HomeMy WebLinkAbout04 ANNUAL ROADWAY REHAB/CITYWIDE SIDEWALK REPAIRAgenda Item 4 fi ` AGENDA REPORT Reviewed: City Manager Finance Director MEETING DATE: APRIL 3, 2012 TO: JEFFREY C. PARKER, CITY MANAGER FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS /CITY ENGINEER SUBJECT: AWARD CONTRACT FOR THE ANNUAL ROADWAY REHABILITATION AND CITYWIDE SIDEWALK REPAIR PROJECT CIP NO. 70001 AND THE RED HILL AVENUE REHABILITATION PROJECT BETWEEN VALENCIA AVENUE AND EDINGER AVENUE CIP NO. 70212, INCORPORATING THE ORANGE COUNTY SANITATION' DISTRICT GISLER —RED HILL SEWER SYSTEM IMPROVEMENTS SUMMARY Staff is requesting that the City Council award a construction contract to the lowest responsive /responsible bidder for the Annual Roadway Rehabilitation and Citywide Sidewalk Repair Project CIP No. 70001 and the Red Hill Avenue Rehabilitation Project between Valencia Avenue and Edinger Avenue CIP No. 70212, which includes the Orange County Sanitation District (OCSD) Gisler —Red Hill Sewer System Improvements. RECOMMENDATION It is recommended that the City Council award a construction contract to the lowest responsive /responsible bidder, R.J. Noble Company, in the amount of $1,599,335.83, for the Annual Roadway Rehabilitation and Citywide Sidewalk Repair Project CIP No. 70001 and the Red Hill Avenue Rehabilitation Project between Valencia Avenue and Edinger Avenue CIP No. 70212, incorporating the Orange County Sanitation District Gisler —Red Hill System Improvements, Reach B, Contract No. 7 -37 and authorize the Mayor and the City Clerk to execute the contract documents on behalf of the City. FISCAL IMPACT Sufficient funds have been budgeted and appropriated in the Fiscal Year 2011 -2012 Capital Improvement Program Budget. CIP No. 70001 is part of the City's on -going Maintenance of Effort (MOE) obligation to maintain eligibility for Renewed Measure M (M2) funding. Work by the City on the OCSD Gisler -Red Hill System Improvements is valued at approximately $46,000 and is subject to reimbursement to the City by the OCSD via Amendment No. 1 to an existing Reimbursement Agreement which was approved by the City Council on February 7, 2012.. DISCUSSION The Annual Roadway Rehabilitation and Citywide Sidewalk Repair CIP No. 70001 for Fiscal Year 2011 -2012 includes repair of sidewalks at various locations throughout the City, as well as asphalt concrete pavement repair, asphalt concrete overlay, slurry sealing, and traffic striping on various streets within Zone 7 of the City's Pavement Management Program. Zone 7 is generally bounded by Edinger Avenue to the north, Tustin Ranch Road to the east, Barranca Parkway/Warner Avenue to the south, and the west city boundary. Within this zone Valencia Avenue will be rehabilitated Annual Roadway Rehabilitation /Sidewalk Repair CIP 70001 Red Hill Ave. Rehabilitation CIP 70212 & OCSD Gisler —Red Hill System Improvements April 3, 2012 Page 2 between Newport Avenue and its terminus at the SR 55 Freeway, including full road reconstruction at an abandoned railroad spur. This year's work also includes localized pavement repairs and slurry sealing on Main Street from Newport Avenue to the SR -55 Freeway; bridge deck repairs on the Jamboree Road overcrossing of Edinger Avenue; minor pavement repairs and slurry sealing within several City parks; and asphalt overlays of the City Hall and Senior Center parking lots. As with CIP No. 70001, the Red Hill Avenue Rehabilitation Project between Valencia Avenue and Edinger Avenue CIP No. 70212 consists of asphalt concrete pavement repairs, slurry sealing, concrete curb and sidewalk repairs, and traffic striping. Due to the proximity and similar nature of work, the Red Hill Avenue project was bid concurrently with CIP No. 70001. In order to minimize traffic impacts on Red Hill Avenue that would otherwise result from two separate projects, work on CIP No. 70212 includes rehabilitation of six sewer manholes as shown on plans for the OCSD Gisler —Red Hill System, Reach B, Contract No. 7 -37. The plans and specifications for this project were prepared by the OCSD and were incorporated into the City's bid package. Formal bids were publicly opened on March 20, 2012 and reviewed by Public Works. Six (6) bids were received and are summarized below by order of least dollar amount: • R.J. Noble Company $ 1,599,335.83 • Hardy & Harper, Inc. $ 1,616,000.00 • Sequel Contractors, Inc. $ 1,620,189.50 • All American Asphalt $ 1,641,640.60 • Palp, Inc., dba Excel Paving Company $ 1,706,947.00 • Silvia Construction, Inc. $ 1,898,799.20 Staff has reviewed the references and the State Contractor's License for R.J. Noble Company and has determined that they are appropriate for the subject project. It is recommended that the City Council award the construction contract to the lowest responsive /responsible bidder, R.J. Noble Company, for the Annual Roadway Rehabilitation and Citywide Sidewalk Repair Project CIP No. 70001 and the Red Hill Avenue Rehabilitation Project between Valencia Avenue and Edinger Avenue CIP No. 70212, incorporating the OCSD Gisler — Red Hill Sewer System Improvements, Reach B, Contract No. 7 -37 and authorize the Mayor and the City Clerk to execute the contract documents on behalf of the City. Stack, P.E. Public Works /City Engineer Attachment: Location Maps S: \City Council Itemst2012 Council Items\Award of Contract for Roadway Rehab (CIP 70001) & Red Hill Rehab (CIP 70212).docx U) LL O A T Q 0 O z CL U W z O N F- U W O oC CL z O a J m Q 2 W OC a D a O cc J Q z z Q ui 2 CC z U W O M CL Flo U) LL 0 COM, WOR CIA CD F� ci :z CL 5 LU =D m LU cc 0 LU in 2m LU -3 ME LLI LU LU ui z LU LU LU 9= LLI LLI cc CL