HomeMy WebLinkAboutPOWERPOINT PRESENTATION - LANDSCAPE AND LIGHTING DISTRICTPublic Hearing
June 5., 2012
• District was formed on July 15, 1985 in
accordance with the Landscaping & Lighting
Act of 1972.
• Current number of parcels in the District is
5.1704.
• In 1997, the District conducted a Proposition
218 ballot proceeding where the assessment
methodology was approved by property
owners within the District.
The District funds various items within the
Tustin Ranch area:
Parkway, Trail & Slope Landscaping
• Arterial and Collector Street Lighting
• Local Residential Street Lighting
• 760 lights total in District
Tustin Landscape and Lighting District
Benefit Area A
W
Benefit Area B
Benefit Area C
7
`.1
BENEFIT AREAS
Arterial and
Collector
Lighting (ACLT)
Parkway, Slope,
and Trail
Landscaping
(PSTL)
Local
Residential
Street Lighting
(LRLT)
The table below summarizes the assessment amounts per Equivalent Dwelling Unit
(EDU) for each Benefit Area:
$11.39 / EDU
$100.79 / EDU
$8.29 / EDU
$64.89 / EDU
$103.01 / EDU
Proposed FY 2012-13 Budget =
Proposed District Assessments =
Estimated Balance Transfer from
RAD 95-1 Construction Fund =
$726.1700
$520.1674
$206.1026
• Maintenance of improvements that provide
general benefit cannot be funded by the District
assessment.
• Arterial street lighting and slopes along the
eastside of Jamboree Road provide general
benefit.
• Removing the maintenance cost for these areas
decreases the total assessments for the District
by $80,025.
• The cost to maintain these general benefit areas
will be funded by the RAD 95-1 Construction
Fund.
Conduct a public hearing concerning proposed
levy of annual assessments.
Adopt resolution confirming fiscal year 2012-
2013 annual assessments.
Tustin Landscape and Lighting District
fill &I I to