HomeMy WebLinkAboutRDA 82-041. RESOLUTION NO. RDA 82-4
2 ~
4
A RESOLUTION OF THE TUSTIN COMMUNITY REDEVELOPMENT AGENCY
OF THE CITY OF TUSTIN, CALIFORNIA, APPROVING PLANS AND
SPECIFICATIONS FOR EL CAMINO REAL/MAIN STREET IMPROVEMENTS
5
6
7
8
9
WHEREAS, it is the intention of the Redevelopment Agency of the City of
Tustin, California to construct certain improvements on E1 Camino Real, E1
Camino Way and Main Street, and;
10
11
12
13~
14
WHEREAS, the City Engineer has presented plans and specifications for
the construction of said work;
NOW THEREFORE, BE IT RESOLVED that the plans and specifications
presented by the City Engineer be and are hereby approved as the plans and
specifications for:
EL CAMINO REAL/MAIN STREET IMPROVEMENTS
15 BE IT FURTHER RESOLVED that the Secretary is hereby authorized and
directed to advertise as required by law for the receipt of sealed bids or
16. proposals for the doing of the work specified in the aforesaid plans and
: specifications which said advertisement shall be substantially in the
17 following words and figures to-wit:
18:
"NOTICE TO CONTRACTORS"
19
2O
21
22
SEALED PROPOSALS will be received at the office of the Tustin
Community Redevelopment Agency Secretary, Tustin City Hall, 300 Centennial
Way, Tustin, California, until 10:00 A.M. on the 9th day of July, 1982, at
which time they will be publicly opened and read, for performing work as
follows:
23
EL CAMINO REAL/MAIN STREET IMPROVEMENTS
Bi ds are required for the entire work described herein:
26
27
28.
A-1
1
2
3
4
5
6
7
8
9'
10
11
12
13
14
15
16
17
181
19
20
21
22,
23
24
25
26
27
28
ITEM
NO.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
SCHEDULE OF WORK ITEMS
DESCRIPTION
Traffic Control
Sheeting, Shoring & Bracing
Clearing & Grubbing
Saw Cut
Excavation & Removals
8" Thick PCC Pavement
Cold Planing (5' Wide Cut)
Asphalt Concrete
Pavement Reinforcing Fabric
Place AC (Misc. Areas)
Const. Type "A-2" C & G
Const.(Mod.) Type "A-2" C & G
(Incl. Transitions)
Const. Type "D" C & G
Const. Type "B-I" Curb
Const. 6"x6" PCC Header
Construct Alley Gutter
(3' Wide)
Const. Cross Gutter (6' Wide)
Const. Local Depression
Const. 4" Thick Modular PCC Sidewalk
Const. 6" Thick PCC Driveway Apron
Const. Concrete Pavers (lOOmm)
Const. Concrete Pavers (60mm)
Modify Local Depressions
Modify Catch Basins
UNIT
Lump Sum
Lump Sum
Lump Sum
Lin. Ft.
Cu. Yd.
Sq. Ft.
Lin. Ft.
Ton
Sq. Yd.
Sq. Yd.
Lin. Ft.
Lin. Ft.
Lin. Ft.
Lin. Ft.
Lin. Ft.
Lin. Ft.
Lin. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Lump Sum
Lump Sum
qUANTITY
1
1
1
2,O00
7,500
15,950
940
11,550
2,550
350
6,850
260
120
370
2,740
24
55
200
47,535
18,650
13,520
19,800
1
1
A-2
1
2
3
4
5
6
7
8
9
10
11
12
13
14!
15
16
17
18
19
2O
21
22
23
24
25
26
27
28
ITEM
NO.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
SCHEDULE OF WORK ITEMS
DESCRIPTION
Const. Private Catch Basin
Const. Parkway Culvert
(Type "B")
Const. Parkway Culvert
(Type "C")
Const. Retaining Wall
8" Thick, Variable Height
Const. Retaining Wall
12" Thick
Adjust Manhole to Grade
Adjust Water Valve to Grade
Const. Decorative Utility
Vault Covers
12" CL.150 A.C.P. Water Main
10" CL.150 A.C.P. Water Main
8" CL.150 A.C.P. Water Main
6" CL.150 A.C.P. Water Main
4" CL.150 A.C.P. Water Main
10" Tapping Valve & Sleeve
8" Tapping Valve & Sleeve
6" Tapping Valve & Sleeve
12" Gate Valve
lO"Gate Valve
8" Gate Valve
6" Gate Valve
4" Gate Valve
Fire Hydrant Assembly
UNIT
Lump Sum
Each
Each
Lin. Ft.
Lin. Ft.
Each
Each
Lump Sum
Lin. Ft.
Lin. Ft.
Lin. Ft.
Lin. Ft.
Lin. Ft.
Each
Each
Each
Each
Each
Each
Each
Each
Each
QUANTITY
1
4
25
300
32
30
50
1
757
51
745
298
45
3
3
3
2
1
2
5
1
3
A-3
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18~
19
20
21
22
23
24
25
26
27
28
1
2
ITEM
NO.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
SCHEDULE OF WORK ITEMS
DESCRIPTION
2" Water Service Piping
1-1/2" Water Service Piping
1" Water Service Piping
Water Meter Box (2" Service)
Water Meter Box(I-i/2" Service)
Water Meter Box (1" Service)
Conc. Sewer Encasement
10" Flange Adapter & Blind Flange
6" Flange Adapter & Blind Flange
3" Flange Adapter & Blind Flange
Traffic Signal Work at
E1 Camino Real/6th St.
Traffic Signal Work at
E1 Camino Real/Main
Misc. Electrical Work at
E1 Camino Real/Main
Traffic Signal Work at
E1 Camino Real/lst St.
Traffic Signal Work at
E1 Camino Real/Newport
Traffic Signing & Striping
Raised Pavement Markers
Install "El Camino Real" Bell w/Footing
Install Memorial Sign with Footing
6' Long "1890" Bench w/Back
6' Long "1890" Bench w/o Back
8' Long "1890" Bench w/Back
UNIT
Lin. Ft.
Lin. Ft.
Lin. Ft.
Each
Each
Each
Lin. Ft.
Each
Each
Each
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Each
Each
Each
Each
Each
Each
QUANTITY
72
10
322
1
1
1
20
3
1
1
1
1
460
10
1
5
1
7
A-4
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
2O
21
22
23
24:
25
26
27
28
1
2
ITEM
NO.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
SCHEDULE OF WORK ITEMS
DESCRIPTION UNIT
10' Long "1890" Bench w/Back Each
12"x12"x24"Conc. Bench Footings Each
"1890" Trash Receptacles Each
Drinking Fountain & Sewer Connect. Each
Street Entry Sign Post Each
Street Entry Sign Graphics Each
Bus Stop Shelter Each
Kiosk Each
Cast Aluminum Bollards Each
Cast Aluminum Bollards w/Light Each
3'x3' Tree Grate (w/Frame & Conc. Each
Footing)
4'x4' Tree Grate (w/Frame & Conc. Each
Footing)
Tree Guards w/Frame
Bronze Street Clock w/Chimes
(Alternate) Cast Iron Clock w/o Chimes
Automatic Irrigation System
Granite Boulders
Tree Removal, Stump Grinding & Root
Pruning
Soil Preparation & Fi ne Grading
Top Soil For Planter Backfill
42" Boxed Tree
24" Boxed Trees w/ Deep Root Barrier
15 Gallon Tree
Each
Each
Each
Lump Sum
Lump Sum
Lump Sum
Sq. Ft.
Cu. Yd.
Each
Each
Each
qUANTITY
2
54
12
1
4
4
7
1
104
15
14
26
40
1
1
1
1
1
5,300
8O
1
36
49
A-5
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
2O
21
22
23
24
25
26
27
28
1
2
ITEM
3 NO.
93.
94.
95.
96.
97.
SCHEDULE OF WORK ITEMS
DESCRIPTION
5 Gallon Shrub
2 Gallon Shrub
I Gallon Shrub
Ground Cover From Flats
Deep Root Barriers at
Existing Trees
60-Day Maintenance
UNIT
Each
Each
Each
Each
Each
Lump Sum
QUANTITY
46
5
351
4,000
98
A-6
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
2O
21
22
23
24
25
26
27
28
The foregoing quantities are approximate only being given as a basis
for the comparison of bids, and the Tustin Community Redevelopment Agency
does not, expressly or by implication, agree that the actual amount of
work will correspond therewith, but reserves the right to increase or
decrease the amount of any class or portion of the work or to omit
portions of the work as may be deemed necessary or advisable by the
Engineer.
Plans, specifications and proposal forms to be used for bidding on this
project can only be obtained by prospective bidders at the office of the
Agency Secretary, Tustin City Hall, 300 Centennial Way, Tustin,
California, 92680, upon payment of $20.00 per set, which amount shall be
non-refundable.
Plans and specifications will only be mailed out upon payment of
$30.00 per set, which amount shall be non-refundable.
Cross-sections are available at an additional cost of $10.00 per set
if picked up and $15.00 per set if mailed out, both non-refundable.
In conformance with Section 37931 of the Government Code, all bids
shall be presented under sealed cover on the proposal form provided and
accompanied by one of the following forms of bidder's security:
a. Cash
b. Cashier's check made payable to the Tustin Community
Redevelopment Agency.
c. Certified check made payable to the Tustin Community
Redevelopment Agency.
d. Bidder's bond executed by an accredited surety insurer, made
payable to the Tustin Community Redevelopment Agency.
The security shall be in an amount equal to at least ten percent
(10%) of the amount of the bid. A bid shall not be considered unless one
of the forms of bidder's security is enclosed therewith.
A Security Bond for payment of labor and materials will be required
in the amount of fifty percent (50%) of the estimated total contract price
and a Faithful Performance Bond in the amount of one hundred percent
(100%) of the estimated total contract price in the form attached to the
contract documents. Said bonds shall be issued by a Surety Company rated
Grade A or better and Class IX or better by the latest edition of Best's
Key Rating Guide.
The Tustin Community Redevelopment Agency reserves the right to
reject any or all bids, and/or waive any informality on a bid. No bidder
may withdraw his bid for a period of thirty (30) days after the date set
for the opening thereof.
The Contract will be awarded to the lowest qualified bidder
A-7
Provisions of the State Contract Act are not applicable, and prospective
bidders will not be required to be prequalified.
All work to be done under the direct supervision of the City Engineer,
City of Tustin.
All work to be paid for at the unit prices bid from appropriate monies.
Pursuant to California Government Code Section 4590, the contractor will
be entitled to post-approved securities with the Agency or an approved
financial institution in order to have the Agency release funds retained by
the Agency to insure performance of the contract.
The Tustin Community Redevelopment Agency has obtained from the Director
of Industrial Relations the general prevailing rate of per diem wages and
the general prevailing rate for legal holiday and overtime work in the
locality in which the work is to be performed for each craft or type of
work needed and a copy of the same is on file in the office of the Agency
Secretary.
Not less than said prevailing rates shall be paid to workers employed on
this public works contract as required by Labor Code Sections 1771 and 1774
of the State of California.
PASSED AND ADOPTED by the Tustin Community Redevelopment Agency of the
City of Tustin, California, this 7th day of June ,
1982.
Chblman, Tustln opment
Agency
ATTEST:Mar~y .~n ~', SecrbJe ry~
Tusti n Co~1~fnunity Re~e~vel opment Agency
Advertise in the Tustin News:
June 24, 1982
July 1, 1982
A-8
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
MARY E. WYNN, City Clerk and Secretary Clerk of the Comunity Redevelopment
Agency of the City of Tustin, California, does hereby certify that the whole num-
ber of the members of the City Council as the Community Redevelopment Agency is
five; that the above and foregoing Resolution No. RDA 82-4 was duly and regularly
introduced, passed and adopted at a regular meeting of the City Council as the
Community Redevelopment Agency held on the 7th day of June, 1982 by the following
vote:
AYES :
NOES :
ABSENT:
COUNCILPERSONS:
OOUNCILPERSONS:
COUNCILPERSONS:
Edgar, Kennedy, Greinke, Hoesterey
None
Saltarelli
City of Tustin, Californiav