HomeMy WebLinkAboutRDA 79-3RESOLUTION RDA 79-3
A RESOLUTION OF THE TUSTIN COMMUNITY REDEVELOPMENT
AGENCY OF THE CITY OF TUSTIN, CALIFORNIA. APPROVING
PLANS AND SPECIFICATIONS FOR THE EL CAMINO REAL
WATER MAIN FROM SIXTH STREET TO FIRST STREET AND
DIRECTING THE SECRETARY TO ADVERTISE FOR BIDS.
WHEREAS, it is the intention of the Tustin Community Redevelopment Agency of
the City of Tustin, California, to construct certain domestic water improvements as
described herein, and:
WHEREAS, the City Engineer has presented plans and specifications for the
construction of said work;
NOW, THEREFORE, BE IT RESOLVED that the plans and specifications presented by
the City Engineer be and are hereby approved as the plans and specifications for:
EL CAMINO REAL WATER MAIN
FROM SIXTH STREET TO FIRST STREET
BE IT FURTHER RESOLVED that the Secretary is hereby authorized and directed to
advertise as required by law for the receipt of sealed bids or proposals for the
doing of the work specified in the aforesaid plans and specifications which said
advertisement shall be substantially in the following words and figures, to-wit:
"NOTICE TO CONTRACTORS"
SEALED PROPOSALS will be received at the office of the Tustin Community
Redevelopment Agency Secretary, Tustin City Hall, 300 Centennial Way, Tustin,
California, until ll:O0 A.M. on the 15th day of June, 1979, at which time they
will be publicly opened and read, for performing work as follows:
EL CAMINO REAL WATER MAIN
FROM SIXTH STREET TO FIRST STREET
Bids are required for the entire work described herein:
A-1
ITEM NO.
1.
2.
3/
4.
5.
6.
7.
8.
9,
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
UNIT
Lin. Ft.
Lin. Ft.
Lin. Ft.
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Pounds
Lump Sum
Lump Sum
Lump Sum
Tons
Tons
SCHEDULE OF WORK ITEMS
QUANTITY
3,840
1,830
45
3
4
2
3
36
3
1
2
1
2
3,604
1
1
1
160
4O
DESCRIPTION
Sawcut Pavement
10" ACP Water Main
6" ACP Water Main
10" Gate Valves
6" Gate Valves (RT-Flange)
6" Gate Valves (Flange)
Fire Hydrants
1" Corporation Stops
1½" Corporation Stops
2" Corporation Stops
IOXlOXlO Tapping Sleeve W/Valve
4X4X4 Tapping Sleeve W/Valve
Coupling to Existing Water Main
Cast Iron Fittings
Connection to Existing 2" Water Main
Connection to Existing 1" Water Main
Steel Casing Pipe
Asphalt Concrete Base Course
Asphalt Concrete Wearing Course
A-2
The foregoing quant',~ies are approximate only, being/given as a basis for the
comparison of bids, and the Tustin Community Redevelopment Agency does not, express-
ly or by implication, agree that the actual amount of work will correspond there-
with, but reserves the right to increase or decrease the amount of any class or
portion of the work, or to omit portions of the work as may be deemed necessary or
advisable by the Engineer.
Plans, specifications and proposal foE'ms .to be used for biddino on this project
can onlybe obtained by prospective biddefS"a%~th~Qffi~e of the T~sti: Come,unity
Redevelopn~nt Agency Secretary, Tustin Ci'tV'N~. ~ ~, , 300 Centennial Way, Tustin, ~±~..~
California, 92680, upon payment of $5.00 ~W'S~ which amount shall be non-re{undable.
Plans and specifications will only be mailed out upon payment of $10.00 per
set, which amount shall be non-refundable.
In conformance with Section 39731 of the Government Code, all bids shall be
presented under sealed cover on the proposal form provided and accompanied by one
of the following forms of bidder's security:
a. cash
b. cashier's check made payable to the Tustin Community Redevelopment Agency
c. certified check made payable to the Tustin Community Redevelopment Agency
d. bidder's bond executed by an accredited surety insurer, made payable to
the Tustin Community Redevelopment Agency
The security shall be in an Qmount equal to at least ten percent (10%) of the
amount of the bid. A bid shall not be considered unless one of the forms of bid-
· der's security is enclosed therewith'.
A Surety Bond for payment of labor and materials will be required in the
amount of fifty percent (50%) of the estimated total contract price and a Faithful
Performance Bond in the amount of one hundred percent (100%) of the estimated total
contract price in the form attached to the contract documents. Said bonds shall be
issued by a company having a rating of A+AA or better.
Tustin Community Redevelopment Agency reserves the right to reject any or all
bids, and/or waive any informality on a bid. No bidder may withdraw his bid for a
period of thirty (30) days after the date set for the opening thereof.
The contract will be awarded to the lowest qualified bidder.
Provisions of the State Contract Act are not applicable, and prospective bidders
will not be required to be prequalified.
All work to be done under the direct supervision of the City Engineer, City
of Tustin.
All work to be paid for at the unit prices bid from appropriate monies.
A-3
Said Tustin Commun{~Redevelopment Agency, pursuah~ to the Labor Code of the
State of California, has ascertained and determined that the general prevailing rate
of hourly and per diem wages in the locality in. which the said work herein described
is to be performed, for each craft or type of workman or mechanic needed to execute
the contract and also the general prevailing rate for legal holidays, and overtime
work for each craft or type of workman or mechanic, to be as indicated in City
Council Resolution 77-52 as previously published in a newspaper of general circula-
tion, and on file in the office of the City Clerk.
Employer payments other than those itemized therein, as defined in Section
1773.1 of the Labor Code, are to be paid in accordance with the terms of the
collective bargaining agreement applicable to the type or classification of the
workmen or mechanics employed on the project.
Copies of all collective bargaining agreements relating to the work as set
forth in the aforementioned Labor Code are on file and available for inspection in
the office of the Department of Industrial Relations, Division of Labor Statistics
and Research.
BY ORDER OF THE TUSTIN COMMUNITY
REDEVELOPMENT AGENCY OF THE CITY OF
TUSTIN, CALIFORNIA
Dated': 5-21-79
RUth C. Poe '7 ,r~ . ,~
SeCretary-6f th~ Tustin~Co~uni~y
Redevelopment Agency, California
BE IT ALSO RESOLVED that the Tustin Community Redevelopment Agency of the City
of Tustin has ascertained and does hereby determine that the general prevailing rate
of wages and employer payments in the locality of the City of Tustin, California,
for each craft or type of workman needed to execute the work herein above specified
is as set forth in City Council Resolution No. 77-52.
PASSED AND ADOPTED by ~he'City coUncil of the Tustin Community Redevelopment
Agency, California, this .2/~T- day of_~ 1979.
ATTEST
~ecretary
Publish in Tustin News
May 31 and June 7, 1979
A-4
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
RUTH C. POE, City Clerk and Secretary of the Community Redevelopment Agency of
the City of Tustin, does hereby certify that the whole number of the members
of the Redevelopment Agency is four; that the above and foregoing Resolution
No. RDA ?9-3 was duly and regularly introduced, read, passed and adopted at
a regular meeting of the Community Redevelopment Agency held on the 2lst pay
of May 1979, by the following vote:
AYES: MEMBERS: Saltarelli, Sharp, Kennedy, Welsh
NOES: MEMBERS: None
ABSENT: MEMBERS None
A-5