HomeMy WebLinkAboutZA Action 10-002ZONING ADMINISTRATOR ACTION 10-002
CONCEPT PLAN 09-001
SOCCCD PHASE 3A ATEP AT TUSTIN LEGACY
The Zoning Administrator of the City of Tustin does hereby resolve as follows:
The Zoning Administrator finds and determines as follows:
A. That a proper application for Concept Plan 09-001 was filed by the South
Orange County Community College District (SOCCCD), requesting Concept
Plan approval to support the future development of the proposed Phase 3A
area of the Advanced Technology Education Campus (ATEP), not to
exceed 305,000 square feet, at Tustin Legacy.
B. That the site is designated in the General Plan within the MCAS Tustin
Specific Plan and located within Planning Area 1-A within the MCAS Tustin
Specific Plan, which provides for educational and institutional uses of the
property. The project is consistent with the Air Quality Sub-element of the
City of Tustin General Plan.
C. That pursuant to the Agreement between the City of Tustin and South
Orange County Community College District (SOCCCD) for Conveyance of a
portion of MCAS Tustin and the establishment of an Advanced Technology
Educational Campus, dated April 22, 2004, (the "Conveyance Agreement"),
SOCCCD agreed:
1. The subject property would be used in perpetuity and continuously as
an Advanced Technology Educational Campus. The definition of
Advanced Technology Educational Campus contained in the
Conveyance Agreement means an education oriented development
which may include traditional and non-traditional advanced education
(extension and/or advanced degree opportunities), adult education,
continuing education, vocational, job and educational training, or other
education and training opportunities, as well as accessory uses when
customarily associated with and subordinate with the educational uses
listed above that would include the following uses: dormitory/student
apartment housing; minor support commercial, office and retail service
uses including but not limited to food services; administrative offices; a
post office; medical/dental clinics; laboratories and office facilities used
for basic and applied research, testing and consulting;
industrial/commercial business incubators which support educational
programs or provide educational opportunities; maintenance facilities,
structures and storage facilities, and guard houses, gates and other
security facilities and structures. Any uses not listed above are subject
to a determination by the Community Development Director as either
Zoning Administrator Action 10-002
Concept Plan 09-001
Page 2
permitted, permitted subject to a conditional use permit or prohibited,
consistent with the terms and conditions of the Specific Plan, the
Conveyance Agreement, the SOCCCD properly quitclaim deed, and
the Sublease (until the Sublease terminates).
2. The subject property will be developed and used consistent with all
Governmental Requirements, the Tustin General Plan, the MCAS
Tustin Reuse Plan and Specific Plan ("Specific Plan"), the Cooperative
Agreement DO2-119 between the City of Tustin, Orange County Flood
Control District and County of Orange, the Agreement between the
City of Irvine and the City of Tustin regarding the Implementation,
Timing and Funding of Transportation/Circulation Mitigation for the
MCAS Tustin Project, the Amendment to the Joint Exercise of Powers
Agreement Between the City of Santa Ana and City of Tustin
Regarding the Tustin-Santa Ana Transportation System Improvement
Authority, any Redevelopment Plan enacted with respect to the
SOCCCD property, the Conveyance Agreement, and the Ground
Lease in consultation with City (submittals required to be submitted to
City for comment and review prior to adoption or implementation).
3. Prior to commencing any use of the subject property or construction of
installation of improvements, it shall comply with Development
Processing Requirements, including the requirement to submit a
Concept Plan for the Advanced Technology Education Campus in
accordance with Section 4.2.2 of the Specific Plan and requirements
contained in Section 4 of the Specific Plan.
4. To the extent that it processes plans for review and approval from the
California Division of State Architect (DSA), the City shall continue to
exercise normal processing, review and approval rights and collection
of normal fees in connection therewith, on the following items pursuant
to Section 1.7.3 of the Conveyance Agreement: plans for grading,
draining, siting of improvements, alterations of the public right-of-way,
circulation, parking and utility connections. Further, it will provide
copies of all plans processed with DSA for City review and comment.
D. That pursuant to Section 4.2.2.A of the MCAS Tustin Specific Plan,
preparation and submittal of a Concept Plan is required to be submitted for
any portion of asub-planning area to document to insure that:
1. The necessary linkages are provided between the development project
and the Planning Area/Neighborhood in which it is located;
2. The integrity of the Specific Plan and purpose and intent of each
Neighborhood is maintained; and
Zoning Administrator Action 10-002
Concept Plan 09-001
Page 3
3. Applicable considerations of City requirements other than those
spelled out in this Specific Plan are identified and satisfied.
E. That a public meeting was duly called, noticed, and held by the Zoning
Administrator for Concept Plan 09-001 on March 22, 2010, and continued to
April 5, 2010, and continued to April 13, 2010, and held on July 26, 2010;
F. That Concept. Plan 09-001 is in conformance with the Tustin General Plan
and MCAS Tustin Specific Plan and approval of Concept Plan 09-001,
subject to conditions contained in Exhibit A attached hereto, and would
achieve the development requirements set forth by the MCAS Tustin
Specific Plan, including:
Ensuring the continuity and adequacy of all circulation systems, such
as: roadways, access points, pedestrian walkways, and other
infrastructure systems needed to serve the project;
2. Ensuring the continuity and design quality of architecture, landscape,
streetscape, and hardscape themes and treatments;
3. Providing urban design features as per Chapters 2 and 3 of the MCAS
Tustin Specific Plan;
4. Ensuring conformity with the Non-Residential .Land Use Trip Budget;
and,
5. Ensuring compliance with all applicable provisions of the MCAS Tustin
Specific Plan.
G. That on January 16, 2001, the City of Tustin certified the Program Final
Environmental Impact Statement/Environmental Impact Report (FEIS/EIR)
for the reuse and disposal of MCAS Tustin. On April 3, 2006, the City
Council adopted Resolution No. 06-43 approving an Addendum to the
FEIS/EIR ("City Addendum"). The proposed project is consistent with the
MCAS Tustin Specific Plan and is determined not to result in any new
significant environmental impacts, propose substantial changes or a
substantial increase in the severity of any previously identified significant
impacts in the FEIS/EIR and Addendum. Moreover, no new information of
substantial importance has surfaced since certification of the FEIS/EIR and
Addendum. The Zoning Administrator has also reviewed and considered the
Addendum to the FEIS/EIR ("SOCCCD Addendum") adopted by SOCCCD
on March 24, 2009. The FEIS/EIR and City Addendum supports the
determination that the proposed project will not result in any new significant
environmental impacts or proposes substantial changes or increases in the
severity of any previously identified significant impacts in the FEIS/EIR.
Zoning Administrator Action 10-002
Concept Plan 09-001
Page 4
II. The Zoning Administrator hereby approves Concept Plan 09-001 for the Phase
3A project with a maximum square footage not to exceed 305,000 square feet,
subject to the conditions contained within Exhibit A, attached hereto.
PASSED AND ADOPTED by the Zoning Administrator of the City of Tustin, at a regular
meeting on the 26t" day of July, 2010.
Q~~~
ELOISE H/~ IS
RECORDING SECRETARY
STATE OF CALIFORNIA )
COUNTY OF ORANGE )
CITY OF TUSTIN )
ELIZABETH A. BINSACK
ZONING ADMINISTRATOR
I, Eloise Harris, the undersigned, hereby certify that I am the Zoning Administrator
Secretary of the City of Tustin, California; that Zoning Administrator Action 09-001 as
duly passed and adopted at a regular meeting of the Tustin Zoning Administrator, held
on the 26t" day of July, 2010.
~~
ELOISE HA IS
RECORDING SECRETARY
EXHIBIT A
CONDITIONS OF APPROVAL
CONCEPT PLAN 09-001
SOCCCD PHASE 3A ATEP AREA
GENERAL
1.1 The proposed project shall substantially conform to the submitted Concept
Plan for the Phase 3A ATEP area project date stamped April 5, 2010, and
on file with the Community Development Department, as herein modified
in accordance with this Exhibit subject to review and approval by the
Director of Community Development of any future modifications.
Concept Plan 09-001 is approved for development of a maximum square
footage far the Phase 3A site not to exceed 305,000 square feet. The
project may be implemented in a single phase .or multiple sub-phases
including a different number of buildings provided it substantially conforms
in terms of general site lay-out and general location of buildings and
improvements with the Concept Plan. All uses shall be consistent with the
definition of Advanced Technology Education Campus contained in the
Conveyance Agreement and uses permitted on the site under the Specific
Plan, as it may be amended. The applicant shall be required to identify in
its subsequent Design Review Submittal, the maximum square footage
that would be subordinate or ancillary to educational uses on the site,
consistent with the definition of permitted uses contained in the
Conveyance Agreement.
1.2 Unless otherwise specified, the conditions contained in this Exhibit shall
be complied with as specified, subject to review and approval by the
Community Development Department.
1.3 As a condition of approval of Concept Plan 09-001, the applicant shall
agree, at its sole cost and expense, to defend the City's approval of the
Concept Plan from any claim, action, or proceeding brought by a third
party against the City, its officers, agents, consultants and employees,
which seeks to attack, set aside, challenge, void, or annul the Zoning
Administrator's approval of this Concept Plan. The City agrees to promptly
notify the applicant of any such claim or action filed against the City and to
fully cooperate in the defense of any such action. The City may, at its sole
cost and expense, elect to participate in the defense of any such action
under this condition.
1.4 McCain Smith Road:
a. McCain Smith Road shall be classified as a private street accessible to
the general public and shall be constructed to retain a minimum right-of-
way of 50 feet and shall comply with the applicable City street
Zoning Administrator Action 10-002
Concept Plan 09-001
Page 2
standards, with the exception that the City of Tustin will assume
responsibility for construction and cost of the sidewalk, landscaping and
lighting for the street on the north side of McCain Smith Road or within
the future community park site with construction of the future community
park.
b. The full right-of-way for McCain Smith Road shall be located within the
Concept Plan 3A boundaries on SOCCCD property and will be secured
by a future easement for vehicular and pedestrian access in conjunction
with any future conveyance of the adjacent portions of the subject
property by the City of Tustin to SOCCCD as required to implement the
MCAS Tustin Reuse Plan/Specific Plan and facilitate redevelopment of
MCAS Tustin pursuant to Section 9 of the Conveyance Agreement,
subject to review and approval by the City.
c. The intersection of McCain Smith Road and Valencia Avenue shall be
posted (signed) for right-in and right-out turn movements only.
d. The City and SOCCCD have agreed that the construction of the McCain
Smith Road will be undertaken by the first party (either the City or
SOCCCD) doing any construction north of Valencia Avenue. All
construction costs, with the exception of the improvements to be
constructed by the City as identified in Condition 1.4 a, will be shared by
SOCCCD and the City equally. Prior to any subsequent Design Review
approvals, the City and District shall enter into a Reimbursement
Agreement related to the required construction.
1.5 McCord Road/Blackbird and Valencia Intersections.
a. The proposed median modification at Valencia and its intersection with
McCord Road shall be constructed and maintained by SOCCCD as
shown on the Concept Plan for as long as the Child Care Center site is
proposed for ownership by the City of Tustin.
b. McCord Road. McCord Road shall be classified as a private street
accessible to the general public and shall be constructed to retain a
minimum right-of-way of 56 feet and comply with all City street
standards including City Street Standard B-102 with thirty-six feet (36)
minimum curb to curb dimension and ten (10) foot parkways on each
side. The parkways shall include five foot (5) sidewalks and street lights
on both sides of the street. The applicant shall construct McCord Road
in conjunction with construction of those portions of the Phase 3A
Concept Plan south of Valencia so long as the Child Care Center site is
proposed for ownership by the City of Tustin.
Zoning Administrator Action 10-002
Concept Plan 09-001
Page 3
c. Blackbird Driveway. The Blackbird driveway located to the west of the
McCord Road right-of-way shall designed and constructed by the
applicant to ensure adequate for alternative access to Phase 3 future
development to the west on the applicant's property and the Child Care
Center from McCord Avenue in accordance with applicable City
standards and to the satisfaction of the City to ensure full turn around
and other access accommodation without obstructions from future
parking lot hardscape islands and parking spaces proposed with the
Phase 3A Concept Plan. The applicant shall construct Blackbird
Driveway in conjunction with the construction of the Phase 3 Concept
Plan south of Valencia Avenue.
d. A reciprocal access easement from McCord West across Blackbird and
the full right-of-way of McCord Road will be required by the City in
conjunction with any future conveyance of the adjacent portions of the
subject property by the City of Tustin to SOCCCD required to implement
the MCAS Tustin Reuse Plan/Specific Plan and facilitate redevelopment
of MCAS Tustin pursuant to Section 9 of the Conveyance Agreement.
The easement will be needed for access to the Child Care Center along
McCord Avenue, the truck radius necessary for delivery to the rear of
the child care center, and for the radius and movements needed to
accommodate the area along the north side of the child care center and
the west for ingress at the main signalized intersection proposed on the
Concept Plan on Valencia by SOCCCD. Prior to issuance of an
encroachment permit, SOCCCD shall submit a proposed legal
description which complies with the intent of this condition for review
and approval of the City.
e. If for any reason, the Child Care Center is no longer proposed for
ownership by the City of Tustin and the ownership of this site is
assumed by the applicant, the applicant shall be responsible for
modifying the Valencia median to close it opening at the intersection
with McCord Road, and the applicant would be released from any need
for construction of McCord Drive or the Blackbird Driveway and the
need for the non-exclusive vehicular and pedestrian easement across
the McCord Road right-of-way or Blackbird Driveway, subject to the City
reserving the right to review and provide comments on any site plan
submitted for development of the applicant's property or portions of the
applicant's properly within a LIFOC area that affects the McCord Road
right-of-way nor currently proposed for land uses by the applicant's
Phase 3 Concept Plan.
1.6 Infrastructure Construction and Payment Agreement. In the event that the
City and applicant subsequently enter into an Infrastructure and
Construction Agreement ("Agreement") that addresses the provision of
Zoning Administrator Action 10-002
Concept Plan 09-001
Page 4
future reservation of certain easements and obligations of the City and
applicant for design and construction of McCain Smith Road, McCord
Road, the McCord Road/Valencia Median and Intersection and Blackbird
Driveway contemplated by the MCAS Tustin Specific Plan, Conveyance
Agreement and the Phase 3 Concept Plan, conditions 1.4 and 1.5 shall
become null and void. However, the applicant shall be required to comply
with all requirements of the Agreement between the City and applicant.
1.7 Valencia Avenue: SOCCCD shall be responsible for design and
construction of sidewalks, parkways and median landscaping along
Valencia Avenue along the frontage of the Concept Plan Phase 3A site.
1.8 Red Hill Avenue: SOCCCD shall be responsible for design and
construction of permanent and interim parkway and streetscape as
applicable along that portion of the frontage of Red Hill of the Concept
Plan Phase 3A site, with interim parkway and streetscape improvements
to be within the future right-of-way roadway improvements with the future
right-of-way improvements to be constructed by others. All such
improvements shall be subject to review and approval by the City
Engineer based upon plans for the future widening of Red Hill Avenue.
1.9 In the event that the existing military chapel is retained on the subject
property within the Concept Plan Phase 3A site, the total square footage
shall be considered to be included within the maximum 305,000 square
feet permitted with the Concept Plan approval. The structure, and any
relocation, shall also be required to comply with the minimum building and
landscaping setback areas and parking required under the MCAS Tustin
Specific Plan.
1.10 Prior to or concurrent with construction plan development, SOCCCD shall
demonstrate compliance with the City's 800 megahertz radio
requirements.
PLAN SUBMITTAL
2.1 streetscape Palette. At the Design Review Submittal, SOCCCD shall
submit preliminary plans and plant palettes for each specific public street
consistent with Design Review Submittal requirements to be reviewed and
approved by the City and which demonstrate that any streetscape palette
complies with the MCAS Tustin Specific Plan, the Tustin Legacy Park
Design Guidelines, and Ordinance 1376.
2.2 At the Design Review Submittal, all application information required by the
Tustin City Code and Department of Community Development shall be
submitted including but not limited to the following:
a. SOCCCD shall demonstrate that all uses proposed in conjunction with
Concept Plan 09-001 will meet the MCAS Tustin Specific Plan parking
Zoning Administrator Action 10-002
Concept Plan 09-001
Page 5
requirements, including but not limited to the total number of required
spaces, and the required design size and parking lot requirements
associated with such spaces.
b. SOCCCD shall demonstrate that all buildings and structures shall
comply with the minimum building and landscaping setback areas
required under the MCAS Tustin Specific Plan.
2.3 The Austin-Foust Associates memorandum dated January 29, 2010, shall
be signed and stamped by the author, with a final copy transmitted to the
City, which shall include the following modifications:
a. Regarding Item No. 3 -Indicated that the "Loop Road" referenced in
the memorandum is actually the location of the main entrance
driveway into the ATEP site. Loop Road is the temporary name of a
roadway in another development at the Tustin Legacy.
b. Regarding Item No. 6 -Indicate that the proposed signalized driveway
is at the Valencia/Main Entrance (Loop Road).
2.4 The Concept Plan Progress Print (Revision date 01-27-10) shall be
modified to show the curb-to-curb crass-section of McCain Smith Road as
being 14-feet and 18-feet adjacent to the City Park. The intent is to
provide on-street parking on the north side of the required right-of-way and
the minimum half-street dimension required to accommodate parking and
travel is 18-feet. In the event that the applicant desires to also provide
parking on the south side of McCain Smith Road, the curb to curb width
from the centerline south to the curb face will need to be 18-feet.