The ES polymer gives the membrane a harder surface. All of these attributes extend the life of the roof and reduce life cycle costs. This will also include installing a title 24 coating. Reinforcement is also important. This membrane should have some fiberglass scrim to provide dimensional stability and shrink resistance . Most of the generic materials use a less expensive polyester which tends to allow for significant movement, which fatigues the polymer. Polyester shrinks which puts a sheer stress on the seams. It is heat sensitive so it is often distorted during application. Fiberglass is dimensionally stable, will not shrink, has excellent heat resistance and provides extremely high tensile strength. Polyester does provide tear strength which is why it is put in with the fiberglass to make up the composite scrim reinforcement in the membrane . There is no charge for the daily inspections or the warranty. These are done to make sure that this roof lasts, which is in everyone best interest. Weekly reports will be provided to the City of Tustin. This roof comes with a 30 year warranty. Expected Life is an average, assuming that a proper evaluation 8 maintenance program is performed on a yearly basis. City of Tustin Energy Efficiency Conservation Strategy 58 1 /12/2010 Estimated Cost of Solution Chosen: $100,000.00 Recommended Action Year: Year 1: 2009 Solution: Cost Estimate Relolace Oution 1 Expected Life: 30 Years Cost Estimate: $100,000.00 This option would require tearing the roof off down to the deck. A red rosin paper is loose laid which is covered by a type II base sheet. This is nailed according to FM regulations. Then, two plies of Type IV plies are mopped in type III asphalt, shingle fashion directly to the insulation. The two ply is covered with one ply of a high performance modified asphalt smooth sheet. The angles, projectings, and critical areas will receive an extra ply of protection. Then the entire system will be covered with a mineral surface cap sheet. The quality of the angles, which will get the majority of the abuse, varies widely from each manufacturer. Most modifieds will be affected by sun. When a mineral surfaced modified membrane is used, that mineral surface is intended to provide UV protection although it is nominal. I recommend a UV resistant compound such as one that incorporates SBS, SIS and ES rubbers in the compound. These materials work together as they age to keep the membrane soft and flexible. SBS, which is the common polymer in the generic modified sheets hardens as it ages and the material becomes brittle. SIS softens in the same way old Scotch tape softens and turns to goo as it ages. These two materials blended together significantly improves the long term weathering characteristics of the membrane by providing outstanding UV and heat aging resistance. The ES polymer gives the membrane a harder surface. All of these attributes extend the life of the roof and reduce life cycle costs. This will also include installing a title 24 coating. Reinforcement is also important. This membrane should have some fiberglass scrim to provide dimensional stability and shrink resistance . Most of the generic materials use a less expensive polyester which tends to allow for significant movement, which fatigues the polymer. Polyester shrinks which puts a sheer stress on the seams. It is heat sensitive so it is often distorted during application. Fiberglass is dimensionally stable, will not shrink, has excellent heat resistance and provides extremely high tensile strength. Polyester does provide tear strength which is why it is put in with the fiberglass to make up the composite scrim reinforcement in the membrane . There is no charge for the daily inspections or the warranty. These are done to make sure that this roof lasts, which is in everyone best interest. Weekly reports will be provided to the City of Tustin. This roof comes with a 30 year warranty. Expected Life is an average, assuming that a proper evaluation & maintenance program is performed on a yearly basis. City of Tustin Energy Efficiency Conservation Strategy 59 1/12/2010 Client Name: _ __ f City of Tustin Facility Name: Community Center Roof Section: Flat _ I Square Footage: All Corporate Yard_ ~ 48,200 -_ Estimated Cost of Solution Chosen: $714,000.00 - _ _ _ __ Recommended Action Year: Year 1: 2009 Recommended Solution: Option 2 V Option 3 Relalace Oration 1 Expected Life: 30 Years Cost Estimate: $714,000.00 This option would require tearing the roof off down to the deck. A red rosin paper is loose laid which is covered by a type II base sheet. This is nailed according to FM regulations. Then, two plies of Type IV plies are mopped in type III asphalt, shingle fashion directly to the insulation. The two ply is covered with one ply of a high performance modified asphalt smooth sheet. The angles, projectings, and critical areas will receive an extra ply of protection. Then the entire system will be covered with a mineral surface cap sheet. The quality of the angles, which will get the majority of the abuse, varies widely from each manufacturer. Most modifieds will be affected by sun. When a mineral surfaced modified membrane is used, that mineral surface is intended to provide UV protection although it is nominal. I recommend a UV resistant compound such as one that incorporates SBS, SIS and ES rubbers in the compound. These materials work together as they age to keep the membrane soft and flexible. SBS, which is the common polymer in the generic modified sheets hardens as it ages and the material becomes brittle. SIS softens in the same way old Scotch tape softens and turns to goo as it ages .These two materials blended together significantly improves the long term weathering characteristics of the membrane by providing outstanding UV and heat aging resistance. The ES polymer gives the membrane a harder surface. All of these attributes extend the life of the roof and reduce life cycle costs. This will also include installing a title 24 coating. Reinforcement is also important. This membrane should have some fiberglass scrim to provide dimensional stability and shrink resistance. Most of the generic materials use a less expensive polyester which tends to allow for significant movement, which fatigues the polymer. Polyester shrinks which puts a sheer stress on the seams. It is heat sensitive so it is often distorted during application. Fiberglass is dimensionally stable, will not shrink, has excellent heat resistance and provides extremely high tensile strength. Polyester does provide tear strength which is why it is put in with the fiberglass to make up the composite scrim reinforcement in the membrane . There is no charge for the daily inspections or the warranty. These are done to make sure that this roof lasts, which is in everyone best interest. Weekly reports will be provided to the City of Tustin. These roofs come with a 30 year warranty. Built Up Roofing: 1. Administration $84,600 2. Shops $86,900 3. Mechanics $116,800 4. Warehouse $115,200 Total BUR $403,500 Metal: 4. Mechanics-metal $32,800 6. Warehouse-metal $81,200 7. Water Dept Trailer $28,000 8. Garage $37,500 9. Storage $31,500 10. Fuel Pump $24,200 11. Car Wash $75,300 Total Metal $310,500 City of Tustin Energy Efficiency Conservation Strategy 60 1!12/2010 Grand Total $714,000 Expected Life is an average, assuming that a proper evaluation & maintenance program is performed on a yearly basis. City of Tustin Energy Efficiency Conservation Strategy 61 1/12/2010 Client Name: ~ City of Tustin Roof Section: ~ Flat Estimated Cost of Solution Chosen: $265,000.00 Recommended Action Year: Year 2: 2009 Recommended Solution: Cost Estimate $255,000.00 Option 1 Option 2 Option 3 Replace Oation 1 Expected Life: 30 Years Cost Estimate: $265,000.00 This option would require tearing the roof off down to the deck. A red rosin paper is loose laid which is covered by a type II base sheet. This is nailed according to FM regulations. Then, two plies of Type IV plies are mopped in type III asphalt, shingle fashion directly to the insulation. The two ply is covered with one ply of a high performance modified asphalt smooth sheet. The angles, projectings, and critical areas will receive an extra ply of protection. Then the entire system will be covered with a mineral surface cap sheet. The quality of the angles, which will get the majority of the abuse, varies widely from each manufacturer. Most modifieds will be affected by sun. When a mineral surfaced modified membrane is used, that mineral surface is intended to provide UV protection although it is nominal. I recommend a UV resistant compound such as one that incorporates SBS, SIS and ES rubbers in the compound. These materials work together as they age to keep the membrane soft and flexible. SBS, which is the common polymer in the generic modified sheets hardens as it ages and the material becomes brittle. SIS softens in the same way old Scotch tape softens and turns to goo as it ages .These two materials blended together significantly improves the long term weathering characteristics of the membrane by providing outstanding UV and heat aging resistance. The ES polymer gives the membrane a harder surface. All of these attributes extend the life of the roof and reduce life cycle costs. This will also include installing a title 24 coating. Reinforcement is also important. This membrane should have some fiberglass scrim to provide dimensional stability and shrink resistance . Most of the generic materials use a less expensive polyester which tends to allow for significant movement, which fatigues the polymer. Polyester shrinks which puts a sheer stress on the seams. It is heat sensitive so it is often distorted during application. Fiberglass is dimensionally stable, will not shrink, has excellent heat resistance and provides extremely high tensile strength. Polyester does provide tear strength which is why it is put in with the fiberglass to make up the composite scrim reinforcement in the membrane . There is no charge for the daily inspections or the warranty. These are done to make sure that this roof lasts, which is in everyone best interest. Weekly reports will be provided to the City of Tustin. This roof comes with a 30 year warranty. Expected Life is an average, assuming that a proper evaluation 8 maintenance program is performed on a yearly basis. City of Tustin Energy Efficiency Conservation Strategy 62 1/12/2010 Estimated Cost of Solution Chosen: $230,000.00 Recommended Action Year: Year 7: 2009 Recommended Solution: Cost Estimate $230,000.00 Option 1 Option 2 Option 3 Realace Oution 7 Expected Life: 30 Years Cost Estimate: $230,000.00 This option would require tearing the roof off down to the deck. A red rosin paper is loose laid which is covered by a type II base sheet. This is nailed according to FM regulations. Then, two plies of Type IV plies are mopped in type III asphalt, shingle fashion directly to the insulation. The two ply is covered with one ply of a high performance modified asphalt smooth sheet. The angles, projectings, and critical areas will receive an extra ply of protection. Then the entire system will be covered with a mineral surface cap sheet. The quality of the angles, which will get the majority of the abuse, varies widely from each manufacturer. Most modifieds will be affected by sun. When a mineral surfaced modified membrane is used ,that mineral surface is intended to provide UV protection although it is nominal. I recommend a UV resistant compound such as one that incorporates SBS, SIS and ES rubbers in the compound. These materials work together as they age to keep the membrane soft and flexible. SBS, which is the common polymer in the generic modified sheets hardens as it ages and the material becomes brittle. SIS softens in the same way old Scotch tape softens and turns to goo as it ages .These two materials blended together significantly improves the long term weathering characteristics of the membrane by providing outstanding UV and heat aging resistance. The ES polymer gives the membrane a harder surface. All of these attributes extend the life of the roof and reduce life cycle costs. This will also include installing a title 24 coating. Reinforcement is also important. This membrane should have some fiberglass scrim to provide dimensional stability and shrink resistance. Most of the generic materials use a less expensive polyester which tends to allow for significant movement, which fatigues the polymer. Polyester shrinks which puts a sheer stress on the seams. It is heat sensitive so it is often distorted during application. Fiberglass is dimensionally stable, will not shrink, has excellent heat resistance and provides extremely high tensile strength. Polyester does provide tear strength which is why it is put in with the fiberglass to make up the composite scrim reinforcement in the membrane . There is no charge for the daily inspections or the warranty. These are done to make sure that this roof lasts, which is in everyone best interest. Weekly reports will be provided to the City of Tustin. This roof comes with a 30 year warranty. Expected Life is an average, assuming that a proper evaluation & maintenance program is performed on a yearly basis. City of Tustin Energy Efficiency Conservation Strategy 63 1 /12/2010 ~ Client Name: ~ City of Tustin Facility Name: Gym Roof Section: Built Up Roofing Square Footage: '.14,500 APPENDIX D: MAJOR EQUIPMENT INVENTORY Identification Tons Manufacture Model# Serial# Senior Center Lobb South AC #1 7.5 McOua PGDA036G075AIN1X 8882600011 Senior Center (Multipurpose Room) AC #2 2.5 McOua Unreadable Unreadable Senior Center (Main Lobby) AC #5 3.5 McOuay PGHA042G075AIN 8884000012 Senior Center (Auditorium South) AC #6 7.5 McOuay Unreadable 8883200007 Senior Center Loun a/TV Room AC #7 5 McOua PGHA060H1251N 8883500042 Senior Center (Auditorium North) AC #8 10 Comfortmaker R100DON151 8883200013 Senior Center (Class/Computer Rooms) AC #4 10 Comfortmaker Unreadable Unreadable Senior Center (Game Room) AC #3 2.5 McOuay PGHA030G050AIN 8884000005 Senior Center Kitchen Exhaust-Swam Coolers AC #9 5 Comfortmaker PGHA060H1251N 8884000040 Senior Center (New Room N/W) AC #10 5 Carrier 50HJ0006--311-- 3902610198 Identification Tons Manufacture Model # Serial # Youth Center (East) AC #1 7.5 Carrier 48HJD008--531 3896630308 Youth Center (South) AC #2 10 Carrier 48HJD012--531 2596630741 Youth Center (North) AC #3 10 Carrier 48HJD012--531 3396630656 Identification Tons Manufacture Model # Serial # CT Gym (Basketball Court North) AC #1 20 McOuay CUR201ETLC 52883849-01 CT Gym (Basketball Court South) AC #2 20 McOuay CUR201ETLC 52683850-01 CT Gym (Lobby and Hallways) AC #3 4 Comfortmaker PGM8048F1001N1 6934316794 CT Gym (Classroom A)AC #4 4 Comfortmaker PGMB048F1001N1 6934316796 CT Gym (Classroom B)AC #5 4 Comfortmaker PGMB048F1001N1 6934316801 CT Gym (Classroom C) AC #6 5 Comfortmaker PGMB060F1001N1 6932682453 Identification Tons Manufacture Model# Serial# CivicCenter. City Hall - 1st Floor 50 Trane CC5040V68A79D3D0 J92E70943 Civic Center: City Hall - 2nd Floor 40 Trane CC4040V48A69D3D0 J92E70944 Civic Center: City Hall -Computer Room - 1st Floor 3 Trane TCD036C400AA G23142138D Civic Center. Civic Center Boiler- All Raypak H3-0624A-CCHBAA 9301105312 CivicCenter. Police De artment- 1st Floor 30 Trane CC3040V38A5AD3D0 J92E70855 CivicCenter: Police Department-2nd Floor 30 Trane CC3040V38A5AD3D0 J92E70856 Civic Center. PD -Computer Room -1st Floor 3 Trane TCD036C4006A F4211 9749 Civic Center. PD -Dispatch - 1st Floor 4 Trane TWA048C400A0 622266127 CivicCenter:PD-Wei ht Room-1st Floor 3 Bard WH361-A05 Civic Center. PD -Boiler- All Raypak H3-03336-BCAHBAA 9206100461 Civic Center. Council Chambers (West)- 1st Floor 10 Trane WCD1208400BA H041436360 Civic Center. Councl Chambers (East) - 1st Floor 10 Trane WCD1208400BA H041436390 Civic Center: Council Chambers (Atrium) - 1st Floor 10 Trane WCD120B400BA H041436450 CivicCenter: CommunityCenter(West)-1st Floor 10 Trane WCH120B4008A H04143666D Civic Center. Community Center East) - 1st Floor 10 Trane WCH120B400BA H05142650D Identification Tons Manufacture Model# Serial# Field Services: Administration-Lounge 5 Trane YHC06043LA1M 443100351E Field Services: Administration-Lobby 4 Carrier 48TFE004--501GA 1 001 62448 5 Field Services: Administration-Offices 5 Trane YHC0604A3RLAIM 443100165E Field Services: Shops/Sign Singer EC30C5M Field Services: Mechanics/Heater Lennox G12RQ3-82 5877017614 Field Services: Mechanics/AC 3 American Standard 2A7A1036A1000AA Field Services: Warehouse 0.5 Carrier 52SOA212301AA 2595E63623 Field Services: Water Dept Trailer 3 Copeland ZR54K3-PF-230 00127309N City of Tustin Energv Efficiencv Conservation Strategy 64 1 /12/2010