HomeMy WebLinkAboutPC RES 1391 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3O 31 32 RESOLUTION NO. 1391 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF TUSTIN RECOMMENDING CERTIFICA- TION OF THE DRAFT ENVIRONMENTAL IMPACT RE- PORT, TUSTIN-ORANGE TRUNK SEWER REACHES 10 THROUGH 18. The Planning Commission of the City of Tustin does hereby resolve as follows: 1. The Planning Commission finds and determines: Se A draft Environmental Impact Report has been prepared by Boyle Engineering Corporation for the Orange County Sanitation District No. 7 indicating the proposed impact of an intercep- tion trunk sewer facility serving the City of Tustin, the City of Orange and County territory. be Said trunk line is part of the master plan of' trunk sewer facilities for County Sanitation District No. 7 of Orange County, as approved b~: the district in February 1974. ® c · In reference to the majority of items required in an environmental impact report, the draft is considered to be adequate. ~ The Planning Commission hereby recommends to the Board of Directors of the Orange County Sanitation District No. 7, the certification of the Environ- mental Impact Report for the Tustin-Orange Trunk Sewer Reaches 10 through 18, subject to the follow-~, ing additional comments and amendments: a e Alignment of sewer a.long Newport Avenue The E.I.R. states 't~'at the sewer would be located' along the easterly side of Newport Avenue. This may create some hardships to the local businesses. It could be recommended that the. sewer be located on the westerly side of Newport if there was not a substructure con- flict. This would keep the easterly side open for the local businesses. be Constricted traffic movements The report state~ that one 12 foot wide travel lane will be main- tained in each direction .at all times during construction. This will create a temporary problem in certain areas of the project, but it is unavoidable. This proposed measure is an acceptable method of maintaining traffic con% trol. II I C · Coordination with future storm drain crossing and the proposed trunk sewer will be required so as not to create future grade problems with either facility. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 30 31 32 de Phasing and Time Schedule An amendement to the draft should indicate the latest estimate of the phasing of the project, with consider- ation being given for the impact upon Commer- cial developments if construction is underway during a holiday sales period and the impact if open ditching is prevalent during the rainy season. e. Impact Upon Traffic The Police Department of t--he City of Tustin notes that traffic congestior can be expected to increase on an already over- burdened Newport Avenue, which is improved to less than designed standards, .with probable increase in accidents. f. Growth Impact The section of the draft E.I.R. related to growth inducing impact is presented in a mitigating and justifying context. The report should indicate by numerical count, the.. additional population to be served. PASSED AND ADOPTED at a regular meeting of the Planning Commission of the City of Tustin, California, held on the 24th day of June~ 1974. COMMiSS IoN CHAIRMAN PLANNING ~MMISSI~N RECKING SECRETARY STATE OF CALIFORNIA) COUNTY OF ORANGE ) CITY OF TUSTIN )° I, PHAYE B. TAYLOR, the undersigned, hereby certify that I am the Recording Secretary of the Planning Commission of the City of Tustin, California;. that the foregoing Resolution was duly passed and adopted at a regular meeting of the Planning Commission, held on th~~~_~day of~~z~, 197_~ r-