Loading...
HomeMy WebLinkAbout07 AWARD CONTRACT FOR TRAFFIC SIGNAL BATTERY BACKUP SYSTEM INSTALLATIONS1TY O GST1 AGENDA REPORT MEETING DATE: APRIL 17, 2012 TO: JEFFREY C. PARKER, CITY MANAGER Agenda Item Reviewed: City Manager Finance Director FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS /CITY ENGINEER SUBJECT: AWARD CONTRACT FOR THE TRAFFIC SIGNAL BATTERY BACKUP SYSTEM INSTALLATIONS — PHASE 1 CIP NO. 40079 AND THE TRAFFIC SIGNAL CONTROLLER EQUIPMENT UPGRADES /REPLACEMENTS — PHASE 1 CIP NO. 40080 SUMMARY Staff is requesting that the City Council award a construction contract to the lowest responsive /responsible bidder for the traffic signal Battery Backup System Installations - Phase 1 CIP No. 40079 and the Controller Equipment Upgrades /Replacements - Phase 1 CIP No. 40080, and appropriate $95,000 from the undesignated / unappropriated reserves of the Measure M2 Fair Share Fund to the projects RECOMMENDATION It is recommended that the City Council: Appropriate $35,000 to the Battery Backup System Installations - Phase 1 CIP No. 40079 and $60,000 to the Traffic Signal Controller Equipment Upgrades /Replacements - Phase 1 CIP No. 40080 from the undesignated /unappropriated reserves of the Measure M2 Fair Share Fund; and 2. Award a construction contract to the lowest responsive /responsible bidder, Sully - Miller Contracting Company, in the amount of $319,317 for the Battery Backup System Installations - Phase 1 CIP No. 40079 and the Traffic Signal Controller Equipment Upgrades /Replacements - Phase 1 CIP No. 40080, and authorize the Mayor and City Clerk to execute the contract documents on behalf of the City. FISCAL IMPACT A total of $295,000 of Measure M2 Fair Share Funds has been budgeted and appropriated in the Fiscal Year 2011 -2012 Capital Improvement Program for the two projects, consisting of $155,000 for the BBS and $140,000 for the TSC upgrades. Although the engineer's construction estimate for the BBS and the TSC upgrades totaled a little more than $269,000, the lowest bid is $319,317, which exceeds the current budget. To fully fund project construction, which includes construction support and contingencies, and to award the construction contract, appropriations from the undesignated /unappropriated Measure M2 Fair Share Fund will need to be allocated in the amount of $35,000 for the BBS and $60,000 for the TSC upgrades, respectively. As of the end of March 2012, the undesignated /unappropriated Measure M2 Fair Share Fund balance is approximately $455,000. With this action, the remaining undesignated /unappropriated Measure M2 Fair Share Fund balance will be approximately $360,000. Battery Backup Installations and Traffic Signal Controller Upgrades April 17, 2012 Page 2 DISCUSSION AND BACKGROUND The installation of Battery Backup Systems (BBS's) at traffic signals is desired in order to maintain safe, normal vehicular operations when planned or unplanned electrical interruptions occur. The program currently shown in the Capital Improvement Program (CIP) includes four phases spread out over four (4) successive fiscal years, thereby ensuring that all city- maintained traffic signals have operational battery backup systems. The project under consideration is the first phase of CIP No. 40079, consisting of eleven (11) traffic signals along Irvine Boulevard from Myford Road to Yorba Street, excluding the signals at Tustin Ranch Road and Prospect Avenue which already have BBS's. It also includes five (5) traffic signals along Tustin Ranch Road from La Colina Drive to Pioneer Way. CIP No. 40080 consists of three phases of upgrades or replacements of existing traffic signal controller equipment spread over three (3) successive fiscal years due to the aging inventory. The current project under consideration is the first phase of CIP No. 40080, and includes replacement of the entire controller cabinet assemblies on Irvine Boulevard at B Street, Fashion Lane, Charloma Drive and Browning Avenue. Also, upgrades to existing controller and detection equipment will be performed on Irvine Boulevard at Myford Road and Red Hill Avenue; at nine intersections along Tustin Ranch Road from Auto Center Drive to Portola Parkway, excluding the new signal at Greenway Drive /Adams Drive; and on Jamboree Road at Patriot Way and Pioneer Road. CIP Nos. 40079 and 40080 were bid together because the work in each project is similar in nature and can be performed more efficiently by the same contractor. Formal bids were publicly opened on April 5, 2012 and reviewed by Public Works staff. Six (6) bids were received and are summarized below by order of least dollar amount: • Sully - Miller Contracting Company ....................... • Republic Intelligent Transportation Services, Inc. • Flatiron Electric Group, Inc ... ............................... • Steiny and Company, Inc .......................... . • Macadee Electrical Construction, Inc .................. • KDC, Inc. DBA Dynalectric ... ............................... ...... .......................$319,317 00 ............................. $324,425.00 ............................. $333,493.00 ......................... $334,777.00 ............................. $348,227.00 ............................. $351,146.00 Staff has reviewed the references and State Contractor's License for Sully - Miller Contracting Company and has determined that they are appropriate for the subject project. It is recommended that the City Council appropriate $95,000 from the undesignated /unappropriated fund balance of the Measure M2 Fair Share Fund to fully fund the projects and award the construction contract to the lowest responsive /responsible bidder, Sully - Miller Contracting Company and authorize the Mayor and City Clerk to execute the contract documents on behalf of the City. Stack, P.E. Public Works /City Engineer Attachment: Location Maps TRAFFIC SIGNAL BATTERY BACKUP SYSTEM CIP NO. 40079 (PHASE 1) LOCATION MAP � Km SIGNAL CABINET ASSEMBLY REPLACEMENTS & SIGNAL EQUIPMENT UPGRADES CIP NO. 40080 (PHASE 1) LOCATION MAP � Km