HomeMy WebLinkAboutRDA MINUTES 1982 06 07 MINUTES OF A REGULAR MEETING
OF THE REDEVELOPMENT AGENCY OF
· THE CITY OF TUSTIN, CALIFORNIA
JUne 7, 1982
1. CALL. TO ORDER
The meeting was called to order by Chairman Edgar at 3:17 p.m. in the City
Council Chambers, 300 Centennial Way, Tustin, California.
~ 2o ROLL CALL
Agency Members Present: Edgar, Greinke, Hoesterey, Kennedy, Saltarelli
Agency Members Absent: None
Others Present: James G. Rourke, City Attorney
William A. Huston, Exec. Director/City Manager
Mary E. Wynn, Recording Secretary/City Clerk
Mike Brotemarkle, Comm. Dev. Director
Bob Ledendecker, Director of Public Works
Ronald Nault, Finance Director
Roy Gonzales, Personnel Director
Royleen White, CommUnity Services Director
Approximately 10 in the audience
3. APPROVAL OF MINUTES
It was moved by Hoesterey, seconded by Kennedy, to approve the minutes of
May 17, 1982. Carried 5-0.
4. REQUEST FOR TRAFFIC SIGNAL AT MAIN AND "B" STREETS
Bob Ledendecker, City Engineer, reported that this intersection missed
meeting the warrant requirements by 75% and he recommended that no action
be taken.
CoUncilwoman Kennedy reported that she had spent some time on Main Street
and was alarmed at the travel speeds and she requested enforcement by the
Police Department. Mayor Edgar pointed out that staff has recommended in
the past that the 25 mph limit be changed to 35 mph so that radar could be
used.
It was moved by Saltarelli, seconded by Hoesterey, that no action be taken
at this time and that another traffic survey be taken when construction at
that corner is completed. Carried 5-0. 94
5. RESOLUTION NO. RDA 82-4 - A Resolution of the Tustin Redevelopment Agency
of the City of Tustin, California, APPROVING PLANS AND SPECIFICATIONS FOR
EL CAMIN0 REAL/MAIN STREET IMPROVEMB~TS AND DIRECTING THE CITY CLERK TO
ADVERTISE FOR BIDS
The City Engineer reported that the number of parking spaces are staying
the same and that there are no areas projecting out into the street. The
plans will be complete in a few days and construction should be completed
in mid November. He introduced Mr. Fisher, the consultant.
Mr. Fisher, consultant, explained that the landscape improvements consist
of paving (brick look alike) texture that will have a slight coarseness
but would not prohibit pushing strollers. There will be planting at the
bus stops with benches, newspaper racks and bicycle racks. The Pine trees
atthe south end of the project will be replaced with flowering trees. The
F~cu~ree~!lw~ll~be pruned ashweLl-asjputting inlaba=rier ~totrootsbreak-
ing the sidewalk. We will put iron tree gates around the tree:! wells.
There will be general upgrading to the landscaping but not as much as in
the first plans submitted. Most of the concrete paving will be replaced
and any drainage problems will be addressed.
CoUncilman Greinke reported that the Historical Society has asked for a
bench in front of their establishment to draw attention to their office.
It was moved by Kennedy, seconded by Greinke, to adopt Resolution No. RDA
82-4.
REDEVELOPMENT AGENCY MINUTES
Page 2, 6-7-82
In response to Councilman Hoesterey's desire to see the final proposal,
Mr. Ledendecker suggested that he could bring a set of plans that would be
98% complete to the evening meeting.
Councilwoman Kennedy withdrew her motion and moved, seconded b~'Greinke,
to continue this item to the 7:30 p.m. meeting. Carried 5-0. 95
6. AGENCY C0NCERNS
MR. GREINKE'S STATUS ON THE REDEVELOPMENT AGENCY
Mr. Greinke asked the City Attorney to explain his position on the
Redevelopment Agency.
Attorney Rourke explained that Mr. Greinke did not want to be in a
position Where he-could notacquire-.prdperty in the Redevelopment Agency
areas. As long as the City Council has, by majority action, established
itself as the body of the Redevelopment Agency, Mr. Greinke is
automatically a member. The only other alternative would be for the
Council to appoint residents of the City as the governing board, none of
whom could be Councilpersons. In the case of Mr. Schuster, when he was a
Councilperson, he understood that he could not acquire any property in the
Redevelopment Agency. He already owned property in the Redevelopment
Agency and he chose to not participate, even though he was a member~ Mr.
Greinke could choose to not participate.
Mr. Greinke stated that he would serve on the Redevelopment Agency as a
participating member. 81
7. ADJOURNMENT - It was moved b~ Kennedy, seconded by Boesterey, to adjourn
to the 7:30 p.m. meeting of the Redevelopment Agency.
Carried 5-0.
MINUTES OF A REGULAR MEETING
OF THE REDEVELOPMENT AGENCY OF
THE CITY OF TUSTIN, CALIFORNIA
JUne 7, 1982
7:30 p.m.
1 · CALL TO ORDER
The meeting was called to order by-Chairman Edgar at 8:46.p.m., in the City
Council Chambers, 300 Centennial Way, Tustin, California.
2. R0LL CALL
Agency Members present: Edgar, Greinke, Hoesterey, Kennedy
Agency:Members Absent: Saltare~li
Others Present: James G. Rourke, City Attorney
William A. Huston, Exec. Director/City Manager
Mary E. Wynn, Recording Secretary/City Clerk
Mike Brotemarkle, Comm. Dev. Director
Bob Ledendecker, Director of Public Works
Ronald Nault, Finance Director
Charles Thayer, Chief of Police
Approximately 10 in the audience
AGENDA ORDER
5. CONTINUED FROM AFTERNOON MEETING
RESOLUTION NO. RDA 82-4 - A Resolution of the Tustin, Redevelopment Agency
of the City of Tustin, California, APPROVING pLANS AND SPECIFICATIONS FOR
EL CAMINO REAL/MAIN STREET IMPROVEMENTS AND DIRECTING THE CITY CLERK TO
ADVERTISE FOR BIDS
A Recess was declared at 8:07 p.m. to review plans.
The Redevelopmerit Agency reconvened at 8:21 p.m.
It Was .mowed by Greinke, seconded by Eoesterey(, tO.,OdRBt_,~9lution No.
RDA 82-4-
REDEVELOPMENT AGENCY MINUTES
Page 3, 6-7-82
Mr. Hoesterey requested that the motion be amended that the Redevelopment
Agency review the type of trees that would go in at the North and South
ends of E1 Camino Real.
The motion was amended by Greinke, seconded by Hoesterey, to adopt Res~
lution No. RDA 82-4 and that the Redevelopment Agency would review the
type of trees that go in at the North and South ends of E1 Camino Real.
Carried ~0, Saltarelli absent. 95
3. ADJOURNMENT - It was moved by Hoesterey, seconded by Greink~, to adjourn
to a Workshop to review status of South/Central Redevelop
ment Project Area and to the next regular meeting on June
21, 1982. Carried 4-0, Saltarelli absent.