HomeMy WebLinkAboutPC RES 2704 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 2704
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF TUSTIN, CALIFORNIA,
AMENDING CONDITIONAL USE PERMIT 89-03 AND
DESIGN REVIEW 88-62, A REQUEST TO MODIFY
AN APPROVED MECHANICAL EQUIPMENT SCREEN,
LANDSCAPE PLANTER AND BUILDING MATERIALS
FOR A 48,000 SQUARE FOOT OFFICE BUILDING
LOCATED AT 15101 RED HILL AVENUE.
The Planning Commission of the City of Tustin does hereby
resolve as follows:
I. The Planning Commission finds and determines as follows:
ae
That proper applications (Amendment to CUP 89-03
and Amendment to DR 88-62) has been filed on behalf
of W & S Commercial to request modification to an
approved mechanical equipment screen, landscaped
planter and building materials for a 48,000 square
foot building located at 15101 Red Hill Avenue.
Be
Ce
That a public hearing was duly called, noticed and
held on said application on November 13, 1989.
,
That establishment, maintenance, and operation of
the use applied for would not, under the
circumstances of the proposed modifications from
.the previously approved plans, be detrimental to
the health, safety, morals, comfort, or general
welfare of the persons residing or working in the
neighborhood of such proposed use in that:
The proposed roof equipment screen, planter and
building material revisions have been found to be
in substantial conformance with the conceptually
approved plans.
The proposed modifications would not alter the
intensity or use of the project.
The proposed plaater and building material
revisions have been found to be in substantial
conformance with the conceptually approved plans.
8
9
10
11
121
13
14
15
16
17
i9
~0
~3
25
~7
Resolution No. 2704
Page 2
De
A Negative Declaration was previously prepared and
certified as adequate for the project in
conformance with the California Environmental
Quality Act.
II. The Planning Commission hereby approves an Amendment to
Conditional Use Permit 89-03 and Design Review 88-62 to
authorize modification to the roof equipment screen
landscape planter and building materials for a 48,000
square foot office building located at 15101 Red Hill
Avenue, subject to the following conditions:
·
Condition No. 1.1 of Exhibit A of Planning
Commission Resolution No. 2567 approving
Conditional Use Permit 89-03 and Design Review 88-
62 shall be modified to allow alterations to the
previously approved site development plans to
replace the rounded mechanical equipment screen
with a square equipment screen, replace a split
level raised planter with a single level raised
planter, and replace the ceramic building tiles
with brick veneer as identified on Attachment I
attached hereto and incorporated herein by
reference.
·
Ail original conditions of approval contained
within Exhibit A of Planning Commission Resolution
No. 2567 shall remain in effect, except as modified
herein.
·
The property owner shall sign and return an
Agreement to Conditions Imposed form as established
by the Community Development Department prior to
issuance of any permits.
·
The Planning Commission's approval of the proposed
Use Permit and Design Review amendments is
contingent upon final' approval of Design Review
modifications by the Tustin Redevelopment Agency.
Failure to obtain such approvals will be grounds
for this Resolution to become null and void.
5
6
8
9
10
11
13
14
15
17
18
i9
~0
'~1
~3
~6
~7
C.
Resolution No. 2704
Page 3
·
The applicant shall submit to plan check details
any modification to calculations and specifications
for modification to original building permits,
including any revisions to plans for approval by
the Community Development Department. In checking
said plan, applicant shall pay applicable plan
check fees.
·
The proposed roof screen material color shall be
modified to be more compatible with the brick
veneer color. A final color sample shall be
submitted subject to final approval of the
Community Development Department.
·
The brick veneer grouting shall be a dark color to
· be compatible with the window frames. A final
color sample shall be submitted, subject to
approval of the Community Development Department.
PASSED AND ADOPTED at a regular meeting of the Tustin
Planning Commission, held on the 27th day of November, 1989.
..
~EgLIE PO~TIOUS ,
Chairman
Secretary
STATE OF CALIFORNIA
COUNTY OF ORANGE
CITY OF TUSTIN
I, PENNI FOLEY, the undersigned, hereby certify that I am the Recording
Secretary of the Planning Commission of the City of Tustin, California; that
Resolution No. ~-7~]~/ was duly passed and adopted at a, regular meeting of
the Tustin Planning Commission, held on the~7~-~- day of y6/~K~
198 ¢ . '