WHEREAS, it is the intention of the Tustin Community Redevelopment
Agency of the City of Tustin, California, to install certain conduit and
structures as described herein, and;
WHEREAS, the City Engineer has presented plans and specifications for
the construction of said work;
NOW, THEREFORE, BE IT RESOLVED that the plans and specifications
presented by the City Engineer be and are hereby approved as the plans and
specifications for:
PLACEMENT OF CONDUIT AND ST~ FOR UNDEBGROUND
RLRCITRI~ AND TELEPHGNE FACILITIES WITHIN THE EL CAMINO REAL
UNDEBGRDUND UTILITY DISTRICT NO. 5.
BE IT FURTHER RESOLVED that the Secretary is hereby authorized and
directed to advertise as required by law for the receipt of sealed bids or
proposals for the doing of the work specified in the aforesaid plans and
specifications which said advertisement shall be substantially in the
following words and figures, to-wit:
"NOTICE TO CONTRACTORS"
SEALED PRf~DSALS will be received at the office of the Tustin
Cu,,.unity Redevelopment Agency Secretary, Tustin City Hall, 300 Centennial
Way, Tustin, Caifornia, until 11:00 a.m. on the 24th day of February, 1981,
at which time they will be publicly opened and read, for performing work as
follows:
PLACf~4ENT OF CONDUIT AND ST~ FOR UNDEBGROUND
~.F. CTRICAL AND TELEPH(lgE FACILITIES WITHIN THE EL CAMINO REAL
UND~ UTILITY DISTRICT NO. 5.
Bids are required for the entire work described herein:
SCHEDULE OF WORK ITf~4S
ITf~ NO. UNIT QUANTITY
1. Each 5
DESCRIPTION
8 1/2'x4 1/2'x6 1/2' Tel. Co.
M.H. with c~ver, ladder and racking (sheet
No. 1, sta. 2+57+;sheet No.2, sta. 3+27+;
sheet NO. 5, sta. 12+67+; sheet No. 6,
sta. 19+44+; sheet NO. 6,sta. 22+54+;)
2. Each 4
12'x6'x7' Tel. Co. M.H. with cover, ladder and
racking (sheet 2, sta. 1+06+; sheet 3, sta.
29+46+; sheet 5, sta. 15+81+; sheet 4, sta.
39+99f)
DELETED
4. Each 1
Remove and dispose of exist. 8 1/2'x4 1/2'x
1/2' M.H. (sheet 4, sta. 31+65e) ( Tel.
Co. )
ITEM NO.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
UNIT QUANTITY DESCRIPTION
Lump Sum I
Lin. Ft. 3,444
Lin. Ft. 19,217
Lin. Ft. 1,655
Lin. Ft. 2,428
Lin. Ft. 10
Lin. Ft. 361
Lin. Ft. 5,002
Lin. Ft. 25,393
Lin. Ft. 2,590
Lin. Ft. 2,750
Lin. Ft. 14,472
21. Each 3
22. Each i
23. Each 5
24 Each 1
25. Each 7
DELETED
DELETED
DELETED
DELETED
Sheet 3, construction notes 6,14,15, & 16;
sheet 4, construction notes 2,3,4,9,10,11, &
12; sheet 5, construction note 18 (Tel. Co.)
2" PTS 66 (Tel. Co.)
4" Duct (Tel. Co.)
1" Duct (Edison Co.)
2" Duct (Edison Co.)
2 1/2" Duct (Edison Co.)
3" Duct (Edison Co.)
4" Duct (Edison Co.)
5" Duct (Edison Co.)
Semi-Encasement of Ducts (Edison Co.)
Full-Encasement of Ducts (Edison Co.)
Trench Excavation and Backfill (Edison Co. and
Tel. Co. Facilities)
8'x18'x9'-4' Edison Co. Vault with Cover and
Ladder. Item No. V-9
8'x22'x9'-4' Edison Co. Vault with Cover and
Ladder. Item No. V-lO
2'x3' Edison Co. Pull Box. Item No. PB-1
2'x3' Edison Co. Pull Box. Item No. PB-2
2 1/2'x4' Edison Co. Pull Box. Item No. PB-3
A-2
ITEM NO. UNIT QUANTITY
26. ~ 1
27. Each 1
28. Each 1
29. Each 4
30. Each 8
31. Each 24
32. Lin. Ft. 240
33. Tons 640
34. Sq. Ft. 6630
35. SQ. Ft. 616
36. Sq. Ft. 132
37. Lin. Ft. 20
DESCRIPTION
2 1/2' x 4' Edison Co. Pull Box.
3' x 5' Edison Co. Pull Box.
3' x 5' Edison Co. Pull Box.
4' x 7' x 7' Edison Co. CST.
5' x 8 1/2' x 7' Edison Co. CST.
10" Dia. Vent Stand Pipe
10" Dia. Vent Pipe
Asphalt Concrete Pavement
4" Thick PCC Sidewalk
6" Thick PCC Drive Apron
PCC Sidewalk
Type A-2 Curb & Gutter
Item No. PB-4
Item No. PB-5
Item No. PB-6
Item No. SS-9
Item No. SS-17
The foregoing quantities are approximate only being given as a basis for the
comparison of bids, and the Tustin Community Redevelopment Agency does not,
expressly or by implication, agree that the actual amount of work will
correspond therewith, but reserves the right to increase or decrease the amount
of any class or portion of the work or to omit portions of the work as may be
deemed necessary or advisable by the Engineer.
Plans, specifications and proposal forms to be used for bidding on this
project can only be obtained by prospective bidders at the office of the Tustin
Community Redevelopment Agency Secretary, Tustin City Hall, 300 Centennial Way,
Tustin, California, 92680, upon payment of $10.00 per set, which amount shall be
non-refundable.
Plans and specifications will only be mailed out upon payment of $15.00 per
set, which amount shall be non-refundable.
In conformance with Section 37931 of the Government Code, all bids shall
be presented under sealed cover on the proposal form provided and accompanied
by one of the following forms of bidder's security:
a. Cash
b. Cashier's check made payable to the Tustin Community Redevelopment
Agency
c. Certified check made payable to the Tustin Community Redevelopment
Agency
d. Bidder's bond executed by an accredited surety insurer,
made payable to the Tustin Community Redevelopment Agency .
The security shall be in an amount equal to at least ten percent (10%
of the amount of the bid. A bid shall not be considered unless one of the
forms of bidder's security is enclosed therewith.
A-3
A Security Bond for payment of labor and materials will be required in
the amount of fifty percent (50%) of the estimated total contract price and a
Faithful Performance Bond in the amount of one hundred percent (100%) of the
estimated total contract price in the form attached to the contract
documents. Said bonds shall be issued by a Surety Company rated grade A or
better and Class IX or better by the latest edition of Best's Key Rating
Guide.
Tustin Community Redevelopment Agency reserves the right to reject any or
all bids, and/or waive any informality on a bid. No bidder may withdraw his bid
for a period of thirty (30) days after the date set for the opening thereof.
The contract will be awarded to the lowest qualified bidder.
Provisions of the State Contract Act are not applicable, and prospective
bidders will not be required to be prequalified.
All work to be done under the direct supervision of the City Engineer,
City of Tustin.
All work to be paid for at the unit prices bid from appropriated monies.
The Tustin Community Redevelopment Agency has obtained from the Director
of Industrial Relations the general prevailing rate of per diem wages and
the general prevailing rate for legal holiday and overtime work in the
locality in which the work is to be performed for each craft or type of
work needed and a copy of the same is on file in the office of the City
Clerk.
Not less than said prevailing rates shall be paid to workers employed on
this public works contract as required by Labor Code Sections 1771 and 1774
of the State of California.
PASSED AND ADOPTED by the Tustin Community Redevelopment Agency of the
City of Tustin, California, this 2nd day of February,
1981.
SecretaryTM
Advertise in the Tustin News:
February 12, 1981
February 19, 1981
A-4
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF ~JSTIN )
MARY E. WYNN, City Clerk and Secretary Clerk of the Community Redevelopment
Agency of the City of Tustin, California, does hereby certify that the whole num-
ber of the members of the City Council as the Community Redevelopment Agency is
five; that the above and foregoing Resolution No. RDA 81-1 was duly and regularly
introduced, passed and adopted at a regular meeting of the City Council as the
Community Redevelopment Agency held on the 2nd da~ of February, 1981 by the
following vote:
AYES :
NOES :
ABSENT:
COUNCILPERSONS:
COUNCILPERSONS:
COUNCILPERSONS:
Saltarelli, Edgar, Hoesterey, Sharp, Kennedy
None
None
MARY E. WYNN, City_C~rk
City of Tustin, California