HomeMy WebLinkAbout09 AMENDMENT NO. 2 TO CSA FOR HUNSAKERAGENDA REPORT Reeeweld.m 9 Finance Director MEETING DATE: FEBRUARY 1, 2011 TO: HONORABLE MAYOR AND COUNCIL MEMBERS VIA: DAVID C. BIGGS, CITY MANAGER FROM: CHRISTINE A. SHINGLETON, ASSISTANT CITY MANAGER DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS /CITY ENGINEER SUBJECT: APPROVAL OF AMENDMENT NO. 2 TO CONSULTANT SERVICES AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES FOR TUSTIN LEGACY BACKBONE INFRASTRUCTURE BETWEEN THE CITY AND HUNSAKER & ASSOCIATES SUMMARY Approval is requested of Amendment No. 2 to a Consultant Services Agreement for Tustin Legacy backbone infrastructure between the City and Hunsaker & Associates to provide additional engineering services related to infrastructure design requirements for Tustin Ranch Road roadway improvements, Valencia Avenue traffic signal and sewer line modifications, and Park Avenue roadway, storm drain, water, and sewer improvements. RECOMMENDATION It is recommended that the City Council: 1. Approve Amendment No. 2 to a Consultant Services Agreement for Tustin Legacy backbone infrastructure between the City and Hunsaker & Associates, increasing the not to exceed amount by $282,800 to $622,750, and authorize the City Manager to execute the document on behalf of the City. 2. Appropriate $282,800 from unappropriated funds in the MCAS 2010 Tax Allocation Bond Proceeds Fund (561) to the Tustin Ranch Road Extension Project Capital Improvement Program Fund (CIP No. 70100). FISCAL IMPACT The consulting services will be compensated on a time and material basis with a not to exceed budget of $282,800. The Scope of Services will require an appropriation from unappropriated funds in the MCAS 2010 Tax Allocation Bond Proceeds Fund to cover the additional engineering services related to additional infrastructure design requirements for Tustin Ranch Road roadway improvements, Valencia Avenue traffic signal and sewer line modifications, and to future Park Avenue and Legacy Road roadway, storm drain, water, and sewer improvements. Out of this amount, it is expected that $44,300 would be reimbursable from IRWD for design of their capital facilities pursuant to a future Capital Facilities Reimbursement Agreement between the City and Hunsaker & Associates Contract Amendment No. 2 February 1, 2011 Page 2 IRWD which will be brought back to the council at a future meeting. An itemized list of approved Tustin Legacy agreements for professional consulting services, including pending approvals, is attached for reference. DISCUSSION On September 7, 2010, the City Council approved a Consultant Services Agreement with Hunsaker & Associates to provide engineering services at Tustin Legacy related to the City's Disposition Strategy and Business Plan, aerial mapping, and improvements related to Tustin Ranch Road and Valencia Avenue. On November 2, 2010, the City Council approved Amendment No. 1 to the Consultant Services Agreement for engineering services related to preparation of a final tract map for conveyance purposes. Subsequently, the City requested and received a proposal for additional engineering services, specifically related to changes to the Tustin Ranch Road graded area, wall alternatives, preparation of the SWPPP, and Park Avenue and Legacy Road improvements, from Hunsaker & Associates based upon its familiarity and experience with the work required. Due to its vast knowledge of the project and its current working relationship with the City, Hunsaker & Associates was determined to be the most qualified to provide the required services at this time. Approved for Forwarding By: Christine A. Shingleto Assistant City Manage ~~ ~ ~~ David C. Biggs, City Manager Douglas S. Stack, P.E. r irector of Public Works /City Engineer /chment: Proposed Contract Amendment No. 2 Tustin Legacy Agreements Summary 1-20-11 S:\City Council Items\2011 Council ItemslApproval of Amendment No. 2 to Legacy Contract with Hunsaker.docx AMENDMENT NO. 2 TO CONSULTANT SERVICES AGREEMENT This AMENDMENT NO. 2 TO CONSULTANT SERVICES AGREEMENT ("Amendment No. 2") is made and entered into by and between the CITY OF TUSTIN, a municipal corporation ("City") and HUNSAKER & ASSOCIATES IRVINE, a California Corporation ("Consultant"), pursuant to Section 1.6 "Additional Services" and Section 2.3 "Changes", of the Consultant Services Agreement. WHEREAS, City and Consultant entered into a Consultant Services Agreement on September 7, 2010, to provide consulting services to the City for engineering services for the Tustin Legacy Disposition Strategy and Business Plan; and WHEREAS, the City requested certain additional engineering services related to additional infrastructure design requirements for Tustin Ranch Road roadway improvements, Valencia Avenue traffic signal and sewer line modifications, and Park Avenue and Legacy Road roadway, storm drain, water, and sewer improvements; and WHEREAS, Hunsaker & Associates submitted an authorization request for additional engineering services dated January 20, 2011, attached hereto as Exhibit "A"; and THEREFORE, it is agreed that the Original Agreement be amended as follows to reflect the modifications requested by Hunsaker & Associates and authorized by the City of Tustin: 1. Modification of Compensation. Section 2 entitled "Compensation" is amended to provide additional engineering services as identified in Exhibit "A" of this Amendment No. 2 up to an additional amount not to exceed $282,800. 2. General Requirements. All other provisions contained in the Original Agreement shall continue to apply. IN WITNESS WHEREOF the parties have executed this Amendment No. 2 as of the date stated below. DATED: "City" City of Tustin, a municipal corporation By: David C. Biggs City Manager APPROVED AS FORM: Doug Holland City Attorney "Consultant" Hunsaker & Associates Irvine, a California corporation Kamal Karam Executive Vice President, Principal By: 2 EXHIBIT "A" PROPOSAL Attached hereto is Consultant's Proposal dated January 20, 2011. HUNSA~ER &ASSaCrATES 1 R V I N E, I N C. PLANNING ENGINEERING December 22, 2010 SURVEYING Revised January 20, 2011 GOVERNMENT RELATIONS IRVINE Mr. Ken Nishikawa LOS ANGELES Tustin Legacy Development RIVERSioE Services Manager SAN DIEGO CITY OF TUSTIN 300 Centennial Way Tustin, CA 92780 Subject: Tustin Legacy, Tustin, California Tasks 2, 3, 6,and7 Work Beyond the Original Scope of Contract FOUNDING PARTNERS: Dear Mr. NlShlkawa: RICHARD HUNSAKER TOM R. McGANNON Hunsaker & Associates Irvine, Inc. (H&A) is pleased to submit this addendum to )OHN A. MICHLER proposal for work beyond the original scope of contract. We propose to furnish the DOUGLAS G. SNYDER additional scope of services. Task 2.0 -Tustin Ranch Road 1. Amend the rough grading plan to reflect a design for a proposed Verdura wall system at the toe of the embankment slope for TRR, north of Edinger and along the approximately location of receptors 10 to 21. The plans will reflect the PRINCIPALS: proposed profie as well as incorporate the locations and DAVID FRATTONE spacing of the geogrids. FRED GRAYLEE BRADLEY HAY in addition, the grading plan will include the two lots on either PAUL HUDDLES70N side of TRR and south of Edinger (Neighbofiood "B" and the KAMAL H. KARAM parse! ramp). The grading plan will also include an additional DOUGLAS L. STACEY 15 acres of property. West of TRR and north of existing KRIS WEBER blamer Avenue (portion of Lot 7 'sn Neighborhood "G" south JOSEPH E. WIGHTMAN and LIFOC Parcel 8} and east of Park Avenue. The design will expand to include proposed bioswales along TRR as shown on RBF landscaping plan. Following a plan check review of the initial grading plan submittal, H&A has been instructed by City staff to remove al! design associated with the proposed pedestrian crossing over Tustin Ranch Road. This is a change from the original approved Scope of Work, This is an addendum to Task 2.1 ................................ . . . Three Hughes . .. ...... . Irvine, California 2. Amend the erosion control plan to include the additional areas 92618-2071 described in the revised limits of the grading plan. (949) 583-1010 PH (949) 583.0759 FX This is an addendum to Task 2.1 www.hunsaker.com ~ zs,~oo $ 5,000 Mr. Ken Nishikawa Tustin Legacy Development Services Manager CITY OF TUSTIN January 20, 2011 Page 2 3. Update all existing individual homeowner's disclosure exhibits based on the most current design to show vertical and horizontal locations of all proposed improvements adjacent to the rear property lines. (Improvements include TRR, sound wall, retaining walls and both Verdura walls). An overall plan view will be prepared to show all proposed improvements in relationship to the rear property line, individual exhibits will be prepared for each of the homeowners. This is an additional proposal under Task 2.1 item 2 .............. $ 5,900 4. Provide an interim hydrology report that is reflective of the proposed grading design. This interim report will respect the previously approved overall drainage reports by bath the City of Tustin and City of Irvine. The hydrology analysis will extend to Peters Canyon Wash and will include a unit hydrograph and basin routing analysis to detain the upstream flows, as well as in the interim condition. Downstream pipe capacities and basin size will be analyzed. This is an additional Item under Task 2.2. Item 4 .................... $ 18,000 5. Provide structural engineering services for the completion of the reinforced concrete storm drain box culverts far Lines A, C and M. This is an additional proposal under Task 2.2 Item 5 .............. $ 17,500 6. Preparation of Verdura Walls. A. Engineering services and preparation for two (2) Verdura retaining walls, as depicted on the rough grading plans prepared by H&A. Review of available geotechnical information to identify engineering properties of onsite and/or import soils for retaining wall design, including #oundation, retained backflll and reinforced soils in the wall. Review of site geometry, topographic maps, wall profile, and other data made available to SRD for the purpose of determining backfill suitability, surcharge conditions, and developing structural design. Engineering analyses for the structural design of the Verdura Retaining Wall System, including analyses for internal, external, and seismic wale stability, presented within one report for submittal to the jurisdiction. Mr. Ken Nishikawa Tustin Legacy Development Services Manager CITY OF TUSTIN January 20, 2l}11 Page 3 Preparation of one set of wall construction drawings that will include general and construction notes, material specifications, structural wall profiles and typical details. Preparation of one plan check response report including resubmittal of construction plans (if necessary). B. H&A to incorporate a profile of the proposed Verdure wall along the northerly embankment side of Tustin Ranch Road north of Edinger. C. H&A to provide coordination with the soils engineer of record, as well as Soils Retention Design's Inc. and the landscape architect of record. D. H&A to provide project management and attend meeting attendance. This is an additional proposal under Task 2.3 Item 4 . ............. $ 14,500 7. Preparation of the SWPPP by a Qualified SWPPP Developer (QSD) as required by the CGP. The SWPPP will be designed to address the following objectives. A. Alt pollutants and their sources, including sources of sediment associated with construction, construction site erasion and al! other activities associated with construction activity are controlled; B. Where not otherwise required to be under a Regional Water Board permit, all non-storm water discharges are identified and either eliminated, controlled, or treated; C. Site BMPs are effective and result in the reduction or elimination of pollutants in storm water discharges and authorized non-storm water discharges from construction activity to the BATBCT standard; D. Calculations and design details as well as BMP controls for site run-on are complete and correct, and E. Stabilization BMPs installed to reduce or eliminate pollutants after construction is completed. F. Provide the QSDIQSP state mandated training for up to three (3) City representatives. This is an additional proposal under TasK 2.7 ......................... $ 6,000 Mr. Ken Nishikawa Tustin Legacy Development Services Manager CITY OF TUSTIN January 20, 2011 Page 4 8. Revise vertical and horizontal location of sound wall in order to eliminate the need to encroach onto property of Receptor 2. This change in design will impact location of proposed sound wall from property owner of Receptor 1 to, and including, property owner of Receptor 5. A. Revise grading plan to reflect above changes. B. Revise plan and profile and structural talcs to reflect above changes. C. Revise overall and individual lot disclosure exhibits identifying location of proposed sound wall to reflect above changes. This is an additional proposal to Task 2.3 ................................ $ 4,800 9. Following a plan check review of the initial tentative map and final map submittal, H&A has been instructed by City staff to revise both maps to add back in most of the lettered/open space lots that were previously shown. This is a change from the original approved Scope of Work... 5 000 Total Task 2.0 $ 903,200 Task 3.4 -Valencia Avenue North Loop 1. Sewer force main abandonment. • H&A to include specs and design for the abandonment of the existing sewer force main from the existing location of the sift station to an existing manhole approximately 600' west of the centerline of Kensington. A detail far the reconfiguration of the manhole will be included. This is an additional proposal to Task 3.4 ................................ $ 3,200 2. Modify Traffic Signal at Valencia Avenue and Kensington Park. • Prepare plans for modified traffic signal at Valencia Avenue and Kensington Park. • Obtain the existing Vaffic signal plan from the City of Tustin. • Field review the existing conditions at the protect site. Site inspection would include the existing geometry, sight distance, signing, striping, traffic patterns, and above Mr. Ken Nishikawa Tustin Legacy Development Services Manager CITY OF TUSTlN January 20, 2011 Page 5 ground utilities. The findings would be incorporated into the design. • Prepare a traffic signal plan for the intersection of Valencia Avenue and Kensington Park at a scale of 1" _ 20'. The plans would be designed per the City of Tustin standards. Schematic traffic signal interconnect details would be added to the Traffic Signal plans, as needed. • Provide a title sheet showing the notes and details as appropriate for the design plans. This is an additional proposal to Task 3.0 ................................ $ 6,900 3. Street Improvement and Striping Plan • Revise median and curb alignment at the westerly intersection of Valencia Avenue and Tustin Ranch Road in order to accommodate 2 left pocket lanes as well as 2 thru lanes as requested by City traffic engineer, revise street improvement plans and profile far the revised curb median alignment. • Revise ultimate striping plan to reflect changes above. This is an additional proposal to Task 3.1 ................................ 6 900 Total Task 3.0 $ 17,000 NEW TASKS Task 6.0 -Park Avenue and Legacy Road (from Park Avenue to Tustin Ranch Road) and (from existing Jamboree off ramp to Legacy Road) Based on an expanding grading design to include the 15 acres located in between Tustin Ranch Road, Park Avenue, t_egacy Road and the Jamboree off ramp, the following backbone infrastructure design is now necessary to complete the ultimate design and construction of Park Avenue and Legacy Road. Task 8.1 -Storm Drain 1. Storm Drain (Line B} -Prepare a plan and profile along with the hydraulics for completing the design of the proposed main line within Park Avenue ............................................................ $ 18,000 2. Prepare plan and profile for proposed 48-inch RCP line in Legacy Road .............................................................................. $ 8,200 Mr. Ken Nishikawa Tustin Legacy Development Services Manager CITY OF TUSTIN January 20, 2011 Page 6 Task 6.2 -Structural Design for Proposed Box 1. Provide structural engineering services for the reinforced concrete box and transition structure for Line B ...................... $ 9,000 Task 8.3 --Construction Quantity and Cost Estimating 1. Provide cast estimate, based on construction quantities......... $ 5,500 Task 6.4 -Specifications and Bid Documents 1. Provide construction specification and contract documents for public bidding ............................................................................ $ 3,500 Task 6.5 -Project Management/Coordination 1. H&A will provide project management and coordination, including meeting attendance ................................................... $ 4,000 Task 6.6 -Street Improvement Plans 1. Prepare street improvement plans for approximately 3,700 LF road improvements for Park Avenue and Legacy Road based on the current design already incorporated into the mass grading plans ............................................................................ $ 19 900 Task 6.7 -Sewer Plans 1. Prepare improvement plans for approximately 500 LF of proposed 8-inch sewer line in Legacy Road ............................ $ 5,800 Task 6.8 -Domestic Water Line 1. Prepare improvement plans for approximately 900 LF of 10- inch water line in Legacy Road ................................................ $ 3,900 Task 6.8 -Signing and Stripping Plans 1. Prepare signing and stripping plans for the proposed portions of Park Avenue and Legacy Road ........................................... $ 4,200 Task 6.10 -Dry Utility Coordination 1. H&A will coordinate with master dry utility consultant regarding proposed locations for street lights and transformers. H&A will provide mast current base information. $ 2,100 Task 6.11 -Traffic Signal at Park Avenue and Legacy Road 1. Prepare plans for the intersection at Park Avenue and Legacy Road ......................................................................................... $ 7,800 Mr. Ken Nishikawa Tustin Legacy Development Services Manager CITY OF TUSTIN January 20, 2011 Page 7 2. Prepare traffic signal modifications at Jamboree Road off ramp and existing Park Avenue ............................................... $ 6,800 3. Prepare plans for the intersection of the commercial parcel and Legacy Road (optional) ..................................................... $ 7.800 Total Task 6.0 $ 106,600 IRWD Capital Improvement Plans Task 7.0 -Park Avenue and Legacy Road (from existing Jamboree offramp to Legacy Road and from Tustin Ranch Road to Park Avenue) Task 7.1 -Domestic Water Plans 1. Prepare improvement plans for approximately 1,800 LF of 12- inch water line in Park Avenue ................................................. $ 9,000 Task 7.2 -Sewer Plans 1. Prepare improvement plans for approximately 1,700 LF of proposed 15-inch and 18-inch sewer line in Park Avenue from Legacy Road through Park Road and in between Parcels 7 and 8 lot line to the existing stub at Tustin Ranch Road.......... $ 9,800 Task 7.3 -Recycled Water Plan 1. Prepare one plan for installation of approximately 1,830 LF of proposed 6-inch recycled water plans in Legacy Road and Park Avenue ............................................................................. $ 8,000 Task 7.4 -Construction Quantity and Cost Estimating 1. Provide cost estimate, based on construction quantities......... $ 3,500 Task 7.5 - Speciflcatfons and Bid Documents 1. Provide construction specification and contract documents for public bidding .................................................................•.......... $ 4,500 Task 7.S -Project ManagementfCoordination 1. HB~A will provide project management and coordination, as well as meeting attendance ...................................................... $ 3.800 Total Task 7.0 S 38,600 Mr. Ken Nishikawa Tustin Legacy Development Services Manager CITY OF TUSTIN January 20, 2011 Page 8 Retmbursables As requested, the reimbursables costs shown below corresponds to the applicable proposal and tasks. 1. Proposal 1 -Comprehensive Task Tasks 1.1, 1.2, 1.3 and 1.4 ....................................................... $ 1,000 2. Proposal 2 -Tustin Ranch Road Tasks 2.1, 2.2, 2.3, 2.4, 2.5, 2.6 and 2.7 .................................. $ 6,540 3. Proposal 3 -Valencia Avenue North Loop Tasks 3.1, 3.2, 3.3, 3.4, 3.5, 3.8, 3.7, 3.8 and 3.9 ................... $ 2,000 4. Proposal 4 -Encumbrance Map Tasks 4.1, 4.2, 4.3, and 4.4 ...................................................... $ 1,500 5. Proposal 6 -Park Avenue and Legacy Road Tasks 6.1 through 6.11 ............................................................. $ 4,000 6. Proposal 7 - IRWD Capital Improvement Plans Tasks 7.1 through 7.5 ............................................................... $ 2.500 Total Reimbursables $ 17,60p GRAND TOTAL $ 282,800 We propose to furnish the above services based on our standard hourly rates, as shown on Exhibit A. The following is a summary of fhe insurance coverages that Hunsaker & Associates Irvine, Inc. provides and is included in our offer of this proposal: General Liability .................... $ 2,000,000 Personal Injury ...................... $ 1,000,000 Auto Liability .......................... $ 1,000,000 Professfonalliability ............. $ 2,000,000 Valuable Papers .................... $ 1,850,000 Upon request, we will provide a Certificate of Insurance for the insurance coverages listed above. Should you require additional coverage, the costs that we incur from our insurance carriers wilt be invoiced at their direct costs and are not included in our fee quoted within this proposal. Mr. Ken Nishikawa Tustin Legacy Development Services Manager CITY OF TUSTIN January 20, 2011 Page 9 Should this proposal meet with your approval, please sign below and return it to our office. We have enclosed a copy of this proposal for you to retain for your records. Very truly yours, Accepted by, HUNSAKER & ASSOCIATES IRVINE, INC. CITY OF TUSTIN Kamal Karam Executive Vice President, Principal KK: tl Enclosures xc: Benny Tenkean, City of Tustin W.O. 0449-20 (flc1wo1044912o Lat-kk.aoc) Date Exhibit A City of Tustin Additional Engineering Services HOURLY RATE SCHEDULE Princlpal .......................................................... $ 170/Hour Project Manager ............................................. $ ib0/Hour Praject Engineer ............................................ $ 140/Hour Office Technical Staff .................................... $ 1241Hour Field Survey Two-Person Crew .................... $ 216/Hour Field Survey Three-Person Crew ................. $ 2601Wour The above rates are far all professional staff. We do nat bill for secretarial or other office support personnel. We also do not bill for computer time and minor copying. It should be noted that our fee does not include the cost of reproductions, computer plotting or deliveries. Outside services will be invoiced directly to you through your suppliers or at cost plus 10% when invoiced through Hunsaker & Associates Irvine, Inc. Invoicing will be on a monthly basis and payable within 30 days after receipt of our invoice. Should payment not be received within thirty (30} days, a one and one-half percent (1'/z%} per month late fee will be charged on any unpaid balance. Our standard hourly rate is subject to an increase on July 27, 2011. KiCal (ftc1wo10449120 LOt-kk.dacj 1-20-11 A-1 Tustin Ranch -Road -Tasks 2,3,6,7 Nunsaker 8 AssoGates Irvine, !na City of Tustin TUSTIN LEGACY AGREEMENTS EXISTING AGREEMENTS WITH CITY OF TUSTIN Thursday, January 20, 2011 Master Development Consultant/Contractor Type of Services Footprint Approval by aty Work Item Cost Task Order including TRR Council Issued Extension RBF Engineering & Planning y 8/3/2010 Disposition Strategy $ 75,000 y Engineering y Armstrong Ave. $ 66,800 Engineering y Valencia Ave. $ 87,700 Engineering y Tustin Ranch Road $ 313,200 y Engineering y Warner Ave. $ 61,700 Engineering y Barranta Parkway $ 166,600 Engineering y Red Hill Ave. Median $ 112,000 Engineering y Detention Basin Improvements $ 428,000 Engineering y Red Hill Ave. Widening $ 114,900 Sub-Total $ 1,425,900 RBF -Amend. #1 Engineering y Nq' Tustin Ranch Road -Parkway Landscaping $ 8,800 Y Sub-Total $ 8,800 RBF -Amend. #2 Engineering y NAl Tustin Ranch Road - WQMP $ 9,200 y Tustin Ranch Rd - Bioswales $ 4,000 y Tustin Ranch Rd -Tract Maps $ 11,600 y Sub-Total $ 24,800 TOTAL $ 1,459,500 Developer's Research Financial y 9/7/2010 Disposition Strategy $ 75,000 y TOTAL $ 75,000 SMS Architects Planning and Design y 9/7/2010 Disposition Strategy $ 75,000 y TOTAL $ 75,000 NMG GeoTech y 9/7/2010 Armstrong Ave. $ 7,700 y GeoTech y Valencia Ave. $ 6,300 y GeoTech y Tustin Ranch Road $ 22,300 y GeoTech y Warner Ave. $ 7,300 y GeoTech y Barranca Parkway $ 5,100 y Sub-Total $ 48,700 NMG-Amend.#1 GeoTech y Pendingz Tustin Ranch Road $ 29,000 GeoTech y Valencia Ave. $ 4,500 GeoTech y Overall Grading, SWPPP, Walls, Demo $ 35,000 Sub-Total $ 68,500 TOTAL $ 117,200 Hunsaker Engineering y 9/7/2010 Disposition Strategy $ 25,000 y Engineering y Mapping/PERF/Water Quality $ 60,000 y Engineering y Tustin Ranch Road $ 129,600 y Engineering y Valencia Ave. $ 40,800 y Sub-Total $ 255,400 Hunsaker-Amend#1 Engineering y 11/2/2010 Disposition Strategy $ 72,500 y Engineering y Tustin Ranch Road -Homeowner Mitigation $ 12,050 y Sub-Total $ 84,550 Hunsaker -Amend #2 Engineering y Pending' Tustin Ranch Road $ 103,200 Engineering y Valencia Ave. $ 17,D00 Engineering y Park Ave. & Legacy Road S 106,500 Engineering y I RWD Capital Plans $ 38,600 Engineering y Reimbursables $ 17,500 Sub-Total $ 282,800 TOTAL $ 622,750 Page 1 1/20/2011 TUSTIN LEGACY AGREEMENTS EXISTING AGREEMENTS WITH CITY OF TUSTIN Thursday, January 20, 2011 Master Development Consultant/Contractor Type of Services Footprint Approval by City Work Item Cost Task Order including TRR Council Issued Extension Psomas Mapping both in the MD NAB Mapping of activities including LIFOC parcels and $ 31,000 y footprint and SOCCCD land swap outside the footprint TOTAL $ 31,000 John Burns Real Estate Residential Market y 11/2/2010 Disposition Strategy $ 29,400 Y Consultin# Analvsis TOTAL $ 29,400 Vandermost Consulting Environmental y 11/2/2010 Regulatory Agency Consulting $ 20,000 y TOTAL $ 20,000 The Concord Group Non-Residential y 11/2/2010 Disposition Strategy $ 42,000 Y Market Analvsis TOTAL $ 42,000 Pacific States Environmental y 11/16/2010 Environmental Consulting $ 10,000 y Sub-Total $ 10,000 Pacific States -Amend #1 Environmental y PendingZ Environmental Consulting $ 40,385 Y Sub-Total $ 40,385 TOTAL $ 50,385 Vista Environmental Environmental y 12/7/2010 Tustin Ranch Road $ 9,828 Y TOTAL $ 9,828 Oavid Taussig & Associates Financial n 1/4/2011 Disposition Strategy including refinement of $ 47,500 y infrastructure backbone fees TOTAL $ 47,500 So CaI Sandbags Maintenance & Erosion y 12/7/2010 Maintenance of undeveloped portions including $ 547,524 y Control erosion control TOTAL $ 547,524 Spectrum Landscaping - Maintenance n 6/15/2010 Maintenance ofsites outside Master Developer $ 71,208 y Amend #5 footprint TOTAL $ 71,208 TOTAL CONTRACTS $ 3,198,295 TOTAL TASKS ORDERED $ 1,809,295 NOTES: 1. "NA"are items in which funding was appropriated through the adoption of the 2010/2011 Budget and were authorized by staff through a Purchase Order or within contract amendment limit (10% of total amount) that could be amended by staff, with greater were within the appropriation amounts of the City Manager. 2. "Pending" are items anticipated to be brought to the City Council for approval in the near future. Page 2 1/20/2011