DATE: JUNE 5, 2000
Inter-Com
TO'
FROM'
SUBJECT:
WILLIAM A. HUSTON, CITY MANAGER
PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION
TO ADVERTISE FOR BIDS - IRVINE BOULEVARD REHABILITATION
BETWEEN THE SR-55 FREEWAY AND PROSPECT AVENUE (CIP NO.
7160) AND PROSPECT AVENUE RECONSTRUCTION BETWEEN FIRST
STREET AND IRVINE BOULEVARD (CIP NO. 7161)
ISUMMARY
This project will provide for the pavement rehabilitation of irvine Boulevard between the SR-55
Freeway and Prospect Avenue, and the pavement reconstruction of Prospect Avenue between
First Street and Irvine Boulevard.
RECOMMENDATION
It is recommended that the City Council adopt Resolution.No. 00-41 approving the plans and
specifications for the Irvine Boulevard Rehabilitation between the SR-55 Freeway and Prospect
Avenue (CIP No. 7160) and Prospect Avenue Reconstruction between First Street and Irvine
Boulevard (CIP No. 7161), and authorizing and directing the City Clerk to advertise for bids.
FISCAL IMPACT
The engineer's construction estimate is $430,000 for Irvine Boulevard and $280,000 for Prospect
Avenue. The City's Capital Improvement Program budget for FY 1999-2000 provides sufficient
funds for Irvine Boulevard, however, a request for an additional $100,000 in funding as part of the
FY 2000-2001 Capital Improvement Program is required to cover the construction costs for
Prospect Avenue.
The City was successful in securing grant funding for this project from the Orange County
Transportation Authority (OCTA) Combined Transportation Funding Program (CTFP) through the
Arterial Highway Rehabilitation Program (AHRP). The AHRP provides up to 50% reimbursement
for eligible construction items through the Federal Local Surface Transportation Program (LSTP),
which is administered by Caltrans. The City received Authorization to Proceed to the construction
phase from Caltrans on May 19, 2000.
BACKGROUND
The Irvine Boulevard Rehabilitation Project will provide for the removal and replacement of
damaged asphalt concrete pavement, repair of existing curb and gutter, construction of an
asphalt concrete surface course, and replacement of the traffic striping. The Prospect Avenue
Reconstruction Project will provide for the total reconstruction of the asphalt concrete
pavement, replacement of damaged curb and gutter, and replacement of the traffic striping.
Approval of Plans and Specifications and Authorization to Advertise for Bids - Irvine Boulevard
Rehabilitation between the SR-55 Freeway and Prospect Avenue (CIP No. 7160) and Prospect
Avenue Reconstruction between First Street and Irvine Boulevard (CIP No. 7161)
June 5, 2000
Page 2
The tentative schedule for this project is as follows:
Authorization to advertise for bids ......................................................... 6/5/00
First Legal Advertisement .................................................................... 6/16/00
Second Legal Advertisement ....................................... : ....................... 6/23/00
Bid Opening ......................................................................................... 7/12/00
Award of Contract .................................................................................. 8/7/00
Commence Construction ....................................................................... 9/5/00
Complete Construction ....................................................................... 11/22/00
Director of Public Works/City Engineer
)Jer~/~Otteson
Assistant Civil Engineer
TDS:JO:ccg:Advertise bids Irvin~Prospect & Reso #00-41 .doc
A~achments
~5
27
RESOLUTION NO. 00-41
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA APPROVING PLANS AND SPECIFICATIONS FOR IRVINE
BOULEVARD REHABILITATION BETWEEN THE SR-55 FREEWAY AND
PROSPECT AVENUE (CIP NO. 7160) AND PROSPECT AVENUE
RECONSTRUCTION BETWEEN FIRST STREET AND IRVINE
BOULEVARD (ClP NO. 7161)
WHEREAS, it is the intention of the City Council of the City of Tustin, California to
contract for the rehabilitation of Irvine Boulevard between the SR-55 Freeway and
Prospect Avenue and the reconstruction of Prospect Avenue between First Street
and Irvine Boulevard; and
WHEREAS, the City Engineer presented plans and specifications for the
construction of said work; and
NOW, THEREFORE, BE IT RESOLVED that the plans and specifications
presented by the City Engineer be, and are hereby approved, as the plans and
specifications for:
Irvine Boulevard Rehabilitation between the SR-55 Freeway and
Prospect Avenue (CIP No. 7160) and Prospect Avenue Reconstruction
between First Street and Irvine Boulevard (CIP No. 7161)
AND BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and
directed to advertise as required by law for the receipt of sealed bids or proposals for
the performance of the work specified in the plans and specifications;
AND BE IT FURTHER RESOLVED that these projects are categorically exempt
from the requirements of the California Environmental Quality Act; Class I Section
15301' Existing Facilities, and is categorically excluded per the National Environmental
Policy Act, 23 CFR 771.117;
·
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
th
Tustin held on the 5 day of June 2000.
Jeffrey M. Thomas, Mayor