HomeMy WebLinkAbout13 RESOLUTION NO. 12-481`�Y O
G, ,�...�.A
���`
OS't�
MEETING DATE:
TO:
FROM:
AGENDA REPORT
JUNE 5, 2012
JEFFREY C. PARKER, CITY MANAGER
Agenda Item
Reviewed:
City Manager
Finance Director
DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
13
,
��
�r.,
SUBJECT: ADOPT RESOLUTION NO. 12-48 TO APPROVE PLANS AND
SPECIFICATIONS AND AUTHORIZE ADVERTISEMENT FOR BIDS FOR THE
CONSTRUCTION OF TUSTIN LEGACY FIRE STATION — RELOCATION OF
STATION #37 (CIP NO. 10048)
SUMMARY
The plans and specifications for construction of the Tustin Legacy Fire Station — Relocation of
Station #37 have been completed and are ready to be bid.
RECOMMENDATION
It is recommended that the City Council adopt Resolution No. 12-48 approving the plans and
specifications for construction of the Tustin Legacy Fire Station — Relocation of Station #37 (CIP
No. 10048), and authorize the City Clerk to advertise to receive bids from the five pre-qualified
general contractors approved by the City Council on October 4, 2011.
FISCAL IMPACT
Sufficient funds have been budgeted and appropriated in the Fiscal Year 2012-2013 Capital
Improvement Program for construction of the Tustin Legacy Fire Station — Relocation of Station
#37 (CIP No. 10048). The engineer's estimate for construction of the Fire Station is $3,894,980.
The project is funded by Community Facilities District 06-01 Funds (434).
DISCUSSION AND BACKGROUND
Construction of the Tustin Legacy Fire Station will replace the existing OCFA Fire Station #37,
which is currently located at 14901 Red Hill Avenue. The new station is to be located on an
undeveloped 1.25-acre parcel owned by the City at 15011 Kensington Park Drive, which is at the
southwest corner of Kensington Park Drive and Edinger Avenue.
The new Fire Station Facility will be an "Essential Services" facility as defined in the State of
California Health and Safety Code and a United States Green Building Council LEED certified
building. The Facility will include a single-story, wood-framed structure of approximately 9,400
square feet with three apparatus bays, office facilities for two companies, and living space for a
crew of eight firefighters.
Site development will include all necessary offsite improvements including curb cuts for driveways,
sidewalk and paving, street restriping, and utility connections. On-site facilities will include parking
areas, walls and fences, landscaping, utility facilities, above ground fuel storage and dispensing
facilities, emergency electrical power generator, building equipment, ancillary and incidental
fixtures, structures, and improvements necessary to provide an operational Fire Station Facility.
Approve P&S for Legacy Fire Station (CIP No. 10048)
June 5, 2012
Page 2
Occupancy of the new Fire Station is tied to the completion of the bridge crossing over Edinger
Avenue. The actual bid timing will be coordinated with the estimated completion of the Tustin
Ranch Road Roadway Improvements Phase 2 once that project schedule has been submitted and
accepted. _
Stack, P.E.
Public Works/City Engineer
Attachment 1: Resolution No. 12-48
Attachment 2: Location Exhibit
Attachment 3: Pre-Qualifed General Contractors List
S:\Ciry Council Items�2012 Council ItemsWpproval of P&S Legacy Fire Station (CIP 10048).docx
ATTACHMENT 1
Resolution No. 12-48
RESOLUTION NO. 12-48
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA APPROVING PLANS AND SPECIFICATIONS FOR THE
CONSTRUCTION OF THE TUSTIN LEGACY FIRE STATION —
RELOCATION OF STATION #37 (CIP NO. 10048), AND AUTHORIZING
ADVERTISEMENT FOR BIDS
WHEREAS, it is the intention of the City Council of the City of Tustin, California
to contract for construction of the Tustin Legacy Fire Station — Relocation of Station #37
project (CIP No. 10048); and
WHEREAS, the City Engineer has presented plans and specifications for the
construction of said work; and
WHEREAS, on January 16, 2001, the City of Tustin certified the Program Final
Environmental Impact StatemenUEnvironmental Impact Report (FEIS/EIR) for the reuse
and disposal of MCAS Tustin. On April 3, 2006, the City Council adopted Resolution No.
06-43 approving an Addendum to the FEIS/EIR. The proposed project is consistent
with MCAS Tustin Specific Plan and is determined not to result in any new significant
environmental impacts, propose substantial changes or a substantial increase in the
severity of any previously identified significant impacts in the FEIS/EIR and Addendum.
Moreover, no new information of substantial importance has surfaced since certification
of the FEIS/EIR and Addendum; and
WHEREAS, on October 4, 2011, the City of Tustin pre-qualified five general
contractors as eligible to bid this project;
NOW, THEREFORE, BE IT RESOLVED that the plans and specifications
presented by the City Engineer are hereby approved as the plans and specifications for
the construction of:
Tustin Legacy Fire Station — Relocation of Station #37 (CIP No. 10048)
BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and
directed to advertise as required by law for the receipt of sealed bids or proposals from
the five pre-qualified general contractors for the performance of the work specified in the
aforesaid plans and specifications.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Tustin held on the 5th day of June, 2012.
John Nielsen, Mayor
ATTEST:
Pamela Stoker
City Clerk
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
I, Pamela Stoker, City Clerk and ex-officio Clerk of the City Council of the City of Tustin,
California, do hereby certify that the whole number of the members of the City Council is
five; that the above and foregoing Resolution No. 12-48 was duly and regularly passed
and adopted at a regular meeting of the City Council held on the 5th day of June, 2012
by the following vote:
COUNCILMEMBER AYES:
COUNCILMEMBER NOES:
COUNCILMEMBER ABSTAINED:
COUNCILMEMBER ABSENT:
PAMELA STOKER,
City Clerk
ATTACHMENT 2
Location Exhibit
' VICINITY MAP (
L Tustin Legacy Fire Station
Relocation of Station f 37 ��
•
i t t�,� (C No. 10048)
iii I PrLc
.. - .it
.. , , ,..,
,,h, Ex: , . -orl
L1*V Pel4A100k4 41#
I,
/ TUBTN LEGACY
` . • NO SCALE
PROJECT LOCATION 0%
15011 Kennington Park Drive ? F9%` ,
,R♦ ditkie,
��
a oi
IA
MM
3
E: aV-1oo4ad ` x 7" ,F(4
ATTACHMENT 3
Pre-Qualified General Contractors
For
Construction of Tustin Legacy Fire Station #37
PRE-QUALIFIED GENERAL CONTRACTORS
FOR
CONSTRUCTION OF TUSTIN LEGACY FIRE STATION #37
October 4, 2011
1. AMG & Associates
26470 Ruether Avenue, #108
Santa Clarita, CA 91350
2. Bayley Construction
3730 S. Susan Street, Suite 200
Santa Ana, CA 92704
3. Erickson-Hall Construction Company
500 Corporate Drive
Escondido, CA 92029-1517
4. Jaynes Corporation of California
1112 Elm Street, 4th Floor
San Diego, CA 92101
5. Swinerton Builders
17731 Mitchell North, Suite 200
Irvine, CA 92614