RESOLUTION NO. 1391
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF TUSTIN RECOMMENDING CERTIFICA-
TION OF THE DRAFT ENVIRONMENTAL IMPACT RE-
PORT, TUSTIN-ORANGE TRUNK SEWER REACHES 10
THROUGH 18.
The Planning Commission of the City of Tustin does
hereby resolve as follows:
1. The Planning Commission finds and determines:
Se
A draft Environmental Impact Report has been
prepared by Boyle Engineering Corporation for
the Orange County Sanitation District No. 7
indicating the proposed impact of an intercep-
tion trunk sewer facility serving the City of
Tustin, the City of Orange and County territory.
be
Said trunk line is part of the master plan of'
trunk sewer facilities for County Sanitation
District No. 7 of Orange County, as approved b~:
the district in February 1974.
®
c ·
In reference to the majority of items required
in an environmental impact report, the draft
is considered to be adequate. ~
The Planning Commission hereby recommends to the
Board of Directors of the Orange County Sanitation
District No. 7, the certification of the Environ-
mental Impact Report for the Tustin-Orange Trunk
Sewer Reaches 10 through 18, subject to the follow-~,
ing additional comments and amendments:
a e
Alignment of sewer a.long Newport Avenue The
E.I.R. states 't~'at the sewer would be located'
along the easterly side of Newport Avenue.
This may create some hardships to the local
businesses. It could be recommended that the.
sewer be located on the westerly side of
Newport if there was not a substructure con-
flict. This would keep the easterly side open
for the local businesses.
be
Constricted traffic movements The report state~
that one 12 foot wide travel lane will be main-
tained in each direction .at all times during
construction. This will create a temporary
problem in certain areas of the project, but it
is unavoidable. This proposed measure is an
acceptable method of maintaining traffic con%
trol.
II
I
C ·
Coordination with future storm drain crossing
and the proposed trunk sewer will be required
so as not to create future grade problems with
either facility.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
30
31
32
de
Phasing and Time Schedule An amendement to
the draft should indicate the latest estimate
of the phasing of the project, with consider-
ation being given for the impact upon Commer-
cial developments if construction is underway
during a holiday sales period and the impact
if open ditching is prevalent during the
rainy season.
e.
Impact Upon Traffic The Police Department of
t--he City of Tustin notes that traffic congestior
can be expected to increase on an already over-
burdened Newport Avenue, which is improved to
less than designed standards, .with probable
increase in accidents.
f.
Growth Impact The section of the draft E.I.R.
related to growth inducing impact is presented
in a mitigating and justifying context. The
report should indicate by numerical count, the..
additional population to be served.
PASSED AND ADOPTED at a regular meeting of the Planning
Commission of the City of Tustin, California, held on the 24th
day of June~ 1974.
COMMiSS IoN CHAIRMAN
PLANNING ~MMISSI~N RECKING SECRETARY
STATE OF CALIFORNIA)
COUNTY OF ORANGE )
CITY OF TUSTIN )°
I, PHAYE B. TAYLOR, the undersigned, hereby certify
that I am the Recording Secretary of the Planning
Commission of the City of Tustin, California;. that
the foregoing Resolution was duly passed and adopted
at a regular meeting of the Planning Commission, held
on th~~~_~day of~~z~, 197_~
r-