Loading...
HomeMy WebLinkAbout07 AWARD CONTRACT MITCHELL AVE/UTT DRAGENDA REPORT Agenda Item Reviewed: City Manager Finance Director MEETING DATE: JUNE 7, 2011 TO: WILLIAM A. HUSTON, INTERIM CITY MANAGER FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER SUBJECT: AWARD CONTRACT FOR THE MITCHELL AVENUE/UTT DRIVE PEDESTRIAN ENHANCEMENTS PROJECT CIP 40073 SUMMARY Staff is requesting that the City Council award the construction contract for the Mitchell Avenue/Utt Drive Pedestrian Enhancements Project CIP 40073 to the lowest responsive/responsible bidder. RECOMMENDATION It is recommended that the City Council award the construction contract for the Mitchell Avenue/Utt Drive Pedestrian Enhancements Project CIP 40073 to the lowest responsive/responsible bidder, PTM General Engineering Services, Inc., in the amount of $72,070.00, and authorize the Mayor and the City Clerk to execute the contract documents on behalf of the City. FISCAL IMPACT Sufficient funding has been budgeted and appropriated in this Fiscal Year 2010-2011 Capital Improvement Program for this project. Ninety percent of the estimated construction cost of the project is funded with a grant from the State legislated Safe Routes to School (SR2S) Program in the amount of $225,230. The City is utilizing Measure "M" Turnback funds to fund the City's ten percent share of construction cost. Approximately $50,000 of Mitchell/Utt intersection improvements associated with the Mitchell Avenue Storm Drain Improvement (CIP No. 50035) are eligible SR2S expenditures and will be credited against the grant accordingly. DISCUSSION The proposed project includes the installation of an in-pavement lighted crosswalk at an existing school crosswalk adjacent to Beswick Elementary School across the west leg of Mitchell Avenue at Utt Drive. The proposed flashing lights will be activated by pedestrians and serve to provide additional warning to drivers that a pedestrian is using the crosswalk. The project also includes the installation of a streetlight and replacement of curb ramps to be in compliance with current federal Americans with Disabilities Act (ADA) requirements. In order to minimize the impact of construction activities on the school and adjacent residences, construction of the project will be completed in conjunction with the Mitchell Avenue Storm Drain Project CIP 50035 and will be scheduled to occur during the summer months while the Beswick Elementary School is not in session. Certain items of work being constructed by the contractor for CIP 50035, including replacement of curb ramps, cross-gutter, and paving at the Mitchell Avenue/Utt Drive intersection, are eligible to be paid for with the State Safe Routes to Schools grant and will be charged to this project. Mitchell Avenue/Utt Drive Pedestrian Enhancements Project CIP 40073 June 7, 2011 Page 2 Formal bids were publicly opened on May 17, 2011 and reviewed by Public Works. Seven (7) bids were received and are summarized below by order of least dollar amount: • PTM General Engineering Services, Inc .................................. $72,070.00 • Macadee Electrical Construction, Inc ..................................... $75,269.00 • Unique Performance Construction, Inc .................................. $75,703.00 • KDC, Inc. dba Dynalectric ......................................................$79,842.00 • California Professional Engineering, Inc .................................. $75,976.30 • Flatiron Electric Group, Inc .................................................... $76,989.00 • Steiny and Company, Inc .................................................... $81,918.28 Staff has reviewed the references and the State Contractor's License for PTM General Engineering Services, Inc. and has determined that they are appropriate for the subject project. It is recommended that the City Council award the construction contract for the Mitchell Avenue/Utt Drive Pedestrian Enhancements Project CIP 40073 to the lowest responsive/responsible bidder, PTM General Engineering Services, Inc., and authorize the Mayor and the City Clerk to execute the contract documents on behalf of the City. ~1~~/ I ~~ ou I S. Stack, P.E. ire t of Public Works/City Engineer Attachment: Location Map S:\City Council Items12011 Council ItemsWward of Contract for Mitchell Utt Ped Enhancements CIP 40073.docx Z O U .-. e^~ S d' Z U w O w w U z Q z w z Q w w 0 w z Q J J W 2 U LiJ Q z H U w O