HomeMy WebLinkAbout06 ANN'L MJR MAINT 11-20-00 ',/~,;~ NO. 06 AGENDA R' 0RT ooo TO: FROM: SUBJECT: WILLIAM A. HUSTON, CITY MANAGER PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE FOR BIDS FOR THE ANNUAL MAJOR MAINTENANCE PROJECT, FY 2000-2001 (C.I.P. No. 7001) SUMMARY This project will repair and resurface or slurry seal various streets throughout the City, as well as in portions of unincorporated Orange County and the City of Santa Ana, where jurisdictional boundaries fall within the street paving limits. This work is being performed as part of the City's on-going Maintenance of Effort (MOE) requirements to maintain eligibility for Measure M funding. This project implements the current phase of the Citywide Pavement Management System (PMS). RECOMMENDATION It is recommended that the City Council adopt Resolution No. 00-78, approving the plans and specifications for the Annual Major Maintenance Project FY 2000-2001 and authorizing and directing the City Clerk to advertise for bids. FISCAL IMPACT The FY 2000-2001 Capital Improvement Project (CIP) budget provides sufficient funding for all of the various components in the Annual Major Maintenance Project, including design, construction and contract administration. This project is part of the City's on-going Maintenance of Effort (MOE) requirements to maintain eligibility for Measure M funding. Reimbursements from the County of Orange and the City of Santa Ana will reduce project costs by approximately $48,000. BACKGROUND The FY 2000-2001 Major Maintenance Project consists of asphalt concrete repair/overlay, crack routing and sealing, slurry seal, traffic striping and markings,, and replacement of traffic Iccp detectors at various locations throughout the City. These streets lie predominantly within Zone 4 of the City's Pavement Management System (PMS), which is the current phase of the maintenance cycle. Zone 4 is bounded by Irvine Boulevard and the northerly City limits, Red Hill Avenue, I-5 Santa Ana Freeway, and the westerly City Limits. Attached is a map showing streets within the program in black. Due to pavement failure, the alley between Newport Avenue and Orange Street, just south of San Juan Street will be reconstructed as part of this year's program. Approval of Plans and Specifications and Authorization to Advertise for Bids for the Annual Major Maintenance Project, FY 2000-2001 (CIP No. 7001) November 20, 2000 Page 2 Portions of Browning Avenue, Holt Avenue, Warren Avenue and Wass Street lie within the unincorporated area of the County of Orange. The County has committed to financial participation in the project, through reimbursements, in proportion to the area of improvements within their jurisdiction. The estimated reimbursement amount for the County is $24,000, but will be determined based on actual costs. The City of Santa Ana's participation was also requested for work on portions of McFadden Avenue and Red Hill Avenue that lie within the City of Santa Ana. Despite several requests, a commitment has not yet been provided. The estimated reimbursement amount for Santa Ana is $24,000, but will be determined based on actual costs. Tustin will continue to pursue a commitment of participation from Santa Ana. However, if a letter of commitment is not signed by the time of bid award, the No. 2 eastbound lane in McFadden Avenue, from the west City Limits to SR 55, and the No. 3 and part of the No. 2 southbound lanes in Red Hill Avenue from Warner Avenue to Barranca Parkway will have to be excluded from this project. The Engineer's construction contract estimate for the subject project is $487,000.00 The tentative schedule for this project is as follows: Authorization to advertise for bids ............................................................ 11/20/00 First Legal Advertisement ........................................................................... 12/1/00 Second Legal Advertisement ...................................................................... 12/8/00 Bid Opening .................................................................................................. 1/9/01 Award of Contract ......................................................................................... 2/5/01 Start Construction ........................................... : ........................................... 3/12/01 Complete Construction ............................................................................... 5/10/01 Tim D. Serlet Director of Public Works/City Engineer Keith Linker Associate Civil Engineer Attachment: Resolution No. 00-78 Location Exhibit !3 i6 15 i9 20 2! 26 2g RESOLUTION NO. 00-78 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA APPROVING PLANS AND SPECIFICATIONS FOR THE ANNUAL MAJOR MAINTENANCE PROJECT, FY 2000-2001, AND AUTHORIZING ADVERTISEMENT FOR BIDS (ClP No. 7001) WHEREAS, it is the intention of the City Council of the City of Tustin, California to contract for the construction of the Annual Major Maintenance Project, FY 2000- 2001; and WHEREAS, the City Engineer has presented plans and specifications for the construction of said work; NOW, THEREFORE, BE IT RESOLVED that the plans and specifications presented by the City Engineer are hereby approved as the plans and specifications for; Annual Major Maintenance Project, FY 2000-2001, (ClP No. 7001) BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to advertise as required by law for the receipt and sealed bids or proposals for the doing of the work specified in the aforesaid plans and specifications; BE IT FURTHER RESOLVED that this.project is categorically exempt from the requirements of the California Environmental Quality Act; Class I' Existing Facilities. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held On the 20t'h day of November, 2000. Jeffery M. Thomas, Mayor ATTEST: City Clerk · ~ II NOIHS¥-I '~ "I¥1NN31N33