HomeMy WebLinkAboutPOWERPOINT PRESENTATION - ITEM 1ti
4/17/2012
4/17/2012
Analysis (Summarized)
Long -Term Public Parking Improvement Cost Assumptions
Parking stall is 24 ft. long by 8 ft. (street) or 20 ft. long by 8 ft. wide (parking
lot). The larger (street) totals 192 s.f.
Actual utilization of public street or drive aisles (lot) not included in calculations.
Unit cost of 2 inch cold milling (grinding) asphalt is $0.15 per s.f.
Unit cost of asphalt compacted in place is $90 per ton
Unit cost of slurry seal is $0.25 per s.f.
Unit cost to remove and replace curb is $50 per foot
2 inch grind and asphalt overlay at 21 year intervals
Replace 10% of curb at 21 year intervals
Slurry seal at 7 year intervals
Maintenance Cost Assumptions
Landscape Maintenance is $10.41
Irrigation (water) is $4.17
Tree Trimming is $0.23
Hardscape is $0.26
Sweeping is $5.00
Striping is $3.46 5
That the City Council conduct a public hearing on the
matter, and adopt Resolution No. 12 -27 establishing an
annual parking maintenance fee of $60 per space, as
authorized by Ordinance No. 1416
}'