HomeMy WebLinkAbout04 CUP 10-009/DR 10-018ITEM #4
TUSTIN
Report to the
Planning Commission
DATE:
SUBJECT:
PROPERTY OWNER/
APPLICANT:
LOCATION:
GENERAL PLAN:
ZONING:
JANUARY 25, 2011
CONDITIONAL USE PERMIT 10-009
DESIGN REVIEW 10-018
WASL TUSTIN INVESTORS V, LLC.
1740 E. GARRY AVENUE, SUITE 105
SANTA ANA, CA 92705
13841 RED HILL AVENUE
PLANNED COMMUNITY COMMERCIAUBUSINESS
CENTRAL COMMERCIAL (C-2)
ENVIRONMENTAL
STATUS: A PREVIOUS MITIGATED NEGATIVE DECLARATION WAS
ADOPTED FOR THE PROPOSED 'PROJECT. PURSUANT
TO SECTION 15162 OF THE CEQA GUIDELINES, IF NO
NEW EFFECTS WOULD OCCUR AND NO SUBSTANTIAL
INCREASE IN PREVIOUSLY IDENTIFIED IMPACTS
WOULD OCCUR, THEN NO SUPPLEMENTAL OR
SUBSEQUENT ENVIRONMENTAL DOCUMENTATION IS
REQUIRED. A WRITTEN ENVIRONMENTAL ANALYSIS
CHECKLIST WAS PREPARED FOR THE PROJECT. THE
ENVIRONMENTAL ANALYSIS CHECKLIST CONCLUDED
THAT THE PROPOSED PROJECT DOES NOT RESULT IN
ANY NEW SIGNIFICANT ENVIRONMENTAL IMPACTS,
SUBSTANTIAL CHANGES OR A SUBSTANTIAL
INCREASE IN THE SEVERITY OF ANY PREVIOUSLY
IDENTIFIED IMPACTS, AND NO NEW INFORMATION OF
SUBSTANTIAL IMPORTANCE HAS SURFACED.
REQUEST: A REQUEST TO CONSTRUCT AND OPERATE A 201
UNIT AGE-RESTRICTED (62 YEARS OR OLDER)
ASSISTED LIVING/CONGREGATE CARE FACILITY ON A
2.$$2 ACRE SITE LOCATED AT 13841 RED HILL
AVENUE.
PC Report
January 25, 2011
CUP 10-009 & DR 10-018
Page 2
~s'
That the Planning Commission adopt Resolution No. 4168 approving Conditional Use
Permit 10-009 and Design Review 10-018 to authorize the construction and operation of
an age-restricted (62 years or older) assisted living/congregate care facility. The project
site is a 2.882 acres lot located at 13841 Red Hill Avenue
BACKGROUND
Previous Project Approval
The proposed project to establish and operate a 201 unit assisted living/congregate
care facility was originally given final approval by the Tustin City Council on January 2,
2008. The City Council approved various entitlements for the project which included
General Plan Amendment 07-001, Zone Change 07-002, Design Review 07-012, and
Conditional Use Permit 07-011.
General Plan Amendment 07-001 and Zone Change 07-002 are still in effect, however,
entitlements for Design Review 07-012 and Conditional Use Permit 07-011 expired on July
2, 2010 due to inactivity on the project and after numerous extensions had been granted.
Previously existing at the project site was a church facility which has since been
demolished.
Currently the project site is vacant and the same project as previously approved has been
submitted under new entitlements for Conditional Use Permit 10-009 and Design Review
10-018. The applicant is proposing the same project which incorporates the same building
and site plan as was previously approved.
PC Report
January 25, 2011
CUP 10-009 & DR 10-01$
Page 3
Conditional Use Permit and Design Review
Pursuant to Sections 9232.b.24. and 9233.c.1. of the Tustin City Code, rest homes (the
proposed assisted living/congregate care facility has been determined to be similar to a
rest home) are conditionally permitted within the Central Commercial (C-2) zoning
districts. Pursuant to the Section 9272 of the Tustin City Code, approval of a Design
Review is required for site design and improvement of new structures.
Previous Environmental Approval
A Mitigated Negative Declaration for the development of a 201 unit age restricted (62
years or older) assisted living/congregate care facility at 13841 Red Hill Avenue was
certified and adopted by the Tustin City Council on December 4, 2007, through Resolution
No. 07-93. Said Mitigated Negative Declaration evaluated the environmental impacts
associated with General Plan Amendment 07-001, Zone Change 07-002, Design Review
07-012, and Conditional Use Permit 07-011.
DISCUSSION
Site and Surroundings
The project site is bounded to the north by an office building and apartments, a
commercial shopping center across Red Hill Avenue, a carwash building and U-Haul
parking area across a public alley to the south, and a Tustin High school play field to the
west (Attachment A -Location Map). In general, with the exception of the apartments to
the north of the project site, all structures are one-story in height,
PC Report
January 25, 2011
CUP 10-009 & DR 10-018
Page 4
Project Description
The proposed project involves construction of a subterranean parking garage and three
story buildings interconnected with breezeways (Attachment B -Submitted Plans). A
total of 201 units consisting of one- and two-bedrooms along with 204 parking spaces
will be provided for tenants, employees, and visitors. Of the 204 parking spaces, 171
spaces will be assigned to the residents and 33 spaces will be available to employees
and guests (30 spaces in the subterranean parking garage and 3 spaces at grade/street
level). A pool, spa, outdoor courtyard and community center, which includes a fitness
center, game room, dining room, business center, family conference room, living room,
lobby and management offices, are also proposed.
Conditional Use Permit
The assisted living/congregate care facility will be limited to persons that are 62 years or
older and will provide a combination of housing, personalized supportive services, and
health care designed to meet the needs of those who need help with daily living as
follows:
• Three meals a day served in a common dining area
• Housekeeping services and personal laundry services
• Transportation
• Assistance with eating, bathing, dressing, toileting, and walking
• Access to health and medical services
• 24-hour security and staff availability
• Emergency call systems for each resident's unit
• Health promotion and exercise programs
• Medication management
• Social and recreational activities
The differentiation between the requested use and that of a senior residential facility is the
assisted living/congregate care services provided the age restriction, and the restriction
upon these residents who may have automobiles. Therefore, conditions have been
added to ensure that the proposed facility operates as such (See coridition 1.6 of
Resolution No. 4168). If these services and restrictions were not in place, the proposed
facility would be operating as a residential facility along what is substantially a commercial
corridor and would be significantly underparked.
Design Review
The proposed facility is a three-story building interconnected through breezeways with a
subterranean parking garage. A total of 201 units consist of 30 studio units, 145 one-
bedroom units, and 26 two-bedroom units will be provided. The floor areas of each unit
PC Report
January 25, 2011
CUP 10-009 & DR 10-018
Page 5
vary from 450 square feet for studios to 1,000 square feet for two bedrooms. Each unit is
equipped with kitchenette and either a private patio or balcony.
The building architecture is generally of a Mediterranean style with a stucco exterior wall
surface and the roofs. The exterior elevation is proposed with private balconies and
patios with contrasting exterior colors which create interest to the overall exterior
elevation of the project. The roof line is also proposed with a combination of flat and
gable roofs, thus providing an undulating building height across the project site. The
building's height is 42 feet on the average with the highest tower at 47 feet. Upon
completion, the proposed project will be the tallest building within the immediate vicinity.
However, the proposed height is consistent and compatible with the maximum allowed
height for the Central Commercial (C-2) zoning district, which is 50 feet.
The facility entrance is designed with asingle-story element and is oriented towards the
northeastern side of the property at Red Hill Avenue. The proposed building is enveloped
with a driveway along the northern and western property line. The driveway along the
western property line is also a fire lane which will be improved with turf block to allow for
dual usage of the area as green area and walkways.
PC Report
January 25, 2011
CUP 10-009 & DR 10-018
Page 6
The facility is equipped with a number of amenities to accommodate patrons' needs
which include court yards, swimming pool and spa, congregate areas for dining, game
room, fitness center, business center, and conference room. These facilities will provide
on-site activities and services convenient to the patrons, thus reducing the project's
potential number of daily trips.
Traffic, Circulation, and Parking
The Tustin City Code does not list specific parking standards for this particular use of an
assisted living/congregate care facility. Pursuant to Section 9263c of the Tustin City
Code, uses that are not listed in the Parking Ordinance shall provide parking as
determined by the Community Development Director. Due to the uniqueness of the
proposed use, the Community Development Director determined that a traffic & parking
study should be conducted.
A traffic study was submitted and reviewed by the City's Engineering Division (Exhibit 2
of the Environmental Analysis). The study concluded that the proposed project is
expected to generate approximately 406 new vehicle daily trips, which in comparison
with the previous church development at the site, would be an increase of 56 daily trips.
The project has been analyzed for on-site circulation. Due to close proximity of the
project site to intersections of Red Hill Avenue and San Juan Street, access to the
project site will be through one two-way driveway by either a right turn movement for the
southbound traffic or a left turn movement for northbound traffic from Red Hill Avenue.
Exiting traffic will be restricted to right turns only. Thus, impact to traffic along Red Hill
Avenue and San Juan Street is reduced to less than significant. These on-site
circulation restrictions will be included as mitigation measures and conditions of
approval of the project.
The level of service analysis was also performed for Red Hill Avenue and EI Camino
Real and Red Hill Avenue and San Juan Street. The study determined that no
significant impact will result from the proposed project and that the level of service will
remain the same.
A parking study analyzed three comparable senior living communities. to determine the
parking ratio for the facility along with parking occupancy rate. The study found a
maximum parking ratio of 0.68 spaces per dwelling unit, and the proposed project will
provide 1.01 parking ratio. Although it should be noted that of the 204 parking spaces,
only 171 spaces or .85 ratio per unit will be assigned to the units and the remaining 33
spaces will be available for guests and employees. A valet service at grade level will
also be provided to assist seniors with groceries or shopping bags and delivering their
vehicles to the subterranean parking garage. The assigned parking will be allotted by
permit process, requiring each tenant to apply for a parking space. As proposed, the
parking analysis determined that the project will have an adequate number of parking
spaces to accommodate the proposed project.
PC Report
January 25, 2011
CUP 10-009 & DR 10-018
Page 7
W.G. Zimmerman Engineering Inc. prepared the initial traffic and parking analysis for
the proposed project. They have provided a letter dated January 4, 2011 confirming
that the original traffic and parking analysis for the proposed project still remains valid
(Attachment D).
Environmental Analysis
The City prepared an Environmental Analysis Checklist to evaluate the potential
environmental impacts associated with Conditional Use Permit 10-009 and Design
Review 10-018 (Exhibit B Of Resolution No. 4168. The Environmental Analysis
checklist demonstrates that all potential impacts of the project were addressed by the
previous certified Mitigated Negative Declaration and no additional impacts have been
identified.
FINDINGS
In determining whether to approve the Conditional Use Permit for the proposed
development, the Planning Commission must determine whether or not the proposed use
will be detrimental to the health, safety, morals, comfort, or general welfare of the persons
residing or working in the neighborhood, nor be injurious or detrimental to the property and
improvements in the neighborhood of the subject property, or to the general welfare of the
City of Tustin. A decision to approve this request may be supported by the following
findings:
1) The proposed assisted living/congregate care facility has been determined to be
similar to a rest home which is a conditionally permitted use pursuant to Sections
9232.b.24. and 9233.c.1. of the Tustin City Code.
2) The location of the proposed assisted living/congregate care facility is compatible
with surrounding uses in that the use can be considered as quasi-
commercial/residential facility consistent with the adjoining residential and
commercial developments.
3) As conditioned, a covenant running with the land will be required to limit the use
as an assisted living/congregate care facility for 62 years or older subject to
providing certain senior services and limiting the number of residents who may
have automobiles.
4) The proposed use is not anticipated to result in parking impacts since the parking
analysis submitted for the proposed project concluded that there is adequate
number of parking spaces and site amenities to accommodate the project.
PC Report
January 25, 2011
CUP 10-009 & DR 10-018
Page 8
5) The Traffic Engineering Division has reviewed the proposed project and has
concluded that there will be no adverse traffic impacts, and there is sufficient
street capacity to support the proposed project.
Pursuant to Section 9272 (Design Review) of the Tustin Municipal Code, the Planning
Commission finds that the location, size, architectural features, and general appearance of
the proposed development will not impair the orderly and harmonious development of the
area, the present or future development therein, or the occupancy as a whole. In making
such findings, the Commission has considered at least the following items:
Height, bulk, and area of building -The facility offers various projections and
changes in height to break up the massing of the structures. The inner
courtyard provides secure open space for the residents.
Setbacks and site planning -The facility is separated from adjacent properties
by a drive aisle which also serves as a fire lane. A substantial landscaped
setback is provided from Red Hill Avenue and landscaping along the alley
frontage.
3. Exterior materials and colors -Materials consist of stucco, the roofing, glazing
and accent features most similar to the Mediterranean architectural tradition
which can be found in other buildings within the City.
4. Type and pitch of roofs - A series of hipped roof towers adorned with the break
up the flat roofing with parapet in order to create relief at the top of the building.
5. Size and spacing of windows, doors, and other openings -Fenestrations within
the building have pattern to them and ensure that there are not large portions of
blank wall on the building.
6. Towers, chimneys, roof structures - A series of towers are prevalent throughout
the building and serve to create vertical interest and a skyline.
7. Location, height, and standards of exterior illumination -Illumination will be
confined to the project site to avoid spillover onto adjacent properties.
8. Landscaping, parking area design, and traffic circulation - A traffic and parking
study has been prepared for the project to evaluate potential impacts. A
separate landscaping plan offers both courtyard landscaping as well as exterior
landscaping visible to the public right-of--way.
9. Location and method of refuse storage -Refuse will be stored and accessed
within the underground parking garage. Residents will use a system of chutes
to dispose of waste and recyclables.
10. Physical relationship of proposed structures to existing structures in the
neighborhood -The project site is along a commercial corridor and will offer a
visual enhancement to the existing neighborhood.
PC Report
January 25, 2011
CUP 10-009 & DR 10-018
Page 9
11. Appearance and design relationship of proposed structures to existing
structures and possible future structures in the neighborhood and public
thoroughfares -The project is similar in massing to the recently completed
cottages development around the corner on EI Camino Real.
12. Development Guidelines and criteria as adopted by the City Council -The
project is consistent with guidelines and criteria as adopted by the City Council.
,'
Rya wiontek Elizabeth A. Binsack
Associate Planner Community Development Director
Attachments:
A. Location Map
B. Land Use Fact Sheet
C. Submitted Plans
D. Traffic Analysis Letter dated January 4, 2011
E. Noise Analysis Letter dated December 3, 2010
F. Planning Commission Resolution No. 4074
G. City Council Resolution No. 07-93 & 07-94
H. Ordinance No 1346
I. Resolution No. 4168
ATTACHMENT A
LOCATION MAP
TUSTIN CITY MAP
Project No. CUP 10-009 & DR 10-018
address: Monarch Village
13841 Red Hill Avenue
Tustin, CA 92780
4~
\ ~
y._
~~ ~ ~ - i
1
\\ ' - f
.. \ ~
1
,' ,' ~~,~
r i ~
. ~ ~~ ~
/ ~
J
~'..~' i
•_
i/'
1
/ ,
r
i '
i
~ ~
__
_~.:~CATION 1IIAP
ATTACHMENT B
LAND USE FACT SHEET
LAND USE APPLICATION FACT SHEET
1. LAND USE APPLICATION NUMBER(S): CONDITIONAL USE PERMIT 10-009 & DESIGN REVIEW
10-018
2. LOCATION: RED HILL AVE & EL CAMINO REAL 3. ADDRESS: 13841 RED HILL AVENUE
4. APN(S):500-141-10
5. PREVIOUS OR CONCURRENT APPLICATION RELATING TO THIS PROPERTY: GPA 07-001,
ZC 07-002 CUP 07-011 DR 07-012
6. SURROUNDING LAND USES:
NORTH: OFFICE/RESIDENTIAL SOUTH: COMMERCIAL
EAST: COMMERCIAL WEST: TUSTIN HIGH SCHOOL
7. SURROUNDING ZONING DESIGNATION:
NORTH: R3/C-1 SOUTH: C-2 EAST: C-1 WEST: P&I
8. SURROUNDING GENERAL PLAN DESIGNATION:
NORTH: HIGH DENSITY RES./COMMUNITY COMMERCIAL SOUTH: COMMUNITY COMM.
EAST: COMMUNITY COMMERCIAL WEST: PUBLIC/INSTITUTIONAL
9. SITE LAND USE:
A. EXISTING: VACANT B. PROPOSED: ASSISTED LIVING/CONGREGATE CARE
C. GENERAL PLAN: PC COMMERCIAL/BUSINESS D. ZONING: C-2
PROPOSED GP: SAME PROPOSED ZONING: SAME
DEVELOPMENT FACTS:
10. LOT AREA: 125.538 S.F. 2.882 ACRES
11. BUILDING LOT COVERAGE: 100% MAX. PERMITTED 52% PROPOSED
12. SITE LANDSCAPING: DR REQUIRED 15% PROPOSED
13. PARKING: CUP REQUIRED 204 PROPOSED
14. BUILDING HEIGHT: 50' MAX PERMITTED 47' PROPOSED
15. BUILDING SETBACKS: REQUIRED PROPOSED
FRONT: NONE 22' 9"
SIDE: NONE/10' FROM RES. 10' & 33' 11"
REAR: NONE 32' 11"
ATTACHMENT C
SUBMITTED PLANS
G 1~
~- ~ ~ CC~~~
j Y f ~+ P
a ~
~ %~¢~iJ~
~I ~ ~~
i~l~!,
€i~ ~ ~
i
ii I i =,1
i w
x o I
i
d
I
Q
' \ ~
/
/ ~
U ~
C
__~ /
~`
; Z G
!I
~ //
R rr
r ~+'~ W~Q
~
W
y, fl lt~n `~
_ _ '~~ f7
~
'~ =~u
~~~
~ U
~
~
~,
~'
.. .
r'..
~,~ ~
r
i
~~
I
I
I ,~;,1«~®b i S ~I
/
Vii
d ~ ~ I~~ { ~ ~ SE
'
~
{ ~j
Z ~
j '
f' i
1
~ I '.
. - F- r~ ~
r
LJ V ~
r . ~ ~ I~ ~~
€; ~ ? ~
_
~,,
~
t_
~
~ ~
~
I~ ,
~ ~
~,
- ~ ~ ~ } ~I ~ ~~5~ Cf~ ~
x:- LL1 a
:_
s ~ z ~~ ~ ~
, ~ ~R ~~~
.
.a ~
e Q ~ '~ rF
~~ L'r~ '~ ~~
r
~ ~
~
j
~~ ~~
~ ,
~
I
1
4 ~ -,w „ems. •
~n Z , { cs ~J ~ ~ _
`
~~~
' I J
~~~
~ =
U j
~~ .~~~~ ° ~ ~i
W
~
Z "'
?UW=
~.~ F
C
~,.~ ,.
~ OZ"'O
Z~
~
1 O w ~
i
N d Q
~ "'~'4!A < Z m p
~ t _
"rlFi z
~ u
(f~
,q W
~pF
W V ~
~. ~ I
r `~ ~ F ~ ~ r ~ fp~=~
*~. ,-- Q fw- ~ Fjp~On.
C N ~ y j H W m N Z
-t~ c~ ~ ~ ~ p?m^O
~ <E _ ~ =o CJ ~ k ~ ~
~
F
~ f
~ ~ ~ ~ l~pe
s~pUl~~
~
F~' ~ ~
~ .~~'~. YtC ~ S~
a.~
.
• O
w
v~wo ~
~ b ~ .,
_
t
~ .~
~
`
~'
'~ ~ .r.. ., a
w~
_ ~ ~
L a
~gQ
Z -- ~+,
~ 3z
0 ~ F J 5 rcu
~~
~
+ L _
~ ~
r ~ ~~
~
~
~
j~
}
~{~~
~
k~$~ ~~
~ ~
~
~
~ ~I
i c
~I~I
I l l l l l l l l l
l a
~
~~ ~ ~
~
~ r,~lfs~f ~
~
~~ ~
~ a
6 ~ r ~~,~ a ~ ~ I ~~ ~ ~~
G a ~ _
~~ 6~ ~~ ~ ~ R_ ~~~ qg~~ ~t a d~~ ~~ ~ ~ Y~S
~ ~~~~ ~~
_ _
s. - - 1 - 11 - .. ~ ,~
-~ ~
~ ~~_ ~ 8~ ~ ~~ ~~ ~ ~~ l a 967
~i") I e
~ ~'~ ~ < .; _ ~~ s i ~
Y
a ~ ~ ~ ~ ~ - ~ ;< i ~~
t:
k ~ ~.-
-~,i~+ E
b
fi'
~g :.-
s d` - ~ ~~ _ ~ ~ i
k ' ~ ~ ~ ~
I _ - a
I s ~ -- - - ~ ~ ~ (' ~.~
~ _ ~ ~, ~ ~
~ ~~ l , I
~_
~~ _ I
~ ~~~ ~, ~ ~
~ ~ I . ~ --- -----
~ - I -
~ ~ 1 I ~ ~
~)
.o- ' ~~'~ < ~l ~ b ~~~
Q ~ ~i ~
_ ~ ~~
~I
~ ~ ~ ,. ~ ~ 1, , ~ ~ _ ~ 6~ ~ '~..~
. - ~_~ ~ ~,
~ ' I ~' ~ ' ~ y it <
_ ~
z - °~ _ ~
,~~ii ~~
_~
- I
n. ~
1
~~~ ~~
~F _
o-,ol- o-es
~~ - ~ ~
~pf_
~g~ I~
.. <
I I
~_ ~ II o
~ ~~ °~,
7
~~ ' _ ~~ ~~
~ ~ ~
I' II
~I~ D ~ ~~ ~_ (~
bw~ ~~ i
~~p KKy ~ - fall
~~~ 3 _ ~I!'~ Q
I f~ I III _~ I C I y ~ ~ ° ~ i~~ ~
_ jl ~ - ~~
II o
i
L, ~ -~- ~.
A - ~ ~_,.
l °~
-~~~~ - ~ ° 1N S9-OLZ M„Z0,l6.66N
\, I
_~ .~-______ _ _ ______ _ _ ~ I
~~ ~ .l3lN Jll9fld
~ ~ ~ ~Illlilllllllll 61~f,
~ ~ ~ ~ I ~ (~~~~ ~
Q ~~~~ ~~ ~ ~ ~ ~ ~i~~'j~ ~~z o
8~~3~ ~~~ ~ ~ ~ ~I~I~I I I I I I I I I I I I ~ ~ i~ills~i ~ ~ ~~g ~ ~ Q
y b
`~ 62
~> ~; ~
,~ ~_
- ------------ -- _ -- z
- ~ -=ate ~ g
- - __ _ -
~ ~~ - 1 ~ ' l - - ~_,~~
E~~ ~ - ~ - ~ ~~ ~ - ~
j l~~ `I ~ 4p Z
i _ f~ li, _: J w
~"v ~ -- - { ~ ~-, I -- ~
~-_ ~ .,
¢- ---
-~~
_._~ W I r _ , 3 __ _
~ ~ ~ ~ ~~ ~ _ i ~~
- ,
__
-~-- ~ --- ~ ~-1
--_ ~J_;
Cu y~_ ~ _ i
- - ~_
i
'~' 1 ~1 _ ~~ psi
~~
4 . ~ `~
______~
u+
C~ Y
~~ ~ ~ 1 _
~C , ~ I
_ ~ --. ,
~' , ~ ~--
-~~ ~
u _ r _ ~
-'
R ;i ~' ~ ~~~ A ~' ~
_ i _ ~ ~
A
K+ n ~
~~ l
.~
"' (~
~~ F 1 ~ ~d b~3~
~~ c _ t ~ tr ~ uu
- ~ i
_ --_
~~
~ ~ ~ `~
fslB
~ a~~LL ~~~ ~~ g~ a~~~~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ a ~ i~~~~bi~ G~ ~ ~~5 ~~ Q
- ~ ~~ -->
->>
~~~
~ -ti__ ~a
,. ~ ~ f b
-~,. ~. r' -,--
~..~..~i . ~ , E F
_ ~
~~ - ~
-,~%j r\
~~
~' ~ 1 \
~' ~ ~>I~'' __
~_.~
~i ~ f-
-- -
I~ ~ -~
_ I ~ ~:'.
~.
;r ~'
-~ ~~
_ , -
_ _ , --
_ -
_ ~,
~~ -~
_ ~w'
_. i _ ~_
~.
--~F `:
~e
v~ -~ `~~~~j-.- ,~.~ €,<~ ~rm~i-_ -
~ ~
~~
_?
Z
g
d
w
Q
z
W
0
w
~ o ~ ~I I l l l l l l l l i i l l i~(E~~~ ~
~ ~ ~ ~~ ~ ~ ~jE~#{~~
d ~~~$ ~~ "~ .e it1'fj~~ s ~ owz Y O
$~~~ ~~~ ~ ~~ ~I~I~) I l l l l l l l l l l a~ ~~~il,I! ~~ ~~~ G~ Q
`~-_~~ ~ .
--. i ,~'
~1-- ~<`
`'-~ _
_ _;-
_~
r,
`" ~ ~. i
~ ..-__-
r-~
~~~ -
a
iii -~ _~..i.
i{ _~
_ ~ ~ ~-'
~ ~}f
_ .1.-~J __-- _
I
~ ' ~
€_
1 ~-
' _
.,
`~_ ~I:^i
\ i ~~y
i~
~~~ .
~q
~ Y
z i
----I ~Y
~'[' f 1
{`1
Z
g
~.
M
J
W
W
Q
Z
O
N
- ~)
~~~ gg ~-
_1" 1
`. ~ ~ { f
~ ~ 41 I I I I I I I I I I I I I y~f r~7s
~ ~
~p~~~ ~~ ~ g I~~~~~! .o
d 8$$~ @~ ~ ~ ~ e f~ ~'~~~ O
g~m~ ~~~ ~ ~ ~ ~I~f~l I l l l l l l l l l l ~ ~ ~~~lii~ ~ ~ ~~ ~ ~ Q
~~ , _
ti7 ~y - :~
~'! ~
~ ~~
__
~~
o O e
,~
~
000 'I 9100 ~ .. e O
?DOD '~ O ~,0 O
J i
:. __ /
_ _„ ~
E
AD
0 0
~ D e
Os / ~ ,
~
. ~
~ i gyp'
I :.. _ _.~ _pt
( \WI/
~~{{
94
~.~ ~
i
D #
~,
oo ~ /
~ _ O _
Vi
00
D0
u Do
00
Y.~ ~
~
1
1..,r ~ _
~ -
..
-0
'....
` eo
..900 p O'
esoe sa 0e
oe
' oo
~ ~ '~
r
- eo 1
ao ~~
e
s e
90
i ~
-a e V
4. 90
'r~;j'-'-` e0
i no
00
.
~'
~- 00
00
~~
ee
60
eD
_
.,_. 00
ooa 00
_
- Oe
00 ~ .. ,
'-
00
00 ' ~0e
00
~f _ OO
e a. eo
~.
4
00 ;
~
~~
-
~ ~
~--~~~/// ~
T, ~~
~ ~ I. e0 ~
4 61. oo ~._~..~
11 gllfi
pmY,
-- t00
00
AA
~. 00
~
'
~
~
~
~
au ~ .. eO
0 X00
1 00
AO
L _ tt i
A 0 0
~` o0o
0 D$ o
O O O ,ePO
9 9 0 aeo
A 0 0
~
_ _ _ _
I
~,
~ ~ i ~~ ~ I i s ~~
E } _ ~ c Z
J
` S ~
.
x W }
L
'
~
s
ee
$~~ rt ~
~~~ ~ k
g< i
i I
~ ~ ~I ~ ~ tQ f N
o ~~ ~. ! i ~i
I
i ~ zw Q
~,
~m
~ it ~~~ ~
~ ~ e
p ~ ~
~~i
~ I
I z
3
~ ~
~ ~
E S ~. ' i ~?
~
~ ~ . e
I
I 'i i
I
l
o
a~ ~
_
N
~ ~
h
f-
~.
z:
~ _
t
g
Z Z
_
U
d
I
~
t~
~
w
Q
~, ~ ~ ~!lilllll~~ `~
z
~
~ a ~ ~,~ i -~ N
~ ~ ~
I Ilia Ali ~~ <~
~ N
3 _ - ~ ~~ ~ I ' ~ ~J
w ~ Q
G ~ ll it i~~ ~ .
z ~ ~ 5 ~ I,I li~'~i ~ ~I~li ~~ 1 z
_ $ d
~ ~ ~i ~li 1I o c~
~ I Q ~ '_
~ .i ~' _• e a I I ~ ~w Q
I
.. - ;'L.
° .. - ~ -
z
z ~ I ~
z
z
3 - ~
g ,. .. ..
~.
i_ ~,
k a
~ i
S
~~ ~a, ~ ~1~i~ ~.
~I,i ~ I a
z
l
m o ~ o.
I m
' I~~ ~~i
~i_M
,.
y
-
Q
' ,.
~1 ~ ~
I
~ ~'
~ -
- o
~~ ~ - ~
~' ~~ ~ - T
~ Q
F -~
~
~ P.
' - _ .~
_
Ig
~
w
l-
J
l ~
' ' o' U
i
j
~ r I
,
~ ~, ~
,.
F
~ ~ ,.
~
,
-
~
i
~ _,.
__. ~
~ -~
.F'-'-.-
i i
~ ~ i ~_ ~ ~ _
°~ ~~~ I, -
I
~ -
~ = °-_
~ ~~ ~I
~~ t
~, ~ ~~-~
I rte. ._ : ,., ~._ _ ~ ~;
__.. _ ~
-. _. Y ,}f
I
J F gill III
~ ~ € l
~ ~~~
~ a
U ~ _~ ~
~
~, c
i
}
I I
k
I
a _
~
~ r
s
~ ~
~ ~
! i ~
' I ~~
<
F
~3~a ~5
~ I
i _'
~ ~j
,. w Q
_~ 1- r___ _ ~ _ _ y
~'
r -~ ~ --~ {
s !I !.~ I I
_- ,.. ~w ~ ~_ _,. ~_ - r
~~ _ ..:~. _ w,~,u_ ~
i ° ~ a ~ ~ ~
z
_~~ al r ~~ ~., ~, y ~ - 1~ ~ i Q
III ~ ~ ~ ~~~ ~ ~ ~ l~ ~ ~ : I ~ ~ ~ ~ ~ I i~ z
a ~I ~ ~'~ i _ ~ I z. w
~,
~~
o' of i _ ~ ~ ~ ~ ~~ _ _~ o~~! U
- -~ a ~ ~ o' ~ j ~ a_ _ ~ o d
{ ~~
_..~.~.__ ti '~ ~ ~
e ~ t ~ ~%
r
a I
',~
r
L ~ ~ ~ ~
~ ~~
J o ~-,
° ~
I~
~~ ~ ~
~ ~
-- -- -- -
i
'' - '`
~ ~ ~I~ lil of
`= F °s z ~ ~,' , ~ s
r ~ ~ ~ ~, i 'I '~ ~ o
v
~ g~ ~ o ~ ~ . I~ li ~ ~ ~ g ~l c.i
V E ~ Y< k F] I ~ GI r ~ ~I~I YI ~ w c~ Q
I
__
o
~ z _
. .,,
~~
i
<~ ~ ~~` ~ 3
~_ ~ ~ __ ~-
_ >~~ _~.=
c
_ : ~ z ~' ~ ~~ _ ! ~ _ ~iJ ~ _ _ , _ __ o
~~, ~ ~
f~ ~~
~. _ ~ r ~ a
o ~ o ° i ~ ~,
o ~ ~ ~ o ~:
., ~ ~
` ° ~~ z ~, ~~ 1' _ ~ ~, ~-
i i ~~
j M ~ ~~ ~~ ! ~ I ~
li ~"' _~
f
J__ i
i ~~
~. ..
U ~ W ~'
0
~ 3 g ~~ g I I ~ j ' ~ ~-
~ ~~ ~ e ~~i t ~ i a ~ ~ ~
~ ~~a ~ ~I ~ 4 N
v ~< ~' I I l i ~ ~~~ ~z
~° I~ e Q
w ~ E
r
I
i I
I
%.~.^
`~ r II'II~ III! I
_ Z
~_~ ~ u ~ ~~' i 111 ~ ~~
g _ ~j3Q~~L3 ~ Y ~ - G Q CV
V :.~:~ SZ~' '~~ Y ~ f~' ~w Q
I
II
I
V
_
~ ~
y
o
v s ~3 s
~
~' ~ ~~ ~~
~~
III.
I
Z
~ c3 r 4 N
~w r 9
v 3
b ` ,, I
~~
~ j
~~~~_
.n. ~ iii, _~ r- ~,
~ s
~',
~~
.~ g~~ ~~ ~ o~'
Vii; Z ~
y ~ _. _~
QL
1 ~,
- -_ 1 j z
,_ ,,,
~ I
~I u ~ ~ Q
~; z
~ w
~ ~ tiE • ~ - i - '~ ~ I ~ ~
~ ~"
I ~ ~ ~.~' i
<~ ~
_~< ~m i
~. _ .~_
~ ~ ~,
~ i=_ ~ ~ C ~, _.
~,
~j ~_° ~ i ~ ! o ''
j ~ - I ° ~I
~~ ~ ~~ - .
o ~,
s
m
_ i
i-
a~
~ ~ ~
- - ---
M, ~ i ~ ~
- ~
I
fff III I ~ ^'
~ f~-- ~
1. ~ _
~ 1 ~ i ' ~ ~I
,~
n ~,
~~~
,<
J ~~
~._ ~
~ 1 _ __
. ,,
•~ ~ ~ ~ ~ ~~ ~ i ~ "~
~ ~ ~ ~
~ ~ a~ ~ ~ ~~ ~ ~ o
g~
a
_ ~ ~ i it j ~a M
a F ~~ ~ I w .. .. gw s
_ - _ ~ a ~~.,.~ i ~ H
a
s
a
z
0
Q
a
N
~
a
x ~ r ~
~
~? ~ Q
~
~~
~z~r ~a
!' VIII
II
~I~I~
cam,
s~ it ''i ~ ~ o
~ ! ~ ~~
a ~ ~-,
_~ ~ Y
1 '~ 'I I,
_~ .~_ ._
i. -Y
I ~ ~~
~~
~~~ ~ ~ ~ ~,
~.~.
L ~
r~
;~+ ~
i r~~r
~ ~~
~~ ~ EE1i ~ I
,. __
i~~l I~
~ fE ~ I
~ ~~ i_
'~ ~,
~~
~ t~ ~ -~--
II
1
i
~- i
r
91 ,} ~ ti
-,
Z
o
W
0
F_ _ _
F ~_
;F
I
l
~ 1..
~~-~~
~,
~~
,,Y ~
F:,
,,
;,
_-~
;..
~~
~ ~,
~~~
~~ `,'
E
A,;~.
~i
'~~~
~ ~ . ~.~'
._ ~
~ `~._~
,~
~`I ~
~-- r,
=~ ~ ~ ~~
,~
i r~, ~~ ~j
1 8 ~-
~` '~ ~~~11
I f ~~ W ~ ,`
~ ~ a ~
s ~
f `~
~~ ~r - _J~
s,~~~
sG
I ~ F,-~1
:-
~_,
~_
~,
W
,-
~'
~1
~~~~
T
~..~ _ _ ,
_~-
{
z~
y N 4 } I
F
.~ ~ o ~ 41 ~ ICI ~lil
1i1 a ~ = a~ g I I ~ i ^j O
T i
Y i y
r
~ ~'' I'~ I I' lil C7
~ ~~ i i ~ _ 4~ 53 Q
' ~
_~~ ;:
V
N
} { ~,
. I
I ~ - N -
it 1
,~
it i
'
- ; ~3
!_
~
,i II
~
~,
E
~ ~ }7i!
_~
~
~, ~ ,
~ i~ z
o
(: ~ R
_
~: ', I ~ =1 ~
~ ~
{
w
w
~
d
` ~ ~ _
~-
~ ~~ --
~
w
~
Q
~I I
~ - _~
f~~l~
_. ~ .
' ~ --~~~ I
I i_ ~
~.
~
I ~
~~~~~
~~ ~ ~~ ~~~,
'~
i i
~_~ t
r~,
~~
~~ ~_I III ;~i
~~
I
~~'1
I'~ ~~i ~ ~r ~
~
i
ii
~~
--
-~~--j
~-_~ ~I
I I
i
' ~ t
-
-
_
i ~ ~ I
t~~ L ~
': i _~~~?
[ 1 J[ ',
~~~ __
i~) ~;
` ~~I
LL. ~I
__ ~ ~._..
~ ; ~ ~ ~ ~! l ~ I `~_ ~ ~i
r
$~ '. r '
f . ... ,-. .....~
+ ~ 7 _ ~ ,___ _r
J .~
~J ,I I. I ]
t M
4
~ ~' V
,
w e
Y
i ~ _- ~~
~
/r_
I ~ f~ j '
~_ _ ~ 1 11
~ I :. ~ ~ ~ v~
~.
~ -
~ I
1
- E t ~i
0 ~ _ _ _
i I~ ~
Q
j ~ ~ >QG
w
~
/ >>Q
J
__ ~ _
~.. r
II Q
4 /
~ \ ~ i ' Q
G
i _
__ i ~~ I
~\
~1
F\ ~~
l I
I ~
E
,
s
~ 1 ~ L
~ ~~
'
~ ~~
i ..
. _
_I
~ ~~ ~
i
SSS )r
i~ l I i_1 i
i II
~
i. J i.
~ _:
~
I i
.
I ~ »
Jr
~~ ~°~ Kd~a a~x.~
C;Y Faj
~~ %sa 40b(16 VJ `e~moW rxue5 V7 `NLLSfI_L y ~ In
i 7aa~aS 4x91 1 £9l ~ ~ ~
~~' ~ ~ .L1~13Y~[~d0'l'3A3Q SCI Q1X[Ni ~ ~ ~ ~ ~ ~
~~ S.L~~1,IH~21d b'dW~J
~~ ~'~ ~ I~ILLSf1.L-flJd7'IIA H~2It~i~IOhI
=~
~ o o ~ °z
y Q
~I j 5 ~ ~ .~ L F- w
O :~ ~ >p CJ.
d u w d' o n .~~
z r
p d C p
~ V ~i < m ~ F~ G
G
~ r
-
~d~i~L'~v: i=3~~oS ~a
u~
a
A LL
~ `5
C7 ;px
~~ rw-1 m O ~ w
W
{y] ~
a ~
7 ,_, by
d 1. y
~ y p ~ f-
fW ~,
I i .. ~ c
Y-_,_
~
- ~-
9
m F
!
-
.,
~ .
~
~ ~
a
~~ 9
~
v < ti. Z r
~ ~
f` _ i ~
~ I I ~ >_ y ~ ~ x ~ z
7
/
{
~ - _ ~ ~ a .m~~~ ~ ,
,;~
-
~y
°lW
~ i
~
:
J
I
F i
~ ~ __ ~ ~ I l f ~ -
~ `~
a ( ~~ i
~ f .- ~ ~N 1
- ~ ~' ~ ~ ~ t f ~ i,~
_ '~
_. ._ ~ ,~ ~ ~r ~
E.~
i
I
a
!
'
Q
~-
,r r
1 ~
~W
3-.. (
- .
~ ~ ~
--- _'
j ~
~
~
!
~
.~
~
i I f ~
." ~ ~ ,
~. - ~ - s
~~ " ~ l , ~ j - j ~ ~
~
~ •~,; r~ ~
~I J° ~I
I ~ _ ~, ~
~ t, - _
i ' 1~
~ ~ i
~'
~
l
~ =
~i
~_.
ATTACHMENT D
TRAFFIC ANALYSIS LETTER
JANUARY 4, 2011
January 4, 2011
John Haffner
ASL Monarch Living, Inc.
1740 E. Garry Ave., Ste 105
Santa Ana, CA 92705
Re: Monarch Village -Tustin
Traffic and Parking Analysis Confirmation
Dear Mr. Haffner:
W.G. Zimmerman Engineering Inc., has reviewed the traffic and parking analysis we performed
as part of the Traffic Study for the Monarch Village -Tustin Senior Facility, dated August 2007
at the request of the City of Tustin. Our traffic and parking analysis for the project remains valid.
Traffic Analysis:
Our validity assessment of the traffic analysis generated by the project is based upon
construction of 201 units of senior apartments.
Parking Analysis:
Our validity assessment for the Parking Analysis is based upon the parking structure and above
ground parking layout proposed in the August 2007 Traffic Study, including the number of
parking stalls, circulation, and visitor spaces. It is our understanding that the Valet Service and
parking management program shall remain enforced by the management company.
Should you have any questions regarding this letter, please do not hesitate to contact me
directly at 714.799.1700 ext. 11.
Respectfully submitted,
W.G. Zimmerman Engineering, Inc.,
~~~
Bill Zim erm . P.E., T.E., PTOE
Presiders
W.G. Zimmerman Engineering, Inc.
5772 Bolsa Avenue, Suite 200
Huntington Beach, CA 92649
' (714} 799 -1700 / (714) 799 -1701 Fax
ATTACHMENT E
NOISE ANALYSIS LETTER
DECEMBER 3, 2010
12!06/2010 12:08
3108028002
Davy
~ Associates, Inc.
Consultants in .caustics
DAVY AND ASS~IATES
SlOO Hortlr iywNeal~ /lvd. Sulb ~? • MY1rIMfMN Inch, CA f02ia • TM: 3lp.~1~D00 • Fyz: 3l0-aO~AQDY • 1
December 3, 2010
Mr. Jahn Haffner
ASL Monarch Living, Inc.
1740 E Oarry Avenue, Suite 105
Santa Anne, CA 92705
SUBJECT: Monarch Village Acoustical Report
Dear John:
in accordance with your request, I have reviewed the Acoustical Re
Monarch Village dated February 9, 2006. The projected noise level
was CNEL 66.5 at the Building. The projected noise level for the ye
than CNEL 67.5.
Our recommendation in 2006 waa that all south facing perimeter H
doors be glazed with STC 32 glazing. With this recommendatlon i
noise levels will be less than CNEL 45 and therefore will meet the
City of Tustin. i don't think that any addifional analys'~ is required.
Sincerely,
DAVY ~ A33OCIATES, INC.
~^4lCu"~ ~. ~QU1~
7
Bruce A. Davy, p. E.
Pr®sident
PAGE 02/02
~~
t I prepared for
'the year2016
2020 will be less
Hive and glass
~mented, interior
iremerrts of the
BD/kbd
ATTACHMENT F
PLANNING COMMISSION RESOLUTION NO. 4074
RESOLUTION NO. 4074
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF TUSTIN, APPROVING CONDITIONAL USE
PERMIT 07-011 AND DESIGN REVIEW 07-012 FOR
AUTHORIZATION TO DEMOLISH AN EXISTING CHURCH
FACILITY AND CONSTRUCT A 201-UNIT ASSISTED
LIVING/CONGREGATE CARE FACILITY AGE
RESTRICTED TO 62 YEARS OR OLDER AT 13841 RED
HILL AVENUE
The Planning Commission does hereby resolve as follows:
The Planning Commission finds and determines as follows:
A. That a proper application has been submitted by American Senior Living
Development, LLC to demolish existing church facility antl construct an
age-restricted (62 years or older) assisted living/congregate care facility at
13841 Red Hill Avenue;
B. That the General Plan Planned Community Commercial/Business land use
designation provides for a variety of commercial and business uses. In
addition, the project has been reviewed-for consistency with the Air Quality
Sub-element of the City of Tustin General Plan and has been determined to
be consistent with the Air Quality Sub-element.
C. That pursuant to Section 9233.c.(p) of the Tustin City Code, assisted
living/congregate care facilities have been determined to be similar to rest
homes which are conditionally permitted within the Central Commercial (C-
2)zoning districts.
D. That the applicant has requested approval of General Plan Amendment 07-
011 and Zone Change 07-002 in conjunction with the application for
Conditional Use Permit 07-011 and Design Review 07-012;
E. That a public hearing was duly called, noticed, and held for Conditional Use
Permit 07-011 and Design Review 07-012 on November 13, 2007, by the
Planning Commission.
F. That the establishment, maintenance, and operation of the proposed use
will not, under the circumstances of this case, be detrimental to the health,
safety, morals, comfort, or general welfare of the persons residing or
working in the neighborhood of such proposed use, nor be injurious or
detrimental to the property and improvements in the neighborhood of the
subject property, or to the general welfare of the City of Tustin in that:
Resolution No. 4074
Page 2
1) The proposed use is authorized pursuant to Section 9233.c.(p) of
the Tustin City Code with the approval of a General Plan
Amendment 07-001 and Zone Change 07-002.
2) The location of the proposed assisted living/congregate facility is
compatible with surrounding uses in that the use can be considered
as quasi-commercial/residential facility consistent with the adjoining
residential and commercial developments.
3) As conditioned, a covenant running with the land will be required to
limit the use as an assisted living/congregate care facility for 62
years or older subject to providing certain senior services and
limiting the number of residents who may have automobiles.
4) The proposed use is not anticipated to result in parking impacts
since the parking analysis submitted for the proposed project
concluded that there is adequate number of parking spaces and site
amenities to accommodate the project.
5) The Traffic Engineering Division has reviewed the proposed project
and has concluded that there will be no adverse traffic impacts, and
there is sufficient street capacity to support the proposed project.
G. Pursuant to Section 9272 of the Tustin Municipal Code, the Planning
Commission finds that the location, size, architectural features, and general
appearance of the proposed development will not impair the orderly and
harmonious development of the area, the present or future development
therein, or the occupancy as a whale. In making such findings, the
Commission has considered at least the following items:
1. Height, bulk, and area of buildings.
2. Setbacks and site planning.
3. Exterior materials and colors.
4. Type and pitch of roofs.
5. Size and spacing of windows, doors, and other openings.
6. Towers, chimneys, roof structures,.
7. Location, height, and standards of exterior illumination.
8. Landscaping, parking area design, and traffic circulation.
9. Location and method of refuse storage.
10. Physical relationship of proposed structures to existing structures in the
neighborhood.
11. Appearance and design relationship of proposed structures to existing
structures and possible future structures in the neighbofiood and
public thoroughfares.
12. Development Guidelines and criteria as adopted by the City Council.
J. That an Initial Study was prepared to evaluate the potential environmental
impacts associated with General Plan Amendment 07-001, Zone Change 07-
Resolution No. 4074
Page 3
002, Conditional Use Permit 07-011, and Design Review 07-012 that
concluded, with mitigation measures, potential significant impacts can be
reduced to a level of insignificance and a draft Mitigated Negative Declaration
(MND) was prepared.
The Planning Commission hereby approves Conditional Use Permit 07-011 and
Design Review 07-012 authorizing the demolition of the existing church facility
and construct an age-restricted (62 years or older) assisted living/congregate care
facility at 13841 Red Hill Avenue, subject to the conditions contained within exhibit
A, attached hereto.
PASSED AND ADOPTED by the Planning Commission of the City of Tustin, at a
regular meeting on the 13th day of November, 2007.
ti----
JOH ELSEN
Chair` rson
~'
ELIZABETH A. BINSACK
Planning Commission Secretary
STATE OF CALIFORNIA )
COUNTY OF ORANGE )
CITY OF TUSTIN )
I, Elizabeth A. Binsack, the undersigned, hereby certify that I am the Planning
Commission Secretary of the City of Tustin, California; that Resolution No. 4074
was duly passed and ado~ted at a regular meeting of the Tustin Planning
Commission, held on the 13t day of November, 2007.
~-~~
-gin. %~,~~~ z ~~~
ELIZABETH A. BINSACK
Planning Commission Secretary
EXHIBIT A
RESOLUTION NO. 4074
CONDITIONAL USE PERMIT 07-011 AND DESIGN REVIEW 07-012
CONDITIONS OF APPROVAL
GENERAL
(1} 1.1 The proposed project shall substantially conform with the submitted plans
for the project date stamped, November 13, 2007, on file with the
Community Development Department, as herein modified, or as modified
based on recommendations of the project architect and the
Redevelopment Agency as required to meet project budget, or as modified
by the Director of Community Development in accordance with this
Exhibit. The Director of Community Development may also approve
subsequent minor modifications to plans during plan check if such
modifications are consistent with provisions of the Tustin City Code.
(1} 1.2 Unless otherwise specified, the conditions contained in this Exhibit shall be
complied with as specified or prior to the issuance of any building permits for
the project, subject to review and approval by the Community Development
Department.
(1) 1.3 Resolution No. 4074 shall become null and void in the event that General
Plan Amendment 07-001 and Zone Change 07-002 are not approved by
the Tustin City Council.
(1} 1.4 The subject project approval shall become null and void unless permits for
the proposed project are issued and substantial construction is underway
within 12 months. All time extensions may be considered if a written request
is received within thirty (30) days prior to the expiration date.
(1) 1.5 Approval of Conditional Use Permit 07-011 and Design Review 07-012 is
contingent upon the applicant returning to the Community Development
Department a notarized "Agreement to Conditions Imposed" form and the
property owner signing and recording with the County Clerk-Recorder a
notarized "Notice of Discretionary Permit Approval and Conditions of
Approval" form. The farms shall be established by the Director of
Community Development, and evidence of recordation shall be provided to
the Community Development Department.
SOURCE CODES
(1) STANDARD CONDITION (5) RESPONSIBLE AGENCY REQUIREMENTS
(2) CEQA MITIGATION (6) LANDSCAPING GUIDELINES
(3) UNIFORM BUILDING CODE(S) (7) PC/CC POLICY
(4) DESIGN REVIEW **" EXCEPTIONS
Exhibit A
Resolution No. 4074
Page 2
(1) 1.6 As a condition of approval of Conditional Use Permit 07-011 and Design
Review 07-012, the applicant shall agree, at its sole cost and expense, to
defend, indemnify, and hold harmless the City, its officers, employees,
agents, and consultants, from any claim, action, or proceeding brought by
a third party against the City, its officers, agents, and employees, which
seeks to attack, set aside, challenge, void, or annul an approval of the City
Council, the Planning Commission, or any other decision-making body,
including staff, concerning this project. The City agrees to promptly notify
the applicant of any such claim or action filed against the City and to fully
cooperate in the defense of any such action. The City may, at its sole cost
and expense, elect to participate in defense of any such action under this
condition.
USE RESTRICTIONS
(***) 1.7 Prior to the issuance of a building permit, the applicant shall record a
covenant running with the land that is binding upon the property owner and
successors in interest subject to review and approval by the Director of
Community Development and the City Attorney consistent with the
conditions of approval including but not limited to the following:
• The use shall be limited to an assisted living/congregate care
facility for persons of 62 years or older.
• Combination of housing, personalized supportive services, and
health care designed to meet the needs of those who need help
with daily living shall be provided at all times and shalt include, but
not limited to the following:
o Three meals a day served in a common dining area
o Housekeeping services and personal laundry services
o Transportation
o Assistance with eating, bathing, dressing, toileting,
and walking
o Access to health and medical services
0 24-hour security and staff availability
o Emergency call systems for each resident's unit
o Health promotion and exercise programs
o Medication management
o Social and recreational activities
The above services may be provided either by the owner of the
facility ("owner") or by the use of outside providers; however, the
owner shall be responsible to ensure these services are
available upon request.
• Of the 204 parking spaces, only 171 residents may have
automobile. This restriction shall be incorporated in any lease or
rental agreement.
Exhibit A
Resolution No. 4074
Page 3
• The owner and/or operator of the facility shall ensure that on-site
services and parking are provided such that off-site or
surrounding properties parking are not impacted.
(2) 1.8 Roof ceiling construction shall be roofing on 1/2" plywood. Batt insulation
shall be installed in joist spaces. The ceilings shall be on layer 5/8"
gypboard nailed direct.
(2) 1.9 All exterior walls shall be 2X4 studs 16" o.c. with Batt insulation in the stud
spaces. Exterior walls shall be stucco or other approved exterior plaster.
Interior walls shall be made. with 5/8"gypboard. All other windows and
glass doors shall be double glazing.
(2) 1.10 All southeast facing perimeter windows and glass doors shall be glazed
with STC 32 glazing. STC 32 glazing may be provided with either '/.."
laminated glass or a dual pane assembly with a '/z" airspace. In either
case, the glazing supplier shall be prepared in an independent, accredited
testing laboratory in accordance with ASTM E-90.
(2) 1.11 All entry doors shall be 1-3/4" solid core doors with weather stripping seals
on the sides and top. Glazing in entry doors shall not be accepted.
(Z) 1.12 Striping on Red Hill Avenue shall be modified to provide northbound left
turns into the project driveway, but no left turns out of the driveway. A
"Right Turn Only" sign shall be installed on private property for traffic
exiting the project driveway.
(2) 1.13 Large semi-trailers and moving vans shall be prohibited from entering the
site. Move-in conditions along with other terms and conditions for
residency at the complex shall be included in the signed Tenant
Agreement.
(2) 1.14 Prior to issuance of a building permit, count-down pedestrian heads shall
be installed at the intersection of Redhill and San Juan Street by City
forces at the expense of the applicant.
(2) 1.15 The project shall maintain a total of 204 parking spaces with a minimum of
0.85 parking ratio per unit at all times (171 spaces assigned to the units and
33 spaces for employees and guests parking}.
(4) 1.16 Access to the underground garage area shall be provided to Police
personnel via an Emergency Vehicle Access System. The system shall be
installed along with fire access to allow police officers to use a remote
clicker that is installed in all police vehicles.
Exhibit A
Resolution No. 4074
Page 4
(2) 1.17 If in the future the City determines that parking or traffic problems exist on
the site or in the vicinity, the Community Development Director may require
that the property owner prepare an analysis and bear all associated costs. If
the study indicates that there is a parking or traffic impact, the
applicant/property owner shall provide interim and permanent mitigation
measures to alleviate the problem.
(2) 1.18 No outdoor storage shall be permitted during grading or building stages,
except as approved by the Tustin Community Development Director.
(2) 1.19 During construction, permission from adjacent property owners shall be
required for any work located on adjacent properties.
(1) 1.20 Prior to signs installation, the applicant shall submit on-site sign plans for
review and approval and permits obtained.
PLAN SUBMITTAL
(1) 2.1 At the time of building permit application prior to Dec. 31, 2007, the plans
shall comply with the latest State and the City Tustin adopted Codes: 2001
California Building Code (CBC), 2001 California Mechanical Code (CMC),
2001 California Plumbing Codes (CPC), 2004 California Electrical Code
(CEC), California Title 24 Accessibility Regulations, 2005 Title 24 Energy
Regulations, City Ordinances, and State and Federal laws and regulations
2005 Edition. It is expected that a new set of Califomia Codes will take
effect on Jan. 1, 2008. Please note that this set of comments is based on
current codes.
(1) 2.2 Building plan check submittal shalt include the following:
• Seven (7) sets of construction plans, including drawings for
mechanical, plumbing, and electrical.
• Two (2) copies of structural calculations.
• Two (2) copies of Title 24 energy calculations.
• Details of all proposed lighting fixtures and a photometric study
showing the location and anticipated pattern of light distribution of all
proposed fixtures. All new light fixtures shall be consistent with the
architecture of the building. All exterior lighting shall be designed and
arranged as not to direct light or glare onto adjacent properties,
including the adjacent streets. Wall-mounted fixtures shall be directed
at a 90-degree angle directly toward the ground. All lighting shall be
developed to provide a minimum of one (1) foot-candle of light
coverage, in accordance with the City's Security Ordinance.
Exhibit A
Resolution No. 4074
Page 5
A note shall be provided on the plans that "All parking areas shall be
illuminated with a minimum of one (1)foot-candle of light, and lighting
shall not produce light, glare, or have a negative impact on adjacent
properties."
(1) 2.3 Vehicle parking, primary entrance to the building, the primary paths of travel,
cashier space, sanitary facilities, drinking fountain, and public telephones
shall be accessible to persons with disabilities and shall be shown on the
plans.
(1 j 2.4 Prior to issuance of a demolition, precise/rough grading, and/or building
permit with valuation of $50,000 or greater, the applicant shall submit for
approval by the City of Tustin, Construction & Demolition (C&D) debris
collection, disposal, and diversion information on the City-prescribed
forms.
At least 50 percent of the construction debris shall be diverted from landfill
to the recycling plants. A security deposit in the amount of $50 per ton
(not to exceed $5,000 per project) for a C&D security deposit will be
collected prior to issuance the permit. Prior to final inspection, the
applicant shall submit to the City of Tustin documents (i.e. receipt from
vendor) showing actual weight or volume of each material of C&D diverted
to the recycling center. For any questions or concerns, please contact Joe
Meyers at (714) 573-3173.
(1) 2.5 Seven (7) sets of final grading plans consistent with the site and
landscaping plans as prepared by a registered civil engineer shall be
submitted and shall include the following:
A. Technical details and plans for all utility installations including
telephone, gas, water, and electricity.
B. Three (3) copies of a precise soil report provided by a civil engineer
and less than one (1) year old. Expanded information regarding the
levels of hydrocarbons and ground water contamination found on-site
shall be provided in the soil report. All pavement "R" values shall be in
accordance with applicable City of Tustin standards.
C. All site drainage shall be handled on-site and shall not be permitted to
drain onto adjacent properties.
D. Drainage, vegetation, circulation, street sections, curbs, gutters,
sidewalks, and storm drains shall comply with the on-site Private
Improvement Standards.
E. Two (2) copies of Hydrology Report.
Exhibit A
Resolution No. 4074
Page 6
F. A surety/cash bond will be required to assure work is completed in
accordance with approved plans prior to permit issuance. The
engineer's estimated cost of the grading, drainage, and erosion control
shall be submitted to the Public Works Director for determination of the
bond amount.
(1) 2.6 If buried resources are found during grading within the project area, a
qualified archaeologist would need to assess the site significance and
perform the appropriate mitigation. The Native American viewpoint shall be
considered during this process. This could include testing or data recovery.
Native American consultation shalt also be initiated during this process.
(1) 2.7 The engineer of record shall submit a final compaction report to the
Building Division for review and approval prior to the issuance of a building
permit.
(1) 2.8 The engineer of record shall submit a pad certification to the Building
Division far review and approval prior to the issuance of a building permit.
(1) 2.9 Information to ensure compliance with requirements of the Orange County
Fire Authority, including fire flow and installation of fire hydrants, subject to
approval of the City of Tustin Public Works and/or Irvine Ranch Water
District.
(1) 2.10 Prior to issuance of any permits, the applicant shall submit for approval by
the Community Development and Public Works Departments, a Water
Quality Management Plan (WQMP) specifically identifying Best
Management Practices (BMPs) that will be used on-site to control
predictable pollutant run-off. This WQMP shall identify the: structural and
non-structural measures specified detailing implementation of BMPs
whenever they are applicable to the project; the assignment of long-term
maintenance responsibilities (specifying the developer, parcel owner,
maintenance association, lessee, etc.); and, reference to the location(s) of
structural BMPs.
(1) 2.11 Prior to submittal of a Water Quality Management Plan (WQMP), the
applicant shall submit a deposit of $2,700.00 for the estimated cost of review
of the WQMP to the Building Division. The actual costs shall be deducted
from the deposit, and the applicant shall be responsible for any additional
review cost that exceeded the deposit prior to issuance of grading permits.
Any unused portion of the deposit shall be refunded to the applicant.
(1) 2.12 Prior to issuance of any permits, the property owner(s) shall record a
declaration of restrictions with the County Clerk Recorder. This declaration
binds current and future owner(s) of the property regarding implementation
and maintenance of the structural and non structural BMPs as specified in
Exhibit A
Resolution No. 4074
Page 7
the approved WQMP. This form can be obtained from the Community
Development Department
The Community Development and Public Works Departments shall
determine whether any change in use requires an amendment to an
approved Water Quality Management Plan.
(1) 2.13 Prior to issuance of grading permits, the applicant shall submit a copy of
the Notice of Intent (NOI) indicating that coverage has been obtained
under the National Pollutant Discharge Elimination System (NPDES) State
General Permit for Storm Water Discharges Associated with Construction
Activity from the State Water Resources Control Board. Evidence that the
NOI has been obtained shall be submitted to the Building Official. In
addition, the applicant shall include notes on the grading plans indicating
that the project will be implemented in compliance with the Statewide
Permit for General Construction Activities.
The following requirements shall be defined on permit plan cover sheets
as either general or special notes and the project shall be implemented in
accordance with the notes:
Construction sites shall be maintained in such a condition that an
anticipated storm does not carry wastes or pollutants off the site.
Discharges of material other than storm water are allowed only
when necessary for performance and completion of construction
practices and where they do not: cause or contribute to a violation
of any water quality standard; cause or threaten to cause pollution,
contamination, or nuisance; or contain a hazardous substance in a
quantity reportable under Federal Regulations 40 CFR Parts 117
and 302.
Potential pollutants include, but are not limited to: solid or liquid
chemical spills; wastes from paints, stains, sealants, glues, limes,
pesticides, herbicides, wood preservatives, and solvents; asbestos
fibers, paint flake or stucco fragments; fuels, oils, lubricants, and
hydraulic, radiator or battery fluids; fertilizers, vehicle/equipment
wash water and concrete wash water, concrete, detergent or
floatable wastes; wastes from any engine equipment steam
cleaning or chemical degreasing; and chlorinated potable water line
flushings. During construction, disposal of such materials should
occur in a specified and controlled temporary area on site,
physically separated from potential storm water run-off, with
ultimate disposal in accordance with local, State, and Federal
requirements.
Exhibit A
Resolution No. 4074
Page 8
• Dewatering of contaminated groundwater or discharging
contaminated soils via surface erosion is prohibited. Dewatering of
non-contaminated groundwater requires a National Pollutant
Discharge Elimination System Permit from the California State
Regional Water Quality Control Board.
(1) 2.14 A note shall be provided on final plans that a six (6) foot high chain link fence
shall be installed around the site prior to building construction stages. A
nylon fabric or mesh shall be attached to the temporary construction fencing.
Gated entrances shall be permitted along the perimeter of the site for
construction vehicles.
(1) 2.15 The applicant shall comply with all City policies regarding short-term
construction emissions, including periodic watering of the site and prohibiting
grading during second stage smog alerts and when wind velocities exceed
15 miles per hour.
(1) 2.16 Pursuant to the City of Tustin's Security Ordinance and the Uniform Fire
Code, street numbers shall be displayed in a prominent location on the
street side of the residence. The numerals shall be no less than four (4)
i inches in height and shall be of contrasting color to the background to which
they are attached and illuminated during hours of darkness; six (6) inches in
r height for commercial.
(1) 2.17 An adequate size trash enclosure with solid metal, self-closing, self-latching
gates is required to be located on the property and maintained to avoid
health issues for neighboring commercial and residential areas.
Said enclosure shall be screened by a solid decorative wall consistent with
the adjacent building's material and finish and be of a minimum height of six
(6) feet. The actual location of the enclosure and types of screening and
details of the enclosure shall be submitted at building plan check and are
subject to approval by the Community Development Department. The
location of the bin, size, and quantity shall be reviewed and accepted in
writing by CR&R (contract trash hauler).
LANDSCAPING/HARDSCAPE
(1) 2.19 Submit at plan check complete detailed landscaping and irrigation plans for
all landscaping areas, including the model complex, consistent with adopted
City of Tustin Landscaping requirements. The plans shall include the
following:
Include a summary table identifying plan materials. The plant table
shall list botanical and common names, sizes, spacing, location, and
quantity of the plant materials proposed.
Exhibit A
Resolution No. 4074
Page 9
^ Shaw planting and berming details, soil preparation, staking, etc. The
irrigation plan shall show location and control of backflow prevention
devices, pipe size, sprinkler type, spacing, and coverage. Details for
all equipment must be provided.
• Show all property lines on the landscaping and irrigation plans, public
right-of-way areas, sidewalk widths, parkway areas, and wall
locations.
^ Add a note that coverage of landscaping and irrigation materials is
subject to inspection at project completion by the Community
Development Department.
• Turf is unacceptable for grades over 25 percent. A combination of
planting materials shall be used. On large areas, ground cover alone
is not acceptable.
^ Shrubs shall be a minimum of five (5) gallon size and shall be placed
a maximum of five (5) feet on center.
• Ground cover shall be planted eight (8) to twelve (12) inches on
center.
• Fences, wall, and equipment areas shall be screened with walls,
vines, and/or trees.
^ All plant materials shall be installed in a healthy vigorous condition
typical to the species and shall be maintained in a neat and healthy
condition. Maintenance includes, but is not limited to, trimming,
weeding, removal of litter, fertilizing, regular watering, and
replacement of diseased or dead plants.
• Major points of entry to the project an along the project frontage shall
receive specimen trees to create an identifying theme.
• All trees shall be minimum 24-inch box in size.
(4) 2.20 On-site walls and fences shall be noted on the plans with specific
materials, colors, and decorative treatments subject to review and
approval of the Community Development Department.
PUBLIC WORKS
(1) 3.1 Prior to issuance of a building permit, the applicant/engineer shall obtain
approval of the design to construct Red Hill Avenue to ultimate width and
reconstruct full width of alley. These improvements shall be completed
prior to issuance of Certificate of Occupancy. A separate 24" x 36" street
Exhibit A
Resolution No. 4074
Page 10
improvement plan, as prepared by a California Registered Civil Engineer
shall be prepared. Said plan shall include, but not be limited to the
following:
a) Curb and Gutter h) Domestic water facilities
b) Sidewalk, including curb ramps i) Sanitary sewer facilities
for the physically disabled j) Landscape/irrigation
c) Drive aprons k) Underground utility connections
d) Signing/striping plan
e) Street paving
f) Street lighting
g) Catch basin/storm drain laterals/
connection to existing storm drain system
In addition, a 24" x 36' reproducible construction work area traffic control
plan, as prepared by a California Registered Traffic Engineer or Civil
Engineer experienced in this type of plan preparation shall be required.
(1) 3.2 Prior to issuance of building permit, plans shall be prepared for
construction for:
A. Grading plan.
B. All sanitary sewer facilities shall be submitted as required by the City
Engineer and local sewering agency.
C. A domestic water system shall be designed and installed to the
standards of the City of Tustin Water Services Division or AWWA.
Improvement plans shall also be reviewed and approved by the
Orange County Fire Authority for fire protection purposes. The
adequacy and reliability of water system design and the distribution of
fire hydrants shall be evaluated. The water distribution system and
appurtenances shall also conform to the applicable laws and adopted
regulations enforced by the Orange County Health Department.
Release/approval from East Orange County Water District shall be
obtained prior to receiving water service.
D. A complete hydrology study and hydraulic calculations shall be
submitted for review and approval by the City at the time of grading
plan submittal.
(1) 3.3 Prior to issuance of any permit, the developer shall obtain verification from
each utility company providing service to the project that adequate
capacity is available to serve the project. Any capacity studies required by
the utility companies will be the responsibility of the developer.
Exhibit A
Resolution No. 4074
Page 11
(1) 3.4 Adequate horizontal and vertical intersection sight line far access onto
Red Hill Avenue shall be provided. In general a 25' x 25' limited use area
triangle provides adequate sight at typical driveways. Additional sight
evaluation, however, could be required to satisfy City of Tustin Standard
Drawings and Design Standards for Public Works Construction No. 510
for all affected streets. The sight lines would be shown on the grading
plan and landscape plan. If detailed analyses are requested, all
landscaping within the limited use area would need to comply with City of
Tustin Standard Drawings and Design Standards far Public Works
Construction No. 510.
(1) 3.5 Existing sewer, domestic water, reclaimed water and storm drain service
laterals shall be utilized whenever passible.
(1) 3.6 Any damage done to existing street improvements and utilities shall be
repaired before issuance of a Certificate of Occupancy for the
development.
(1) 3.? Prior to any work in the public right-of-way, an Encroachment Permit shall
be obtained from and applicable fees paid to the Public Works
Department.
(1) 3.8 Prior to issuance of any building permit, the developer shall satisfy
dedication and/or reservation requirements as applicable, including but not
limited to dedication of all required street and flood control right-of-way
easements, vehicular access rights, sewer easements and water
easements defined and approved as to specific locations by the City
Engineer and other agencies.
(1) 3.9 Current Federal Americans with Disabilities Act (ADA) requirements shall
be met at the drive aprons and pedestrian walkway.
(1) 3.1 Q Prior to issuance of building permit, the applicant shall provide written
approval from the Orange County Sanitation District for sewer
connection/use.
(1) 3.11 In addition to the normal full size plan submittal process, all final
development plans including, but not limited to: tract maps, parcel maps,
right-of-way maps, records of survey, public works improvements, private
infrastructure improvements, final grading plans, and site plans are also
required shall be submitted to the Public Works Department/Engineering
Division in computer aided design and drafting (CADD) format. The
standard file format is AutoCAD Release 2004 having the extension DWG.
Likewise, layering and linetype conventions are AutoCAD-based (latest
version available upon request from the Engineering Division). In order to
interchangeably utilize the data contained in the infrastructure mapping
system, CADD drawings shall be in AutoCAD "DWG° format (i.e.,
Exhibit A
Resolution No. 4074
Page 12
produced using AutoCAD or AutoCAD compatible CADD software). The
most current version of AutoCAD is Release 2004. Drawings created in
AutoCAD Release 2000 are compatible and acceptable.
The CADD files shall be submitted to the City at the time the plans are
approved and updated CADD files reflecting "as built" conditions shall be
submitted once all construction has been completed. The subdivision bonds
will not be released until the "as built" CADD files have been submitted.
(1} 3.12 Developer's execution of a public improvement agreement and furnishing
the improvement bonds as required by the City Engineer prior to the
issuance of an encroachment permit shall be required.
(1) 3.13 Prior to issuance of a building permit, the applicant shall provide fire
protection access easements and dedicate them to the City. The
easements shall be located within unobstructed areas and clear access shall
be provided at all times.
(1) 3.14 Prior to issuance of a building permit, the applicant shall obtain a new
address from the Engineering Division.
(1) 3.15 Project Recycling Requirement -The City of Tustin is required to comply
with the recycling requirements contained in the California Integrated
Waste Management Act of 1989. To facilitate City compliance with this
law, the Property owner is required to comply with Section 4327 of the
Tustin City Code which require participation in the City's recycling
program.
(1) 3.16 If the City of Tustin contracted trash hauling company is unable to provide
scout trash pickup, the applicant/property owner shall be responsible for
providing the scout trash pickup or alternative trash service to the
satisfaction of the Public Works Director. The alternative trash service
plan shall be submitted to the Public Works Department for review and
approval for developing and implementing a Waste Management Plan.
(1) 3.17 Improvement plans shall be reviewed and approved by the Orange County
Fire Authority for fire protection purposes. The adequacy and reliability of
water system design and the distribution of fire hydrants will be evaluated.
The water distribution system and appurtenances shall also conform to the
applicable laws and adopted regulations enforced by the Orange County
Health Department.
(1) 3.18 Based upon preliminary analysis, the existing 6-inch water main on Red
Hill appear to be insufficient to provide fire flows for the new facilities.
Based on OCFA fire flow demands and requirements, it may be necessary
to construct a new 8-inch water main on Red Hill to provide current water
flow requirements. A fire flow analysis shall be provided by a Civil
Exhibit A
Resolution No. 4074
Page 13
Engineer and approved by Public Works Department. Any upgrades to
the adjacent water system shall be at the expense of the applicant.
(1) 3.19 This development shall comply with all applicable provisions of the City of
Tustin Water Quality Ordinance and all Federal, State and Regional Water
Quality Control Board rules and regulations.
(1) 3.20 Water system improvements shall be designed in accordance with the
requirements and standards of the City of Tustin Department of Public
Works or AWWA.
(1) 3.21 Hydraulic analysis of the proposed water system and ability to meet OCFA
fire flow demands and requirements be performed and certified by the
developer.
(1) 3.22 Location of fire hydrants to be approved by the City of Tustin and the
Orange County Fire Authority.
(1) 3.23 The Developer is responsible for all costs related to the abandonment, at
the water main, of all existing potable water and fire service connections.
(1) 3.24 The Developer shall be responsible far all costs related to the installation
of new potable and firewater services.
(1) 3.25 Approval from the Water Services Division is required for permitting or
construction of any new service connections, abandonment or relocation
of existing services, or improvements that will affect city's water facilities.
ORANGE COUNTY FIRE AUTHORITY (OCFAI
(5) 4.1 Prior to the issuance of any building permits, the applicant shall obtain
approval of the Fire Chief for all fire protection access roads to within 150
feet of all portions of the exterior of the structure. The plans shall include
plan and sectional views and indicate the grade and width of the access
road measured flow-line to flow-line. The plans shall indicate the OCFA
minimum turning radius of 38 feet outside and 17 feet inside. When adead-
end street exceeds 150 feet or when otherwise required, a clearly marked
fire apparatus access turnaround must be provided and approved by the
Fire Chief. The applicant may contact the OCFA at (714) 573-6100 or visit
the OCFA website to obtain a copy of the "Guidelines for Emergency
Access."
(5) 4.2 Prior to the issuance of any building permits, the applicant shall provide
evidence of adequate fire flow. The "Orange County Fire Authority Water
Availability for Fire Protection" form shall be signed by the applicable water
district and submitted to the Fire Chief for approval.
Exhibit A
Resolution No. 4074
Page 14
(5) 4.3 Prior to the issuance of any building permits, the applicant shall submit a
fire hydrant location plan to the Fire Chief for review and approval.
(5) 4.4 Prior to the issuance of a building permit, the applicant shall submit
evidence of the on-site fire hydrant system to the Fire Chief and indicate
whether it is public or private. If the system is private, it shall be reviewed
and approved by the Fire Chief prior to building permit issuance, and the
applicant shall make provisions for the repair and maintenance of the
system in a manner meeting the approval of the Fire Chief. Please contact
the OCFA at (714) 573-6100 or visit the OCFA website for a copy of the
"Guidelines far Private Fire Hydrant &/or Sprinkler Underground Piping."
(5) 4.5 Prior to the issuance of any certificate of occupancy, all fire hydrants shall
have a blue reflective pavement marker indicating the hydrant location on
the street as approved by the Fire Chief, and must be maintained in good
condition by the property owner. Please contact the OCFA at (714) 573-
6100 or visit the OCFA website for a copy of the "Guideline for Installation
of Blue Dot Hydrant Markers."
(5) 4.6 Prior to the issuance of any building permits, the applicant shall submit
plans and obtain approval from the Fire Chief for fire lanes on required fire
access roads less than 36 feet in width. The plans shall indicate the
locations of red curbs and signage and include a detail of the proposed
signage including the height, stroke and colors of the lettering and its
contrasting background. Please contact the OCFA at (714) 573-6100 or
visit the OCFA website to obtain a copy of the "Guidelines for Emergency
Access Roadways and Fire Lane Requirements."
(5) 4.7 Prior to the issuance of any certificate of occupancy, the fire lanes shall be
installed in accordance with the approved fire master plan. The CC&R'S's
or other approved documents shall contain a fire lane map, provisions
prohibiting parking in the fire lanes and a method of enforcement.
(5) 4.8 Prior to the issuance of any grading permits, the applicant shall obtain the
approval from the Fire Chief for the construction of any gate across
required fire department access roads. Please contact the OCFA at (714)
573-6100 or visit the OCFA website to obtain a copy of the "Guidelines for
Design and Installation of Emergency Access Gates and Barriers."
(5) 4.9 Prior to the issuance of a building permit, the applicant shall submit plans
for the required automatic fire sprinkler system in the structure to the Fire
Chief for review and approval. Please contact the OCFA at (714) 573-
6100 to request a copy of the "Orange County Fire Authority Notes for
New NFPA 13 Commercial Sprinkler Systems."
(5) 4.10 Prior to the issuance of a certificate of occupancy, this system shall be
operational in a manner meeting the approval of the Fire Chief.
Exhibit A
Resolution No. 4074
Page 15
(5) 4.11 Prior to the issuance of a building permit, plans for the fire alarm system
shall be submitted to the Fire Chief for review and approval. Please
contact the OCFA at (714) 573-6100 or visit the OCFA website to obtain a
copy of the "Guideline for New and Existing Fire Alarm Systems."
This system shall be operational prior to the issuance of a certificate of
occupancy.
(5) 4.12 Prior to the issuance of a building permit, the applicant shall submit
architectural plans for the review and approval of the Fire Chief if required
per the "Orange County Fire Authority Plan Submittal Criteria Form."
Please contact the OCFA at (714) 573-6100 far a copy of the
Site/Architectural Notes to be placed on the plans prior to submittal.
FEES
(1) 5.1 Prior to issuance of any permits, payment shall be made of afl applicable
fees, including but not limited to, the following:
• Building plan check and permit fees
• Grading plan check and permit fees
• New development fees
• Transportation System Improvement Program fees
• School fees
• Orange County Fire Authority fees
• Major Thoroughfare and Bridge fees
ATTACHMENT G
CITY COUNCIL RESLOUTION NOS. 07-93 & 07-94
RESOLUTION NO.07-93
A RESOLUTION OF THE CITY COUNCIL
ADOPTING THE FINAL MITIGATED NEGATIVE
DECLARATION FOR GENERAL PLAN
AMENDMENT 07-001 AND ZONE CHANGE 07-002,
A PROPOSAL TO DEVELOP A ASSISTED
LIVING/CONGREGATE ~ CARE FACILITY AGE
RESTRICTED TO 62 YEARS OR OLDER AT 13841
RED HILL AVENUE
The City Council of the City of Tustin does hereby resolve as follows:
I. The City Council finds and determines as follows:
A. That a proper application has been submitted by American Senior
Living Development, LLC to change the General Plan land use
designation from Public and Institutional to Planned Community
Commercial/Business, change the zoning designation from Public
and Institutional (P&I) to Central Commercial (C-2), demolish an
existing church building, and construct an age-restricted (62 years
or older) assisted livinglcongregate care facility. The project site is
a 2.882 acres lot located at 13841 Red Hill Avenue;
B. That the requested general plan amendment and zone change are
considered a "project" by the California Environmental Quality Act
("CEQA") (Pub. Resources Code §21000 et. seq.);
C. That City staff prepared an Initial Study to evaluate the potential
environmental impacts associated with General Plan Amendment
07-001 and Zone Change 07-002 that concluded, with mitigation
measures, potential significant impacts can be reduced to a level of
insignificance and a draft Mitigated Negative Declaration (MND)
was prepared;
D. That a Notice of Intent to Adopt a Mitigated Negative Declaration was
published and the Negative Declaration and Initial Study were made
available fora 20-day public review in compliance with Sections
15072 and 15105 of the State CEQA Guidelines;
E. That the City Council is the final authority for the project and will
consider the MND prior to approval of the proposed general plan
amendment and zone change applications;
F. The City Council considered the Initial Study and the Mitigated
Negative Declaration (Exhibit A) and finds it sufficient for the
Resolution No. 07-93
Page 2
proposed General Plan Amendment 07-001 and Zone Change 07-
002.
II. The City Council hereby adopts Final Mitigated Negative Declaration
attached hereto as Exhibit A and Mitigation Monitoring Report attached
hereto as Exhibit B for General Plan Amendment 07-001 and Zone
Change 07-002 for the construction of an age-restricted (62 years or
older) assisted living/congregate care facility at 13841 Red Hill Avenue.
PASSED AND ADOPTED at a regular meeting of the Tustin City Council held on
the 4~' day of December, 2007.
~~~~
LOU BONE
MAYOR
PA STOKER
CITY CLERK
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
I, Pamela Stoker, City Clerk and ex-officio Clerk of the City Council of the City of
Tustin, California, do hereby certify that the whale number of the members of the
City Council of the City of Tustin is five; that the above and foregoing Resolution
No. 07-93 was duly passed and adopted at a regular meeting of the Tustin City
Council, held on the 4~' day of December, 2007, by the following vote:
COUNCILMEMBER AYES:
COUNCILMEMBER NOES:
COUNCILMEMBER ABSTAINED:
COUNCILMEMBER ABSENT:
Amante, Davert, Bone, Kawashima, Palmer
None
None
None
(5}
(0)
(0)
(0)
PAMELA STOKER
CITY CLERK
RESOLUTION N0.07-94
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUSTIN APPROVING GENERAL PLAN AMENDMENT 07-
001 AMENDING THE GENERAL PLAN LAND USE
DESIGNATIONS FROM PUBLIC/INSTITUTIONAL TO
PLANNED COMMUNITY COMMERCIAUBUSINESS TO
ACCOMMODATE THE CONSTRUCTION OF AN ASSISTED
LIVING/CONGREGATE CARE FACILITY AGE
RESTRICTED TO 62 YEARS OR OLDER AT 13841 RED
HILL AVENUE.
The City Council does hereby resolve as follows:
The City Council finds and determines as follows:
A. That a proper application has been submitted by American Senior Living
Development, LLC to change the General Plan land use designation from
Public and Institutional to Planned Community CommerciaVBusiness to
accommodate the proposed project;
B. That a public hearing was duly called, noticed, and held on said application
on November 13, 2007, by the Planning Commission and the Planning
Commission adopted Resolution No. 4072 recommending that the City
Council approve General Plan Amendment 07-001.
C. That a public hearing was duly called, noticed, and held on said application
December 4, 2007, by the City Council.
C. That General Plan Amendment 07-001 is consistent with and implements
the following Land Use Element goals and policies of the General Plan:
1. Goal 1 of the Land Use Element provides for a well balanced land use
pattern that accommodates existing and future needs for a variety of
land uses.
2. Policy 1.5 encourages compatible and complementary infill of previously
by-passed parcels in areas already predominantly developed.
3. Policy 2.2 requires maintaining consistency among the Land Use
Element, Zoning Ordinances, and other City ordinances, regulations,
and standards.
4. Goal 3 of the Land Use Element ensures that new development is
compatible with surrounding land uses in the community, the City's
circulation network, availability of public facilities, existing development
constraints, and the City's unique characteristics and resources.
Resolution No. 07-94
Page 2
5. Goal 6 of the Land Use Element which encourages improvement of
urban design in Tustin to ensure development that is both
architecturally and functionally compatible, and to create uniquely
identifiable neighborhoods, commercial, and business park districts.
D. That the proposed amendment to the land use designation is in the best
interest of the public and ensure consistency between the General Plan and
the Zoning Ordinance.
E. That an Initial Study was prepared to evaluate the potential environmental
impacts associated with General Plan Amendment 07-001 and Zone
Change 07-002 that concluded, with mitigation measures, potential
significant impacts can be reduced to a level of insignificance and a draft
Mitigated Negative Declaration (MND) was prepared;
II. The City Council hereby approves General Plan Amendment 07-001 amending the
General Plan Land Use Designation of the project site from Public/Institutional to
Planned Community CommerciaVBusiness, as identified in Exhibit A attached
hereto.
PASSED AND ADOPTED at a regular meeting of the Tustin City Council held on the 4rn
day of December, 2007.
~~--
LOU BONE
MAYOR
PAMELA STOKE
CITY CLERK
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
I, Pamela Stoker, City Clerk and ex-officio Clerk of the City Council of the City of Tustin,
California, do hereby certify that the whole number of the members of the City Council of
the City of Tustin is five; that the above and foregoing Resolution No. 07-94 was duly
passed and adopted at a regular meeting of the Tustin City Council, held on the 4~' day of
December, 2007, by the following vote:
COUNCILMEMBER AYES: Amante,
COUNCILMEMBER NOES: None
COUNCILMEMBER ABSTAINED: None
~LMEMBE ENT' None
~~,
Davert, Bone, Kawashima, Palmer (5)
(0)
(a)
(o)
,..
PAMELA STOKE
CITY CLERK
Exhibit A
Resolution No. 07-94
General Plan Amendment 07-001
13841 Red Hill Avenue
~ ~~ ~
,l.l
~~
a(t uCp
rr~~~o
+>Mu
~"M aNG nM[+7,yv
i ~~e
U g ~
r.
lim
Existing
~ ~~ s
,,,., ,~.
,~I
aft o~ca
~a-uutlw
~>~
"~' anAG c~wrwraM.
~
i ~JUa
~ ~
~ ~
r.
~.~ ~ un
Proposed
ATTACHMENT H
ORDINANCE NO. 1346
ORDINANCE NO. 1346
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
TUSTIN, CALIFORNIA, ADOPTING ZONE CHANGE 07-002
AMENDING THE ZONING MAP OF THE CITY OF TUSTIN
TO REZONE THE PROPERTY LOCATED AT 13841 RED
HILL AVENUE FROM PUBLIC AND INSTITUTIONAL (P&I)
TO CENTRAL COMMERCIAL (C-2) ZONING DISTRICT TO
ACCOMMODATE THE CONSTRUCTION OF AN ASSISTED
LIVING/CONGREGATE CARE FACILITY AGE
RESTRICTED TO 62 YEARS OR OLDER
The City Council of the City of Tustin does hereby ordain as follows:
Section 1. FINDINGS
The City Council finds and determines as follows:
A. That a proper application has been submitted by American Senior Living
Development, LLC to change zoning designation from Public and
Institutional (P8~1) to Central Commercial (C-2) to accommodate the
construction of an age-restricted (62 years or older) assisted
living/congregate care facility at 13841 Red Hill Avenue;
B. That a public hearing was duly called, noticed, and held on said application
on November 13, 2007, by the Planning Commission. The Planning
Commission adopted Resolution No. 4073 recommending that the City
Council approves Zone Change 07-002.
C. That a public hearing was duly called, noticed, and held on said application
on December 4, 2007, by the City Council.
D. That the proposed amendment to the zoning district is in the best interest of
the public in that it provides for the construction of a new senior facility that
is age restricted to persons that are 62 years or older.
E. That the proposed zone change is consistent with General Plan
Amendment 07-001 and the policies of the General Plan, as evidenced by
the following findings:
(a) The proposed zone change to Central Commercial District is
consistent with the General Plan Amendment 07-001.
(b) The project site is bounded by areas zoned Retail Commercial (C-1)
and Central Commercial (C-2) districts to the east across Red Hill
Avenue, Central Commercial (C-2) district to the south, Public and
Institutional (P&I) district to the west, and Multiple Family Residential
(R-3, 2200) and Retail Commercial districts to the north. The zone
change to Central Commercial (C-2) district would be compatible
with the surrounding zoning districts.
(c) The location of the proposed project desired by the community to
allow for improvements in the area.
D. That an Initial Study was prepared to evaluate the potential environmental
impacts associated with General Plan Amendment 07-001 and Zone
Change 07-002 that concluded, with mitigation measures, potential
significant impacts can be reduced to a level of insignificance and a draft
Mitigated Negative Declaration (MND) was prepared;
Section 2. The City Council herby approves Zone Change 07-002 and amends the
Zoning Map of the City of Tustin in accordance with Exhibit A, attached hereto.
Section 3. SEVERABILITY
All of the provisions of this ordinance shall be construed together to accomplish the
purpose of these regulations. If any provision of this part is held by a court to be invalid or
unconstitutional, such invalidity or unconstitutionality shall apply only to the particular
facts, or if a provision is declared to be invalid or unconstitutional as applied to all facts, alt
of the remaining provisions of this ordinance shall continue to be fully effective.
PASSED AND ADOPTED at a regular meeting of the Tustin City Council held on
the 2"d day of January, 2008.
_.
PAM LA STOKE ,
CITY CLERK
I1~
r~
u
[ ~
Is,
~t
• i ~ ~.
• ~ ~
A* '~ ; ~ ~
~`
~~~~~ i
~ j~ ~ ~~~E
~ ~~ 1~..
~~e ~~~~~~~~~- ~.
~ ;~
--~~ YA~tt --:~: z-r
- ` ri
1 ~ ~
~~...lr. Is 1. i
1
!~ s~
i
la
~~
s
(_
~~
~~
I
~~
' i ~
f ~~ 1~
I~~~~~~t~~'~/III~I~
i~g..t...-I~I~~ttS
! i~
~t~i6ii~l~l~~f~
i
]•
I
1
~ ~, ~
~ ~ :1~ ~
Section 8: PARKING ANALYSIS
A ramp located on the north side of the proposed development will provide two-
way vehicular access to the subterranean paricing/garage level as shown in
Figure 5. The parking level ramp can be accessed by a two-way passage that
runs along the north side of the building. As proposed, the vehicular access
driveway is 26 feet wide and allows both inbound and outbound traffic. There are
3 stairways along with 3 elevators located at the north and south ends of the
parking level which leads to the main complex.
Monarch Village will provide a total of 204 parking spaces, which includes 33
guest and 7 handicap spacers. The total number of employees of Monarch Village
is projected to be approximately 60 people and a maximum of 20 employees, will
be at the site at any one tune. Many of the employees of Monarch Village wail
utilize public transportation and/or carpoogng to get to and from the work on a
daily basis. Parking spaces measure approximately 20 feet long by 9 feet wide.
The width of the driving aisle in the undergrourxi parking faciUty is approximately
25 feet which allows for iwoa~+ay traffic.
The parking ratio for a development is determined by dividing the total number of
parking spaces by the total numbers of units. Parking ratio 1.0 including the
guest; ApA, and staff is recommended for this project based upon various
parking studies and The Institute of Transportation Engineer's (ITE), Parking
Generatkn Manual, 3'd Edition. Note that the Parking Generation Manual does
not specifically separate out guest, ADA, and emp~yeea parking unless the ~'
fadlity generates turnover such as churches, theaters, and convention Centers.
These parking studies aro discussed below.
A Parking Study was conducted by Newport Traffic Studies for three independent
senior living communities to determine the parking ratio for the iadllh/ along with
a parking occupancy rate. These three independent senior communities aro
similar to this project community as compared in Tabb 5. In Appendix C,
summary of a related ~ITE Journal article is attached and trip generation rates and
parking demand is compared with this fadlities. As shown in Table 6, the thn~s
independent living communities have a mean parking tatb of 0.64 and a median
ratio of 0.63. Monarch Village's proposed parking ratio of 1.0 exceeds this
parking ratio and the average for the two independent liv~lg communities
presented in ITE joumal~ in Illinois.
According to Table 5, the percentage of occupied parking spaces ranges from
8596 to 10096 of the three independent living communities surveyed.
~ 'SENIOR HOUSING TRIP GENERATION AND PARKING DEMAND CHARACTERISTfCS
by Stephsn B Corcoran. P.E. presented at instkuta of Tranaportatbn Engineers 66th Annuaf
MeeUnp. .
rw+rf~c a~rP,~c'r REPORT 13 MONARgi vlLC~-c~E-TUS11N
W.13. LMAiERMIW ENGHiEERiNr3, SIC. AbfERICAN SENIOR LJVIN(i DEVELOPMENT
I
X11
I
I
I
I
I
I
i
iV
i
i
i
i
i
i
it
i
Table 6: Parking Study "Independent Senior Living CommunWes"
Project Ctty Number Packing Occupancy" Parking Rath
of Units S ces S aces/Unk
Springs of Escondido 103 62 8596 0
60
Escondido .
Valencia Rancho 114 72 10096 0
63
Commons Cuca .
The Ventura 115 78 10096 0.68
Bonaventure
'Occupancy at the time of counting. "' ParlJng Spaces indude guest and ADA spaces.
Source: Newport Tiaffla Studies.
Table 6: Amenities Comparison Table
Amenities Monarch
ASL 'Springs of
Escondido 'Valencia
Commons 'Ths
t3onaventun ••Mayslaks,
Oakb IL "Glenview
Terrau IL
Cate I I I I I I
8
Valet Pe
Co ~
Trans ~ /
p~ /
Houaek
~~ and
Reueational
Acf(vkisa /
Can CounsNor / / /
Grocery and
Phamtacy ~ ~
Chauffer Servbs ~
Un~s 201 103 11.4 115 830 243
Perkin Ratb 1.00 0.80 0.63 0.88 0.408 0214
I -Independent SenJor Uvinp Cormrrunity, 'Newport Tnalgc Studla~s .
" ITE jorxnaf ertfafe pvesented ~ 86" annual meeLtr~p, a- M~irtinwm AQe, 6- AveiaQe Apa
The Institute of Transportation Engineers (ITE) informational report, Paiicing
Generation, 3"i Edition, ITE Dods 253, Congregate Care Facility, ,states that the
existing parking ratio (based on Oregon parking study, 2000) is 0.5 spaces per
unit. Based on this parking ratio, the number of parkng spaces required is
calculated by muftiplying number of units to parking ratio 0.5 as shown in Table
7. The definition of Congregate Care Facility most closely matches the Monarch
Villa -Tustin facility. Land Use Code: 253 Congregate Care Facility is defined
as: `Congreegate care facilities are independent living devebpments that provide
centralized amenities such as dining, housekeeping, transportation and
organhed socieUr+ecreational actlvfties. Limited medical servkes (such as nursing
and dental] may or may not be provided. The resident may contract additional
medical services or personal assistance. `
~F~ ~P~cT REPOaT 14 -~or~RCH vN.~~n~srwa
w.c;. z~~ t~w~RUro, ~,c. a~rcaw sEnuoR ~~ o~oPMEHr.
Table 7: Parking Requirement "RE Manuel"
Land Use Group:253
Land Use Number of
Units Parking Ratio
S aces/Unit Space Required
Co r ate Care Faal' 201 0.5 100
Total 100
Source: ~n9 Generation, 3'° Edition"ITE Mannar
Based upon this anatysis of similar existing development, a parking retb of 1.0
exceeds the ITE recommended parking ratio and should provide adequate
parking facilities far visitors and residents.
Conclusion
Three Southern California senior housing complexes and two IlNnois senior
housing developments wero analyzed for parking needs. The maximum parking
ratio of 0.68 for dwelling units compared to parking spaces is provided by 'The
Bonaventuro' in Venture. However, it should be noted that the parking utilization
for this cx~mplex is 10096. All other studies independent senior communities
range from a parking ratio of 0.214 to 0.68. The parking spaces included visitor,
handicap, and resident The percent utilization ranged from 5596 to 100°y6.
Since this development is an age restricted faality with the ages ranging from 62
to 85+, residents mobility wiN be dependant upon public and private
transportation services reducing the need for vehicle ownership. tt is reasonable
to assume residents with vehides will occupy parking spaces in the age group of
62 to 68 with less vehice ownership in the age group of ?0+. The new fadNty will
provide the Valet Car Services kacated on the 3 stab on the surface. Vabt
services will assist residents parking vehides and driving cars up and down the
garage ramp. This Valet Service will also provide assistance to the residents by
taking their groceries or shopping bags out of their vehides and delivering them
to their residence.
The total number of resident parking spaces wiN be albtted by permit process,
requiring each tenant to apply for a parking space. The complex management
will limit the amount of"parking permits.
~F~ a~~ r~oaT 1 S MoNaRp+v~.u-cE-Tt~snN
w a. ziM-,a:~uw sr+ci~~, urc. a-~a~w seraoa uvnx; oeva.aP~rrr
r
L
t
i
~Il
i
i
i
i
i
i
~,+~,
LL
i
~I~
i I I i
I i II
r_-.----r---~--~-~- -~--~--~-
,_,
- -~
~~~}
I
~~
..l
_~
I
--:
I
~~
-t
_~
--,
i
---a--
i.__--
M
g
. ~~
i
I -~--
--i------~ 1
i
I `
(
.~.. ~ ~.
T
~-
T
T
I
~~~~•
~~~~
• -~---
~'
.+_~ ~,~
.1 _ ~~
~ --- ~~
~ w~
I.
i
_T__
~_.
~~
~---
__1 0, S
a
J ~ ,~
3g
~~
a
~ ~ ..,r
~3
Section 7: SYSTEM DEFICIENCIES
Operationally, the adjacent roadway system is operating at an above minimum
level of service. Site ingress/egress has been revised to improve access without
impacting Red Hill Avenue.
Planned development adjacent to the project may require further monitorir~ of
the alley, south of the project site. '
Section 8: PROJECT MITIGATION MEASURES
The existing two way left tum lane wiU remain on Red Hill Avenue to
allow northbound Red HMI Avenue traffic to tum into the facility. Since
only a right tum exit i$ allowed from the facility, a directional median is
recommended along with the guide sign (Right Tum Only) at the two
way driveway access to restrict the drivers from fuming left as shown in
Figure 2.
• Large semi-trailer ar~i moving van will be prohibited from entering the
site. Move-in. condition along with •other terms and oonditfons for
residency at the complex with each tenant will be highlighted in the
signed Tenant Agreement.
f
t
• Count-down pedestrian heads are recommended at the intersection of
Red Hil! Avenue and San Juan.
~F~ ~~ REaoaT 17 Moir vu~€n~N
w.a z~MnrEw~uw ~. urc. ~ sErxoa uvtr~o ~vo.o~xr
~± ~
i
i
~,
iV
~r
Reference:
• "Senior Housing Trip Generation And Parking Demand Characteristics" by
Stephen B. Corcoran, P.E. presented at Institute of Transportation
Engineers 66th Annual Meeting.
• 'Trip Generation Characteristics of Age-Restricted Housing" by Thomas E.
Flynn, P.E., PTOE and Andrew E. Boenau, E.l.T. presented in February
2007.
~~ itiw~c'r a~oPrr 18 vu~-ruses
W.(i. ZIMMERAtAN ENGINEERING, WC. AMERICJW SElNOR LNIlK OEVH.oPMEN'r
APPENDIX A
Traffic Summary Results
~~ ~v^cr 19 ~+acH vKU~~snt+
w s. z~MU~rs~vw ~r~n~. mac. ~~crw ser~ioa uvwa cEVa,.o~nrr
~! 1
I
~~
i
!r
2 4 HOUR VOLUM88
STRBST s REDHILL TUSTIN
LOGTION s 3AN NAN/SL CAttINO DAT$ : 11-17 - 0 5
NORTHBOUND SOUTHBOUND TOTAL
00
12
: 131 81 212
00
1: 84 55 139
00
2 s 55 33 88
00
3
: 49 31 80
o0
4
: 44 5S 102
00
5
: 64 186 250
00
6
: 190 463 653
00
7
: 582 1
329 1
911
00
B , ,
s 539 1
208 747
1
00 , ,
9: 553 747 1
300
00
10 ,
: 516 571 1
087
00
11 ,
: 633 548 1
181
AN 00
12 ,
[ : 751 637 1
388
pl 00
1 ,
: 675 671 1
346
00
2 ,
: 826 690 1
516
00
3 ,
: 800 776 576
1
00
4 ,
: 030
1 640 1
670
5:00 , ,
1
151 758 1
909
00
6 , ,
: 859 651 510
1
00
7 ,
: 870 520 1
390
00
8 ,
: 503 350 853
00
9
: 417 348 765
00
10
: 315 199 514
00
11
: 206 107 313
00
1Z
s 1I
843 11
657 23
500
, , ,
Prepared by NEWPORT TRAFFIC STUDIES
is H=rmTE covr~Ts
sTR~sT REngILL TVSTIN
LOCATION 3AN JIIANJEL CA~dINO DATE s 11-17-05
AM I P2t
NORTB 30UTH TOT71L NORTH SONS TOTAL
BOUNn BOUND TOTAL BOUND BOUND TOTAL
37 27 64 12:00 171 148 320
34 22 56 203 161 364
36 18 54 184 179 353
24 14 38 192 149 341
25 15 40 1:00 154 186 340
26 16 41 164 175 339
18 15 33 i71 151 323
15 9 24 186 158 344
17 11 29 2:00 18? 151 339
15 10 25 198 159 357
11 5 17 217 174 3 91
11 6 17 214 205 429
16 8 24 3:00 201 198 399
14 3 17 197 191 388
12 l0 22 Zoe 201 410
7 10 17 ~ 194 185 379
13 ~ 12 25 4100 219 151 370
7 10 17 221 161 383
9 7 16 294 158 451
15 29 44 296 169 465
16 31 47 5:00 311 215 526
15 13 38 291 178 469
15 57 72 280 181 461
18 75 93 169 184 453
44 96 140 6:00 161 183 444
31 90 111 111 176 397
47 115 162 184 151 336
68 161 230 193 140 333
116 221 338 7:00 209 180 389
119 191 411 184 118 311
171 406 577 268 105 373
176 409 585 ~ 209 107 316
.157 332 488 8:00 169 87 256
134 326 460 119 92 1 10
137 275 911 108 88 196
111 276 387 107 84 191
123 246 369 9:00 111 91 101
153 181 334 105 81 187
145 167 312 101 70 171
132 153 285 100 105 205
123 158 281 20:00 97 51 1!8
132 146 278 79 61 141
135 130 165 81 51 134
126 137 163 57 34 91
134 146 280 11:00 63 39 101
150 129 279 61 14 85
180 131 312 47 23 70
169, 141 310 ~ 35 21 56
Prepsr~d by N8NPORT TRAFFIC STUDIES
1
i
it
!+
1
INTERSECTION TUR2~ COUNT
PBAE HOUR
NORTH-SOUTH STRBSTs RSDHILL
EA3T-WEST STRSSTt l~L CAIdINO REAL
JURISDICTION: TU3TI3T
PEAK HOURS 07 s 15A1t
NORTH LSO
TOTALt 1,407
Total 1st 2nd 3rd 4th
.,..,.
81 10
36
Z6
9
116 29 34 35 18
187 45 47 SO 45
W88T L8O TOTALt 384
HOUR TOTALS 3,290
Rt Thru Lt
Rt
Thrv
Lt
Lt
Thru
Rt
PL°A1C HOUR FACTORS
NORTH LE(i ~ 0.87
SOUT1~ L=O • 0.85
SA3T L8A ~ 0.82
WEST L8"(i ~ 0.82
1st
tad
3rd
4th
Total
ALL LS03 0.8b
TOTAL: 919
SOUTH LSO
Prepared by NEWPORT TRAFFIC STUDIB3
Total
1st
2nd
3rd
4th
DATRt 11-17-05
EAST LSA TOTALS 530
~ 5 8 5 22
46 67 54 29 196
b5 89 86 72 312
1st tad 3rd 4th Total
Lt Thru Rt
INTERSECTION TURN COUNT
PEAS HOUR
NORTS-SOUTH BTR88Ts REDHILL
EAST-WEST STREET: SL CAMINO REAL
JURISDICTION: TUSTIN
PTAlC HOUR t O S ~ 0 O P1[
NORTB LEO
TOTALS 774
Total 1st 2nd 3zd 4th
80 28 14 15 23
173 51 44 46 32
169 46 39 51 33
WEST LEG TOTALS 422
1st
2nd
3rd
4th
Total
HOUR TOTAL: 3,239
Lt
Thru
Rt
Total
1st
2nd
3rd
4th
DATE: 11-17-OS
EAST LSO TOTALS 521
.- -~
Rt 9 ? 6 4 ZS
Thru 78 71 74 70 293)
Lt 59 47 52 44 20Z
PEAK IiOUR F]4.CTORS
NORTS L80i 0.87
SOUTH LEG . 0.96
BAST LEO 0.89
WEST LEQ • 0.84
ALL LEGS . 0.91
TOTALS 1,522
SOUTH LBO
Prepared by NEWPORT TRAFFIC
1st tad 3zd 4th Total
Rt Thru Lt
Lt Thru Rt
1
~,
i
i
!I+
I
INTER38CTION TARN CORN'!'
PEA1C HOIIR
NORTH-SOiJTH STRSETs REDHILL
SABT-WEST STREET s 3Al~ .7UAN
JIIRISDICTIONs TUSTIl~
P8A1C HOOK s 07 : 3 OA1~t
NORTB L80
TOTALS 1,148
Total 1st tad 3rd 4th
2Z 5 14 ~ 1
80 43 23 4 10
155 55 56 17 Z7
W88T LEli TOTALS 257
DATB: 11-17-05
Total
lit
tad
3rd
4th
Rt Tl~ru Lt
EABT LEf~ TOTAL s 3 3 8
Rt 14 21 10 3 48
.T7sru 19 34 19 7 79
Lt 69 72 36 34 211
Lt
Thru
Rt
1st
2nd
3rd
4th
Total
PEAK 80Uf! PA,CTORB
NORTB L8O s 0.97
SOUTB LFA 0.85
EAST LEO 0.67
WEST LED 0.62
ALL LFAB 0.8 6
TOTALS 59I
SODTB LSCi
HOUR TOTl1Ls ],334 Prepazed by NEWPORT TR]~FFIC STUDIES
1st tad 3rd 4th Total
Lt Thru Rt
INTERSECTION TO'R2~ CO~N'P
P$AlC ~O~R
NORTH-SODTH STRESTs RBDBILL
BAST-iPBST STREET: 3AN JIIAN
JURISDICTION: Z'QSTIlt
P8A1C HOURS 04s45Pt~[
'• NORTH LBA
TOTALS 731
Total 1st tad 3rd 4th
13 Z 4 3 4
75 18 19 14 2!
44 6 13 I3 1.2
W'SST LSD TOT11L s 13 2
~,
DATBs :11-17-OS
Total
1st
2nd
3rd
4th
Rt Thrv Lt
EAST LRQ TOT11L s 2 4 5
,~_ .. ._._. .__,.... ~ I
r
-~
Rt I2 2Z 10 58
24
i
Thru 19 19 18 Z4 8
Lt 30 21 20 Z6 97
Lt iat Znd 3rd 4th Total
Thru
Rt
I~t
2nd
3rd
4th
Total
HOUR TOTALS 2,293
PB.A1C MOOR FJ-CTORB
NORTS LEO . 0.89
BOUTS LEO • 0.90
EAST LEO ~ 0.83
WSST LEO 0.83
ALL LEa3 . 0.91
TOT11Lz 1,185
SOT,1T8 LE(i
Praparad by NE9PPORT TRAFFIC 3TUDI
Lt Thru Rt
i
~,1
1
I
I
I~
i
i
i
i
~I~
i
iNT1;R3sCTION TDRNING coONT
NORTB-80DTS STREE'P: RSDHILL
EAST-WBBT 3TRSSTs BL GMINO RE7~L
TIMES 07 r 00]11[-08 r 00 ]11[ DJi1TE: 11-1?-OS
NORTB LSfi
134 1163 9 Total
19 201 3 1st
34 251 1 2nd
64 327 3 3rd
17 384 2 4th
At Thru Lt
~•
Rt
Thru
Total 1st 2nd 3rd 4th Lt
Lt 1st tad 3rd 4th Total
Thr u
Rt
Lt Thru At
lit 62 92 38
2nd 67 104 40
3rd 100 125 45
4th 72 139 41
Total 301 460 164
w..
Prepared by NEiVPOAT TR7IFFIC 3TtJDIEB
88 16 10 36 26
129 31 29 34 35
190 48 45 47 50
7 4 5 8 24
39 46 6? 54 206
59 b5 89 86 299
INTERSECTION TURNING COUNT
NORTH-SOUTH 3TRS$Ts RSDHILL
EAST-WEST STRBSTs EL CAMINO RS71L
TI1~: 08s00A1t-09s00A1[ DATES 11-17-OS
NORTH LSG
Total
1st
2nd
3rd
4th
Total 1st 2nd 3rd 4th
43 9 6
6
16
11
82 18 19 24 21
153 45 24 41 43
Lt
Thru
Rt
lst
2nd
3rd
4th
Total
Rt 5 4 4 2 Z5
Thru 29 36 26 34 12
Lt 72 54 45 53 224
1st 2nd 3rd 4th Total
Prepared by NEWPORT TRAFFIC
Rt Thru Lt
Lt Thru Rt
i.
~+ 1
I
I
I
1
1
1
1,
lid
1
1
1
1
1
1
'fir
1
INTERSSCTION TURNING COUNT
NORTH-BOUTS STRB$Ts RBDHILL
EAST-WEST STREETS BL CA1dIN0 REAL
TII~: 04:OOP1i-OS:OOP1[ DATSs 11-17-05
NORTH LEO
Total lst tad 3rd 4th
Lt
Thru
Rt
Rt
Thrv
Lt
Total '
1Mt
tad
3rd
4th
9 7 11 7 34
48 60 71 56 235
46 58 50 42 196
lit 2nd 3rd 4th Total
54 15 13 13 13
15S 36 29 44 46
153 37 35 45 36
lit
2nd
3rd
4th
Total
Pr®parad by NEWPORT TRAFFIC STUDIES •..~
Rt Thru Lt
Lt Thru Rt
INTSRSBCTION TURNING COUNT
NORTH-SOUTH STRB~T: R$DHILL
BAST-~PBST 3TRSBTs 8L CAMINO REAL
TID~s 05:OOPI~[-06s00P1[ DATE: 11-17-OS
NORTS LRG
Total
1Rt
2nd
3rd
4th
Total 1st 2nd 3rd 4th
80 28 14 1S 23
173 51 44 46 32
169 46 39 51 33
1st
2nd
3rd
4th
Total
Lt
Thru
Rt
Rt 9 7 6 ' 4 26
Thru ?8 71 74 7n 293
Lt 59 47 52 !! 202
1st 2nd 3rd 4th Total
Prepared by NE99pORT TRAFFIC 3TUD
Rt Thru Lt
Lt Thru Rt
i
~+)
i
i
i
i
i
i,
it
i
i
i
i
i
i
~I~
i
INTSR38CTION TURNING COUNT
NORTH-$OIITH 3TRBETs RBDHILL
EAST-WEST 3TR$8Ts S111~T JIIAN
TII~: 07:OOAM-08:00111[ D]1TE: 11-17-05
NORTS L>ui
47 918 33 Total
11 167 9 lat
7 213 8 2nd
22 268 5 3rd
7 270 11 4th
Rt Thru Lt
Rt
Thru
Total lit 2nd 3rd 4th Lt
Lt 1st 2nd 3rd 4th Total
Thru
Rt
Lt Thru Rt
iat 14 75 31
Znd 16 66 33
3rd 11 115 35
4th 14 110 49
Total 55 366 148
,«
Prepared by NEWPORT TRAFFIC STtJDZES
24 3 2 5 14
125 28 31 43 23
183 39 33 55 56
6 Z 14 21 43
16 17 19 34 86
26 36 69 ?2 203
Total 1st 2nd 3rd 4th
NORTB-SOUTH $TR$lCTs RBDHILL
$lU$T-WEST $TREBT s 3AN ~7UJ1N
TTMBs 08:OOAK-09sOOA1t UATlC: 11-17-OS
NORTB L8A
9 2 1 2 4
36 4 10 17 5
79 17 27 17 18
INTER$SCTIOIT • Y/~l\il~Q ~.V~
Lt
Thru
Rt
1st
2nd
3rd
nth
Total
Total
lst
2nd
3rd
4th
1st 2nd 3rd nth Total
Prepared by NEWPORT TRAFFIC
Rt Thru Lt
i)
INTERSECTION TURNING COUNT
NORTH-SOUTH STREET: REDHILL
EAST-NEST 3TR$ET: 3AN JUAN
TI14Es 04:00P8-05:00P1[ DATEt 11-17-05
NORTH L8(i
Total
lsit
2nd
3rd
4th
~~
!~r
Total i~t 2nd 3rd 4tb
Lt
Thru
Rt
Rt
Thru
Lt
11 ~13 7 12 43
6 4 10 19 39
16 15 20 30 81
14 6 3 3 Z
34 7 3 6 18
25 9 5 5 6
lit
2nd
3rd
4th
Total
1st tad 3rd 4th Total
Prepared by NEWPORT TRAFFIC STiTDIES
Rt Thru Lt
Lt Thru Rt
INTERS$CTION TURNING GOIINT
NORTS-SOUTH 3TRBSTs REDHILL
EAST-WEST STRBBTs SAN JU11N
TIME: 05s00Pli-06:OOPM DJ1TE: 11-17-OS
NORTH L8O
Total
lst
2nd
3rd
4th
Total lst tad 3rd 4th
15 4 3 4 4
74 19 14 24 17
56 13 13 12 18
1st
and
3rd
4th
Total
Lt
Thru
Rt
Rt 22 10 24 1'1 73
Thru 19 18 24 15 7
~Lt 21 20 26 2Y 88
1st tad 3rd 4th Total
Frepar~d by NEKI?ORT TRAFFIC STUDI
Rt Thru Lt
Lt Thru Rt
i!
i
' APPENDIX B
,~ Site Photographs
i ~~
e ~F~ i~a~cr 20 c«i v~-,us,u,
C]
Existing Stta
Existing Sita '
raaFF~c ~+~cr ~oRT 21 ~oN~RCH vxuae-n~x+
W.G. ZIt~NERAbW ENGINEERING, MC. AMERK.Ml SENIOR LMNG DEVELOPMENT
~;1
I
li
1~
i
i
~~ - ..,
~~ wa~cr s~POar 22 Mor~ac.~+ v n~srw
w.~. zi~r~ww ~cua~wr+c, urc. ~a~w s~ioa uvu~ o~o~rrr
Red HIII Avenue snd San Juan Street
Red HIII Avenue and Et Camino Real
APPENDIX C
Reference
sw~~c urw~ ~~ 23 cH v~.v-c~-n~st~
w c. w+~w ~~~ n~c. n~irrw se-~noa wtHC oEVa.o~rrr
i
Trip Generation Characteristics of Age-Restricted Housing
By Thomas E. Flynn, P.E., PTOE and Andnw E. Boenau, E.I.T.
Summary: 'age-restricted' housing, essentially for persons 55 and older, has
I become a popular component of many new residential devebpments. This
feature presents study methodology and findings of a traffic data collection effort
to quantify peak hour try generation d~aracteristics of age-restricted housing.
These findings will strengthen the database for this increasingly important land
use.
Tha Four Seasons at Historic Virginia
` The development studied was the Four Seasons at Historic Virginia, an age
restricted, 55-plus, active adult community located 'm Prince WilUam County in
suburban northern Virginia. The Four Seasons at Historic Virginia has the
foliow~g characteristics:
' It is situated along State Route 234, an arterial providing a direct connection
to Interstate 95. No transit, bike, or pedestrian facilities connect the
development with other area larul uses.
• In addition to requiring at least one resident to be age 55 or older, no
pennon under 19 may reside for more than 90 days in any consecutive 12
~ months.
• At full development, K will have approximately 800 detached residential
units. It currently has approximately 460 age-restricted residential units that
are fuly buiR and occupied (full time or seasona~r).
• The only non-residential development is the 12,000-square-foot wmmunity
clubhouse.
• It is estimated by the developer that pefiaps half of the residences inducts
at least one adult wha is stib working, either part time or fuN time. The
authors' opinion is that this is high compared to the typical age restricted
community, which often is a more retirement oriented environment
mountain area or water oriented-where the job market is not as strong.
Along the same lines, it is estimated that perhaps only several pen~ent of
the units are seasonal or second homes-aflain. a characteristic moro
common with resort related retirement communities.
' Residences sell in the general range of $300,000-3650,000. Because the
devebpment is only several years old, a relatively high percentage of the
additional site work is being undertaken by the owners. This indudes patk~s
and additional landscaping. The month prior to the study inducted 50 site
work applications to the homeowners assodation. This activity contributes
to a higher level of traffic generation as compared to normal corxiitions at
full devebpment.
• A fairly small staff of employees works at the clubhouse, with a significant
~ development sales staff of about 30. Once the lots are solo, this sates
~ activity wiU be eliminated. Currently, additional traffic is generated by these
~~
~FK; a~v~ar ~POaT 24 v~t~ 1ust~
W.G. Zq~ArilEAA4W ENG~NEERINCi. MIC. lwERIC~W SENOR tlVl~rCi DEI~ELOPhIEtdr
,.»~
,,.~
sales personnel, which is reflected in the trip generation data presented
herein.
Time Period Vehicle trips
per dwelling
units Percent
EnterlExit
AM k hour 0.18 20/80
PM ak hour 0.33 67/33
24 Hour 3.71 50/50
Conclusion
The trip rates generated by the Four Seasons are very much in line .with similar
data sources. Furthermore. the mathematical differences even can be acoounbed
for. Accordingly, it is the opinion of the authors that the Four Seasons trip rates
summarized in Table are appropriate for use on other age-restrided residential
projects, with perhaps the actual values being marginally on the high side. Until
actual 24-hour data for age-restricted developments are obtained, the 3.71 trips
of Code 251 is recommended.
Discussion: This 'ITE Joumat' artice 'Trip generation characteristics of ago-
restricted housing' by Thomas E. Flynn and Andrew E. Boenau related to the
proposed facility is published in the Febnrary 2007. This article presents the trip
generation rates for age-restricted housing based in Virginia. The land use type
presented in the article is similar to senior adult housing-detached (Code-251)
because minimum age restriction is 55 and also developer estimated that half of
the residents include at least one adult who is still working. While the project site
presented ~ in this report has minimum age restriction of 62 and assisted
living/congregate care facility with dining facilities wh~h ~ similar to congregaba
care facility (Code-253) in the 7ri edition tTE trip generation manual. So the
average trip generation rate 2.02 is used for this facilities based on ITE trip
generation Codo-253.
~flc awP~ ra:POrrr 25 Mow~ac~r viu.+~c~ n~rw
w.a ~~ moo. mac. ~ saruoa uv~ oivaor~rr
~,
SENIOR HOUSING TRIP GENERATION AND PARKING DEMAND
CHARACTERISTICS
By Stephen B. Corcoran, P.E. (M) presented at the Institute of Transportation
Engineers 66th Annual Meetbg
Summary
As the baby boomer generation ages, special housing projects have been
developed for them in lieu of the traditional single-family horrro or apartment
Congregate care facilities, independent living apartments, assisted-care units,
and senior apartments are being marketed, devebped, and built to handle the
needs of older adults.
' The changing lifestyle of older adults affects their transportation needs and
usage as weQ. Trip generation and parking demand within this age group vary
t significantly from traditbnai residential ualrs because residents no beget have to
be at work, pick ~ their childron, or do theft shopping at specific times. Also
many senior communities provide on•site services to meet their residents' needs.
' This paper will present the author's experienoas with senior housing and its trip
and parking characteristics abng with data on projects in suburban Chicago,
Illinois and around the United States. .
t
PARKING DEMAND SURVEYS
Parking demand ~ charadertstics wero obtained from a number of surveys
conducted in the Chicago metropolitan area. The peak parking demand occurred
during the mid-day between 11:00 AM to 3:00 PM corresponding, in part, with the
largest employee shift on-site. Table summarizes those surveys. The peak day of
' the year is Mother's Day when many fadlttles run out of visitor parking, acxordfng
to the on-site staff.
' The peak parking demand rates varied between 0.214 and 0.579 vehicles per
unit/bed with a weighted average rate of 0.404 vehicles per unit/bed. Employee,
resident, and visitor parkbg is inducted. This rate is one third to one half the
parking reles of other residential uses. Readers should note that the survey atlas
with tlx higher parking rates generellyr have more nursing beds which requires
more employees than the resbential units.
~r
T.tir.• t~RAk Psrktna Demand Sunev
Devek~pmerrx_ _ _ Location Dwallirp
Unit Nursing
t3~ds Total
UnItsJB~ds Pule
Psricinp
Rats Pule
Psrfdnp
Demand
Govenent Vii Northb IL 220 151 371 0.490 1ffi
Beacon flip Lombard IL 235 23 258 0.585 148
Friendsh VAIa Schau 620 100 720 0.390 281
Pres Brian gloms Eva IL 312 188 478 0.518 277
Glenview Terrace Glenview 8. 243 243 0.214 52
M Oa IL 630 630 0.408 257
EJM E ineerln Studies
Lilac L W-auk IL 203 203 0.315 84
Irv aaP~cr rzEPOa'r 26 w+ow~acH v~t,-r,Enrsrut
wa ~~ E-+~. arc. ar+ER~raw ssrooa uv~,o oEVEioPr~Errr
~..
0
Deefisid Plate Deerfield IL 98 98 0.230 23
17E Parkin Manual EdNiat
Retirement Comrrwnity (Land Usa
Code 260 600 500 OZ70 135
3061 440 3601 141
Wei kited Avrt 0.404
Discussion:
This article presented in 1996 ITE conference cak;ulate the trip rates and parking
demands for the various senior facllit~s in Illinois. Author categorized the senior
housing facilities into five different category includes Senior singb-family
housing, Senior apartments, independent living units, Assisted-caro units. and
Congregate care facilities. Author collected trip data from senior housing facilities
from different states and found to be 4.52 to 5.64 trips end a day for senor
housing devekpment. But the collected data does not classify the senor housing
category and hard to Justify the trip rate data with this study. in this study, senor
housing facility is similar to independent living units and can not compare the trip
rates calculated by this paper to this study.
While parking demand characteristics were obtained from a number of surveys
conducted In the Chicago metropolitan area. The peak parking demand varied
beiween 0.214 and 0.579 vehicles per unitibed with a weighted average rats of
0.404 vehicles per unit/bed as summarized in the table above. Empbyee,
resident and visitor parking is included. From the table, Mayslake and G[erniew
Terrace development is similar to this project site. Other development fisted in
the table contains nursing beds which require more empbyees _ than the
residential units. This study does not provide the nursing facilities. The parking
demand ratio for the Mayslake and Glerniew Terrace devebpment is lonely
0.214 and 0.408 which is less then the 1.00 provided for this study.'
tiz~ic uw~cr A~oRT 27 Mowwcti viu.~.tus~rr
w.a zinr~Eat~-r r~aro. arc. ~wcw sEreoa uvwc: ~.ow~r
:~
III
i
APPENDIX D
i~
i
~r
ICU Worksheet
~F~ wP~cr 28 wi~n~snH
w c. n ~+. mac. ~ ~~ ~~ oEVeo~r
Int~n~ctlon C~psclt~- Utll~a8on WorksMat
InHrs~etlon Loc~tlar Find Mr a ~ C..n,r~e p4r. Tr+MN
Aat~n~!d b~c - Ewa
bW sad T1aN of RM~3 PrbMofs Ptsk
r.
X11
i
i~
i
i
~~
Ir~t.ts.ctlon Capactt~,r tJtll~attori WorkslttFal
~nws.cuon t.~stiau PE~d Flit 1.Ei GarrQro City: 7tNtn
llad~s+d kr: -~ ~Oamatlvb:
n.a +rna tte.. or rrw~ i'~roJ.aC i~FA
int~n~ctbn Ca~psatb udnz.4on WQrkshat
In1~n~e0oo locatlaa Rid F~ i H Grip _ ~ 1f:Ntll1
AlbranYwt
DMA end T M ~ OM~S i'roJ~~ _ riNh 6bw~rrX
1 M
ov~ImMt
~~
'~~ '~
~ /~~'
^ '
, .E~i. E8R MYBC iMBt~' .11VlI~t> ~ !i!~' Ftt~t lcdL ~' 69R
2 t 1 1 1 o i 0
5 ,,,
# IIa '!t6 187 St 186 28 .278 1. 'tSg4 ')
5 16 0
6 8ulldn. ~ ' .6fr
7 .. 18 16 18 18
8 F iw: `" ~+s :1~ri
g 46tf0 t tixlo tgoo tgoo 1D80 1 1800 1800 ! i
10 C c~t... 4 +# . # # # 4
i1 ,{ f d
sYStu>. ~
151- ofmrrs. 8Q4 1t A 1 . 21 0
1# 11 .0 512. 218:0 XI
' 15.0 1#OAO
16 `:1Jl5irJi F.ictal'n
~•. 1.000 f; 1.080 1. 1.000 1 0 1 i O 1
te. ~ ,1 .. :oso a. o.g5a oga# a65o o tooo 0:650 ,o.vll~ a
•1 , 1808X1 '1800 t6a80 'f 187.011 0X1 .. 17:8 1:116X1 .1 S1 . a
18 9 1+D00 A 187 1 :1508 561 .8 .1006.0 .2
1 , 0 1.2 0' o a,
... ..
2aex
ocit
r. ;pe.
z2 - 6 • . 7 . ~ 20:7 t#:1 1 1
i
2# t o.00 • i ao0 otio t aoo
;;~ • tt S 219 265 1S 5 0
~ ~1 0:00 0:0o i ooa aw
27 '1 1 A. f :0 96.0 .1 1S.o OA 15X1
28 9iNti . ' 1.00' X17 1.00 0: 1.00 1:07 1.OD
20 12 i900A. 12? t8 Qt 1`16 1888'' . 1 1700~t
80 c'S ; t4.1 1 1 if 1
51 i 'D 187 .1 561 ~` 1013
•
.,.;MIA ` 2~7 °'NA ;~.~ ~-
y1 11bi0' 28'x- i
euie r '1'i .
~ ~ fi 16.1
37 ~ 1#: 18 80.1
5 ~ 1 .55:1'
~p 'ISsb 1 ~ ~ 24. 20:8 37. :1.
sIK.
40 ~
41 fiiiilNW !
42. ~
~ :r, - .
•
ra ~ eXr
~6 EeT
47 ' 20.8 57,1 1
#8
R4 13.6
50 1 •
i lr grts~etloii. 7#
52 Cs '" -
• R*vYbh 2007A
t w . pt n
~sie u imt
~~
t
• IMorsoctlon G Util o W
Pub ~•d n .a~sn..c
~1-
i
i
i
i
i
i~
i
i
i
i
i
i
!~
I
kitrn.aen toasw~: l:..d HAI a.~ Caniw pqr.?UNn
~~
ow «~dt~. at wre ~,~.~ __
Intsrsaction Capachy UUltr~tbn Workahwt
ku~es~etloh Loalae: Aid i~ a d Grabs Clq: Ta~lia
An~lys~~ by: _ iJW/rAMi
Dw ~ndi'lrne afOM~s Propel: AM PiNr FuhiA --
~~
r
X11
i
i~
i
i
i
i
ti
Intsnuctibn Cspaeity tttll~atlop WorkshNt
~,...,
n
Yoa Loesdoa: Wd M i >J OYIiYM Cigq Tina
AafQ/+rd bys lllwtrtlMli
DNS sad TYM d Osfi:. Prt~gC Fipv
Intsrs~glon Gp~city lhlU:stion Wont
I~s~ctla~ Locatlaas Rid HM ~ EI (:unY~s Gqt: TuMh
Atilyssd ter: AIMeMpw2
Gsb Mkl 1'qn~ of Gybi Pn~t: 1~r udn
f
t
~~
i
i
i
s~
Intrn~dtoo C~packY Uttllratlon WoricshNt
int~~ctlon Cypacity UtltlsrNon Woriuii~
Inhrs~oUon LocsMo~ Wd NN i Sin .M~t1 Cigr: TurwYt
Mslrs~d bll: Aq~nrMwC
qds gad i'Mn~ o/ Daly: RraJ~1r.C 1W MovMlMrib
r
i
X11
i
I
I
1
I~
1
i
Q~
t
ui:.n.~o~, c,paeie~- uuitr..eiw~ woric+h.at
b~tarsaatloa Loca4lon: Rad H~ 8 Ban.Ara Clgs 7ua-Y1
Oah aad Da
Pro~aat:
4 Mowmaat
' ~
E8 EBT. E8R
VM81.
MMB'f
Il116R
. Int.
~
d6t
ice'
64~t
2 LatMU. 0 1 0 0 1 4 2 0
~ 8 ne + ro
~ 1,2 i 44 Y7 80 60 86 'Mp 34fi
6 10 0
6 Pod u0on + rs
y 16 48 10 44{
e Free wi
a Weal 1604 1804 1 1800 label "18W 1 1804 1x00 1 !
40loat d 4 4 4 ~{ 41 <
i4 X 4 ~
S 1 0' 4 1
a,4 iJA 118:0 aT.. UbA 65: 6
~+ 1 1: 4 1.000 4. .000 .80Y L 4:000 0 l:OOd
~ 0.84if 02-EO
. 't1.850 0. 0: 1:000 d Q, A
" 0.0 4780.! OA 0.0 134 .,1 fi 14 •
16 Sa 1 i1'a4: 1 4 .1 8b .S 1.
18 !,2 dA .0,0 0 OA
d. +0lt 0.
Z4 .role oa
22 ~- 0' 0
2 ..a
: 2{ t d.ia 4 a~x6 e:oo t doo
20 0 1J2 0 4
36 "' 4 0.10 4.0 0.00: 0.00
liid- 4 1 ib:3 15 15A
28 t.~Q :a7 0 .N 4.00 1 1.00
~ ~ d. i~aa ' 4a.a ~- leoaa 4 4 .6
as n:a a2.a: rs.
34 ~. t
~ ~ ~ w-
94 as; 74.:6' .! ~
4 .4 '283
as 8.2 18.5 a2A Z1'
dA s.4 1 A 2;b
8p 1 5
3a 10.9! 15.2 OA .b 2A.3< 20.
YYNt . N ' '°
40
41.
49 _ ?!~ _
! t3
4 b 0.1D EA 74 'eA
4 6
4 28. 3d.i 45.2
4 8
4 a
6 0 ~ 42A. 1.3
6 4 nters 60:8%
5 2 B R wieion t 0a3A
ew tvicrk ad on o CAtP ui 1 nq
Interssctlon Opacity Udlttstlon WoricsM~Rt
Inbrwt3lon Low ft~d F1r E S~ui Jinn Cygr. Tu1W1
/~hry~ trjr. ~ Atl~n~Nw!
CtiM and TInN of Dnlns f't4~et M flour rvkh P+obd MownrlNs
~~ .. ~ ~ "
1l Atrwmint E81: t?8T EBIt YVltl VYBT ' YMNiI?' 1 Ii11T ~ >mT liBR
2 - 0 t 0 ! 0 1 I 1 1
5 '~ed,l oe ~ Yw
{ . 15 7b % 55 <4a1 • 1 55
b P r0ii5ilins 10 0 9
b P nd. '~ ~
7. p Qd ib 16 16 18'
8 ~
q 1 1400 1 1 1400 1900 1900 S 4 1
i01 _cr5e 4 { { { { 4
11, t 5 t 4
1 i nnw: 1
1J Y o 0.0 15 :0 A 2{ 1t A b 0'
14 Y ohl~nlr $ . N 12.0 120:0 qbA 145.0 55A 653.0
tb t erns
'
_ t. 1.400 4A00 ADO 1.000 1 0 tA00 1.000 AJkf2
- 16 T ~ _ _ ~~~: . ~.
:
. D.g50 0.. b 0.550 0. 0.959 ' 0. A.450 1A00 6 a50 0. 0: O:
' 17 S .U,r. ° ~+bwCsi' " 8,0 1 0.0 1 1605.0 561 51 f
15 6 ti4xi " t1o~rE~e" 'tslr 1505.9 1795:1 1 1 69.1 1 56 160bA
tq . ede>Oiir'n. 1:2, 0 ,0~ AA itJt O:A
20 fi ..
' 2 .5
: 0 fi% 4
. r ~. E ~
22 ~:~'.a...
0
. ~
25 rawer: 0:.
P
{ 1 0.10. 1 0,10 1 0 0.
15.'1 { iq4 3A10
; ~ ~ :10 1 d.{0 t OAO 1 0.00
~;~!~ 5. 1.5 1 1 :b 1 ' 1 :0 1bA
28 k ' toot 27 .42 0.07 0.1{ 0 1.00 1.OD
2q 1TSgq AA 2562 1 1 1 1 :fi
- q.6 1 8A
51 M OA 0.0 1 :! r1
.
::1i7- ... ~ :. ~ .. ~
s{ ~., 9Ja ' 115:4
55 1 ~ 1
~ 4:5 14:5. b2.5
A.4 5:5 iA 1 .0 ~~#.
~ 42 16.5 2Y.6
wriy~~• 152 1 20 5411 .6 8.6
,.~.
+ 10 t{:5
{ 1
{ Z
~::.
C
' N
{ - 56. 20' 15
4 4 t~
t q 6A
b 0 -
. 00.0 { 31:
1 Yid off' ~ 67
~
~ FwMion 2003A
Ltv on nn
ei d
s
i
~I)
i
i
i
~~
c
d~
Int~rs~tloe ~apacibr U~gzatlon Worksl~t
a,ha.eYoe ~ Fea t~ a s.e,hrn A Twlin
ne. ~ Tlin. d o.lu 1roj~ lug ExlNno rolMel Mown~s
Int~rsscllon Csp~cJty UNltr~atbn Worlcst~t
t
inMe.~ellow leesltoru Rid Fdt Z Sta .ham City: T~wif
Da1i sad D li ProJ~el: MA.F'gk Houir FuWn WNhout PtoNd
~u
F~
I
il+
i
loters~ction C~paclty Utlltation WotkshNt
Intrs~cYon Loe~llo~ Rid F# s 6~a Jura
~ ~ Tu~/p
wu ana trn. w wage p
Mars.dton C.aP~~~b UttYz.tlon workshNt
~rtraa,ala, tAC.noiK R.a HRI i san.lun E~:'G~rrn
t~a..~ ~.~a~
~I 1
i
i
Inms~ctlon Capsdty Utlf~stion Wa1csM~Ft
7
~.n~.e~lgn ~:4 wi a ~.n.Mna c~grs 7'i,gln
a.~. a.a~~i» a~o~ ~ rie~.e~ wur
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
PAMELA STOKER, City Clerk and ex-officio Clerk of the City Council of the City of Tustin,
California, does hereby certify that the whole number of the members of the City Council
of the City of Tustin is 5; that the above and foregoing Ordinance No. 1346 was duly and
regularly introduced at a regular meeting of the Tustin City Council, held on the 4~' day of
December, 2007, and was given its second reading, passed, and adapted at a regular
meeting of the City Council held on the 2"d day of January, 2008 by the following vote:
COUNCILMEMBERAYES: Amantp`Dave~t, Rone. Kawashima. Palmer (S)
COUNCILMEMBER NOES: llnne (o)
COUNCILMEMBER ABSTAINED: None (o)
COUNCILMEMBER ABSENT: u,,,,o (o)
~---+
PAMELA STOKER
City Clerk
Exhibit A
Ordinance No. 1346
Zone Change 07-002
13841 Red Hill Avenue
~ ~~ ~
,~
~ ~~
,~-,~.
"'" auc awu~a,w
~ ~~.,.
~
~ ~
r
~ ,~
Existing
6~#~ g~~fg ,~
~ ~~ ~
»~ ,~.
,~
~~
,~-,~«.
~~ ~~ ~~~
~ ~.,.,.
g y~
~ ~
r.
um
Proposed
ATTACHMENT
PLANNING COMMISSION RESOLUTION NO. 4168
DESIGN REVIEW 10-018 AND
CONDITIONAL USE PERMIT 10-009
RESOLUTION NO. 4168
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF TUSTIN, APPROVING CONDITIONAL USE
PERMIT 10-009 AND DESIGN REVIEW 10-018 FOR
AUTHORIZATION TO CONSTRUCT AND OPERATE A 201-
UNIT ASSISTED LIVING/CONGREGATE CARE FACILITY
AGE RESTRICTED TO 62 YEARS OR OLDER AT 13841
RED HILL AVENUE.
The Planning Commission does hereby resolve as follows:
The Planning Commission finds and determines as follows:
A. That a proper application has been submitted by WASL Tustin Investors
V, LLC to construct and operate a 201 unit age-restricted (62 years or
older) assisted living/congregate care facility at 13841 Red Hill Avenue;
B. That the General Plan Planned Community Commercial/Business land use
designation provides for a variety of commercial and business uses. In
addition, the project has been reviewed for consistency with the Air Quality
Sub-element of the City of Tustin General Plan and has been determined to
be consistent with the Air Quality Sub-element.
C. That pursuant to Sections 9232.b.24. and 9233.c.1. of the Tustin City Code,
assisted living/congregate care facilities have been determined to be similar
to rest homes which are conditionally permitted within the Central
Commercial (C-2) zoning district.
D. That on January 2, 2008, the City Council gave final approval of
entitlements for the same project which included General Plan-Amendment
07-001, Zone Change 07-002, Design Review 07-012, and Conditional Use
Permit 07-011. On November 13, 2007, the Planning Commission adopted
Resolution No. 4074 approving Design Review 07-012, and Conditional Use
Permit 07-011. General Plan Amendment 07-001 and Zone Change 07-
002 are still in effect. Entitlements for Design Review 07-012 and
Conditional Use Permit 07-011 expired on July 2, 2010 due to inactivity
E. That a public hearing was duly called, noticed, and held for Conditional Use
Permit 10-009 and Design Review 10-018 on January 25, 2011, by the
Planning Commission.
F. That the establishment, maintenance, and operation of the proposed use
will not, under the circumstances of this case, be detrimental to the health,
safety, morals, comfort, or general welfare of the persons residing or
working in the neighbofiood of such proposed use, nor be injurious or
detrimental to the property and improvements in the neighborhood of the
subject property, or to the general welfare of the City of Tustin in that:
Resolution No. 4168
Page 2
1) The proposed assisted living/congregate care facility has been
determined to be similar to a rest home which is a conditionally
permitted use pursuant to Sections 9232.b.24. and 9233.c.1. of the
Tustin City Code.
2) The location of the proposed assisted living/congregate care facility
is compatible with surrounding uses in that the use can be
considered as quasi-commercial/residential facility consistent with
the adjoining residential and commercial developments.
3) As conditioned, a covenant running with the land will be required to
limit the use as an assisted living/congregate care facility for 62
years or older subject to providing certain senior services and
limiting the number of residents who may have automobiles.
4) The proposed use is not anticipated to result in parking impacts
since the parking analysis submitted for the proposed project
concluded that there is adequate number of parking spaces and site
amenities to accommodate the project.
5) The Traffic Engineering Division has reviewed the proposed project
and has concluded that there will be no adverse traffic impacts, and
there is sufficient street capacity to support the proposed project.
G. Pursuant to Section 9272 of the Tustin Municipal Code, the Planning
Commission finds that the location, size, architectural features, and general
appearance of the proposed development will not impair the orderly and
harmonious development of the area, the present or future development
therein, or the occupancy as a whole. In making such findings, the
Commission has considered at least the following items:
1. Height, bulk, and area of building -The facility offers various projections
and changes in height to break up the massing of the structures. The
inner courtyard provides secure open space for the residents.
2. Setbacks and site planning -The facility is separated from adjacent
properties by a drive aisle which also serves as a fire lane. A substantial
landscaped setback is provided from Red Hill Avenue and landscaping
along the alley frontage.
3. Exterior materials and colors -Materials consist of stucco, the roofing,
glazing and accent features most similar to the Mediten'anean
architectural tradition which can be found in other buildings within the
City.
4. Type and pitch of roofs - A series of hipped roof towers adorned with the
break up the flat roofing with parapet in order to create relief at the top of
the building.
Resolution No. 4168
Page 3
5. Size and spacing of windows, doors, and other openings -Fenestrations
within the building have pattern to them and ensure that there are not
large portions of blank wall on the building.
6. Towers, chimneys, roof structures - A series of towers are prevalent
throughout the building and serve to create vertical interest and a skyline.
7. Location, height, and standards of exterior illumination -Illumination will
be confined to the project site to avoid spillover onto adjacent properties.
8. Landscaping, parking area design, and traffic circulation - A traffic and
parking study has been prepared for the project to evaluate potential
impacts. A separate landscaping plan offers both courtyard landscaping
as well as exterior landscaping visible to the public right-of--way.
9. Location and method of refuse storage -Refuse will be stored and
accessed within the underground parking garage. Residents wifi use a
system of chutes to dispose of waste and recyclables.
10. Physical relationship of proposed structures to existing structures in the
neighbofiood -The project site is along a commercial corridor and will
offer a visual enhancement to the existing neighbofiood.
11. Appearance and design relationship of proposed structures to existing
structures and possible future structures in the neighborhood and public
thoroughfares -The project is similar in massing to the recently
completed cottages development around the comer on EI Camino Real.
12. Development Guidelines and criteria as adopted by the City Council -
The project is consistent with guidelines and criteria as adopted by the
City Council.
H. That a Mitigated Negative Declaration for the development of a 201 unit age
restricted (62 years or older) assisted living/congregate care facility at 13841
Red Hill Avenue was certified and adopted by the Tustin City Council on
December 4, 2007, through Resolution No. 07-93. Said Mitigated Negative
Declaration evaluated the environmental impacts associated with General Plan
Amendment 07-001, Zone Change 07-002, Design Review 07-012, and
Conditional Use Permit 07-011.
That the City prepared an Environmental Analysis Checklist attached hereto
as Exhibit B, to evaluate the potential environmental impacts associated with
Conditional Use Permit 10-009 and Design Review 10-018. The
Environmental Analysis Checklist demonstrates that all potential impacts of
the project were addressed by the previous certified Mitigated Negative
Declaration and no additional impacts have been identified.
II. The Planning Commission hereby approves Conditional Use Permit 10-009 and
Design Review 10-018 authorizing the construction and operation of a 201 unit
age-restricted (62 years or older) assisted living/congregate care facility at 13841
Red Hill Avenue, subject to the conditions contained within Exhibit A, attached
hereto.
Resolution No. 4168
Page 4
PASSED AND ADOPTED by the Planning Commission of the City of Tustin, at a
regular meeting on the 25th day of January, 2011.
STEVE KOZAK
Chairperson
ELIZABETH A. BINSACK
Planning Commission Secretary
STATE OF CALIFORNIA )
COUNTY OF ORANGE )
CITY OF TUSTIN )
I, Elizabeth A. Binsack, the undersigned, hereby certify that I am the Planning
Commission Secretary of the City of Tustin, California; that Resolution No. 4168
was duly passed and adopted at a regular meeting of the Tustin Planning
Commission, held on the 25 day of January, 2011.
ELIZABETH A. BINSACK
Planning Commission Secretary
EXHIBIT A
RESOLUTION NO. 4168
CONDITIONAL USE PERMIT 10-009 AND DESIGN REVIEW 10-018
CONDITIONS OF APPROVAL
GENERAL
(1) 1.1 The proposed project shall substantially conform with the submitted plans
for the project date stamped, January 25, 2011, on file with the
Community Development Department, as herein modified, or as modified
by the Director of Community Development in accordance with this
Exhibit. The Director of Community Development may also approve
subsequent minor modifications to plans during plan check if such
modifications are consistent with provisions of the Tustin City Code.
(1) 1.2 Unless otherwise specified, the conditions contained in this Exhibit shall be
complied with as specified or prior to the issuance of any building permits for
the project, subject to review and approval by the Community Development
Department.
(1) 1.3 The subject project approval shall become null and void unless permits for
the proposed project are issued and substantial construction is underway
within 12 months. All time extensions may be considered if a written request
is received within thirty (30) days prior to the expiration date.
(1) 1.4 Approval of Conditional Use Permit 10-009 and Design Review 10-018 is
contingent upon the applicant returning to the Community Development
Department a notarized "Agreement to Conditions Imposed" form and the
property owner signing and recording with the County Clerk-Recorder a
notarized "Notice of Discretionary Permit Approval and Conditions of
Approval" form. The forms shall be established by the Director of
Community Development, and evidence of recordation shall be provided to
the Community Development Department.
(1) 1.5 As a condition of approval of Conditional Use Permit 10-009 and Design
Review 10-018, the applicant shall agree, at its sole cost and expense, to
defend, indemnify, and hold harmless the City, its officers, employees,
agents, and consultants, from any claim, action, or proceeding brought by
a third party against the City, its officers, agents, and employees, which
SOURCE CODES
(1) STANDARD CONDITION (5) RESPONSIBLE AGENCY REQUIREMENTS
(2) CEQA MITIGATION (6) LANDSCAPING GUIDELINES
(3) UNIFORM BUILDING CODE(S) (7) PC/CC POLICY
(4) DESIGN REVIEW '"*~' EXCEPTIONS
Exhibit A
Resolution No. 4168
Page 2
seeks to attack, set aside, challenge, void, or annul an approval of the City
Council, the Planning Commission, or any other decision-making body,
including staff, concerning this project. The City agrees to promptly notify
the applicant of any such claim or action filed against the City and to fully
cooperate in the defense of any such action. The City may, at its sole cost
and expense, elect to participate in defense of any such action under this
condition.
USE RESTRICTIONS
(1) 1.6 Prior to the issuance of a building permit, the applicant shall record a
covenant running with the land that is binding upon the property owner and
successors in interest subject to review and approval by the Director of
Community Development and the City Attorney consistent with the
conditions of approval including but not limited to the following:
The use shall be limited to an assisted living/congregate care facility
for persons of 62 years or older.
Combination of housing, personalized supportive services, and health
care designed to meet the needs of those who need help with daily
living shall be provided at all times and shall include, but not limited to
the following:
o Three meals a day served in a common dining area
o Housekeeping services and personal laundry services
o Transportation
o Assistance with eating, bathing, dressing, toileting, and
walking
o Access to health and medical services
0 24-hour security and staff availability
o Emergency call systems for each resident's unit
o Health promotion and exercise programs
o Medication management
o Social and recreational activities
The above services may be provided either by the owner of the
facility ("owner") or by the use of outside providers; however, the
owner shall be responsible to ensure these services are available
upon request.
• Of the 204 parking spaces, only 171 residents may have an
automobile. This restriction shall be incorporated in any lease or
rental agreement.
The owner and/or operator of the
services and parking are provided
properties parking are not impacted.
facility shall ensure that on-site
such that off-site or surrounding
Exhibit A
Resolution No. 4168
Page 3
(1) 1.7 Roof ceiling construction shall be roofing on 1 /2" plywood. Batt insulation
shall be installed in joist spaces. The ceilings shall be on layer 5/8"
gypboard nailed direct.
(1) 1.8 All exterior walls shall be 2X4 studs 16" o.c. with Batt insulation in the stud
spaces. Exterior walls shall be stucco or other approved exterior plaster.
Interior walls shall be made with 5/8"gypboard. All other windows and
glass doors shall be double glazing.
(1) 1.9 All southeast facing perimeter windows and glass doors shall be glazed
with STC 32 glazing. STC 32 glazing may be provided with either '/"
laminated glass or a dual pane assembly with a '/2" airspace. In either
case, the glazing supplier shall be prepared in an independent, accredited
testing laboratory in accordance with ASTM E-90.
(1) 1.10 All entry doors shall be 1-3/4" solid core doors with weather stripping seals
on the sides and top. Glazing in entry doors shall not be accepted.
(1) 1.11 Striping on Red Hill Avenue shall be modified to provide northbound left
turns into the project driveway, but no left turns out of the driveway. A
"Right Tum Only" sign shall be installed on private property for traffic
exiting the project driveway.
(1) 1.12 Large semi-trailers and moving vans shall be prohibited from entering the
site. Move-in conditions along with other terms and conditions for
residency at the complex shall be included in the signed Tenant
Agreement.
(1) 1.13 Prior to issuance of a building permit, count-down pedestrian heads shall
be installed at the intersection of Redhill and San Juan Street by City
forces at the expense of the applicant.
(1) 1.14 The project shall maintain a total of 204 parking spaces with a minimum of
0.85 parking ratio per unit at all times (171 spaces assigned to the units and
33 spaces for employees and guests parking).
(1) 1.15 Access to the underground garage area shall be provided to Police
personnel via an Emergency Vehicle Access System. The system shall be
installed along with fire access to allow police officers to use a remote
clicker that is installed in all police vehicles.
(1) 1.16 If in the future the City determines that parking or traffic problems exist on
the site or in the vicinity, the Community Development Director may require
that the property owner prepare an analysis and bear all associated costs. If
the study indicates that there is a parking or traffic impact, the
applicant/property owner shall provide interim and permanent mitigation
measures to alleviate the problem.
Exhibit A
Resolution No. 4168
Page 4
(1) 1.17 No outdoor storage shall be permitted during grading or building stages,
except as approved by the Tustin Community Development Director.
(1) 1.18 Prior to signs installation, the applicant shall submit on-site sign plans for
review and approval and permits obtained.
PLAN SUBMITTAL
(1) 2.1 At the time of building permit application, the plans shall comply with the
latest edition of the codes, City Ordinances, State, Federal laws, and
regulations as adopted by the City Council of the City of Tustin.
(1) 2.2 Building plan check submittal shall include the following:
• Seven (7) sets of construction plans, including drawings for
mechanical, plumbing, and electrical.
• Two (2) copies of structural calculations.
• Two (2) copies of Title 24 energy calculations.
• Details of all proposed lighting fixtures and a photometric study
showing the location and anticipated pattern of light distribution of all
proposed fixtures. All new light fixtures shall be consistent with the
architecture of the building. All exterior lighting shall be designed and
arranged as not to direct light or glare onto adjacent properties,
including the adjacent streets. Wall-mounted fixtures shall be directed
at a 90-degree angle directly toward the ground. All lighting shall be
developed to provide a minimum of one (1) foot-candle of light
coverage, in accordance with the City's Security Ordinance.
• A note shall be provided on the plans that "All parking areas shall be
illuminated with a minimum of one (1)foot-candle of light, and lighting
shall not produce light, glare, or have a negative impact on adjacent
properties."
(1) 2.3 Vehicle parking, primary entrance to the building, the primary paths of travel,
cashier space, sanitary facilities, drinking fountain, and public telephones
shall be accessible to persons with disabilities and shall be shown on the
plans.
(1) 2.4 Seven (7) sets of final grading plans consistent with the site and
landscaping plans as prepared by a registered civil engineer shall be
submitted and shall include the following:
A. Technical details and plans for all utility installations including
telephone, gas, water, and electricity.
Exhibit A
Resolution No. 4168
Page 5
B. Three (3) copies. of a precise soil report provided by a civil engineer
and less than one (1) year old. Expanded information regarding the
levels of hydrocarbons and ground water contamination found on-
site shall be provided in the soil report. All pavement "R" values
shall be in accordance with applicable City of Tustin standards.
C. All site drainage shall be handled on-site and shall not be permitted to
drain onto adjacent properties.
D. Drainage, vegetation, circulation, street sections, curbs, gutters,
sidewalks, and storm drains shall comply with the on-site Private
Improvement Standards.
E. Two (2) copies of Hydrology Report.
F. A surety/cash bond will be required to assure work is completed in
accordance with approved plans prior to permit issuance. The
engineer's estimated cost of the grading, drainage, and erosion
control shall be submitted to the Building Official for determination
of the bond amount.
(1) 2.5 If buried resources are found during grading within the project area, a
qualified archaeologist would need to assess the site significance and
perform the appropriate mitigation. The Native American viewpoint shall be
considered during this process. This could include testing or data recovery.
Native American consultation shall also be initiated during this process.
(1) 2.6 The engineer of record shall submit a final compaction report to the
Building Division for review and approval prior to the issuance of a building
permit.
(1) 2.? The engineer of record shall submit a pad certification to the Building
Division for review and approval prior to the issuance of a building permit.
(1) 2.8 Prior to issuance of grading permits, the applicant shall submit a copy of
the Notice of Intent (NOI) indicating that coverage has been obtained
under the National Pollutant Discharge Elimination System (NPDES) State
General Permit for Storm Water Discharges Associated with Construction
Activity from the State Water Resources Control Board. Evidence that the
NOI has been obtained shall be submitted to the Building Official. In
addition, the applicant shall include notes on the grading plans indicating
that the project will be implemented in compliance with the Statewide
Permit for General Construction Activities.
Exhibit A
Resolution No. 4168
Page 6
The following requirements shall be defined on permit plan cover sheets
as either general or special notes and the project shall be implemented in
accordance with the notes:
• Construction sites shall be maintained in such a condition that an
anticipated storm does not cant' wastes or pollutants off the site.
• Discharges of material other than storm water are allowed only
when necessary for performance and completion of construction
practices and where they do not: cause or contribute to a violation
of any water quality standard; cause or threaten to cause pollution,
contamination, or nuisance; or contain a hazardous substance in a
quantity reportable under Federal Regulations 40 CFR Parts 117
and 302.
• Potential pollutants include, but are not limited. to: solid or liquid
chemical spills; wastes from paints, stains, sealants, glues, limes,
pesticides, herbicides, wood preservatives, and solvents; asbestos
fibers, paint flake or stucco fragments; fuels, oils, lubricants, and
hydraulic, radiator or battery fluids; fertilizers, vehicle/equipment
wash water and concrete wash water, concrete, detergent or
floatable wastes; wastes from any engine equipment steam
cleaning or chemical degreasing; and chlorinated potable water line
flushings. During construction, disposal of such materials should
occur in a specified and controlled temporary area on site,
physically separated from potential storm water run-off, with
ultimate disposal in accordance with local, State, and Federal
requirements.
• Dewatering of contaminated groundwater or discharging
contaminated soils via surface erosion is prohibited. Dewatering of
non-contaminated groundwater requires a National Pollutant
Discharge Elimination System Permit from the .California State
Regional Water Quality Control Board.
(1) 2.9 A note shall be provided on final plans that a six (6) foot high chain link fence
shall be installed around the site prior to building construction stages. A
nylon fabric or mesh shall be attached to the temporary construction fencing.
Gated entrances shall be permitted along the perimeter of the site for
cons#ruction vehicles.
(1) 2.10 The applicant shall comply with all City policies regarding short-term
construction emissions, including periodic watering of the site and prohibiting
grading during second stage smog alerts and when wind velocities exceed
15 miles per hour.
Exhibit A
Resolution No. 4168
Page 7
(1) 2.11 Pursuant to the City of Tustin's Security Ordinance and the Uniform Fire
Code, street numbers shall be displayed in a prominent location on the
street side of the residence. The numerals shall be no less than four (4)
inches in height and shall be of contrasting color to the background to which
they are attached and illuminated during hours of darkness; six (6) inches in
height for commercial.
(1) 2.12 An adequate size trash enclosure with solid metal,. self-closing, self-latching
gates is required to be located on the property and maintained to avoid
health issues for neighboring commercial and residential areas.
Said enclosure shall be screened by a solid decorative wall consistent with
the adjacent building's material and finish and be of a minimum height of six
(6) feet. The actual location of the enclosure and types of screening and
details of the enclosure shall be submitted at building plan check and are
subject to approval by the Community Development Department. The
location of the bin, size, and quantity shall be reviewed and accepted in
writing by CR&R (contract trash hauler).
(1) 2.13 Transformers should be located in screened areas to reduce visibility from
the public right-of-way. All above ground equipment boxes will need to be
heavily landscaped to screen them and are subject to field verification.
(1) 2.14 The project shall comply with the City's Water Efficient Landscape
Ordinance (TCC Section 9700)
(1) 2.15 Submit at plan check complete detailed landscaping and irrigation plans
for all landscaping areas, including the model complex, consistent with
adopted City of Tustin Landscaping requirements. The plans shall include
the following:
• Include a summary table identifying plan materials. The plant table
shall list botanical and common names, sizes, spacing, location, and
quantity of the plant materials proposed.
• Show planting and berming details, soil preparation, staking, etc. The
irrigation plan shall show location and control of backflow prevention
devices, pipe size, sprinkler type, spacing, and coverage. Details for
all equipment must be provided.
• Show all property lines on the landscaping and imgation plans, public
right-of--way areas, sidewalk widths, parkway areas, and wall
locations.
• Add a note that coverage of landscaping and irrigation materials is
subject to inspection at project completion by the Community
Development Department.
Exhibit A
Resolution No. 4168
Page 8
• Turf is unacceptable for grades over 25 percent. A combination of
planting materials shall be used. On large areas, ground cover alone
is not acceptable.
• Shrubs shall be a minimum of five (5) gallon size and shall be placed
a maximum of five (5) feet on center.
• Ground cover shall be planted eight (8) to twelve (12) inches on
center.
• Fences, wall, and equipment areas shall be screened with walls,
vines, and/or trees.
• All plant materials shall be installed in a healthy vigorous condition
typical to the species and shall be maintained in a neat and healthy
condition. Maintenance includes, but is not limited to, trimming,
weeding, removal of litter, fertilizing, regular watering, and
replacement of diseased or dead plants.
• Major points of entry to the project an along the project frontage shall
receive specimen trees to create an identifying theme.
• All trees shall be minimum 24-inch box in size.
(1) 2.16 On-site walls and fences shall be noted on the plans with specific
materials, colors, and decorative treatments subject to review and
approval of the Community Development Department.
PUBLIC WORKS
(1) 3.1 Prior to issuance of any permits, the applicant shall submit for approval by
the Community Development and Public Works Departments, a Water
Quality Management Plan (WQMP). If the WQMP has been determined
to be a Priority WQMP, it shall identify Low Impact Development (LtD)
principles and Best Management Practices (BMPs) that will be used on-
site to retain storm water and treat predictable pollutant run-off. The
Priority WQMP shall identify: the implementation of BMPs, the assignment
of long-term maintenance responsibilities (specifying the developer, parcel
owner, maintenance association, lessees, etc.), and reference to the
location(s) of structural BMPs.
(1) 3.2 Prior to submittal of a Water Quality Management Plan (WQMP}, the
applicant shall submit a deposit of $2,700.00 to the Public Works
Department for the estimated cost of reviewing the WQMP.
(1) 3.3 This development shall comply with all applicable provisions of the City of
Tustin Water Quality Ordinance and all Federal, State and Regional Water
Quality Control Board rules and regulations.
Exhibit A
Resolution No. 4168
Page 9
(1) 3.4 Prior to issuance of any permits, the applicant shall record a "Covenant
and Agreement Regarding O & M Plan to Fund and Maintain Water
Quality BMPs, Consent to Inspect and Indemnification" with the Orange
County Clerk-Recorder. These documents shall bind current and future
owner(s) of the property regarding implementation and maintenance of the
structural and non-structural BMPs as specified in the approved WQMP.
(1) 3.5 Prior to issuance of any permit, the applicant /engineer shall obtain
approval of the design to construct Red Hill Avenue to its ultimate Major
Arterial half-width adjacent to the site (with full width sidewalk with tree
wells) and reconstruct the full width of the existing public alley from the
City of Tustin Public Works Department. The improvements shall be
completed by the applicant prior to issuance of a Certificate of Occupancy.
Separate 24" x 36" public improvement plans, as prepared by a Califomia
Registered Civil Engineer shall be prepared. Said plans shall include, but
not be limited to the following:
a) Curb and Gutter h) Domestic water facilities
b) Sidewalk, including curb ramps I) Sanitary sewer facilities
for the physically disabled j) Landscape/irrigation
c) Drive aprons k) Underground utility connections
d) Signing/striping plan
e) Street paving
f.) Street lighting
f) Catch basin/storm drain laterals/
connection to existing storm drain system
In addition, a 24" x 36' reproducible construction work area traffic control
plan, as prepared by a Califomia Registered Traffic Engineer or Civil
Engineer experienced in this type of plan preparation shall be required.
(1) 3.6 The applicant shall provide for the undergrounding of all existing and
proposed utility distribution facilities within the public right-of-way adjacent
to the project, as well as within the project, per Section 8402 of the Tustin
City Code. The applicant shall be responsible for the associated costs
and arrangement with each public utility.
(1) 3.7 Prior to issuance of any permit, the developer shall obtain written
verification from each utility company providing service to the project that
adequate capacity is available to serve the project. Any capacity studies
required by the utility companies will be the responsibility of the developer.
(1) 3.8 Permission from property owners shall be required for any work located on
adjacent properties.
(1) 3.9 Adequate horizontal and vertical intersection sight lines for access onto
Red Hill Avenue shall be provided. In general a 25' x 25' limited use area
triangle provides adequate sight at typical driveways. Additional sight
Exhibit A
Resolution No. 4168
Page 10
evaluation, however, could be required to satisfy City of Tustin Standard
Drawings and Design Standards for Public Works Construction No. 510
for all affected streets. The sight lines would be shown on the grading
plan and landscape plan. If detailed analyses are requested, all
landscaping within the limited use area would need to comply with City of
Tustin Standard Drawings and Design Standards for Public Works
Construction No. 510.
(1) 3.10 Any damage done to existing street improvements and utilities shall be
repaired before issuance of a Certificate of Occupancy for the
development.
(1) 3.11 Prior to any work in the public right-of-way, an Encroachment Permit shall
be obtained from and applicable fees paid to the Public Works
Department.
(1) 3.12 The applicant shall satisfy dedication and/or reservation requirements as
applicable, including, but not limited to, dedication in Fee Title of all
required street rights-of-way; dedication of all required flood control right-
of-way easements; and dedication of vehicular access rights, sewer
easements, and water easements defined and approved as to specific
locations by the City Engineer (at no cost to the City) and/or other
agencies.
(1) 3.13 Current Federal Americans with Disabilities Act (ADA) requirements shall
be met at the drive aprons and pedestrian walkways.
(1) 3.14 Prior to issuance of a building permit, the applicant shall provide written
approval from the Orange County Sanitation District for sewer
connection/use.
(1) 3.15 Developer's execution of a public improvement agreement and furnishing
the necessary improvement bonds as required by the City Engineer prior to
the issuance of an encroachment permit shall be required.
(1) 3.16 Prior to issuance of a building permit, the applicant shall obtain a new
address from the Engineering Division.
(1) 3.17 Construction and Demolition Waste Recycling and Reduction Plan
(WRRP).
A. The applicant/contractor is required to submit a WRRP to the Public
Works Department. The WRRP must indicate how the applicant
will comply with the City's requirement (City Code Section 4351, et
al) to recycle at least 50% of the project waste material.
B. The applicant will be required to submit a $50.00 application fee
and a cash security deposit. Based on the review of the submitted
Exhibit A
Resolution No. 4168
Page 11
Waste Management Plan, the cash security deposit will be
determined by the Public Works Department in an amount not to
exceed 5% of the project's valuation.
C. Prior to issuance of a any permit, the applicant shall submit the
required security deposit in the form of cash, cashier's check,
personal check, or money order made payable to the "City of
Tustin".
(1) 3.18 If the City of Tustin's contracted trash hauling company is unable to
provide scout trash pickup, the applicant/property owner shall be
responsible for providing the scout trash pickup or altemative trash service
to the satisfaction of the Public Works Department. The alternative trash
service plan shall be submitted to the Public Works Department for review
and approval for developing and implementing a Waste Management
Plan.
(1) 3.19 The Applicant, Property Owner and/or tenant(s) are required to participate
in the City's recycling program.
(1) 3.20 A double check detector assembly (DCDA) is required for the project.
Prior to issuance of a Building Permit, an easement for public utility
access purposes shall be dedicated to the City of Tustin. The easement
shall start from the public right-of-way up to the DCDA with a minimum
distance of five (5) feet all around the DCDA to allow for unobstructed
access, inspection, testing, and maintenance. The applicant shall submit
a legal description and sketch of the area to the Public Works Department
for review and approval, as prepared by a California Registered Civil
Engineer or Califomia Licensed Land Surveyor.
(1) 3.21 An irrigation system is required for the project. A separate water meter
with reduced pressure principle assembly (RPPA) shall be provided to
prevent cross-connection with the public water system.
(1) 3.22 A written release/approval from the East Orange County Water District
(EOCWD) shall be obtained by the Developer prior to receiving water
service from the City of Tustin. The applicant shall submit a water permit
application to EOCWD, and is responsible for all application, connection
and other EOCWD fees.
(1) 3.23 The proposed domestic water system plans must conform to all applicable
regulations enforced by the Orange County Health Department.
(1) 3.24 The existing 6-inch water main on Red Hill Avenue is insufficient to
provide fire flows for the new facilities. Based on OCFA fire flow demands
and requirements, it may be necessary to construct a new 8-inch water
main on Red Hill Avenue to meet current water flow requirements.
Exhibit A
Resolution No. 4168
Page 12
(1) 3.25 Water system improvements shall be designed in accordance with the
requirements and standards of the City of Tustin Department of Public
Works and/or American Water Works Association (AWWA).
(1) 3.26 The applicant is responsible for all costs related to the installation,
upgrade, alteration, relocation or abandonment of all existing City of Tustin
public water facilities affected by the proposed project.
(1) 3.27 Approval from the Water Services Division is required for permitting or
construction of any new water service connections, abandonment or
relocation of existing water services, or improvements that will affect the
City's water facilities.
(1) 3.28 CADD Requirements - In addition to the normal full-size map and plan
submittal, all final maps and plans including, but not limited to, tract maps,
parcel maps, right-of-way maps, records of survey, public works
improvements, private infrastructure improvements, final grading plans,
and site plans shall be submitted to the Public Works Department in
computer aided design and drafting (CADD) format to the satisfaction of
the City Engineer. The standard file format is AutoCAD Release 2007, or
latest version, having the extension "DWG". All layering and linotype
conventions are AutoCAD-based (latest version available upon request
from the Public Works Department). The CADD files shall be submitted to
the City at the time plans are approved, and updated CADD files reflecting
"as built" conditions shall be submitted once all construction has been
completed. No project bonds will be released until acceptable "as built"
CADD files have been submitted to the City.
ORANGE COUNTY FIRE AUTHORITY (OCFA)
(5) 4.1 Prior to the issuance of any building permits, the applicant shall obtain
approval of the Fire Chief for all fire protection access roads to within 150
feet of all portions of the exterior of the structure. The plans shall include
plan and sectional views and indicate the grade and width of the access
road measured flow-line to flow-line. The plans shall indicate the OCFA
minimum turning radius of 38 feet outside and 17 feet inside. When adead-
end street exceeds 150 feet or when otherwise required, a clearly marked
fire apparatus access turnaround must be provided and approved by the
Fire Chief. The applicant may contact the OCFA at (714) 573-6100 or visit
the OCFA website to obtain a copy of the "Guidelines for Emergency
Access."
(5) 4.2 Prior to the issuance of any building permits, the applicant shall provide
evidence of adequate fire flow. The "Orange County Fire Authority Water
Availability for Fire Protection" form shall be signed by the applicable water
district and submitted to the Fire Chief for approval.
Exhibit A
Resolution No. 4168
Page 13
(5) 4.3 Prior to the issuance of any building permits, the applicant shall submit a
fire hydrant location plan to the Fire Chief for review and approval.
(5) 4.4 Prior to the issuance of a building permit, the applicant shall submit
evidence of the on-site fire hydrant system to the Fire Chief and indicate
whether it is public or private. If the system is private, it shall be reviewed
and approved by the Fire Chief prior to building permit issuance, and the
applicant shall make provisions for the repair and maintenance of the
system in a manner meeting the approval of the Fire Chief. Please contact
the OCFA at (714) 573-6100 or visit the OCFA website for a copy of the
"Guidelines for Private Fire Hydrant &/or Sprinkler Underground Piping."
(5) 4.5 Prior to the issuance of any certificate of occupancy, all fire hydrants shall
have a blue reflective pavement marker indicating the hydrant location on
the street as approved by the Fire Chief, and must be maintained in good
condition by the property owner. Please contact the OCFA at (714) 573-
6100 or visit the OCFA website for a copy of the "Guideline for Installation
of Blue Dot Hydrant Markers."
(5) 4.6 Prior to the issuance of any building permits, the applicant shall submit
plans and obtain approval from the Fire Chief for fire lanes on required fire
access roads less than 36 feet in width. The plans shall indicate the
locations of red curbs and signage and include a detail of the proposed
signage including the height, stroke and colors of the lettering and its
contrasting background. Please contact the OCFA at (714) 573-6100 or
visit the OCFA website to obtain a copy of the "Guidelines for Emergency
Access Roadways and Fire Lane Requirements."
(5) 4.7 Prior to the issuance of any certificate of occupancy, the fire lanes shall be
installed in accordance with the approved fire master plan. The CC&R'S's
or other approved documents shall contain a fire lane map, provisions
prohibiting parking in the fire lanes and a method of enforcement.
(5) 4.8 Prior to the issuance of any grading permits, the applicant shall obtain the
approval from the Fire Chief for the construction of any gate across
required fire department access roads. Please contact the OCFA at (714)
573-6100 or visit the OCFA website to obtain a copy of the "Guidelines for
Design and Installation of Emergency Access Gates and Barriers."
(5) 4.9 Prior to the issuance of a building permit, the applicant shall submit plans
for the required automatic fire sprinkler system in the structure to the Fire
Chief for review and approval. Please contact the OCFA at (714) 573-
6100 to request a copy of the "Orange County Fire Authority Notes for
New NFPA 13 Commercial Sprinkler Systems."
(5) 4.10 Prior to the issuance of a certificate of occupancy, this system shall be
operational in a manner meeting the approval of the Fire Chief.
Exhibit A
Resolution No. 4168
Page 14
(5) 4.11 Prior to the issuance of a building permit, plans for the fire alarm system
shall be submitted to the Fire Chief for review and approval. Please
contact the OCFA at (714) 573-6100 or visit the OCFA website to obtain a
copy of the "Guideline for New and Existing Fire Alarm Systems."
This system shall be operational prior to the issuance of a certificate of
occupancy.
(5) 4.12 Prior to the issuance of a building permit, the applicant shall submit
architectural plans for the review and approval of the Fire Chief if required
per the "Orange County Fire Authority Plan Submittal Criteria Form."
Please contact the OCFA at (714) 573-6100 for a copy of the
Site/Architectural Notes to be placed on the plans prior to submittal.
FEES
(1) 5.1 Prior to issuance of any permits, payment shall be made of all applicable
fees, including but not limited to, the following:
• Building plan check and permit fees
• Grading plan check and permit fees
• New development fees
• School fees
• Orange County Fire Authority fees
• Major Thoroughfare and Bridge fees
(1) 5.2 Within. forty-eight (48) hours of approval of the subject project, the
applicant shall deliver to the Community Development Department, a
cashier's check payable to the COUNTY CLERK in the amount of fifty
dollars ($50.00) to enable the City to file the appropriate environmental
documentation for the project. If within such forty-eight (48) hour period
that applicant has not delivered to the Community Development
Department the above-noted check, the statute of limitations for any
interested party to challenge the environmental determination under the
provisions of the California Environmental Quality Act could be
significantly lengthened.
EXHIBIT B
Resolution No. 4168
COMMUNITY DEVELOPMENT DEPARTMENT
300 Centennial Way, Tustin, CA 92780
(714) 573-3100
ENVIRONMENTAL ANALYSIS CHECKLIST
For Projects With Previously Certified/Approved Environmental Documents:
Mitigated Negative Declaration for Monarch Village
This checklist and the following evaluation of environmental impacts takes into consideration the preparation of
an environmental document prepared at an earlier stage of the proposed project. The checklist and evaluation
evaluate the adequacy of the earlier document pursuant to Section 15162 of the California Environmental
Quality Act (CEQA) Guidelines.
A. BACKGROUND
Project Title(s): Conditional Use Permit 10-009 and Design Review 10-018
Lead Agency: City of Tustin, 300 Centennial Way, Tustin, California 92780
Lead Agency Contact Person: Ryan Swiontek Phone: (714) 573-3123
Project Location: 13841 Red Hill Avenue, Tustin, CA 92780
Project Sponsor's Name and Address
John Haffner
WASL Tustin Investors V, LLC
1740 E. Garry Avenue, Suite 105
Santa Ana, CA 92705
General Plan Designation: Planned Community CommerciaUBusiness
Zoning Designation: Central Commercial (C-2)
Project Description: Conditional Use Permit 10-009 is a request to establish and operate an age
restricted assisted living/congregate care facility. Design Review 10-018 is
a request to evaluate the aesthetics of the proposed 181,159 square foot, 201
unit assisted living/congregate care facility.
Surrounding Uses: North: Office Use (C-1) and Multifamily Residential (R-3 2200)
East: Red Hill Avenue and Commercial Shopping Center (100 C1 10000)
South: Commercial Uses (C-2)
West: Tustin High School (P&I)
Previous Environmental Documentation:
A Mitigated Negative Declaration for the development of a an age restricted (62 years or older) assisted
living/congregate care facility at 13841 Red Hill Avenue was certified and adopted by the Tustin City
Council on December 4, 2007 through Resolution No. 07-93. Said Mitigated Negative Declaration
evaluated the environmental impacts associated with General Plan Amendment 07-001, Zone Change 07-
002, Design Review 07-012, and Conditional Use Permit 07-011.
B.
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this project, involving at least one
impact that is a "Potentially Significant Impact" as indicated by the checklist in Section D below.
^Land Use and Planning
^Population and Housing
^Geology and Soils
^Hydrology and Water Quality
^Air Quality
^Transportation & Circulation
^Biological Resources
^Mineral Resources
^Agricultural Resources
^Hazards and Hazardous Materials
^Noise
^Public Services
^Utilities and Service Systems
^Aesthetics
^Cultural Resources
^Recreation
^Mandatory Findings of
Significance
C. DETERMINATION:
On the basis of this initial evaluation:
^ I find that the proposed project COULD NOT have a significant effect on the environment, and a
NEGATIVE DECLARATION will be prepared.
^ I find that although the proposed project could have a significant effect on the environment, there will
not be a significant effect in this case because the mitigation measures described on an attached sheet
have been added to the project. A NEGATIVE DECLARATION will be prepared.
^ I find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
^ I find that the proposed project MAY have a significant effect(s) on the environment, but at least one
effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and
2) has been addressed by mitigation measures based on the earlier analysis as described on attached
sheets, if the effect is a "Potentially Significant Impact" or "Potentially Significant Unless Mitigated."
An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that
remain to be addressed.
^ I find that although the proposed project could have a significant effect on the environment, there WILL
NOT be a significant effect in this case because all potentially significant effects 1) have been analyzed
adequately in an earlier EIR pursuant to applicable standards, and 2) have been avoided or mitigated
pursuant to that earlier EIR, including revisions or mitigation measures that are imposed upon the
proposed project.
® I find that although the proposed project could have a significant effect on the environment, there WILL
NOT be a significant effect in this case because all potentially significant effects I) have been analyzed
adequately in an earlier NEGATIVE DECLARATION pursuant to applicable standards, and 2) have
been avoided or mitigated pursuant to that earlier NEGATIVE DECLARATION, including revisions or
mitigation measures that are imposed upon the proposed project.
Preparers
Ryan ~'wjbntek, Associate Planner
Elizabeth A. Binsack, Community Development Director
D. EVALUATION OF ENVIRONMENTAL IMPACTS
Date: O 1-19-11
Date 01-19-11
See Attachment A attached to this Checklist
EVALUATION OF ENVIRONMENTAL IMPACTS
I. AESTHETICS -Would the project:
a) Have a substantial adverse effect on a scenic vista?
b) Substantially damage scenic resources, including, but not
limited to, trees, rock outcroppings, and historic buildings
within a state scenic highway?
c) Substantially degrade the existing visual character or
quality of the site and its surroundings?
d) Create a new source of substantial light or glare which
would adversely affect day or nighttime views in the area?
II. AGRICULTURE RESOURCES: In determining
whether impacts to agricultural resources are significant
environmental effects, lead agencies may refer to the
California Agricultural Land Evaluation and Site Assessment
Model (1997) prepared by the California Dept. of
Conservation as an optional model to use in assessing impacts
on agriculture and farmland. Would the project:
a) Convert Prime Farmland, Unique Farmland, or Farmland
of Statewide Importance (Farmland), as shown on the maps
prepared pursuant to the Farmland Mapping and Monitoring
Program of the California Resources Agency, to non-
agricultural use?
b) Conflict with existing zoning for agricultural use, or a
Williamson Act contract?
c) Involve other changes in the existing environment which,
due to their location or nature, could result in conversion of
Farmland, to non-agricultural use?
III. AIR QUALITY: Where available, the significance
criteria established by the applicable air quality management
or air pollution control district may be relied upon to make the
following determinations. Would the project:
a) Conflict with or obstruct implementation of the applicable
air quality plan?
b) Violate any air quality standard or contribute substantially
to an existing or projected air quality violation?
c) Result in a cumulatively considerable net increase of any
criteria pollutant for which the project region is non-
attainment under an applicable federal or state ambient air
quality standard (including releasing emissions which exceed
quantitative thresholds for ozone precursors)?
d) Expose sensitive receptors to substantial pollutant
concentrations?
e) Create objectionable odors affecting a substantial number
of people`?
No Substantial
New More Change From
Sign cant Severe Previous
Impact Impacts Analysis
^ ^
^ ^
^ ^
a ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
IV. BIOLOGICAL RESOURCES: -Would the project:
a) Have a substantial adverse effect, either directly or
through habitat modifications, on any species identified as a
candidate, sensitive, or special status species in local or
regional plans, policies, or regulations, or by the California
Department of Fish and Game or U.S. Fish and Wildlife
Service?
b) Have a substantial adverse effect on any riparian habitat
or other sensitive natural community identified in local or
regional plans, policies, regulations or by the California
Department of Fish and Game or U.S. Fish and Wildlife
Service?
c) Have a substantial adverse effect on federally protected
wetlands as defined by Section 404 of the Clean Water Act
(including, but not limited to, marsh, vernal pool, coastal, etc.)
through direct removal, filling, hydrological interruption, or
other means?
d) Interfere substantially with the movement of any native
resident or migratory fish or wildlife species or with
established native resident or migratory wildlife corridors, or
impede the use of native wildlife nursery sites?
e) Conflict with any local policies or ordinances protecting
biological resources, such as a tree preservation policy or
ordinance?
f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation Plan, or
other approved local, regional, or state habitat conservation
plan?
V. CULTURAL RESOURCES: -Would the project:
a) Cause a substantial adverse change in the significance of
a historical resource as defined in § 15064.5?
b) Cause a substantial adverse change in the significance of
an archaeological resource pursuant to § 15064.5?
c) Directly or indirectly destroy a unique paleontological
resource or site or unique geologic feature?
d) Disturb any human remains, including those interred
outside of formal cemeteries?
VI. GEOLOGY AND SOILS: -Would the project:
a) Expose people or structures to potential substantial
adverse effects, including the risk of loss, injury, or death
involving:
No Substantial
New More Change From
Significant Severe Previous
Impact Impacts Analysis
^ ^
^ ^
D D
D D
D D
^ ^
^ ^
^ ^
^ ^
^ ^
i) Rupture of a known earthquake fault, as delineated on the
most recent Alquist-Priolo Earthquake Fault Zoning Map
issued by the State Geologist for the area or based on other
substantial evidence of a known fault? Refer to Division of
Mines and Geology Special Publication 42.
ii) Strong seismic ground shaking?
iii) Seismic-related ground failure, including liquefaction`?
iv) Landslides?
b) Result in substantial soil erosion or the loss of topsoil?
c) Be located on a geologic unit or soil that is unstable, or
that would become unstable as a result of the project, and
potentially result in on- or off-site landslide, lateral spreading,
subsidence, liquefaction or collapse?
d) Be located on expansive soil, as defined in Table 18-1-B
of the Uniform Building Code (1994), creating substantial
risks to life or property`?
e) Have soils incapable of adequately supporting the use of
septic tanks or alternative wastewater disposal systems where
sewers are not available for the disposal of waste water?
VII,HAZARDS AND Z=IAZARDOUS MATERIALS:
Would the project:
a) Create a significant hazard to the public or the
environment through the routine transport, use, or disposal of
hazardous materials?
b) Create a significant hazard to the public or the
environment through reasonably foreseeable upset and
accident conditions involving the release of hazardous
materials into the environment?
c) Emit hazardous emissions or handle hazardous or acutely
hazardous materials, substances, or waste within one-quarter
mile of an existing or proposed school?
d) Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to Government
Code Section 65962.5 and, as a result, would it create a
significant hazard to the public or the environment?
e) For a project located within an airport land use plan or,
where such a plan has not been adopted, within two miles of a
public airport or public use airport, would the project result in
a safety hazard for people residing or working in the project
area?
f) For a project within the vicinity of a private airstrip,
would the project result in a safety hazard for people residing
or working in the project area?
No Substantial
New More Change From
Significant Severe Previous
Impact Impacts Analysis
o ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ a
No Substantial
New More Change From
Significant Severe Previous
g) Impair implementation of or physically interfere with an Impact Impacts Analysis
adopted emergency response plan or emergency evacuation
plan? ^ ^
h) Expose people or structures to a significant risk of loss,
injury or death involving wildland fires, including where
wildlands are adjacent to urbanized areas or where residences
are intermixed with wildlands? ^ ^
VIII. HYDROLOGY AND WATER QUALITY: -Would
the project:
a) Violate any water quality standards or waste discharge
requirements'? ^ ^
b) Substantially deplete groundwater supplies or interfere
substantially with groundwater recharge such that there would
be a net deficit in aquifer volume or a lowering of the local
groundwater table level (e.g., the production rate of pre-
existing nearby wells would drop to a level which would not
support existing land uses or planned uses for which permits
have been granted)? ^ ^
c) Substantially alter the existing drainage pattern of the site
or area, including through the alteration of the course of a
stream or river, in a manner which would result in substantial
erosion or siltation on- or off-site`? ^ ^
d) Substantially alter the existing drainage pattern of the site
or area, including through the alteration of the course of a
stream or river, or substantially increase the rate or amount of
surface runoff in a manner which would result in flooding on-
or off-site? ^ ^
e) Create or contribute runoff water which would exceed the
capacity of existing or planned stormwater drainage systems
or provide substantial additional sources of polluted runoff? ^ ^
f) Otherwise substantially degrade water quality? ^ ^
g) Place housing within a 100-year flood hazard area as
mapped on a federal Flood Hazard Boundary or Flood
Insurance Rate Map or other flood hazard delineation map? ^ ^
h) Place within a 100-year flood hazard area structures
which would impede or redirect flood flows? ^ ^
i) Expose people or structures to a significant risk of loss,
injury or death involving flooding as a result of the failure of a
levee or dam`? ^ ^
j) Inundation by seiche, tsunami, or mudflow? ^ ^
k) Potentially impact stormwater runoff from construction
activities? ^ ^
1) Potentially impact stormwater runoff from post-
construction activities?
m) Result in a potential for discharge of stormwater
pollutants from areas of material storage, vehicle or equipment
fueling, vehicle or equipment maintenance (including
washing), waste handling, hazardous materials handling or
storage, delivery areas, loading docks or other outdoor work
areas?
n) Result in a potential for discharge of stormwater to affect
the beneficial uses of the receiving waters?
o) Create the potential for significant changes in the flow
velocity or volume of stormwater runoff to cause
environmental harm?
p) Create significant increases in erosion of the project site
or surrounding areas?
IX. LAND USE AND PLANNING- Would the project:
a) Physically divide an established community?
b) Conflict with any applicable land use plan, policy, or
regulation of an agency with jurisdiction over the project
(including, but not limited to the general plan, specific plan,
local coastal program, or zoning ordinance) adopted for the
purpose of avoiding or mitigating an environmental effect?
c) Conflict with any applicable habitat conservation plan or
natural community conservation plan?
X. MINERAL RESOURCES -Would the project:
a) Result in the loss of availability of a known mineral
resource that would be of value to the region and the residents
of the state?
b) Result in the loss of availability of alocally-important
mineral resource recovery site delineated on a local general
plan, specific plan or other land use plan?
XI. NOISE -
Would the project result in
a) Exposure of persons to or generation of noise levels in
excess of standards established in the local general plan or
noise ordinance, or applicable standards of other agencies?
b) Exposure of persons to or generation of excessive
groundborne vibration or groundborne noise levels?
c) A substantial permanent increase in ambient noise levels
in the project vicinity above levels existing without the
project?
No Substantial
New More Change From
Significant Severe Previous
Impact Impacts Analysis
^ ^
^ ^
^ ^
a o
^ ^
^ ^
^ ^
^ ^
^ ^
a ^
o a
^ ^
^ ^
d) A substantial temporary or periodic increase in ambient
noise levels in the project vicinity above levels existing
without the project?
e) For a project located within an airport land use plan or,
where such a plan has not been adopted, within two miles of a
public airport or public use airport, would the project expose
people residing or working in the project area to excessive
noise levels?
f) For a project within the vicinity of a private airstrip,
would the project expose people residing or working in the
project area to excess noise levels?
XILPOPULATION AND HOUSING- Would the project:
a) Induce substantial population growth in an area, either
directly (for example, by proposing new homes and
businesses) or indirectly (for example, through extension of
roads or other infrastructure)?
b) Displace substantial numbers of existing housing,
necessitating the construction of replacement housing
elsewhere?
c) Displace substantial numbers of people, necessitating the
construction of replacement housing elsewhere?
XIH. PUBLIC SERVICES -
a) Would the project result in substantial adverse physical
impacts associated with the provision of new or physically
altered governmental facilities, need for new or physically
altered governmental facilities, the construction of which
could cause significant environmental impacts, in order to
maintain acceptable service ratios, response times or other
performance objectives for any of the public services:
Fire protection?
Police protection?
Schools?
Parks?
Other public facilities?
XIV. RECREATION -
a) Would the project increase the use of existing
neighborhood and regional parks or other recreational
facilities such that substantial physical deterioration of the
facility would occur or be accelerated?
b) Does the project include recreational facilities or require
the construction or expansion of recreational facilities which
might have an adverse physical effect on the environment'?
No Substantial
New More Change From
Significant Severe Previous
Impact Impacts Analysis
^ ^
^ ^
^ ^
^ ^
a o
D D
^ ^
^ ^
^ ^
^ ^
^ a
^ a
^ a
XV. TRANSPORTATION/TRAFFIC -Would the project:
a) Cause an increase in traffic which is substantial in relation
to the existing traffic load and capacity of the street system
(i.e. result in a substantial increase in either the number of
vehicle trips, the volume to capacity ratio on roads, or
congestion at intersections)`?
b) Exceed, either individually or cumulatively, a level of
service standard established by the county congestion
management agency for designated roads or highways?
c) Result in a change in air traffic patterns, including either
an increase in traffic levels or a change in location that results
in substantial safety risks?
d) Substantially increase hazards due to a design feature (e.g.
sharp curves or dangerous intersections) or incompatible uses
(e.g., farm equipment)?
e) Result in inadequate emergency access?
f) Result in inadequate parking capacity?
g) Conflict with adopted policies, plans, or programs
supporting alternative transportation (e.g., bus turnouts,
bicycle racks)?
XVI. UTILITIES AND SERVICE SYSTEMS -
Would the project:
a) Exceed wastewater treatment requirements of the
applicable Regional Water Quality Control Board?
b) Require or result in the construction of new water or
wastewater treatment facilities or expansion of existing
facilities, the construction of which could cause significant
environmental effects?
c) Require or result in the construction of new storm water
drainage facilities or expansion of existing facilities, the
construction of which could cause significant environmental
effects?
d) Have sufficient water supplies available to serve the
project from existing entitlements and resources, or are new or
expanded entitlements needed?
e) Result in a determination by the wastewater treatment
provider which serves or may serve the project that it has
adequate capacity to serve the project's projected demand in
addition to the provider's existing commitments?
f) Be served by a landfill with sufficient permitted capacity
to accommodate the project's solid waste disposal needs?
g) Comply with federal, state, and local statutes and
regulations related to solid waste?
No Substantial
New More Change From
Signif cant Severe Previous
Impact Impacts Analysis
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
^ ^
XVII. MANDATORY FINDINGS OF SIGNIFICANCE
a) Does the project have the potential to degrade the quality
of the environment, substantially reduce the habitat of a fish or
wildlife species, cause a fish or wildlife population to drop
below self-sustaining levels, threaten to eliminate a plant or
animal community, reduce the number or restrict the range of
a rare or endangered plant or animal or eliminate important
examples of the major periods of California history or
prehistory?
b) Does the project have impacts that are individually
limited, but cumulatively considerable? ("Cumulatively
considerable" means that the incremental effects of a project
are considerable when viewed in connection with the effects
of past projects, the effects of other current projects, and the
effects of probable future projects)?
c) Does the project have environmental effects which will
cause substantial adverse effects on human beings, either
directly or indirectly?
No Substantial
New More Change From
Significant Severe Previous
Impact Impacts Analysis
^ ^
a o
o a
EVALUATION OF ENVIRONMENTAL IMPACTS
CONDITIONAL USE PERMIT 10-009 AND DESIGN REVIEW 10-018
AMERICAN SENIOR LIVING DEVELOPMENT
13841 RED HILL AVENUE
BACKGROUND
The project is a request by WASL Tustin Investors V, LLC to construct and operate anage-
restricted (62 years or older) assisted living/congregate care facility. The project site is a 2.882
acres lot located at 13841 Red Hill Avenue (west of Red Hill Avenue between El Camino Real
and San Juan Street) and is currently vacant.
The proposed project involves a construction of a subterranean parking garage and three story
buildings interconnected with breezeways. A total of 201 units consisting of one- and two-
bedroom units along with 204 parking spaces will be provided for tenants, employees, and
visitors. Of the 204 parking spaces, 171 spaces will be assigned to the units and 33 spaces will
be available to employees and guests (30 spaces in the subterranean parking garage and 3 spaces
at grade/street level). A pool, spa, outdoor courtyard and community center is also proposed that
includes a fitness center, game room, dining room, business center, family conference room,
living room, lobby and management offices,.
The assisted living/congregate care facility will provide a combination of housing, personalized
supportive services, and health care designed to meet the needs of those who need help with
daily living as follows:
• Three meals a day served in a common dining area
• Housekeeping services and personal laundry services
• Transportation
• Assistance with eating, bathing, dressing, toileting, and walking
• Access to heal and medical services
• 24-hour security and staff availability
• Emergency call systems for each resident's unit
• Health promotion and exercise programs
• Medication management
• Social and recreational activities
Pursuant to Sections 9232.b.24. and 9233.c.1. of the Tustin City Code, rest homes (the proposed
assisted living/congregate care facility has been determined to be similar to a rest home) are
conditionally permitted within the Central Commercial (C-2) zoning districts. Pursuant to the
Section 9272 of the Tustin City Code, approval of a Design Review is required for site design
and improvement of new structures.
PREVIOUS PROJECT APPROVAL
The proposed project to establish and operate a 201 unit assisted living/congregate care facility
was originally given final approval by the Tustin City Council on January 2, 2008. The City
Monarch Village Tustin
CUP 10-009 and DR 10-018
Page 2
Council approved various entitlements for the project which included General Plan Amendment
07-001, Zone Change 07-002, Design Review 07-012, and Conditional Use Permit 07-011.
General Plan Amendment 07-001 and Zone Change 07-002 are still in effect, however, entitlements
for Design Review 07-012 and Conditional Use Permit 07-011 expired on July 2, 2010 due to
inactivity on the project. Previously existing at the project site was a church facility which has since
been demolished.
Currently the project site is vacant and the same project as previously approved has been submitted
under new entitlements for Conditional Use Permit 10-009 and Design Review 10-018. The
applicant is proposing the same project which incorporates the same building and site plan as was
previously approved. There have been code changes since the prior approval which will need to be
addressed at the time of plan check. It is not anticipated that code changes will have a significant
effect on the project design.
PREVIOUS ENVIRONMENTAL DOCUMENTATION
A Mitigated Negative Declaration for the development of a an age restricted (62 years or older)
assisted living/congregate care facility at 13841 Red Hill Avenue was certified and adopted by the
Tustin City Council on December 4, 2007 through Resolution No. 07-93. Said Mitigated Negative
Declaration evaluated the environmental impacts associated with General Plan Amendment 07-001,
Zone Change 07-002, Design Review 07-012, and Conditional Use Permit 07-011.
EVALUATION OF ENVIRONMENTAL IMPACTS
The. following information provides background support for the conclusions identified in the
Environmental Analysis Checklist.
AESTHETICS - No Substantial Change from Previous Analysis
Items a, & b:
The subject property is not located on a scenic vista. The property is a 2.882-acre vacant
parcel and is surrounded by developed parcels. The proposed project would not disturb
any trees, rock outcroppings, or historical buildings, and the site is not located on a State
scenic highway.
Items c & d:
The project site was improved with atwo-story church building that was constructed in
1963 and demolished in 2009. The construction of a new three-story assisted
living/congregate care facility would change the visual character of the site and its
surrounding. The site is surrounded with developed one and two-story commercial,
institutional, and multifamily residential uses (a U-Haul parking lot and a carwash facility
to the south, Tustin High School sports field to the west, an office building and two-story
apartments to the north, and a commercial shopping center across Redhill Avenue to the
east). The project has been designed with both residential and commercial in mind and
consistent with the development standards and the landscaping standards for the area. In
Monarch Village Tustin
CUP 10-009 and DR 10-018
Page 3
addition, the project's approval will include a Design Review consideration by the
Planning Commission which will ensure that the project does not have negative aesthetics
impacts. Consequently, the project's impact would be less than significant.
The proposed facility would also generate new light sources with the installation of new
exterior lighting for the proposed walkway, landscape areas, patios and/or balconies.
However, the new sources of light would not adversely affect day- or night-time views in
the area since the number of lights would be compatible with atypical quasi
residential/commercial project and would be required to comply with the City's security
code standards. In addition, all lights would be required to be arranged so that no direct
rays would shine onto adjacent properties.
Mitigation Measures/Monitoring Required: Compliance with existing rules and regulations
is not mitigation under CEQA. Consequently, no mitigation is required.
Sources: Submitted Plans
Tustin City Code Section 8103(w)15
Construction Standards for Private Streets, Storm Drain, and On-Site
Private Improvements (April 1989)
Tustin Security Ordinance
II. AGRICULTURAL RESOURCES - No Substantial Change from Previous Analysis
Items a, b & c:
The project site was improved with a church building and is currently vacant and is
surrounded by other developed residential, commercial and institutional buildings. The
proposed project will have no impact on any farmland, nor will it conflict with existing
zoning for agricultural use or a Williamson Act contract. The proposed project will not
result in the conversion of farmland to anon-agricultural use.
Mitigation Measures/Monitoring Required: None Required
Sources: Tustin General Plan
Field Inspection
Submitted Plans
III. AIR QUALITY - No Substantial Change from Previous Analysis
Items a, b, c, d & e:
The project will temporarily increase the amount of short-term emissions to the area due
to the proposed grading, and construction activities at the property. Since the site is
relatively flat, only minor grading will be required. Redevelopment of the site would
result in a 201-unit senior assisted living/congregate care facility that is below the
thresholds of significance established by Tables 6-2 (operation thresholds) and 6-3
(construction thresholds) of the Air Quality Management District's CEQA Air Quality
Handbook. In addition, cumulative construction within the area does not exceed the
Monarch Village Tustin
CUP 10-009 and DR 10-018
Page 4
established AQMD thresholds. Less than significant short-term emissions associated with
demolition, grading, construction, and operation of the proposed project will comply with
the regulations of the South Coast Air Quality Management District and the City of
Tustin Grading Manual, which include requirements for dust control. As such, the
proposed project will not create a significant impact related to air quality.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations is not mitigation under CEQA. Consequently, no mitigation is required.
Sources: South Coast Air Quality Management District Rules & Regulations
Air Quality Management District's CEQA Air Quality Handbook
City of Tustin Grading Manual
Project Application
IV. BIOLOGICAL RESOURCES - No Substantial Change from Previous Analysis.
Items a, b, c, d, e & f:
The project site is currently vacant and surrounded by other developed residential and
commercial buildings. The site is not inhabited by any sensitive species of animals and
would have no impacts on animal populations, diversity of species, or migratory patterns.
No wetlands exist within the project site. No impacts to any unique, rare, or endangered
species of plant or animal life identified in local or regional plans, policies, or regulations by
the California Department of Fish and Game or U.S. Fish and Wildlife Service would occur
as a result of this project.
Mitigation Measures/Monitoring Required: None Required
Sources: Field Inspection
Submitted Plans
Tustin General Plan
V. CULTURAL RESOURCES - No Substantial Change from Previous Analysis
TtAmC a•
The project site is currently vacant and surrounded by other developed residential and
commercial buildings. The property is not located in an area where any cultural or
historic resources have been previously identified on the site.
Mitigation Measures/Monitoring Required: None
Items b, c & d:
The proposed project involves a redevelopment of a vacant parcel and is not located in an
area with undisturbed land. However, as a standard grading condition of approval, if
buried resources are found during grading within the project area, a qualified archaeologist
would need to assess the resource and recommend appropriate mitigation. The Native
Monarch Village Tustin
CUP 10-009 and DR 10-018
Page 5
American viewpoint would be considered during this process. The previous Mitigated
Negative Declaration for the project included the mitigation measures listed below;
potential impacts to archeological resources would be reduced to less than significant.
Mitigation Measures/Monitoring Required: (No new mitigation is required)
If buried resources are found during grading within the project area, a qualified
archaeologist would need to assess the site significance and perform the appropriate
mitigation. The Native American viewpoint shall be considered during this process.
This could include testing or data recovery. Native American consultation shall also be
initiated during this process.
Sources: Submitted Plans
Tustin General Plan
VI. GEOLOGY & SOILS - No Substantial Change from Previous Analysis
Items a-ii, a-iii, b & d:
The proposed project will be located within an area of the City that is known to contain
expansive soils which may subject people or structures to strong seismic ground shaking
and seismic-related ground failure including liquefaction. However, a soils report is
required to be submitted prior to issuance of building permits per the 2010 California
Building Code to demonstrate compliance with Chapter 18 which requires proper
excavation and fills for buildings, structures, foundations, and retaining structures.
Depending upon the site's soils or geological concerns, the applicable Code also requires
appropriate construction techniques be implemented to ensure seismic stability. No
significant impact is anticipated since the project must comply with the 2010 California
Building Code related to Chapter 18.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations is not mitigation under CEQA. Consequently, no mitigation is required
Sources: Tustin General Plan
Tustin Grading Manual
2010 California Building Code Chapter 16 and 18
Items a-i, a-iv, c, & e:
The project site is not located within an area identified as a fault zone on the Alquist-
Priolo Earthquake Fault Zoning Map. However, a soils report is required to be submitted
prior to issuance of building permits per the 2010 California Building Code to
demonstrate compliance with Chapter 18, which requires proper excavation and fills for
buildings, structures, foundations, and retaining structures, and appropriate construction
techniques to ensure seismic stability in sites depending on their soils or geological
concerns. The project will be required to be engineered to withstand unstable soils,
possible landslide, lateral spreading, subsidence, or collapse as they relate to this specific
site. Since all new buildings in the City are required to operate on the existing sewer
Monarch Village Tustin
CUP 10-009 and DR 10-018
Page 6
system, the use of septic tanks or alternative wastewater disposal systems will not be
necessary.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations is not mitigation under CEQA. Consequently, no mitigation is required
Sources: Tustin General Plan
Tustin City Code
2010 California Building Code Chapter 16 and 18
California Seismic Hazard Zone Map, Tustin Quadrangle, January 17, 2001
VII. HAZARDS & HAZARDOUS MATERIALS - No Substantial Change from Previous
Analysis
Items a, b, c, d, e, f,g_and h:
The proposed project involves the construction of a 201 unit assisted living/congregate
care facility. No storage or transport of hazardous materials is anticipated from the
proposed development. The project would not result in exposure to hazardous substances
other than the possibility of household hazardous waste which tenants/clients could
properly dispose of at approved County drop-off locations. The proposed project is not
anticipated to store or emit hazardous materials which could create a hazard to adjacent
properties, schools, or the general public if released into the environment.
The scope and location of the project has no potential to interfere with an adopted
emergency response plan or emergency evacuation plan. The site is in an urbanized area
and has no potential to expose people or structures to a significant risk due to wildland
fires. All grading and construction is subject to compliance with all applicable Uniform
Building and Fire Codes. As such, the project is not anticipated to result in any significant
hazards.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations is not mitigation under CEQA. Consequently, no mitigation is required
Sources: Submitted Plans
Tustin General Plan
Approved Fire Master Plan
VIII. HYDROLOGY & WATER QUALITY - No Substantial Change from Previous
Analysis
Items a, b, f,g h=i, j, and
The project site is relatively flat, and the proposed project will continue to maintain a
relatively flat site with improved site drainage and additional landscaping. A significant
amount of stormwater received on-site will percolate into the soil where landscaping is
provided. The applicant must provide a drainage and hydrology report to the City and
demonstrate that the private storm water drainage system will be able to handle the
Monarch Village Tustin
CUP 10-009 and DR 10-018
Page 7
capacity of any storm water directed into the system. Best Management Practices are
required to be implemented during construction to deter water from flowing off-site. As
such, the project will not violate any water quality standards or waste discharge
requirements or degrade water quality in the area.
The project by nature would not substantially deplete groundwater supplies or interfere
with groundwater recharge such that there would be a net deficit in aquifer volume or a
lowering of the local groundwater table level. The project is located within Zone X
(areas of 0.2 percent annual chance flood), as mapped on a Flood Insurance Rate Map.
Accordingly, the project will be designed and graded with an appropriate drainage system
to avoid any potential flood hazards. The project site will not expose people or structures
to a significant risk of loss, injury, or death as a result of the failure of a levee or dam, or
by inundation by seiche, tsunami, or mudflow. Nor would the project increase significant
erosion at the project site or surrounding areas.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations is not mitigation under CEQA. Consequently, no mitigation is required.
Sources: Field Verification
Submitted Plans
Tustin City Code 4900 et al
Federal Flood Insurance Rate Map 06059C0277J, December 3, 2009
Itemscdeklmn&o•
The project site is relatively flat, and the proposed project will continue to maintain a
relatively flat site with improved site drainage, including drive aisles, curbs and gutters,
and additional landscaping. With new construction, there is the potential to impact
stormwater runoff from construction and post-construction activities with stormwater
pollutants from landscaped areas and trash enclosures. There is also the potential for the
discharge of stormwater that could affect the beneficial uses of the receiving waters and
changes in the flow velocity or volume of storm water runoff. However, the project
proponent will be required to submit a Water Quality Management Plan (WQMP) and the
project will be required to comply with the City's Water Quality Ordinance and most
recently adopted NPDES permit (Santa Ana Regional Water Quality Control Board
(RWQCB) Order R8-2009-0030), thus reducing any potential impacts to a level of
insignificance. Together, these regulations minimize water pollution by regulating point
sources that discharge pollutants into local waters. As such, the project will not violate
any water quality standards or waste discharge requirements or degrade water quality in
the area.
Mitigation Measures: Compliance with existing rules and regulations is not mitigation
under CEQA. Consequently, no mitigation is required
Sources: Field Verification
Submitted Plans
Tustin City Code Section 4900 et al
Monarch Village Tustin
CUP 10-009 and DR 10-018
Page 8
IX. LAND USE PLANNING - No Substantial Change from Previous Analysis
Items a & c:
The proposed project would not divide an established community since the project has a
similar zoning designation as the commercial uses to the south and across Redhill
Avenue. In addition, the use as an assisted living/congregate care facility would be
compatible to the existing residential uses to the north of the project site. The proposed
project is not located in a habitat conservation plan or natural community conservation
plan. The proposed project would not conflict with any applicable conservation plan.
Item b:
General Plan Amendment 07-001 and Zone Change 07-002 for the subject property were
approved by the Tustin City Council on January 2, 2008. General Plan Amendment 07-001
changed the General Plan Land Use Designation of the subject property from Public and
Institutional to Planned Community CommerciaUBusiness. Zone Change 07-002 changed
the zoning designation of the subject property from Public and Institutional to Central
Commercial (C-2).
The aforementioned approved General Plan Amendment and Zone Change were the
required mitigation measures under the previously approved Mitigated Negative
Declaration. Therefore any previously identified potential impacts have been reduced to a
level of no impact and no further mitigation is required.
Mitigation Measures Required: None Required
Sources: Submitted Plans
Tustin General Plan
Tustin Zoning Code
Tustin Zoning Map
X. MINERAL RESOURCES - No Substantial Change from Previous Analysis
Items a & b:
The proposed project is not located on a mineral resource recovery site. The construction
of a senior facility on a vacant lot will not result in the loss of availability of a known
mineral resource.
Mitigation Measures/Monitoring Required: None Required
Sources: Submitted Plans
Tustin General Plan
Monarch Village Tustin
CUP 10-009 and DR 10-018
Page 9
XI. NOISE - No Substantial Change from Previous Analysis
Item a:
The project site is located to the west of Redhill Avenue between El Camino Real and
San Juan Street. The project site is in close proximity of the Interstate 5 Freeway and is
identified in Table N-1 of the Noise Element as an area within the 65 dB to 70 dB
Community Equivalent Noise Level (CNEL) contours. Consequently, the project site is
exposed to significant traffic related noise. The City's noise ordinance requires a
maximum 45 dB value for interior noise and 65 dB for exterior noise. The City's
General Plan recognizes that residents adjacent to major and secondary arterials are
typically exposed to a CNEL over 65 dB. Table N-2 of the Tustin Noise Element
identifies potential conflicts between the land uses and the noise environment. Per Table
N-2, the project site falls within Zone B through Zone C. Zone B requires minor
soundproofing while Zone C requires a detailed noise reduction analysis be conducted
and needed noise insulation features be included in the project's design.
An acoustical study was submitted by the project proponent which indicated that the
project southeast building line will be exposed with an exterior noise level of 66.5 CNEL
(Exhibit 1 -Acoustical Analysis, Monarch Village by Davy and Associates, Inc.). The
report recommends certain improvements be made to the building design to reduce the
noise level to acceptable level as required by the Building Code and the General Plan
Noise Element. These recommendations are included as mitigation measures and will be
made as conditions of approval of the project. With the identified mitigation measures,
potential noise impact would be reduced to less than significant.
Davy & Associates submitted a letter dated December 3, 2010 which indicates that they
had re-reviewed the original Acoustical Analysis for Monarch Village dated February 9,
2006 and offer the same recommendations on the project (Exhibit 1).
Mitigation Measures/Monitoring Required: (No new mitigation is required)
• Roof ceiling construction shall be roofing on 1/2" plywood. Batt insulation shall
be installed in joist spaces. The ceilings shall be on layer 5/8" gypboard nailed
direct.
• All exterior walls shall be 2X4 studs 16" o.c. with Batt insulation in the stud
spaces. Exterior walls shall be stucco or other approved exterior plaster. Interior
walls shall be made with 5/8"gypboard. All other windows and glass doors shall
be double glazing.
• All southeast facing perimeter windows and glass doors shall be glazed with STC
32 glazing. STC 32 glazing maybe provided with either '/" laminated glass or a
dual pane assembly with a '/2" airspace. In either case, the glazing supplier shall
be prepared in an independent, accredited testing laboratory in accordance with
ASTM E-90.
Monarch Village Tustin
CUP 10-009 and DR 10-018
Page 10
• All entry doors shall be 1-3/4" solid core doors with weather stripping seals on the
sides and top. Glazing in entry doors shall not be accepted.
Sources: Submitted Plans
Tustin City Code 4611 et al
Tustin General Plan
Acoustical Analysis, Monarch Village, Tustin California, by Davy and
Associates, Inc., February 2006)
Letter dated December 3, 2010 from Davy & Assoicates
Items b, c & d:
Although the grading and construction of the site may result in typical temporary
construction noise impacts, the Tustin Noise Ordinance only allows construction
activities to occur between the hours of 7:00 a.m. to 6:00 p.m. on Monday through Friday
and 9:00 a.m. to 5:00 p.m. on Saturdays. The proposed project will not create excessive
ground vibrations, nor will it create a permanent increase in the existing ambient noise levels
beyond the City's established standards.
Mitigation Measures/Monitoring Required: Compliance with existing rules and regulations
is not mitigation under CEQA. Consequently, no mitigation is required.
Sources: Submitted Plans
Tustin City Code Section 4611 et al
Tustin General Plan
Item e & f:
The site is not located within an airport land use plan or within two (2) miles of a public
or private airport airstrip. The proposed project is three stories in height consistent with
the City's maximum height limit and similar to other structures in the vicinity.
Mitigation Measures/Monitoring Required: None Required
Sources: Submitted Plans
Tustin General Plan
XII. POPULATION & HOUSING - No Substantial Change from Previous Analysis
Items a, b, and c:
The proposed project would involve the construction of a 201-unit senior assisted
living/congregate care facility on a vacant lot which would not result in significant
population growth in the area. The project will not displace substantial numbers of
existing housing necessitating the construction or replacement housing elsewhere. In
addition, no displacement of substantial numbers if people would occur necessitating the
construction of replacement housing elsewhere.
Monarch Village Tustin
CUP 10-009 and DR 10-018
Page 11
Mitigation Measures/Monitoring Required: None Required
Sources: Submitted Plans
Tustin General Plan
XIII. PUBLIC SERVICES - No Substantial Change from Previous Analysis
Item a:
The proposed project is in an existing urbanized area where fire and police protection are
currently provided. While police patrols to the area may be needed from time to time to
ensure safety, no new additional police protection would be required as a result of the
proposed project. The Police Department has recommended measures to reinforce safety
and effective patrol the area, which will be included as conditions of approval. The
project would utilize existing infrastructure and is not anticipated to increase the need for
new streets, public services, or infrastructure.
The proposed project is located within the Tustin Unified School District (TUSD). Since
the project is intended for seniors over 62 years or older, the project will not cause a
significant rise in the number of students served by local schools. The project will be
subject to the statutory school impact fees per Senate Bi1150.
The project is designed with interior recreational facility such as pool, spa, and garden
area for the seniors to congregate. In addition, each unit is equipped with private patio
or balcony. No increased demand in new parks facilities is anticipated as a result of the
project.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations is not mitigation under CEQA. Consequently, no mitigation is required.
Sources: Submitted Plans
'I`ustin City Code
XIV. RECREATION - No Substantial Change from Previous Analysis
Items a & b:
'The project would include a private community pool recreation area to benefit the
client/tenant of the project. While the residents of the project may use existing City
parks, the increased use of these parks would not be such that substantial deterioration of
the facility would occur or be accelerated, nor does the project propose recreational
facilities that would have an adverse physical effect on the environment.
Mitigation Measures/Monitoring Required: None Required
Sources: Submitted Plans
Tustin City Code
Monarch Village Tustin
CUP 10-009 and DR 10-018
Page 12
XV. TRANSPORTATION/TRAFFIC - No Substantial Change from Previous Analysis
Items a and f:
A traffic study dated August 2007 was submitted and reviewed by the City's Engineering
Division (Exhibit 2). The study concluded that the proposed project is expected to
generate approximately 406 new vehicle daily trips, which in comparison with the
existing development, would be an increase of 56 daily trips.
The project has been analyzed for on-site circulation. Due to close proximity of the
project site to intersections of Red Hill Avenue and San Juan Street, access to the project
site will be through one two-way driveway by either a right turn movement for the
southbound traffic or a left turn movement for northbound traffic from Red Hill Avenue.
Exiting traffic will be restricted to right turns only. Thus, impact to traffic along Red Hill
Avenue and San Juan Street is reduced to less than significant. These on-site circulation
restrictions will be included as mitigation measures and conditions of approval of the
project.
The level of service analysis was also performed for Red Hill Avenue and El Camino
Real and Red Hill Avenue and San Juan Street. The study determined that no significant
impact will result from the proposed project and that the level of service will remain the
same.
A parking study was also conducted at three comparable senior living communities to
determine the parking ratio for the facility along with parking occupancy rate. The study
found a maximum parking ratio of 0.68 spaces per dwelling unit and the proposed project
will provide 1.01 parking ratio. Although it should be noted that of the 204 parking
spaces, only 171 spaces or .SS ratio per unit will be assigned to the units and remaining
33 spaces will be available for guests and employees. A valet service at grade level will
also be provided to assist seniors with groceries or shopping bags and delivering their
vehicles to the subterranean parking garage. The assigned parking will be allotted by
permit process, requiring each tenant to apply for a parking space. As proposed, the
parking analysis determined that the project will have an adequate number of parking
spaces to accommodate the proposed project.
W.G. Zimmerman Engineering Inc. prepared the initial traffic and parking analysis for
the proposed project. They have provided a letter dated January 4, 2011 confirming that
the original traffic and parking analysis for the proposed project still remains valid. The
following are mitigation measures included in the previous Mitigated Negative
Declaration which will be made a condition of approval for the project. No new
mitigation is required.
• The existing two way left turn lane will remain on Red Hill Avenue to allow
northbound Red Hill Avenue traffic to turn into the facility. Since only a right
turn exit is allowed from the facility, a directional median is recommended along
with a directional sign (Right Turn Only) at the two way driveway access to
restrict the drivers from turning left.
Monarch Village Tustin
CUP 10-009 and DR 10-018
Page 13
• Large semi-trailers and moving vans shall be prohibited from entering the site.
Move-in conditions along with other terms and conditions for residency at the
complex shall be included in the signed Tenant Agreement.
• Count-down pedestrian heads are recommended at the intersection of Redhill and
San Juan Street.
• The project shall maintain a total of 204 parking spaces with a minimum of 0.85
parking ratio per unit at all times. Any reduction of on-site parking shall be
subject to review and approval by the Community Development Department.
• If in the future the City determines that parking or traffic problems exist on the site
or in the vicinity, the Community Development Director may require that the
property owner prepare an analysis and bear all associated costs. If the study
indicates that there is a parking or traffic impact, the applicant/property owner shall
provide interim and permanent mitigation measures to alleviate the problem.
Sources: Submitted Plans
Tustin City Code
Traffic Impact Report and Parking Analysis for Monarch Village- Tustin,
CA by W.G. Zimmerman Engineering, Inc., August 2007
Letter dated January 4, 2011 from W.G. Zimmerman Engineering, Inc.
Items b, c, d, e, and ~:
The project will not exceed, either individually or cumulatively, a level of service
standard established by the county congestion management agency for designated roads
or highways. The proposed project will not induce substantial population or growth,
result in changes to air traffic patterns, or conflict with adopted policies, plans, or programs
supporting alternative transportation such as bus turnouts or bicycle racks. The project has
been reviewed by the Orange County Fire Authority and has been determined to have
adequate emergency access.
Mitigation Measures/Monitoring Required: None Required
Sources: Submitted Plans
Tustin City Code
Traffic Impact Report and Parking Analysis for Monarch Village- Tustin,
CA by W.G. Zimmerman Engineering, Inc., August 2007
XVI. UTILITIES & SERVICE SYSTEMS - No Substantial Change from Previous Analysis
Items a, b, c, d, e, f & ~:
The proposed project will not exceed the requirements of the applicable Regional Water
Quality Control Board or require or result in the construction of new water or wastewater
treatment facilities. If approved, the proposed project will utilize the existing sewer and
storm drain systems and thus will not require construction of a new storm water drainage
Monarch Village Tustin
CUP 10-009 and DR 10-018
Page 14
facility or solid waste facility. The project proponent would be required to submit a
hydrology report to ensure proper grading, drainage, and connection of planned sewer
systems. The project will be served by the City's existing trash hauler contract, thus will not
require a new trash hauler. While, adequate water supply from existing resources will be
available to serve the proposed project, the existing 6-inch water main on Red Hill is
insufficient to provide fire flows for the new facilities. Based on OCFA fire flow
demands and requirements, it maybe necessary to construct a new 8-inch water main on
Redhill to provide current water flow requirements.
Mitigation Measures/Monitoring Required: Compliance with existing rules and regulations
is not mitigation under CEQA. Consequently, no mitigation is required.
Sources: Submitted Plans
Tustin City Code
Tustin General Plan
XVII. MANDATORY FINDINGS OF SIGNIFICANCE - No Substantial Change from
Previous Analysis
Items a, b & c:
The proposed project design, construction, and operation will comply with applicable
City codes and regulations. The project, by nature of its location and as designed, does
not have the potential to: degrade the quality of the environment; reduce the habitat of
fish or wildlife species; cause a fish or wildlife population to drop below self-sustaining
levels; threaten to eliminate a plant or animal community; reduce the number or restrict
the range of a rare or endangered plant or animal; or, eliminate important examples of the
major periods of California history or prehistory. The project does not have the potential
to achieve short-term environmental goals to the disadvantage of the long-term. The
proposed project does not have impacts that are individually limited but cumulatively
considerable or that would cause substantial adverse impacts on human beings.
Sources: Submitted Plans
Tustin General Plan
Exhibit 1
Acoustical Analysis
For Monarch Village
Tustin, California
By
Davy and Associates, Inc.
February 2006
Letter dated December 3, 2010
12/06!2010 12:06 3106028002 DAVV AND ASSOCIATES PAGE 02/02
~~V~
~ 1~.SS(.7G1c~t~S, 1r1C.
Consultants in .~Cpustics
2f00 Nafh SepxMr~da AlvO.. Salta I1 ~ MAnAeti+n BsAM, C.4 00266 ~ TN; 3ip.~tOLA900 ~ Fez: 31fM01-E002 • ~nfafl: d~asoc~to/.COm
J
December 3, 2010
Mr. John Haffner
ASL Monarch Living, Inc.
1740 E Oarry Avenue, Suite 105
Santa Anna, CA 92705
SUBJECT: Monarch Village Acoustics! Report
Dear John:
In accordance with your request, I have reviewed the Acoustical !fie '
Monarch Village dated February 9, 2006. The projected noise level
was CNEL 66.5 at the Building. The projected noise level for the ye
than CNEL 67.5.
Our recommendation in 2006 was that all south f2~cing perimeter wi
doors be glazed with STC 32 glazing. With this recommendation in
noise levels will be less than CNEL 45 and therefore wi11 meet the r+
City of Tustin. I don't think that any additional analysis is required.
Sincerely,
DAVY ~ ASSQCIATES, INC.
~~1~~ XY .
Bruce A. Davy, i'.E.
President
~rf I prepared for
~r the year201 fi
r 2020 will be less
and glass
nted, interior
gents of the
B D/kbd
Davy
A„SO~ua A eso inc.
c0
I627I/aahotwe Dmaw Blad., She 112 • Rsda.d~ B~eA, CA 9g27d-1601 • Til: 310613,5161 • Fes: 314~6~1i-S3d1 • Fiwdl:Dbv}A:rse~mfras
JN2006-09
ACOUSTICAL ANALYSIS
Monat+ch v~lags
Tustln• Califomla
RECEIVED
JUN 2 ;~ 2006
cor~wuNmr oiv~o~atr
e~
FOR
American Senor Development, inc.
Tustin. Califomfa
February. 2006
10lntroduction
At the direction of American Senior Development, Inc. Davy b Associates, Inc. has
completed an acoustical analysis of the Monarch Village pmjed in Tustin. California.
1 The California Administrative Code (Title 24) as enforced by the City of Tustin specifies
~ maximum allowable interior rwise levels of CNEL 45 for aq habitable spaces
1 in residential buildings where exterior node from transportation sources exceeds
CNEL 80.
1 Sedbr- 2.0 of this repast contains the results of measurements and calculations of the
1 future exterior noise environment at the site to deterrn~e compliance with these
1 requirement.
1 Sectbn 3.0 of this report contains recommendations for complying with the City of Tustin
1 interior noise level requirements.
' Sectlon 4.0 of this report contains the requirements of the State 8ugding Code
~ concerning ventilation.
~ ~ ~ 0 ;`x~erior and Future AcousticAl Environment
~ '~ .
Caltfommis on
d at the site ~ Tustin
it
~ .
ore
Environmental noise levels were mon
2006 between the hours of 3:00 p.m. and 4:00 p.m. The bcatlon of the site
8
~ .
February
is shown in Figure ,. Node measurements were made at the sotrtl,east building ling.
r
~ Noise levels at the site are dominated by traffic on Red Hql Avenue to the southeast.
1 Treftk on the RL 5 Freeway to the southwest was not audbb at the site. hlo other
i
t.
significant sources of noise were noted during the site vis
~ Environmentel noise levels were measured with a precision integrating lD 820 sound
ter that had been calibrated with a BbK 4230 p-cou ~ Calibra
l
. me
leve
nt noise ievsl
prior to use, The sound level meter measures and displays qu
(LEQ~ as weq as the maxirtrum and the m~imum noise levels during the measurement
~ period. A copy of the analysis of the acoustical data is attached to this report.
~~
~E
~i 1
Figuro 1. Ske Location
2
i
1 ~ ~ The data thus collected were analyzed to determine the CNEL lave! at the
1 measurement locatbn. The CNEL value was determined by measuring itte equivalent
1 Holes level (LEQ) directly, and then cakx~latir~ the equivalent rxtise levy for each of the
1 other 23 hours in the day.' This CNEL approach has been utilized extensively. The
1 accuracy of this procedure has been established with automatic 24•hour measurements
at the same location. The procedure has always been within acceptable acwracy
1 limits. The results o! the monitoring and calculations are summarized below in Table 1.
Table 1
Measured Ambient Noise Levels to d6
Locatbn peak Hour LEG CNEL
SE Binding Line 64.6 d8 65.6 dt3
Sedbn 3501.(c) of the State Building Code states the foUovring:
- Worst-case noise levels either existing or future. shah be used as the basis for
~ determining compliance with thk Section. Future noise levels shag be predkted
for period of at Least 10 years from the tints of building permit appiicadon.
- CALTRANS. Division of Traffic Operatbns publishes an annual traffic vdume book that
~ contains prevbus traffic trends. The 2000 trafflicc volumes on the CalNomia Stato
Highway System Hook (the latest edtllort available) tlsb an average annual ina+esse
~ of 2296 per year in annual traffic volcmes for the yeast 1994 thrrwgh 1999. Assuming
~ that this annual gnywtit ~ 2.29b would hoid.for this site, ft wss projected that tratOc
vdumes v+io~d increase by a factor 124 by the year 2018. This trsiflc volume increase
' over the next 10 years would result in a 0.9 d8 tn~c noise increase. Therefore, the
project future year noise level is summarized in Table Z.
Table 2
Exterior 2016 CNEL Valw st the Sib in dB
LocsBt~ SNE4
SE Builcing Line 66.5 dB
~ see, ror Q,~,mpls. -Ina,lsaon a Bu+at~s ,apahst -~way Nois..• en,o. navy ar-a ster+en skde.
r=ed.~al HfQhway ~ F-~wa-TSn-zaa.
3
With an exterior noise lave! of CNEL 66.5, the building rrwst provMe an A-weighted ~ ~~
noise reduction value of at least 21.5 d8 to achieve an interior CNEL 45 value.
Standard board ~ stand~a glazing provides minimum A--weighed noise ~uc~ion
interior gyp
of 2t) dt3.
If all southeast facing perimeter windows and glass doors are glazed with STC 32
glazMg, the noise reduction of the building w~l be a rr>inimum of 30 dB.
Thy means that with the use of standard oonstruc~ion and STC 32 glazing in ati
southeast facing perimeter windows and glass doors. interior noise levels should not
exceed CNEL 45. Therefore, the Building wiq oanphr with the Califomta Noise
Inautation Standards as enforoed by the Cry of Tustin.
STC 32 glazing can be provided with either 114' laminated glass or a dual Pans
assembly with a 112" airspace. In either case. the glazing supplier should sutxnit a tad
report documenting the STC 32 rating. The test report should be prepared th ~
indeper~ent, accredited testing laboratory in accordance with ASTM E-90.
3.1 Roof ceiling construction wig be roofing on 1/2" plywood. Batt insulation wig be
installed M joist spaces. The ceilings'v+riU be one layer of 5/$" gypboard nailed
direct.
3.2 Aq exterior wails wit be 2x4 studs 18' o.c. wtth t3att insulation in the stud spaces.
Exteriors w~! be exterior plaster a stucco. The Mteriors wiN be 518' gypboaM.
3.3 Ad southeast facing perimeter windows and glass doors will be glazed with STC
32 gla~8• STC 32 glazing can be provided wfth either 114' laminated glass or a
dual pane assembly with a 1/Z' airspace, in either case. the glazing suppler
should submit a test report documenting the STC 32 rating. The test report
should be prepared M an independent, accredited testk~g laboratory e
accordance with ASTM E-90.
3.4 All other windows and glass doors may be standard glazing.
3.5 AN entry doors should be 1-3/4' soNd core doors with weather stripping seals on
the sides and top. Glazing in entry doors should not be accepted.
4
I
~~ ysntilati~n R~
The Cai'~Fomia Noise Insulation Standards (T~le 24) states the fopowing pan~graph
concerning ventilation:
1 "If interior allowable noise levels aro met by requiring that windows be
unopanable or closed. the design for the structure must also spedfy a vent~ation
~ eir-oonditbning system to provide a habitable interior environment. T'he
1 ventilation system must not compromise the dweNinp unit or guest room noise
l feductbn'
1 With windows open typical noise reduction values wiN be in the 12 dB range. This
1 means that a ventilation system must be provided for all habitable roams. This can
normspy be supplied with an FAU (forced air anti) with a summer switch. Outside air
1 intake moat be to oompliancs with Section 12.03.3 of the 1997 edition of the Unifomn
1 Building Code•
1
1,
11
1
1
1
1
1
1
1
1
1
1
1~
r
1~
1
r
i
.~
Bnioe A. Oavy. P.E.
I.N.C.E. Board Certified
oa~y s assoa~es. lnc.
5
SITE MONRORING NOISE ANALYSIS ~.
JN2008.09
PROJECT: MONARCH VILLAGE
LOCATION• SOUTF~MIEST BUILDING LINE ,
TEST DATE: FEBRUARY 8, 2006
START TIME: 3:00 P.M.
END TIME: 4:00 P.M.
EGIUIPMENT USED: ~ ~~
,
INCIDENCE MIC
WINDSCREEN
BbK 4230 CALIBRATOR
TRIPOD
WIND SPEED INDICATOR
MICRONTA THERMOMETER/HYGROMETER
TEMPERATURE: 72°f
RELATIVE HUMIDITY: 5596
WIND: 0-2 mph
LEO: B4.6 L90: 52.8
LMAX: 74.5 L50: 80.1
LMIN: 49.4 L25: 64.5
CNEL: 85.8 L8: 87.4
LDN; 85.6 L2: 70.5
L1: 71.8
DAVY
b ASSOCIATES, INC.
Consultants ~n Acoustics
f
Exhibit 2
Traffic Impact Report and Parking Analysis
For Monarch Village-Tustin
By
W.G. Zimmerman Engineering, Inc.
August 2007
Letter dated January 4, 2011
January 4, 2011
John Haffner
ASL Monarch Living, Inc.
1740 E. Garry Ave., Ste 105
Santa Ana, CA 92705
Re: Monarch Village -Tustin
Traffic and Parking Analysis Confirmation
Dear Mr. Haffner:
W.G. Zimmerman Engineering Inc., has reviewed the traffic and parking analysis we performed
as part of the Traffic Study for the Monarch Village -Tustin Senior Facility, dafed August 2007
at the request of the City of Tustin. Our traffic and parking analysis for the project remains valid.
Traffic Analysis:
Our validity assessment of the traffic analysis generated by the project is based upon
construction of 201 units of senior apartments.
Parking Analysis:
Our validity assessment for the Parking Analysis is based upon the parking structure and above
ground parking layout proposed in the August 2007 Traffic Study, including the number of
parking stalls, circulation, and visitor spaces. It is our understanding that the Valet Service and
parking management program shall remain enforced by the management company.
Should you have any questions regarding this letter, please do not hesitate to contact me
directly at 714.799.1700 ext. 11.
Respectfully submitted,
W.G. Zimmerman Engineering, Inc.,
Bill Zim erm . P.E., T.E., PTOE
Presiden
~,:;-=,:
W.G. Zimmerman Engineering, Inc.
5772 Bolsa Avenue, Suite 200
Huntington Beach, CA 92649
(714} 799 -1700 / (714) 799 -1701 Fax
TRAFFIC IMPACT REPORT AND PARKING ANAYLSIS
FOR MONARCH VILLAGE-TUSTIN
TUSTIN, CA
Pr®pared for.
American Senior Living Development
D
Prepared by.
W.G. Zimmerman Engineering. inc.
801 Padfic Coast Highway, Suite 200
Seai Beach, CA 90740
Phone: (562) 594 - 8589
Fax: (562) 594 - 8549
August 2007
I
1
E TABLE OF CONTENTS
' EXECUTIVE SUMMARY ..................................................................................... .1
Section 1: INTRODUCTION ......................................... .2
......................................
Section 2: PROJECT DESCRIPTION ........................... •4
Section 3: TRIP GENERATION AND DISTRIBUTION ....................................... .6
' Section 4: PROJECT SETTING ...........................................................................9
Section 5: LEVEL OF SERVICE ANALYSIS ...................................................... 10
' Section 8: PARKING ANALYSIS ....................................................................... 13
' :
Section 7: SYSTEM DEFICIENCIES ...................
• 17
17
•..••••••.•.•••.••..•.•••...
................
Section 8: PROJECT MITIGATION MEASURES •
APPENDIX
'; APPENDIX A ...................................................................................................... 19
' _ APPENDIX 8 " .....................................................................................................
APPENDIX C. • 20
23
APPENDIX D ...................................................................................................... 28
' LIST OF TA6LE3
Tabb 1: Intersection Capacity Utilization (ICU) ....................................................6
' Table 2: Trip Generation ...................................................................................:...7
Table 3: Project Trip Assignment ..........................................................................8
Table 4: Level of Service ....................................................................................11
Table 5: Parking Study'Independent Senior Living Communities' .....................14
' Table 6: Amen'~ies Comparison Table ................................................................14
Table 7: Parking Requirement'ITE Manuar .......................................................15
REDElVED
AUG 0 82001
1 COMIIUttRY DEYELOPMEIR
BY R k
0
EXECUTIVE SUMMARY
The following provides a summation of the traffic impact report for the proposed
Monarch Village Assisted Living/Cangregate Care faaGty located within the City of
Tustth.
1. The project site is located on the western side on Red Hill Avenue betweeni San
Juan Street and EI Camino Real.
2. The project proposes to construct an age-restricted assisted IivingJcongregate cero
facility carnprised of 201 units over one subterranean parking level consisting of 201
parking spaces with a parkklg ratio of 1.00.
3. Two intersections were identified for study in this analysis:
• Red Hifi Avenue and San Juan Street
Red Hill Avenue and EI Camtho Real
4. Trip generations were developed and analyzed without tak~g into consideration
al~wable trip credits for the church which currentty occupies the project side.
5. pr~5ed vehicle tuming movements will be restricted to r'ght turn onty from 'the
complex onto Red Hill Avenue. Left tams from Red Hfil Avenue will be maintained.
6. The total of AM peak trip generated is 28 with 40 generated during the PM peak
hour.
7. Existing carwitions for EI Camino Real and Red Hill is at an acceptable intersed:fon
capacity utilization (ICU) level of service (LOS) "C and '8' respectively during the
AM and PM peak hours based upon existing tuming movement counts.
6. Existing conditions for San Juan and Red H~ ~ at an acceptable intersection
capacity utilization (ICU) level of service (LOS) 'C' and `B' respectively during the
AM and PM peak hours based upon existing tuming movement counts.
9. Existing condition with project traffic for the study intersections will be at an
acceptable ICU LOS 'C' and 'B' respectively during the AM and PM peak hours.
10. Post condition 2020 projected traffic with project traffic was compared to past
condition without project for both intersections and showed no significant impacts of
proposed development on study intersections.
11. Post condition 2020 projected ICU difference with project and without project for San
Juan and EI Camino is .001 and .003 respectively during the crkical AM peak hour
which is less then CMP requirement 0.1 and City requirement 0.01.
12. Mitigation measures are proposed for this project.
~rR~~IC Il~~cr REPORT i cH v~uc3elvsrnr
W.G. ZIMMERMAN ENGINEERING. INC. AMERKJW SEN70R ININCi DEVELOPAENT
i
i~~
i
i
i
i
i
i
i,
iV
i
i
i
i
i
i
ilk
i
Section 1: INTRODUCTION
This report presents the results from a traffic impact and parking analysis for the
proposed Monarch vliage assisted livingkongregate care facility bested in the City of
Tustin. This project proposes to construct 201 units abng Red Hill Avenue. The project
is located on the west side of Red Hill Avenue between San Juan Street and EI Camino
Real as shown on the map below. it is in close proximity to Tustin High School Tustin
Auto Center, and the Santa Ana Freeway (i-5). The I-5 freeway can be accessed via
Red Hiil, which is approximately 0.2 miles southwest of the proposed project.
5 _
" b"~'f k i°,;~ ~' w"E' t R ~,r- ~ ~ -;s a Y <t c` ~.~'-~, h ~,f, ~i~+ ~ n -~ ~.
} ?, }~~ J€>~'~ ~~ ~'~ ~ l y R,~u`. ,. a 14 } ~'r3t `y'. 5-rt '.C" ~.f°r F rs Y V iKs~';N'"
f:- o- ,~ »~v;~' t , ~' ? F• "~ .;~ ~ `~ -~ `~y1 tr ,~ ~~'~ ~ +°~, tea,; !
.N4 V. 'l F~ h £yf ~ r N _ K 4
ry"``•.w~h K, y n Y ~f y '~,{ 4- ~` ~ t } qS`i t~ ~j l A t t1 fA ~ ~~~ °_
+ R~ ~ ~- }mot i~i`i~,'~-k: s.-'y, ~, S` ~. .t .Yz a+'~ ~ yl.,'~.-Y+ ~ i . ~+ ~ F~,F~ ~f ~n c~
r Ny ~ t ~,. 7 a }.'i~~Jk~ Y~fn- r ~1P ~t r^'''~v>t~~ b'+` -
~`~~ zf ~ttSt',~ # tisK} Y.~.~-.A~ 4 _ ~~^s "'Ha ~'-t,~C-~9 ~~~ 'r'/.ti~`a.w,i f ~~ r .~'. C?fir '+.-,~r~41 -
~+ .~._.~t' f, r1~- t^t. ~. k ~ ~ ~ .~, ..rr„i~~ .Pti''' ~, ~~ , ~ ~ i~- ~j , si '.. r r t
~",'l. ,,,yyy ~ .~S `rte. s 1c¢~ ~,~4 (' ~ zt~ r r
~'t f ~y M ysk~`..lkiF ~y ;r t' j. k ;4 ~yt~~~: x 'iS'f.,~ Z'~~M 1 h'~-
tw -ti ~ PROJECT I. '~ ~t
"-c~%7'L '!r k-Jf, ;~ ! t ~ .~ ~.y' n' ` ~ ~} ~'`-31' ilr'vM v ., ~~yn- ` t ~., ~ ,,+7 , l . -
tK G t~ t t LOCA'fIC)t'1 ~ r.,,, ~ ; t~ t_d ~ ~ t ~'': ~ '' "
e _s :. 'c
'`•"+ `.a'v ~~~ + ~ -.. ~ tit ~c H ~, ,e,,, } m 4 r'>-~ '` -,;
5 , ~ 3'" LS ~ ~ + . ~a t 51
1
n z
~ ~ ~ ~ {{~~ rt ~;
~ A:~ "i .' Y .~ - ~ t'r~ '*_' t arc }s7 1~~~i T ~}X Fr
i ,
,rte < ;. ~,~ ,~ + ~. ~ ,Z ~t N~~S „~ '~ ~.? f ,`~'" ~ y.n i rt-~
t,r. ;_~•+- ~ i, f... .`' `i Yf t * i try ~;_
~ ~"~ i ~ zE '' t i s
~rCt. ~ S 1~ ~ 4 y ~. t ~ t
f i e r ci -_ +T .. ¢ r.. ~ i~ 4 tir ~ ~I`~ a ln~~~' t ~ },:
~ aA ~ 4
,~~c ~+~cr roar 2 Morw~c-+ v~,+
„~~.~~. mac. „~~ s~~ ~ o~
W
GC
W
2
g
a
w
F-
N
V
W
t1C
a
...
s
• ~~
T ~
T
~~
~~i}
~ ~~
' ~ ~ Section 2: PROJECT DESCRIPTION
E
A two-story church consisting of classrooms, a gymnasium, and a sanctuary located
north of the intersection of Red Hi0 Avenue and EI Camino Reai currently occupies the
project site. The project Proposes amulti--story age restricted assisted living/congregate
care facility over a subterranean parking structure consisting of 201 units on the site
which is illustrated in Figure 1. The proposed devebpment will also indude the
construction of a community center, pool, and rocreational aroa on the 125,538 square
foot lot.
' Facility Description
Assisted Living/Congregate Care - 62 years or older: A sped! combination of housing,
personalized supportive services and health care designed to meet the needs of those
' who need hey with activities of daily living. The_ resident may contract additbnal
medical services or personal assistance. Services provided in Assisted
living/Congregate Caro residences shall include:
' Three meals a day served in a common dining area
Housekeeping services and personal laundry services
' Transportation
Assistance with eating, bathing, dressing, ioileting, and walking
Access to health and rra3dical services
24-hour security and staff availab~ih-
Emergency call systems for.each resident's unit
Heafth prorrwtion and exercise programs
Medicatbn management
Social and recreational activitles
' Zone Description
The proposed General Plan designation would need to be PC Commercial/8usiness
' which would aNvw fora 1.5 Floor Area Ratio. Proposed zoning would be C-2. Please
see Section 9233 of the Tustin City Code for C-2 development standards. Please note
that a CUP will be required for an assisted living/congregate care facility in C-2 district.
' Driveway Description
' Red Hill Avenue will provide direct access to the proposed devebpment and will ad as
the main entrance for the community. A 26-foot wide driveway from Red Hill Avenue will
provide two-way traffic to the subterranean parking structure. The driveway will be
' designated as a "Fire lane' and wiU prohibit parking on it. The existing two way tum
lane on Red Hill Avenue will allow northbound Red HiN Avenue traffic to tum into the
facility as shown in the F'~gure 2. The "Right Tum Only' (Designated as letter 'A' in the
~` figure) sign w~l be installed as per MUTCD (R3-5R).
Tr~FlC n~,~cT RAT 4 p+vr.t,~-TUSnw
w.o. z~~wwy+ Enr~r~arc~. ~• auea~uw s uv~c osvaor~rrr
0
Red Hitt Avenue
Directional. A
Median O~'Y Project Site
is~ r ~a•
Not to SnM
Figure 2
Parking Description
The parking fadtity will be accessed through a two fans access rarr~ located on the
north side of the proposed development. It will provide two-way vehicular access to the
subterranean parkinglgarage level as shown in Figuro 5. A gate located inside the .
parking structure separates guest parking from resident parlc~g. The location of the
gate is set bads sufficiently from the entrance to allow additional off-street vehicb
stacking capability. The bate will be designed in oonfomnanoe with Orange County
Standard 1107 for a minimum of 24 ft. clear travel way when gate is opened.
Data Collection
Traffic and turning counts were performed to determine the nurr~er of Cara usMg Red
HIII at various times of the day in order to establish the peak traffic demand. Traffic data
was obtained by piecing a cube on Red Hill between San Juan and EI Camino and the
numbers of cars that ran over the tube were recorded during a 24-hour period. Turning
count data was obtained by indivlluals manually collecting vehicle movements at the
intersectioh. Newport Traffic Studies, a vehicle counting service, perfom~ed the data
collection on Thursday, November 17. 2005. it should be noted that no construction
activities occurred adjacent to the project when traffic counts were conducted. Traffic
and turning counts were comp~ed and summarized in Appends A.
Capacity Analysis
~F~ u~a~ S aoruu~cH vx.ukka: nisrai
w o. ~M~-tia-t Ericu~n~k~, ntc. a~~w sEN~oa uvu~o ot-v~.o~+r
~! 1
I
i
N
i
i
s~
The intersection capacity utilization (ICU) level of service determines how web an
intersection is functioning and how much extra capacity is available if there was an
influx of traffic. The ICU LOS of an intersection is defined by letters 'A' through "f''
associated with a capacity Percentage as shown in Table 1. The ICU worksheet was
used to determine both the current and future intersection capaaty utilization LOS of the
two intersections. The existing ICU LOS at Red Hill and San Juan currentty operate at
a level of Service of `C' and 'B' respectively for the AM and PM peak periods. The ICU
LOS for existing traffic with the added. project traffic is 'C' and 'B' respectively for the
AM and PM peak periods. At the intersection of EI Camino and Red Hitl, the ICU LOS
currently opertes at a Level of Service of'C' and `B' respectivey during the AM and
PM peak periods, with the added project traffic, the ICU LOS remains the same as the
existing condition.
Table 1: intersection Capacity Utilization (ICU)
ICU. LOS ICU LOS Oeflnition
A In the ra of 0 to t30% ca
B to the ra of t30% and 70% ca
C in the of 70% and 80% ca a
D to the ra of 80% and 9096 ca
E In the ra of 90% and 100% ca
F In the ra of 100% and 110% ca
Section 3: TRIP GENERATION AND DISTRIBUTION
Trip GenQratton
The Institute of Transportation Engineers (Il'E) informational repo sect n e~nee~~ u~
Edition, was used to develop the traffic generated by the project
The ITE code 253, Congregate Care Facility, was used to determine the ir~ress and
egress peak hour trips generated by the new development.
By using the Trip Generation. 7'" Edition, the generated daily trip rate of the project is
2 02. When muftjpiied by the number of new units, the .proposed 201 unit project would
generate a total of 406 new vehicle trips. For the AM Peak hour the trip rate is O.t4. To
determine the AM peak hour trips 0.14 was multiplied by the number of proposed units
(201) which totaled 28 AM peak trips. The same method was used to detemnine the PM
peak trips with a trip rate of 0.20. ft was estimated that there are 28 morning and 40
evening peak hour trips generated as shown in Table 2.
AM peak trips has a direction distribution of 50% entering and 5096 exiting. By
multiplying 5096 by the trip rate 0.14, the total was 0.07. Then 0.07 was multiplied by
201 to obtain the number of AM peak trips entering the development which was 14.
The exiting AM peak trips were calculated the same way using 5096 and was cak:utated
that there would be 14 exiting AM peak trips. PM peak trips were calculated the same
way using a trip rate of 0.20, 60°~ entering, and 4096 exiting. It was estimated that there
would be 24 entering and 16 exiting during the PM peak hour.
~~ ~~ ~t 6 c.~+vr.~-n~srw
w.a z~~a~n-+ ~~e+o. ~• ~~ s~wa uw~ o~or~r
,.~~.:
Trip credits for the existing facility were applied to the project trip generation and the net
total project trips were estimated for the project The ITE code 560, Church, was used
to determine the existing ingress and egress peak hour trips generated by the existing
facility. The average daily traffic added to Red HiII Avenue was estimated to be 56
vehicles per day (VPD). A total of 0 morning and 2 evening peak hour tripe waa
determined from the difference between the traffic generated from the new development
and the existing development as seen in Table 2. However, trip credits for the existing
facility were not applied to the project trip generatron and the total project trips wero
analyzed for the project.
Table 2: Trip Generation
CONGREGATE CARE FACILITY
LAND USE: (2b3)
AM Peak PM Peak
U:! ~
ITE Code: 253
New pevelo nt - 201 Units Dai
2.02
408 Total
0.14
28 In
0.07
14 Out
0.07
14 Total
0.20
40 In
0.12
24 Out
0.08
18
Tri Credos - tTE Code: 660, Church
Exis GFA' -38,434 SD. FT. (350 49 2 24 38 23 15
Net Totsl Pro ect Tri 56 0" 0" 0" 2 1 1
Note:
1. Rates represent average trip generation rates per dwelling units of
congregate care facility land use in ITE's Trip Generation (7"' Edition}.
•GFA -Gras Floor /1rN ou~ded fo ntAed new Mps pxisraMd
Trip Distribution
The distribution of traffic based upon the ADT and the Trip Generat/on, •7°" EditYan, of
the 28 new trips in AM peak hour is distributed with 50% (14 vehicles) entering and 5096
(14 vehicles) exitir~ the project site. A percentage trip distribution on the map ~
presented in Figuro 3. Fram the 5096 of traffic entering. K waa estimated that 4 vehicles
would be entering from the north and 10 vehicles entering from the south. From the
5096 of traffic exitk~g, it was estimated that aM 14 vehicle would be heading south,
because of a left turn restriction from the project site. Based on the facility type, drivers
going northwest or northeast direction will avoid making a `U' turn on Red HIA Avenue
and will take a conservative approach making a right turn or left turn to go towards the
west or the east direction. Whereas driver intended to go north on Red Hiil Avenue will
make a 'U' turn at the intersection of EI Camino and Red Hill Avenue. 20% of the tr~tai
exiting vehicles from the project site during peak period are estimated to make a 'U'
turn on Red Hill Avenue at EI Camino real. During PM peak hour, 40 newly generated
trips is distributed with 6096 (24 vehicles) entering and 40% (16 vehicles) exiting the
project site. From the 6096 of traffic entering, it was estimated that 7 vehicles would be
entering from the north and 17 vehicles entering from the south. From the 40% of traffic
exiting, it was estimated that aH 16 vehicle will be heading south. because of a left turn
TRnFFic a~,rci' at=voRT 7 rwoN~RCr+ vK.wGE-svsrn~
W.G. ZIMMERMAN ENGiNEERINI3, INC. AMERICMi SENIOR WING DEVELOPMEM
~~
X11
i.
r~
i
i
i
!I~
I
restriction from the project site. It is estimated that a majority of vehicles wiU tum right at
EI Camino Real, since a community center as well as shopping centers aro located
along Newport Avenue. The proximity of the project to this intersection makes it a viab~
traffic movement.
Table 3: Project Trip Assignment
. C. ~_._•-- ~--~
rtes rn n hvv~ ~.,. ~. ~~ ..o...
ed Hill AYenua .., .......
t Camino Re~d;~: ~
Ri~d,H111;Avenus•~°~
t,~amino R+sa1'~ .
outhbound~-
8s _ condo y~'~^ ~.
orth~oui>~'~:,. ~'~
.
ast6ogn~,s ,
eft+ ru fight Left hru fight Left ru Right eft ru Right
U" Tum
AM 8 3 6 0 Q 1 0 4 0 5 0 0
pM g 4 7 0 0 3 0 6' 0 8 0 0
Red H fll Avenue a. San Ju
Red H1.A~+enua''' an au~
_ an JuarnStoeN' ;
*
Red;Hill /~-v~r>iu$'`
ftni Juan~Street
outh`bound = ~•. . esttiound.,-: :
, Nortf°i U"~
Eastbound."
Left hni Righi Left hru Right Left hru Right eft hru Right
AM 0 2 0 1 0 0 0 3 0 0 p 1
PM 0 5 0 1 0 0 '0 3 0 0 0 1
~~ IMPI~CT REPORT 8 uow+ac~+v~-TUSK
W.G. LMMERI~AMI ENGINEERING. INC. AMERIC,JV'1 SENIOR UYINCi DEVELOP'ttENT
~/.J~
r ~J
;:~..~-:
,~ i~
Figuro 3: Trip Distribution
t:.'::.
I Section 4: PRGJECT SETTING
Presentty the existing site contains 1 main building, 2 driveways and a parking lot as
shown in Figure 4. Adjacent to the project site abng Red Hiq Avenue. mainly consists
of business and residential facilities along with accessibility to the I-5 freeway.
I Red Hill Avenue is a two-way major street with a total of 6 travel lanes; 3 lanes
northbound, 3 lanes southbound, and a two way left-tum median. Red Hiq Avenuie is
approximately 110 feet wide with a parkway and sidewalk on the west side of the street
` and a shopping center on the east side of the street. Red Hlll Avenue has aright-off
~F~ a~P~ a~oaT 9 Mort viu.nce-nis~ru+
w a ziw~nw ~r~~c, iNC. a~a~c~w s~+oa wu~c3 oEVElor~~rr
`~
r. •; ~ r~.
_ v:5
`v _.:- .
~`
I
XX (JDi:)' % In (Ont) Trip Di:tribntion
' ~ ~ way of 120 feet. The average dairy traffic {ADT) along Red Hill Avenue between San
t Juan Street and EI Camino is 23,500 VPD with a peak hour of volume 1,151 vehides
' northbound and 1,329 vehicles southbound.
San Juan Street is an east-west collector street north of the proposed development.
' San Juan Street is mainly residential with businesses adjacent to the street south of the
Red Hill Avenue intersection. The intersection of San Juan and Red Hill is a signalized
intersection which ~ located approximately 160 feet north of the proposed devebpment
' and is located approximately 0.2 miles north of the Santa Ana Freeway (1-5). C.E. Utt
Middle Schoc.t which is located east of Red Hiq Avenue can be accessed by San Juan.
' Ei Camino Real is an east west secondary road south of the proposed devekpment.
The intersection of EI Camino and Red HiU is a signalized intersection which is located
approximately 325 feet south of the proposed development and is located
' approximately 270 feet north of the Santa Ana Freeway (I-5j. Businesses mainly
surround the intersection and are frequentty used by students walking toKrom school.
Tustin High School can be accessed via EI Camino which is west of the intersection and
to the east of the intersection ~ The Tustin Auto Center.
Major destinations for this development inductee; grocery stores along Newport Avenue
' and Holt Avenue, medical facilities abng Newport Avenue and Tustin Avenue,
phamnacies along Newport Avenue, and community center at C Road along with a
I dinner theater on EI Camina Real.
'~ On-Site Circulation
' The "ProjecC has been analyzed for on-site circulation. Access to the project site will be
through one two-way driveway by either a right turn movement for the southbound traffic
or a left turn movement for northbound traffic from Red Hill Avenue. Exiting traffic wiN
' be restricted to right turns only.
Garage access turn radii meet minimum design standards. Delivery truck fuming radii
for the loading dodos also meet minimum fuming radii. Large moving vans and semi-
trailer truck wiq be prohibited from the project site. Move-in conditions along with other
terms and conditions for residency at the complex with each tenant will be highl~hted in
' the signed Tenant Agreemerrt.
Trash containers are located in the garage. Trash containers will be moved to above
' ground areas for trash pick-up. This method has been successfulty implemented in the
City of Pasadena.
' Section 5: LEVEL OF SERVICE ANALYSIS
The level of service analysis was performed for Red Hitl Avenue 8 EI Camino Real and
Red Hill Avenue 8 San Juan Street based upon fuming movement counts taken in
November of 2005. A level of Service analysis was performed using ICU worksheet
~o-~cH v~UOE ~usrw
' ~~~~ 10
w.c. z,-~a~uv+ ~wmtx~, wc. ,a~~w sanoa uvux3 o~oP~rrr
based upon the project generated traffic without trip credits applied for the existing
baseline, and 2020 projection. LOS ca~utation is attached as Appendix D. Table 4 .
summarizes these results.
Table 4: Levol of Servit~
Existing X2006} Existing with Project
AM PM AM ~ '
LOS % ICU LO8 X ICU LOS % lCU LOS % ICU
C 74.2 B 67.1 C 74.4 B 67.8
2020 Projectbn 2020 Projection with Project
AM° PM AM• PM
Lpg % ICU LOS % {CU LOS X ICU LOS % ICU
E 93.9 D 84.4 E 94.2 ~ D 85.4
Existing (20011) Existing with Project
AM ~ PM AM PM
LOS °/, ICU LOS % ICU LOS % ICU LOS % ICU
C 75.2 B 60.8 C 75.3 B 87.0
2020 Projection 2020 Projection wkh Project
AM° PM AM° PM
I-Og % ICU LOS •~ ICU LOS % ICU LOS % ICU
E 97.6 D 83.4 E 97.7 D 83.6
• Critical condition
otes:
~. Level of service is based on the V/C ratio.
2. Level of service reported from ICU woticsheet.
rw~flc a~P~ RePOaT 11 ~uowortcM vatnra:-TVS'rw
wo. zi~~w I~+c+ra:Ersaro. arc. aNERic~w st.rnoR woo oEVEioP~r