HomeMy WebLinkAbout12 2000 UPDT RPT 11-01-99A(j NUA
DATE:
NOVEMBER 1, 1999
TO:
FROM:
SUBJECT:
WILLIAM A. HUSTON, CITY MANAGER
FINANCE AND COMMUNITY DEVELOPMENT DEPARTMENTS
YEAR 2000 PLAN UPDATE REPORT-OCTOBER
Summary: City staff is continuing to work on addressing potential Y2K problems
and equipment compliance. Monthly status reports are presented to the City
Council summarizing new information, equipment changes and Y2K compliance
progress.
RECOMMENDATION
That the City Council receive and file this report.
FISCAL IMPACT
Approximately $110,000 has been expended to date on Y2K upgrades to the
Police Department software/hardware, access control system, emergency
generator audit/repairs and the Water Operations supervisory control and data
acquisition system. Additional fiscal impacts to implement Y2K compliance and
equipment for the City of Tustin continue to be undetermined at this time.
BACKGROUND AND DISCUSSION
At the April 5, 1999 City Council meeting, staff submitted a report to the Council
identifying Y2K planning activities and actions that have taken place during the
past year. Staff indicated that monthly status reports would be provided beginning
in July 1999. The following are key updates and completed tasks for the month of
October 1999:
CRITICAL CITY FACILITIES/COMPONENTS
Emergency Generator Test. The Public Works Department is still negotiating with
Southern California Edison to conduct an Electrical System Audit for the Corporate
Yard. Once the audit is completed the system and the generator will be tested.
Water Operations. The Supervisory Control and Data Acquisition (SCADA)
system contract has been awarded to Shasta Electric, Inc. The factory acceptance
test of all system components is still in process. Field Installation will begin the first
week of November and should be completed by the end of November. Field
testing and training will occur during December and the project should be
City Council Report
Year 2000 Plan Upd~,,~
November 1, 1999
Page 2
completed by the end of the year. The project is currently 50 'percent complete.
Public Buildings. The Public Works Department is continuing to work with several
contractors who will test the fire alarm systems at the Senior Center, Tustin Family
& Youth Center, Columbus-Tustin Gymnasium, Field Services Maintenance Yard
and the Water Operations buildings. System replacement will be installed, if
needed.
City Hall Building Access The Access Control system bids have been received
and are continuing to be evaluated. The existing system was tested and failed
when rolled over to 2000.
Computer Systems. The City's Management Information System consultant is.
continuing security upgrades for all computers. Updates will be installed as other
vendors release them.
Police Department Software The department's Dictaphone "Prolog" computer
system, Centrex system and MSOffice software has been upgraded and is now
Y2K compliant. The department is waiting for release of the California Highway
Patrol's accident reconstruction software (CSTARS) which is anticipated for
November. Tustin may host the local training session on the software for all
Orange County law enforcement
ORANGE COUNTY EMERGENCY MANAGEMENT ORGANIZATION
At the Orange County Emergency Management Organization meeting on
October 7, 1999, Southern California Gas Company, Southern California Edison
and Air Touch Cellular made presentations on their Y2K readiness. The following
is a brief synopsis of their presentations:
Southern California Gas Company. As of 6/30/99 all mission critical
energy delivery systems are Y2K ready. Their Emergency
Operations Center (EOC) will be activated and staffed on 12/31/99
through 1/1/2000, with additional employees at their key facilities
and other additional staff on-call. The public may obtain additional
information at their web site, www.socalgas.com.
Southern California Edison. As of 7/1/99 they are 100% Y2K ready
for. all mission critical issues. Edison will have 500 additional
people on- staff on 12/31/99. They have pre-ordered additional
repaidreplacement supplies and have agreements with additional
vendors for supplies, in addition to the vendors they currently use
for supplies.
City Council Report
Year 2000 Plan Update
November 1, 1999
Page 3
Air Touch Cellular. As of 7/1/99 they are 100% Y2K ready for all
mission critical issues. This could be a very critical issue for the
City either for Y2K or any emergency as they have the SERT
(Significant Event Response Team) program, based in their Irvine
office. Anytime the City needs additional cell phones, or
communication equipment to send/receive, cell phones can be
made available. Currently Air Touch has pre-staged approximately
50 phones for the American Red Cross, 45 phones for Los Angeles
City Fire and 45-50 phones for Orange County Fire Authority
(OCFA). These phones and assistance can also be made
available, first come first serve basis, to the City of Tustin (free of
charge) for any exercise/event.
ORANGE COUNTY OPERATIONAL AREA CONTINGENCY
PLAN
At the October 6, 1999 City Managers Association meeting, Captain Davis of the
Orange County Sheriffs Office, made a presentation of the. County of Orange
Year 2000 Contingency Plan. The purpose of the Plan is to prepare for and
implement a County/Operational Area Emergency Operations Center response
to the public safety challenges which the County and Operational Area will
potentially face due to the change of the millennium, including social issues
(parties, etc.) and computer problems. In summary, the Contingency Plan Action
covers Planning/Operational Periods, Response,. Recovery/Monitoring, General
Planning assumptions, Staffing Plans, Activation Protocol/Triggers,
Communications Plan, Critical Issues/Sites and Emergency Contact Information.
Appendixed to the Plan is a comprehensive listing of all Orange County cities law
enforcement staffing levels and special celebration events planned for the
millennium. A copy of the October 1999 draft Plan is included as Exhibit A.
COUNTY OF ORANGE YEAR 2000 REPORT
As part .of their on-going contingency planning and rePOrting, the County Executive
Office presented a Year 2000 report to the Board of SupervisOrs in September.
The report provides details on each County department's/agency Y2K compliance
status and copies of contingency planning reports. In summary, the County states
that all' critical systems will be ready at the millennium. Some minimal level of
disruption may be occur at the county, but no long term service issues are
expected. County staff will be available over the January 1st weekend to respond
to system failures. A copy of this report is available in the Community Development
Department.
City Council Report
Year 2000 Plan Update
November 1, 1999
Page 4
ORANGE COUNTY FIRE AUTHORITY
The Orange County Fire Authority (OCFA) has transmitted a copy of the
Authority's Y2K Planning and Preparedness Plan to all Orange County City
Managers. The Plan contains a number of components including a Public
Information Plan, Internal System Review, Contingency Plan, Recovery Plan and
Business Interruption Contingency Plan. OCFA has evaluated their systems and
preparedness efforts and is confident that essential systems are Y2K compliant
and that the Authority is capable of responding to unknown contingencies. The
Y2K Planning and Preparedness Plan will continue to be updated and revised as
new information is obtained. A copy of the OCFA Y2K Planning and Preparedness
Plan is attached as Exhibit B.
The Orange County Fire Authority (OCFA) provides mOnthly Year 2000 Plan
updates to the Executive Committee. During October the Authority continued to
test their fire engines and trucks for Y2K readiness. Testing will be complete by
mid November. OCFA's e-mail system and Microsoft Exchange Server was
upgraded for Y2K compliance. The contract for OCFA's Incident Reporting
/Emergency Medical/Training Records systems has been awarded and the initial
release of the new system was installed in October. Training for OCFA personnel
is scheduled to start mid 'November. A copy of the October 28, 1999 Fire Authority
Year 2000 Plan Update Report is attached as Exhibit C.
~" Ronald/A'. Nault
Finan, c'e Director
'Elizabeth A. Bins-ack
Community Development Director
Exhibits:
A -- Year 2000 (Y2K) Contingency Plan -Orange County Operational
Area
B --OCFA Y2K Planning & Preparedness Plan
C --October 28, 1999 Fire Authority Report
RW/year 2000plan October update
EXHIBIT A
Year 2000 (Y2K)
Continge.ncy
Plan
Orange County
Operational Area.
October/1999 Draft
OPERATIONS SCHEDULE
Operations Period: 0600 Friday 12-3'1-99 to 1800 Monday 1-3-00
F_dday 12-31 -
--
0600hrs-Department and County Emergency Operations Center opens at Level
One for monitoring purposes
0600hrs-AII Operations Commands go .to full staffing
0600hrs-Ail Corrections/Custody Facilities go to full staffing
1700hrs. Transportation Bureau supplemental staff assembles for briefing
(5 Deputy il in 1 Command Post;1Bus;lVan)
1700hrs. Fieid Booking Team assembles at Intake/Release Center for briefing
1700hrs. Operations Mutual Aid Platoon reports for briefing
2 squads report to South Operations(1Lt,2Sgt, 14 Depll)
2 squads report to North Operations(1Lt,2Sgt, 14Depll)
1800hrs_Emergency Operations Center increases to Level Two
1800hrs.Transportation Bureau staff ready for deployment
1800hrs_Field Booking Team ready for deployment
1800hrs_Mutual Aid Platoon ready for .deployment
1800hrs. On Call Platoon begins on-call status
Saturday 1-1
--
0000hrs-Ail Operations Commands remain at full staffing
0000hfs-Ail Corrections/Custody facilities remain at full staffing
0600hfs-Emergency Operations center returns to monitoring Level One
0600hrs-Transportati°n Bureau staff ends tour of duty
0600hfs-Mutual Aid Platoon ends tour of duty
0600hfs-Field Booking Team ends tour of duty
Orange County Sheriff, s Department
Y2K Contingency Plan
Operations & Deployment Schedule
October 4, 1999
0
0
I
,, ,,
0 0 0 0
~~1 zz z z
o, o-~ gl oo ,-
iai!
>- Zl Z >- >.-~ >.-,~ >-
0 0
· .~ ..~c = ,--
Z >-;Z Z >-,>- ~~ 1~
0 0 O: c-; 0
Z >.-~Z Z Z Z ::D Z
'o ~o o
§§g§ §,§ :o "",- o ":
Z Z >- Z (.) Z Z :D A ::D'
~ ~ o
, ,
ILl
>-
>- >-
>-,
980
FROM:
COL,.. Fy OF LOS ANGELES
SHERIFF'S DEPARTMENT
~~~,AUL E MYRON
~ UNDER~HERiFF
..O ~,C= CORRESPONDENCE
__
TO:
~ATE July 8, 1999
- FiLE NO.
ALL CHIEFS AND DIRECTORS
SUBJECT:
DEPARTMENT STAFFING FOR NEW YEAR 2000
-.
The New Year 2000 Holiday has the potential to impact the operational aspect of
law enforcement throughout the County. Therefore, to afford the Departmentwith
the maximum of Field Operations personnel from Friday, December 31, 1999,
through Monday, January 3, 2000, the following will be in effect. '
Field Operation's Regions I, Ii and II1
All regular days off (RDOs) for civilian, and sworn personnel (line,
administrative and special assignment positions), will be canceled.
The use ofvariance time (vacation, deferred holiday, etc.), during the
indicated period will not be allowed, unless approved prior to July 1
1999. ,
Civilian and sworn staffing models (8 hour model and 12/12 hour
model) will be prepared by each Station, indicating the Station's
internal and field deployment. C°pies of the separate models are to
be delivered to Region Headquarters and the Emergency Operations
Bureau on September 1, 1999.
Model for Station's 8 hour shift coverage (EM/Day/PM).
Provide in-service sheets with positions to be staffed
identified.
PrOvide the number of personnel which remain
unassigned after determining the 8 hour required
coverage of Station's inside and field positions.
County of Los Angeles
Y2K Contingency Plan
Law Enforcement Staffing
Updated October 04, 1999
el el ee ee ee el
· -,- ~ : ,-,
"~: -~ >,~0 ~ > p ~
.~- o ~ ~
o ~ o
~ z: ~-i ~- z >- z
~ o o o o o o
>' Z iZ Z Z Z Z
~ o o
I
~"','=: :::) z ~z zl
__, ~31
-- 0 C:: 0
'- o.-o o I---o
m '=-~ =
C: tdi ~l ---
N
~8__. ~ o =
= o~~ =-o
_,-i == ~o~,- .-o~ o~
-=o ~~ o Z~
~ Z ~ ~ ~ ~ Z Z~ ~,0 Z
· -- 0 m --, m ~ ~ 0
Law Enforcement Staffing
Y2K
Contact Numbers
LAPD
LASO
Long Beach
Pdverside SO
SDSO
SBSO
Oceanside PD
C_...ontact
Alternate Contact
Sgt. Mike Tut'de
Phone Number
(909) 38%0662
Law Enforcement Staffing
Y2K
Contact Numbers
A~encv
Anaheim
Brea
Buena Park
Costa Mesa
Cypress
Fountain Valley
Fullerton
Garden Grove
Huntington Beach
Irvine
La Habra
La Palma
Laguna Beach
Los Alamitos
NeWPort Beach
Orange
Plaeentia
Santa Aaa
Seal Beach
Tustin
Westminster
CHP
UCI Police
CSUF Police
O.C. Marshal
OC Sheriff
Dana Poim
Laguna Hills
Laguna Niguel
Laguna Woods
Lake Forest
Mission Viejo
San Clemente
San Juan Cap.
Stanton
Villa Park
Uniecorp. South
County Areas
Contact
Alternate Contact
Lt. Ray Welch / Inv. Mike D'Anna
Capt. Chester Panique
Capt. Gary I-Iicken / Raymundo Mejia
Capt. Jim Watson / Lt. Carl Schuler
Lt. Mike Idom / Denise Davis
Capt. Bob Mosley
Capt. Al Burks
Capt. John Baker
Lt. Dan Johnson / Lt. Lloyd Edwards
Lt. Mike White / Lt. Pat Rogers
Lt. S. Costanzo
Capt. SeffKirkpatriek/Capt. Ed Ethel
Lt. Dwight Henninger
Cassady Frye
Lt. Andy Oonis / Lt. John Desmond
Capt. Bob Gustafson / Lt. Jim Hudson
Capt. Chuck Babcock
Lt. Provence / Suzette Caddell
Capt, $ohn Schaefer
Lt. Joe Garcia / Lt. Mike Shanahan
Capt. Larry Woessner / Lt. Mitch Waller
Sgt. Jim Feick
Chief Kathy Hooven
Chief Judy King
Capt. Steve Harding
Capt. Pete Gannon / Capt. Joe Davis
Lt. Paul Ratchford
Lt. Rex Hatch
Lt. Linda Spreine
Lt. Hector Rivera
Lt. Mike James
Lt. Stan Jacquot
Lt. Fred Lisanfl
Lt. Rick Stahr
Capt. Bob Eason
Capt. Pete Gannon
Lt. Hector Rivera
Phone Numbe,'
(714) 765-1891 /765-1433
(714) 990-7748
(714) 562-3917 / 562-3923
(714) 754-4879 / 754-5384
(714) 229-6628 / 229-6625
(714) 5934452
(714) 738-6839
(714) 741-5867
(714) 960-8800 / 536-5661
(949) 724-7106 / 724-7154
(562) 905-9777
(714) 5234552 x 107 / x 106
(949) 49%0387
(562) 431-2255 x 410
(949) 6<d 3660 / 644-3730
(714) 744-7456 / 744-7468
(714) 993-8168
(714) 245-8050 / 245-8650
(562) 799-4160
(714) 573-3217 / 573-3255
(714) 898-3315 x 409 /x 331
(949) 4874000
(949) 824-7797'
(714) 278-2900
(714) 569-3773
(714) 647-1851/628-7194
(949) 248-3550
(949) 70%2645
(949) 3624310
(949) 425-1819
(949) 461-3541
(949) 470-3065
(949) 361-8230
(949) 443-6371
(714) 373-8835
(714) 64%1851
(949) 425-1819
County of'Orange
Y2K ContingenCy Plan
Law Enforcement Staffing
Updated October 04, 1999
Draft--- Draft--- Draft
XI.
Appendix:
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
A: Emergency Alert System (EAS) Messages
B: Phone Machine Scripts for Countv/OA EOC Responders
C: SONGS Yellow Phone Test
D: Pre-scripted Public Information Hotline Messages
E: Protocol for Operational Area Y2K Response
F: World Time Chart
G: "Follow the Sun"
H: Action Plan - Predate Planning Period
I: Appendix K: Action Plan- Response Period
J: Action Plan- Recovery Period
K: EOC Organization Chart
L: EOC Y2K Staffing Plan
M: Y2K EOC Responder Instructions
N: Estimated Costs Staffing the OA/EOC
O:
P:
Q:
R:
S:
T:
U:
V:
W: Hospital Status
X: Board of Supervisors Sample Declaration
Y:
Z: Others
Jurisdiction Proposed Activation Level
County Department Operations Centers Proposed Activation Level
Other OA's Proposed Activation Level
Jurisdiction Critical Site Locations
Jurisdiction Large Gathering Locations
Jurisdiction Contingency Plan Summary
Hazardous Materials
XII. Annex:
Annex 1: Y2K City Survey Sample
Annex 2: Y2K School District Survey Sample
Annex 3: Y2K Special District Survey Sample
Annex 4: Y2K WEROC Survey Sample
Annex 5: County Department Y2K Survey Sample
Annex 6: Y2K Business Survey Sample
Annex 7: State Y2K Survey
Annex 8:
Annex 9: RIMS Forms
Annex 10: OCEMO Phone Book
Annex 11: Utility Contacts
Annex 11: Other/TBA/TBD
a) Law staffing plans
A:\Year 2000 CONTINGENCY PLAN.doc Page 6 of 6 10/04/99
Vino
xe
Draft--- Draft--- Draft
B,
Activation Triggers to Expand Countv/OA EOC staffin~
1. Widespread power failure.
2. Widespread communications failure.
3. Request by county department or OA member.
4. Request by Mutual Aid Coordinator. -
5. State OES request to support stat.wide response.
Initial Communications Plan
1. Emergency contact for County departments and OA members will be to the EOC Liaison.
2. In loss of phone and fax communications, emergency contact for cities and school districts
will be through Operational Area radio (OA1 and OA 2). Water dis'tricts will'use the
WEROC radio for emergency contact to the Operational Area.
3. Operational Area radio use will be restricted to emergency traffic only between 2400 and
0100 on 1/1/2000. A radio roll call will be conducted at 0030 1/1/2000.
4. In loss of communications, the EAS .system will be used to notify staff to respond to the
County/OA or other EOCs and make other public announcements. The current Operational
Area EAS plan will be used. Pre-scripted EAS messages for use on 12/31/99 - 1/1/2000 are
listed in Appendix A.
5. The SONGS Yellow Phone test will take place. See Appendix C for details.
6. Pre-scripted messages for the public information hotline will be utilized. See Appendix D for
details.
7. Information will be transmitted Using e-mail only after direct phone contact has been made
with the Liaison/Situation Analysis Staff.
8. Current Regional Information Management' System (RIMS) forms will be used for
information transmission. See Annex 9 for sample forms.
Critical Issues and Critical Sites
A.
B.
C.
D.
E.
Inventory of large gathering and party locations is listed in Appendix T.
Inventory of Hazardous Materials is listed in Appendix V.
Inventory of Y2K non-ready sites is listed in Appendix Z.
Hospital status is listed in Appendix W.
Others areas as appropriate and needed are listed in Appendix Z.
Co'
Emergency Contact Information
A. The OCEMO Phone book is to be used for communication contact information. See'
Annex 10.
B. The normal county emergency contact information for County Departments will be
used.
Emergency contact information for Utilities is listed in is listed in Annex 11.
Other Contacts including the Media is listed in Annex 12.
Emergency Declaration
The Board of Supervisors may declare an emergency on behalf of the County and/or the entire
Operational Area. See declaration sample in Appendix X.
A:\Year 2000 CONTINGENCY PLAN.doc Page 5 of 6 10/04/99
Bo
C.
Draft--- Draft --- Draft
Jurisdictions
Jurisdiction's proposed activation level for 12/31/99-1/1J2000.
All jurisdictions Will be asked to provide information on their EOC activation,
level of staffing and emergency contact numbers. All jurisdictions are requested
to call the EOC Liaison upon activation. They will also be requested to notify the
EOC Liaison if they are deactivating before the Operational Area Radio briefing
at 0100 hours on 1/1/2000.
The reported intentions of Jurisdictions to activate their EOC or to monitor the
situation on 12/31/99- 1/1/2000 is listed in Appendix P.
County Departments
All Departments will be asked to provide information on their DOC activation, level of
staffing, and emergency contact numbers. This information is listed in Appendix Q. All
Departments are requested to call the EOC Liaison upon activation and when they
deactivate.
Do
Eo
Other Operational Areas
The reported intention of neighboring Operational Areas is listed in Appendix R.
State and Federal
The Regional Emergency Operation Center (REOC), State Operations Center (SOC) and
the Federal Emergency Management Agency (FEMA) EOC's will be activated. The
county/OA EOC will contact the REOC upon activation and deactivation.
Vie
Activation Protocol and Activation Triggers
A. Activation protocol
1. The County/OA EOC will be activated to a Level One with six staff from 0700 hours to
1900 hours on 12/31/99. The balance of the A shift staff will remain on call on 12/31/99
7 am -7pm and will report only if notified (they are also on call to respond 1/1/2000 on 7
am - 7pm). Expanded activation will be considered dependent upon the situation and
determined by the Director of Emergency Services/Operational Area Coordinat°r
(DES/OAC).
2. At 1530 hours on 12/31/99 the EOC Manager will consult with the DES/OAC to.
determine if the County/OA EOC staffing should be expanded based on worldwide
intelligence.
3. County staff will be instructed to call the EOC answering system between 1700 and
1900 hours to receive mobilization instructions.
4.' If an emergency warrants, the County/OA EOC activation may be expanded before this
time by call out, or in case of communications failure by EAS message.
5. At 1900 hours, a shift change will be conducted with potential expansion of the EOC
activation to a Level 2A or beyond.
6. At 2100 hours, continued expansion of the EOC activation will be determined in
consultation with the DES/OAC based on East Coast intelligence.
7. At 0300 hours, the DES/OAC will determine the necessity of continued staffing of the
EOC beyond 1/1/2000 at 0700.
8. County staff will be instructed to call the EOC answering system between 0500 and
0600 to receive mobilization instructions.
A:\Year 2000 CONTINGENCY PLAN.doc Page 4 of 6 10/04/99
Draft--- Draft--- Draft
go
General Planning Assumptions
Planning assumptions are.defined as a statement which is considered valid and which provides
the basis for planning actions, such as development of planning scenarios. For example, one of
the common Y2K planning assumptions is that ':SEMS shall be-used in emergency responses."
1. The impact of Y2K will be global.
2. The 9-1-1 and local dispatch systems may have failures and/or may become congested dUe
to multiple simultaneous events.
3. Mutual Aid may be overwhelmed.locally and regionally.
4. Intense media coverage may escalate anxiety, increasing physical and mental health
problems.
5. Disruptions may occur in fuel supply and allocation due to disruptions in the supply chain
and panic buying.
6. Consequences may extend beyond the initial millennium change December 31, 1999-
January 1, 2000.
7. Telecommunications may be impacted.
8. International travel and shipping may be impeded.
9. Smart goods movement systems may be at risk (movement of goods and freight).
10. There may be delays in domestic and international air traffic.
11. There is a potential for disruption or contamination of water systems and disruption of waste
water systems.
12. An increased number of Hazardous Materials incidents may occur.
13. Some equipment necessary for emergency response may fail.
14. Public transit systems may be at risk.
15. There will be expanded social issues creating challenges for police and fire departments due
to millennium/New Year's celebrations including drunk driving, traffic congestion, large
gatherings and fireworks.
16. Other issues such as storm/fire season, flu season, and millennium babies may impact
emergency response capabilities. _
Staffing Plans and Organization Charts
A. County/OA EOC Status
1. Activation levels
The County/OA EOC has three main' levels of activation. Level One includes six
staff to monitor the situation. Level Two includes four progressive levels of
activation dependent upon the circumstances. Level Three includes all EOC
staff, as well as activation of the policy group. See EOC Organization Chart in
.
.3.
County/OA EOC staffing will be pre-determined
County staff will be assigned to shifts on teams that reflect levels 1, 2a, 2b, 2c,
2d and 3. Staff will be instructed to call in to an answering system to determine
whether they are to respond. For the staffing plan by agency, by activation level,
or by shift see the EOC Y2K Staffing Plan in Appendix L.
Phone machine scripts for County/OA EOC responders are listed in Appendix B.
A:\Year 2000 CONTINGENCY PLAN.doc Page 3 of 6 I 0/04499
Draft--- Draft--- Draft
YEAR 2000 CONTINGENCY PLAN
COUNTY OF ORANGE/ORANGE COUNTY OPERATIONAL AREA
RESPONSE TO THE Y2K/MILLENI~ CHALLENGE
Purpose
To prepare for and implement a County/Operational Area Emergency Operations Center
(County/OA EOC) response to the public safety challenges which the County and Operational
Area will potentially face due to the change of the millennium, including social issues (parties,
etc.) and computer problems.
ff.
Concept of Operations
The County/Operational Area will use SEMS in planning, response and recovery. The focus of
the planning and initial response will be public safety services. The joint planning conducted by
members will facilitate a response. Each jurisdiction will determine the appropriate level of
staging and activation for their situation, and the County/OA EOC will prepare to support the
response. Due to the multiple issues which may face all jurisdictions, mutual aid both within
the Operational Area and from the Region may be. limited, necessitating extensive coordination,
cooperation and communication. Although this is a pre-planned response, upon responding to
their respective EOCs, all staff will be directed to review the action plan, resource lists, maps
with potential areas of concern, etc. and to ensure all emergency contact numbers are available.
Action Planning and Operational Periods
A. Pre- Date planning Operational Periods-
These periods focus on situation analysis in assessing potential problems and resources
and in preparation including testing of equipment, training, exercises and public
education. The purpose of these operational periods is to prepare to respond: See
Action Plan in Appendix H.
.
Operational Period 1- Identification, Mitigation and Preparation - April 1999 to
September 9, 1999.
Operational Period 2- Develop Detailed Plans and Monitor - September 9, 1999
to December 31, 1999, 0700 hours.
B.
Response I and Response II
The Contingency Plan for'this period includes intelligence gathering, briefings,
communications systems checks and response as appropriate. See Action Plan in
Appendix I.
1. Operational Period 3- Response 1- December 31, 1999, 0700 hours to January 1,
2000, 0700 hours.
2. Operational Period 4- Response 2 - January l, 2000, 0700 hours to January 3, 2000,
1800 hours.
Co
Recovery and Monitoring Operational Periods-
These periods anticipate ongoing response, demobilization, recovery and ongoing
monitoring. See Action Plan in Appendix J.
1. Operational Period 5-' Recovery - January 3, 2000, 1800 hours to February 1,
2000.
2. Operational Period 6- Monitor - February 1, 2000 to January 1, 2001.
A:\Year 2000 CONTINGENCY PLAN.doc Page 2 of 6 10/04/99
Draft--- Draft --- Draft
YEAR 2000 CONTINGENCY PLAN
Table of Contents
I. Purpose
II. Concept of Operations
III. Action Planning and Operational Periods
IV. General Planning Assumptions
V. Staffing Plans and Organization Charts
VI. Activation Protocol and Activation Triggers
VII. Initial Communications Plan
VIII. Critical Issues and Critical Sites
IX. Emergency Contact Information
X. Emergency Declaration
XI. ApPendix:
XII. Annex:
A:\Year 2000 CONTINGENCY PLAN.doc
Page I of 6
10/04/99
0600hrs-On Call Platoon ends on-call status
_Sunday 1-2
--
0000hrs-Ali Operations Commands remain at full staffing-
0000hrs-Aii Corrections/Custody facilities remain at full staffing
__Monday 1-3
--
1800hrs_Aii Operations Commands resume normal staffing
1800hrs-All Corrections/Custody facilities resume normal staffing
1800hrs_Emergency Operations Center stands down from Level One
EXHIBIT B
Year 2000 Preparedness & Planning
Executive Summary
The contents of this binder represent OCFA's Year 2000 (Y2K) preparedness and
planning efforts. The intent' of OCFA's Y2K preparedness and planning efforts, is to
review, assess, plan and correct any potential business interruptions, service impacts and
our ability to respond to fire, rescue and medical emergencies resulting from potential
Y2K impacts.
The following basic planning assumptions were used in preparing this document. These
planning assumptions also represent common assumptions amongst all Y2K planning
activities by both public and private entities. These planning assumptions include:
· The impact potential is global.
· The 9-1-1 and local dispatch systems may have failures and/or may become
overwhelmed due to multiple simultaneous events and/or volume of calls.
Mutual Aid may be overwhelmed locally and regionally.
Intense media coverage may escalate anxiety, increasing physical and mental health
problems.
Disruptions may occur in fuel supply and allocation due to disruptions in supply and
consumer panic buying.
Consequences may extend beyond the period of December 31, 1999 through January
1, 2000.
Utilities (water, electric, sanitation) may be impacted locally and regionally.
Disruptions in goods and services may be disrupted due to distribution method
disruptions.
There may be demands Placed on fire and police departments due to millennium/New
Year's celebrations such as large events, fireworks, drunk driving, traffic congestion,
etc.
OCFA planning efforts have considered these assumptions and others to address both
known internal and external potential Y2K interruptions and its potential OCFA
organizational impact. Currently OCFA is in the final process of completing software
modifications, replacements, and testing of it's internal/external services, equipment, and
the assessment and evaluation of major external events that could potentially create a
situation that would impact our ability to provide fire protection services.
This preparedness and planning binder is divided into eight separate sections, beginning
with this first section, Executive Summary, followed by 8 sections which describe the
level of OCFA preparedness and planning in response to potential Y2K interruptions.
The second section describes our Public Information Plan to cover both public and
internal communications. As we get closer to the yeai' 2000, ongoing communication will
be required to address public concerns associated with potential Y2K interruptions as
well as internal communication with OCFA members on internal business interruptions,
and.on Y2K individual and family preparedness.
The third section, External Influences Overview, attempts to assess external influences
that could have Y2K implications. Surveys were distributed to ail Orange County Cities
by, OCFA, the Orange County Cities Emergency Management Organization (OCCEMO)
and the County of Orange Emergency Management. These surveys generally concluded
the following:
· The County and the cities of Dana Point, San Clemente and Villa Park are planning to
activate their EOC's.
· There is ongoing preparedness discussion and planning being condUcted by the
county and cities that are similar to OCFA planning efforts.
· There is a general believe that most "known" Y2K issues with either public or private
entities are being addressed.
· There are a few millennium events that are currently scheduled, however as we get
closer to the new year additional large events may be planned.
The fourth section, Internal Systems Review, provides a detailed and very comprehensive
review of all of OCFA's information systems, telecommunications, networks, and any
other electronic based system or equipment susceptible to Y2K disruptions. The matrices
in this section comprehensively identifies ail of the Systems reviewed tested and
corrected.
The fifth section, Operations Contingency Plan, specifically describes the Operations
Department plan, policies, staffing, incident levels and procedures that will be
implemented in response to potential Y2K disruptions. This plan also identifies key
functional service areas, area of impacts, preventative measures and contingencies
associated with each function. This plan will ensure that continued emergency services
can be provided and or mitigated regardless of the Y2K disruption.
The sixth section, Recovery Team & Plan, establishes a list of OCFA Recovery Team
members. Members were selected from key organizational functions that would be
essential in responding to any business disruption. The recovery team primary objective
would be to assist in restoring any Y2K disruption that could affect business or support
services in providing fire suppression, rescue and emergency medical services. In
addition, the key business continuation objectives include:
· Assess extent and level of business disruption.
· As a priority, mitigate/correct all business interruptions associated directly with fire
suppression, rescue, and emergency medical operations.
· Ensure that all financial business systems are operational.
· Ensure ongoing communication with all OCF.~ members, particularly information
with respect to Y2K impacts affecting their respective worksites.
· Ensure that ali OCFA facilities are safe from any potential hazards.
· Provide method of communication to OCFA family members on Y2K impacts and
OCFA involvement.
The seventh section, Business Interruptions Contingency Plan, identifies essential and
critical business systems, and operations necessary to support and maintain fire
suppression, rescue and emergency medical services as well as ensure that all other
OCFA business functions have minimal to no business interruptions to both our external
and internal customers.
The eight section, Reference Information, contains reference material associated with this
preparedness and planning of this document.
RECOMMENDATIONS
OCFA has made a comprehensive review of all-internal systems and potential Y2K
disruptions and has made an external review of all potential external impacts. At this time
there are continued reports and information from local, state and national governments,
and major business entities expressing confidence in their ability to be Y2K compliant
and at this time do not foresee any major Y2K business disruptions. While there will be
continued review and monitoring of potential Y2K disruptions, the following
recommendations are made to ensure ongoing focus, review and preparedness. Some of
these recommendations may already be a matter of routine, however, the
recommendations are made for purposes of bringing focus to Y2K and the potential
impacts. Additionally, it should be noted that as continued monitoring and review
continues through January 1, 2000, additional recommendations will be made as
necessary.
Organizational Preoaredness
· Approve OCFA Y2K Plan and provide ail Section/Division Managers copies of the
Y2K preparedness plan. Direct that each review with their staff and become familiar
with the plan, and identify any issues not covered. Direct that each determine their
key business operations that could potentially be impacted and determine contingency
plan. Additionally, each should establish a level of available staff support necessary
for their key business operations and be able to contact staff as necessary.
Direct Public Information Office to provide Y2K preparedness information to OCFA
members on individual and family preparedness beginning in October through
December 1999.
· Direct that all vehicles and apparatus top off fuel tanks prior to December
All Y2K business disruptions, facility, system failures should be reported to Duty
Officer during after hours/weekends during the period of December 31, 1999 and the
first business day in January 2000.
Staffing
· Recovery Team Members identified will all be accessible and able to respond during
the time period of December 31, 1999 and the first business day in January 2000.
Direct that all Section/Division Managers update their staff lists to ensure correct
home address, home telephones, pagers etc. Also to assess level of staff that will be in
the area during December 31, 1999 and the first business day in January 2000 and
establish staff recall procedure.
Facilities
· Direct that all Stations and fuel locations to order and top off fuel during December
before the 31 st.
Direct that all Stations and Sections to review supplies and equipment inventory and
plan to have sufficient essential supplies for a period of 72 hours.
All emergency generators should be tested monthly and all generator fuel tanks
should be topped offbY December 31, 1999.
This binder represents a thorough review of the OCFA's Y2K preparedness and planning.
As such there may exist some "unknowns" that could potentially occur at significant
calendar days. However, this preparedness and planning binder represents a review and
assessment of known potential impacts. The project team assembled to put this document
together will continue to revise and assess the OCFA's Y2K preparedness and planning
efforts on through January 1, 2000. Updates and revisions will continue to be forwarded
to all recipients of this document.
Y2K COMMUNICATIONS PLAN
DRAFT
Purpose
O' 99
To develop an organizational communication plan focused on delivering "key messa,es
regarding Y2K preparations.
Messages should be consistent and reinforce the importance of preparedness covering a
broad spectrum of disasters which could disrupt services both internally to OCFA
employees and the community at large.
Both internal and external sources for dissemination of information should be identified
for purposes of releasing accurate information. Reinforce "Be prepared, Not scared"
Internal:
E-Mail
· Chiefs Message; periodic updates
· Establishment of an "internal OCFA Hotline" for employee specific Y2K updates
External:
· Print Media; establish contact with local reporters specializing in covering technology
issues
· Electronic Media; arrange for interviews, both local cable access and Radio stations
· Arrange for periodic Press briefings; monitor community reaction, offset any negative
perception by providing FACTS!!.
To date, PIO has conducted several interviews with the press regarding Y2K..Recently
in a joint cooperative effort, PIO worked closely with the Sheriffs Department on a
"Y2K" TVprogram. Additional, there are several articles that are in progress with both
the Register and LA Times regarding OCFA preparedness.
All external' communications should be coordinated through a designated spokesperson,
Public Information Officer. This assures that information will be honest and accurate
more importantly request by the press will be handled in a timely fashion.
Y2K EXTERNAL INFLUENCES
RESPONSE AND CONTINGENCY PLAN - Y2K SCENARIOS
COUNTIES:
FUNCTION /
SERVICES
Orange County
Los Angeles County
San Diego County
San Bemardino County
Y2K POTENTIAL
RESPONSE
CONTINGENCY
PLAN
· EOC Activated to
LEVEL I
12-31-99 7:00 p.m. -
1-1-00 7:00 a.m.
Yes
Y2K EXTERNAL INFLUENCES
RESPONSE AND CONTINGENCY PLAN - Y2K SCENARIOS
UTILITIES:
FUNCTION /
SERVICES
Y2K POTENTIAL
RESPONSE
CONTINGENCY
PLAN
Y2K EXTERNAL INFLUENCES
RESPONSE AND CONTINGENCY PLAN - Y2K SCENARIOS
Orange County
Cities:
CITIES
Anaheim
Brea
Buena Park *
Costa Mesa
Cypress *
Dana Point *
Fountain Valley
Fullerton
Garden Grove
Huntington Beach
Irvine *
Y2K .POTENTIAL
A ctiv ities/Ev e nts
· Disneyland
· Major Hotels
· Fireworks
· Local Bowling
Y2K CONTINGENCY
EOC Activation
LEVEL 2
12-31-99
8:00 p.m. - 8:00 a.m.
· No
Alley Annual Party
· No
RESPONSE
PLAN
· No
CITIES
La Habra
La Palina
Laguna Beach
Laguna Hills *
Laguna Niguel *
Laguna Woods *
Lake Forest *
I~os Alamitos *
Mission Viejo *
Newport Beach
Orange
Placentia *
San Clemente *
Y2K POTENTIAL
Activities/Events
THE BLOCK
5,000 - 10,000
Individuals Party
· Pier Bowl Area
10,000 - 20,000 people
· Fireworks
RESPONSE
EOC Activation
Y2K CONTINGENCY
PLAN
· No
· No
· No
· Yes
· Yes/No
· Yes
· Yes
LEVEL I
12-31-99
2:00 p.m.- 2:00 a.m.
· No
CITIES
San Juan Capistrano *
Santa Ana
Seal Beach *
Stanton *
Tustin *
Villa Park *
Westminster *
Yorba Linda *
Note: * Indicates
OCFA Member
Y2K POTENTIAL
Activities/Events
· Community Center
Party
1,000 People
· Firewor 'ks
Villa Park Shopping
Center
500 People
RESPONSE
EOC Activation
LEVEL I
12-31-99 9:00 p.m. -
1-1-00 2:00 p.m.
Y2K CONTINGENCY
PLAN
No
· No
Orange County Fire Authority
Year 2000 Plan
Updated 9/I 0/99
Purpos.e.
To ensure OCFA Information Systems, Telecommunications, Networks, and any other electronic based
systems and/or equipment is able to function properly in the year 2000.
Goal/Objective
To establish a plan to identi~-y and implement modi/~cations and/or replacements where appropriate to
all systems and equipment within the organization that can be Or may be alk~ected by the change to the
year 2000. To establish a focal point for all internal and external questions and requests for i~orma-
tion. To provide a centraJJzed library of identi~ed systems, activities, statuses, testing, and formal writ-
ten responses ikom vendors for review and audit purposes.
Background
The year 2000 issue involves systems and electronics that use calendar dates within their software.
When application sof~ware first began to be written in the 1960s, dates were represented numerically
that did not include the century (ex. April 1, 1966 became 040166). Consequentl.v, computers may
misinterpret 010100 (January 1, 2000) for January 1, 1900, which will cause problems in mathematical
calcu~tions. This problem will m~niCest itself in several ways. It can cause incorrect financial calcula-
tions tn be performed in determining such things as interest, late payments, amounts due, etc. Also ac-
tivities that rely on forecasting and/or scheduling events based upon a calendar day m~y have a prob-
lem. (ex. 010100 would be interpreted as a Monday in 1900, but in the year 2000 it is really a Satur-
day). The year 2000 is also a leap year, which some systems may not account for and cause problems
in February. One last issue as it relates to systems and dates is that even in 1999 there might be a
problem with dates being interpreted as 9999 which some software recog~i~.es as "end of data file" and
si~ls the computer to permanently close flies for that day. (ex. April 9, 1999 is the 99t~ day of 1999
and September 9, 1999 both may be interpreted as 9999).
Scope
· Establish an overall year 2000 plan, a department focal point, and responsible individuals, within
each section for project management.
· Identify ali potential internal systems and/or equipment that may be affected.
· Deter~i~e any external systems that affect OCFA or are affected by OCF.~_
· Estimate and allocate any funa~ug that may be necessary in mo~g, upgraa~ug, replacing,
and/or elim~uating any system or piece of equipment.
· Prioritize the systems and equipment which are core or critical to the business operation of OCFA
or public served.
· Create a contingency plan and/or impact analysis in case planned activities c~nuot be implemented
prior to January 1, 2000.
· Identify solutions/alternatives needed to ensure systems and equipment are year 2000 compliant.
· Schedule and beg~in implementation plans for all known required changes in the 1998/99 fmcal year
and plan funding/[or rem~ug systems in the 1999/00 budget year.
· Develop and implement a specially-ed testing plan.
· Provide reg~dar updates and monitor implementation and testing plans.
· Continue to research for any potential systems or equipment, which has not been identffSed.
..... ~urrent Activities
Orange County Fire Authority
Year 2000 Plan
Page 2
Obt-~ined complL~uce
Obtained compliance
99
· Tested OCFA's Radio
· Obtained compliance
· Obt~i-ed compliance
· Obtained compliance
· Obtained compliance
· Obt-~ed compliance
·
Completed Tasks
· Year 2000 Manager (focal point) identified and Major Milestone and Timeline established
· Senior and Middle Management advised on planning, responsibility, and current activity
· Created centralized documentation and vendor confirmation library
· Prioritization of critical and core business systems affected
· Seg-mentation of areas of responsibility and identified responsible individuals - Sept 1998
· 911 Computer Aided Dispatch (CAD) system completed and tested - March 1998
· CAD Mobile Data Terminals (MI)T) - March 1998 (not tested)
· Motorola Pagers completed and tested - July 1998
· Defibrillator equipment completed for day-to-day operation - Feb. 1998, and gathering software is
scheduled for upgrade in mid-1999)
· Finance Accounting Recording System (FARS) completed - Prior to 1998
(Timekeeping, FSLA Payroll, Fire Suppression St~fl~ug Interfaces to Banner, Credit Unions, etc.)
· Automotive Fleet Management System - July 1998
· OCFA Telephone system Northern Telecom SL1 PBX - Prior to June 1998
· 911 GTE Telephone Switch completed - Prior to June 1998
· Fire Alarm Central Fire Stat/on Monitoring System - Prior to June 1998
· Treasury System (PC) provided by Union Bank for Treasury Mgmt. - October 1998
· 3~ Party Evaluation of OCFA's Y2K Plato - October 1998
· 3~ Party Evaluation of Computer Room Equipment and DEC/Compaq Software - November 1998
· Integrated Fire Prevention System (IFP) - November 9, 1998
· OC Grand Jury Commendation of OCFA's effective & proactive Y2K Plans & Actions - Nov. 1998
· Monthly status/updates to OCFA Board Agendas - Began November 1998
· Evaluated all service and equipment contracts to ensure multiple alternatives are available - Dec
98
· Letters sent to OCFA jurisdiction City Managers with OCFA's Y2K plans/status - jan 99
· Update OCFA's Web-Page to include a Y2K section (Pl.., Status, Hints, l.~.]~, etc.) - Jan 99
· Obtained verification on Y2K compliance for Metro-Net Fire Dispatch system - Jan 99
· Outside Risk .Analysis and Insurance carrier evaluation - Jan 99
· Obtained compliance letters from providers of EMS Def[br411ztor Equipment - Jan 99
· Obtained compli~uce letters from 4 out of 5 Ambulance Dispatch Centers - Feb 99
Obtained complizuce letters from En~inefrruck Manufacturers - Feb 99
(Smeal. Pierce, E-One, KNfE, Detroit Diesel Cummins)
Obt~iued compliance letter from PEBSCO - Mar 99
letters from Trust and Tax Processing Services - Mar 99
information from Liebert Corp.(OCFA UPS) emergency power system - Apr
control system - Mar 99
letter from State Controller - Apr 99
letter from Ford Motor Company - Apr 99
letters from manufacturers of OCFA's electronic Gates & Doors - Apr 99
letters from manufacturers of OCFA's HVAC Systems - .Apr 99
letter from State Treasurer - May 99
Obtained- compliance letter from Emergency Ambulance Service, Inc (EAS) - May 99
Sent Y2k Preparedness surveys through the Hazardous Materials Services Section to R.MPP loca-
tions within Orange County - June 99
Orange County Fire Authority
Year 2000 Plan
Page3
Current Activities con't
Completed Tasks con't
· Finance/HR system (Banner) upgrade - July 1999
· All copier machines replaced with new Y2k compliant Xerox models - July 99
· Hazardous Nfaterial Response. Team (HRNIT) equipment evaluation - July 99
· Helicopter equipment evaluation - July 99'
· PIO Office Y2k preparedness survey of all Orange County cities - Aug 99
· GTE and Pacbell 911 PlAnt Equipment/Software & NL~RS upgrades - Aug 99
· Accounts Receivable "AR" system (Prophecy) migration to the Finance/HR Banner - Aug 99
· Orange County Federal Credit Union - Aug 99
· Orange County Employee Retirement System - Aug 99
Work In-prog'ress
· Upgrade of the back-up system for Finance/I-II~ system (BAnner) is scheduled for Sept 1999.
· Orange County Fire Incident Reporting System (OCFIRS) - targeted for 11/99
· PC replacements (Gateway Pentium II PCs) that are certified as NSTL Year 2000 Compliant.
Gateway PCs are tested with both NTSL's (¥MARI(2000) soi~ware and Microsoft's M. ille-nium Test
soft, are. (Replacements: Headquarters-I/31/99, Career Stations;4/30/99, Reserve Stations 10/1/99).
· Alarm Company Dispatch computer system evaluation
· Fire Apparatus evaluation and testing
· Special Fire Operations equipment evaluation ( USR, SWI~, and TR)
· Continued identi~cation of any additional internal and external potential systems and/or equip-
merit
· Testing of integrated and/or'embedded systems
· Receipt of letters from vendors con~rming Y2K compliance - ongoing
· Development of a general overall OCFA contingency plan and recovery team
· Participation in County Y2k contingency planning
Additional Scheduled Milestones
· Orange County Fire Incident Reporting System (OCFIRS) - targeted for 11/99
· OCFA Training Records System (TRS) - targeted for 12/99
· Fixed Asset System - To be eliminAted/incorporated to the Finance/HR BAnner system
· Replacement of the Motorola radio Network Control Program (NCP) system - targeted for 2-3/00
Detail Information & Charts
· Detail charts have been developed and are used as work in progress to identify, isolate, and moni-
tor upgrade and/or replacement progress, see attached.
· Letters from vendors and suppliers are on file in the Information Systems Office
Summary
OCFA does not believe that the year 2000 will pose a major threat to its computer systems or the serv-
ices it provides to the citizens of Orange County. OCFA has already taken steps to ensure that our
core and critical systems will be year 2000 compliant in early 1999, and we are in the process of identi-
lying and resolving issues surrounding all of our non-critical systems and equipment.
Efforts will be made throughout the remniuiug months to continue research, identification, and resolu-
tion of any potential internal and/or external system or equipment that potentially will be affected by
the year 2000 and may impact or have direct in~uence on OCFA's systems.
'
: , o ,~- ! ~ ,~= - -
', ,5" ~
'~ 'B' 'B' m ~ ~2 ~ m ~ m ~ ~" E' ~ ~' r-
-- ,_ --..,
.., _ _ .o .~ ,~ _- 4 ~'i -
__ = , --. -- '1.
> i . ~c~ '~ -
'"' ~ '5' '--5' 5'
-~ ~ '" 5' := ; ; i--~ =- _ ..~
= :co O I~ '~ ,Ci O '~ 0
~ 0 ; i ~ ~ i D] C) ;~ c~ . _.
,- = i I , .= =. - '
, I I I ~
i_= _ -- _ =C lmm
i I
.
, , j
~ ~ [ i~ ~ ~- ,, _ -_
' -- = I = -'~0- : -
ORANGE COUNTY FIRE AUTHORITY
OPERATIONS Y2K CONTINGENCY PLAN
TABLE OF CONTENTS
(August 23, 1999)
INTRODUCTION 1
BACKGROUND 1
PURPOSE 2
CONCEPT OF OPERATIONS 2
WORSE CASE ASSUMPTIONS 3
IMPACTS & PREVENTATIVE MEASURES 4
OPERATIONS 4
COMMUNICATIONS/ECC 5
COMMUNICATIONS/SUPPORT SERVICES 6 '
DEPARTMENT OPERTION CENTER 6
AIR OPERATIONS 7
SPECIAL STAFFING PLAN 8
OVERVIEW. 8
ASSUMPTIONS 8
PRE-EMERGENCY PREPARATIONS 8
EXISTING RESPONSE PLANS 8
OPERATIONS 9
EMERGENCY PLANNING & COORDINATION 9
EMERGENCY COMMUNICATIONS CENTER 9
SPECIAL OPERATIONS 9
EMERGENCY MEDICAL SERVICES 9
DIVISIONS 10
BATTALIONS 10
STATIONS 10
PERSONNEL 10
DUTY OFFICER GUIDELINES 11
INTENT 11
PROCEDURES 11
INFORMATION/DATA SOURCES 11
EXISTING RESPONSE PLANS 11
PLAN IMPLEMEMNTATIONFrERMINATION CRITERIA 11
CHECKLIST 11
SATFFING LEVELS 13
LEVEL I 13.
LEVEL II 14
LEVEL III 16
LEVEL IV 17
POST INCIDENT ASSESSMENT 18
EQUIPMENT TESTING MATRIX 18
FACILITIES TESTING MATRIX 19
ORANGE COUNTY FIRE AUTHORITY
OPERA. TIONS Y2K CONTINGENCY PLAN
DRAFT
(August 23, 1999)
INTRODUCTION
On January 1, 2000, many computer software programs and embedded microchips that were
pro~amrned to identify the year by its last two digits will inaccurately represent "00" as 1900.
This could cause inaccurate data and computer-reliant systems to malfunction or shut down. The
problem originated with the creation of pro,ams at a time when computer memory was very
expensive. To save on expensive memory, programmers used a two-digit, "00" rather than the
full-four digits, i.e., "2000". Each private industry and local government, as a result, now faces a
problem that touches every computer processing a change of century.
BACKGROUND
The challenge of insuring that Orange County Fire Authority (OCFA)'continues to provide
essential services to the public is unique in that its scope is major and its due date unalterable.
Because of the potential for every one of the OCFA's software and business tools to be at risk of
failure on January 1, 2000, all in-house and vendor software and every computer has been or is
being examined for year-2000 compliance. Every facility, every apparatus, every piece of
equipment has been or is being checked for embedded chips that could be date sensitive and
cause that device to malfunction or shut down. The OCFA has identified all potential risks and
threats to the continuity of its mission, developed actions to mitigate those risks, and is
developing a business continuation plan for action should identified failures occur.
The risk of failure is not limitedto OCFA internal information systems. OCFA depends on data
provided by other emergency service providers, emergency service cooperators, public agencies,
and other businesses. OCFA depends on vendors to deliver telecommunications, fuel, supplies,
and services. Like every organization OCFA depends on services provided by public
infrastructure including, power, water, transportation, law enforcement, voice, and data
communications.
OCFA is not alone in the challenge of maintaining essential business services. Every Federal,
State, and local government agency and every business within the private sector face similar
risks. OCFA's role is critical and it is incumbent that the Fire Authority prepare itself to
continue.to provide services uninterrupted into the year 2000 (Y2K) and beyond.
The Orange County Fire Authority will take a realistic approach to surviving what should be a
simple calendar change. OCFA's approach includes the utilization of existing emergency plans
and procedures such as the Earthquake Handbook and the Civil Unrest Tactical Plan, and the
Incident Command System (ICS) which is regularly employed to manage the affects of natural
large scale disasters such as major forest fires and earthquakes.
PURPOSE
This document is intended to serve as the Operations Department Contingency Plan in response
to possible effects of Y2K. It contains operational policies and procedures that may be
implemented to ensure critical emergency services are maintained. This plan shall be updated as
new or additional information is provided regarding the Y2K situation.
CONCEPT OF OPERATIONS
If all internal and external communications were to become inoperable, the OCFA Earthquake
Handbook provides fire station personnel with the instructions and authority to continue their
response to emergencies in their communities without contact with the command center or
management. OCFA personnel must be trained and ready to meet this challenge, should it occur.
Station personnel and those employees assigned to critical business processes must be prepared
to be self-sufficient for seven to ten days.
OCFA routinely organizes and manages large and complicated emergency incidents by
implementing the Incident Command SyStem (ICS). OCFA will continue to use the ICS coupled
with the OCFA Earthquake Handbook, Civil Unrest Tactical Plan, and other special emergency
standard operating procedures to handle sitUations/emergencies.
In the event that Y2K has a severe impact on the operations of mission critical services, and
based on the ~avity of the situation, 'the Operations Chief or Duty Officer may allocate
appropriate personnel to meet the needs of the Operations Department. This could include
activation of Incident Management Teams (IMT), de-centralized command, mobilization centers,
OCFA Y2K Recover Team, and/or special staffing patterns.
WORSE CASE ASSUMPTIONS
Worse Case Assumptions
The Fire Authority may experience:
Assumption Probability. Duration Consequence(s)
1. 1 Interruptions of commercial power- sites High Short Major
must rely on generator power
2. Increased response activity/"call-load"- High Short Major
OCFA, Area, Region at "draw-down"
3. 1 Interruptions of internal communications Medium / Long Major
(LAN, WAN, intercom, radio, telephone) High
4. 1 Interruptions of external communications Medium / Long Major
(over-load of 911 system & telephones) High
5. Personnel responding to incidents without Medium / Long Major
communications with ECC High
6. Short Major
,
Automatic fire detection, alarm,
extinguishing system malfunctions or
failures
Apparatus, mechanical, other specialized
equipment failures
Shortage of fuel, automotive, other
warehouse supplies
9. Disruption of food supply and distribution
10.
11.
12.
13.
14.
15.
2 Lack of water for fire fighting and
drinking water
2 Sewage treatment failures and resulting
releases of contaminated waste
2 Hazardous materials releases and other
chemical emergency incidents
Medical equipment and device failures -
e.g. pacemakers, defibrillators, etc.
Disruption/shortage of essential emergency
supplies - medical, fire fighting
Personnel may be unavailable or unable to
report to work
Low /
Medium
Low
Medium /
High
Medium
Medium
Medium
High
Low
Low
Low
Medium
Short
Short
Medium
Short
Short
Short
Sho~
Short
Si~ificant
Significant /
Major
Si~ificant
Major
Significant
Minor
Significant
Minor
Information is based on State analysis of the potential situation statewide.
Probability High, Medium, Low
Duration Short/Days; Medium/Weeks; LongAVlonths
Consequences Major, Significant, Minor
1 Do not have the ability to control
2 Out of our control- could vary
IMPACT ,~ND PREVENTATIVE MEASURES FOR WORSE CASE ASSUMPTIONS
I. OPERATIONS
.
o
AREA OF
FUNCTION/
SERVICES
Essential
Administrative
Services
Operations
Stations
ECC
AREA OF IMPACT
1. Operational readiness
2. Employee and public
health and welfare
3. Public and Employee
Safety
4. Utilities:
Electrical
Gas
Water
Waste
5. Telephone
6. Fuel (Mobile Equip.)
PREVENTATIVE
MEASURES
(eRE 2000)
Wide distribution of
plan and train personnel
2. Identify critical facilities
Notify utility of critical
OCFA facility locations
and systems
4. Set up backup
systems(power, bottled
water, propane, phone
systems, cell phones)
when necessarv
5. Top off bulk facilities
6. 14-day supply of water,
fuel, supplies, food, etc.
at each essential facility
7. Assure Y2K systems
compliance and removal
of all non-authorized
programs from
Authority computers
8. Replace, repair, or retire
non-Y2K compliant
systems
9. Provide and evaluate
existing and potential
backup systems
10. Provide and test all
generators
11. Identify alternate
facilities
12. Establish/confirm
contacts/contracts
13. Provide LEO phone
capability to ECC
CONTINGENCY
(POST 1999)
Relocate resources if
necessary
2. COmplete and report
facility, and
equipment test matrix
3. Provide emergency
backup for
wastewater treatment
facilities as needed.
II. COMMUNICATIONS
A. EMERGENCY COMMUNICATIONS CENTER (ECC)
AREA OF
FUNCTION/
SERVICES
1. Emergency Incident
Reporting
· Incoming
· Outgoing
2. Documentation
AREA O F IMPA CT
1. Public's inability to
report emergencies
2. Other incoming
emergency reports
3. 9-1-1 System
4. Inability to
communicate to
stations, cooperators
Region, personnel
normal
communications
systems
5. Inability to dispatch
and document
emergencies using
computerized methods
6. Inability to handle
call-load
PREVENTATIVE
MEASURES
(PRE 2000)
Insure alternate
emergency telephone
numbers are available for
public
2. Through media contacts,
inform the public of
alternate emergency
telephone numbers and
the possibility that they
may need to use these
numbers if the 9-1-1
system is not operable
3. Coordinate the listings of
alternate emergency
numbers with other local
and regional agencies and
departments
4. Secure statements of Y2K
compliance from
manufacturers
Independent verification
of Y2K compliance
6. Secure adequate personnel
& supplies of manual
forms for dispatch
7. Ability to respond in a
timely and effective
manner
8. Ability to document
within a reasonable time
CONTINGENCY
(POST 1999)
1. Local resource
deployment based on
emergency situation
and functionality of
communication
systems
2. Re-establish normal
communications
II. COMMUNICATIONS
B. COMMUNICATIONS SUPPORT SERVICES
AREA OF
FUNCTION/
.SERVICES
1. PBX systems
2. Vaults, towers
3. Mobile/Base
4. HT
5. Consoles
AREA OF IMPACT
Failure of mission
critical
communications at
facilities
2. Inability to receive
emergency
communications and
dispatch resources
3. Critical element of
employee and public
safety
MEASURES
(PRE 2000)
1. Statements of Y2K
compliance of all
equipment and
software
(PRC/Vendor)
2. Independent of
verification of Y2K
compliance
Replace, Repair or
Retire non-Y2K
compliant systems
o
CONIINGENCY
(POST 1999)
WAN (Intercom &
MIR.PS, 800 MHz
State Radios,
functioning)
2. Cell/Satellite
Phones&o~v Earth
Orbit satellite
phones
3. Amateur radios
.
Other Agencies
(Local Government
OES, etc.)
[II.
DEPARTMENT OPERATIONS CENTER (DOC)
.
o
o
AREA OF
FUNCTION/
SERVICES
OES
State
Region
A.rea
Local
Government
Cooperators
AREA O F IMPA CT
o
2~
Statewide
deployment of Fire
and Mutual Aid
resources
Statewide
emergency
coordination with
other response
agencies
o
.
.
PREVENTATIVE
MEASURES
(PRE 2000)
Develop Area
contingency
Develop interagency
response plans
Integrate ail State
Level Fire Agencies
into one organization
CONTINGENCY
(POST 1999)
1. Implement
interagency, Area
and/or Region
resource plan as
needed
2. Utilize OES/State
radios
3. Satellite
communications
°
Couriers/Runners
Utilize 800 MHz
based on local
capabilities.
IV. AIR OPERATIONS
AREA OF
FUNCTION/
SERVICES
1. Aircraft
Functionality
2. Airport automation
software(s)
3. Avionics
4. GPS
5. Auxiliary Power
Unit (Al'U)
6. Base Operations
7. Aircraft refueling
AREA O F IMPA CT
1. Ability to respond
2. Federal Aviation
Administration
ability to control
airspace
3. Employee and public
safety
PREVENTATIVE
MEASURES (PRE 2000)
1. Assure Y2K
compliance of all
systems
2. Replace, repair or
retire non-Y2K
compliant systems
o
Assure OCFA aircraft
are not airborne
through the
millennium change
CONTINGENCY
(POST I999)
°
Implement
Contingency Plan
and testing matrices
SPECI.~L STAFFING PLAN
Overview
There is unconfirmed, and often conflicting, information that suggests possible technological
problems may be result from computer malfunctions or shutdowns of date sensitive
programming. This could allegedly affect many "date-sensitive" vital infrastructure systems that
depend upon computers.
During the past several months, however, many key public safety officials have expressed more
concern over the potential public reaction to Y2K than the possible technological impacts. There
is a growing concern that public perception and behavior that leads to public disturbances, such
as what occurred during the Rodney King incident that resulted in the Los Angeles riots, could
once again erupt, causing significant operational impact to Fire and Law Enforcement agencies.
Some possible examples include the potentially harmful impacts resulting from celebrations at
large venues that get out of control, hoarding of essential supplies, price gouging, looting, public
fear and panic, etc.
Assumvtions
Potential infrastructure disruption/malfunction considerations affecting Operations Department
· Electricity
· Telephones
· Paging systems
· Radio systems
· Cellular phones
· Petroleum distribution pipelines
· Gasoline/diesel fuel
· Natural gas
· Water systems
· Sewer systems
. · Traffic signals & street lights
· Life support systems at hospitals & homes
· Security gates & systems
· Fire detection, alarm, extinguishing, & building systems
Recommended Pre-emergency Preparations
Existing.Response Plans
It is believed that the greatest potential challenges for public safety include those created
by public perception or reaction to the perceived crisis, more than the actual interruption
of services resulting from technological malfunctions.
.-.
The special response actions caused by the effects of Y2K are simply extensions of
existing emergency response plans and daily incident operations. In addition to special
planning efforts at the time of the incident, there are existing response plans that can be
applied to handle possible impacts.
It is recommended that Operations personnel review these plans. Some of these plans
include the Civil Unrest Tactical Plan, .E. arthquake Handbook, Orange County Fire
Services Operational Area Plan and Plan Annex, Hazardous Materials Emergency
__
Response Plan, Orange County Or>erational Area Emergency Response Plan, .Ci__~.~
Emer~enc,v Plans, and the Y2K Operations Contingency Staffing Plan.
Operations · Provide two Duty Officers to each cover half the County (Branch I, Div l&4; Branch II,
Div 2&3) on Dec 31 ~
· Pre-designate and place "on-call" the IMT members for Dec 3 l't
· Authorize two Safety Officers for Dec 31t'
· Authorize spending for pre-designated overtime staffing (e.g., ECC, Switchboard,
HMRT-4, City EOCs, etc.) and on-call staffing (e.g. MPC, DOC, BCs, PIOs, etc.
Emergency Planning and Coordination (EPAC)'
· . Develop a Special Staffing and Response Plan- August/September
· Review and update applicable emergency response plans- September/October
· Review and update Earthouake Handbook- September/October
· Review and update Civil Unrest Tactical Plan- September/October
· Update DOC Response Plan- September/October
· Update EOC Response Staffing Plan & Checklist- September/October
· Determine which cities will staff their EOCs and request an agency rep. - October
· Identify DOC and EOC staff availability- October
Emergency Communications center (ECC) · Review and update appropriate ECC special procedures- September/October
· Determine system continuity (Y2K compliant)- September
· Test emergency backup systems- September/October
· Determine Dispatcher and Switch Board operator availability list (Dec 20 - Jan 7)
· Establish Chief Officer availability list (Dec 20 - Jan 7)
· Provide radio and ceil phone' cache at Div. HQ for relief Apparatus (Dec 28th)
Special Operations (Crews & Equip. and Air Ops.)
· Review and update emergency response plans for Crews & Equipment and Air
Operations- September/October
· Determine pilot and crew chief availability list (Dec 20 - Jan 7)
· Determine system reliability (potential Y2K impacts on helicopters, etc.)- Sept.
Emergency Medical Services (EMS) · Review.and update applicable, emergency response plans- September/October
· Establish paramedic availability list (Dec 20 - Jan 7)
· Determine system reliability (potential Y2K impacts on defibrillators, etc)- Sept.
Divisions (1-4)
· Re-enforce leave request policy based on personnel availability's
· Follow-up on battalion chief preparations (see list below)
· Stage/relocate relief apparatus, equip, and Communication Cache (cell phones, HTs,
batteries/chargers) in each Division at FS- 61/D-l, FS-6/D-2, FS-49/D-3, FS-23/D-4.
(Dec 28th)
· Identify Staffing Coordinator in each Division (Dec 31 ~t )
· . Identify Staging Area Manager & Resource Recorder for each Division location and
place personnel on-call (Dec 31 s)
Battalions (1-8) · Re-enforce leave request policy
· Determine Career personnel availability (Dec 20th - Jan 7~h)
· Require Career personnel to take safety gear home and advise them to report to their Div
location if called back from home - see Division locations above. (Dec 23~ - Jan 7~')
· Follow-up on station preparations (see list below)
· Determine availability of Reserves (Dec 20th- Jan 7th)
· Hard cover HMRT4 and Reserve Stations (Dec 31~)
· Ensure "DATS Relief" in CAD is current for all units and that Relief equipment is
prepared to be placed in service at the 4 Division locations (Dec 28th).
Stations · Enforce leave request policy based on personnel aVailability's (Dec 2ffh - Jan 72)
· Ensure all vekicles are.topped-off- daily (fuel tanks at ~ full beginning in November)
· Top-off fuel tanks and gas cans- November/December
· Test station and mobile generators- September/October
· Ensure station generator supplies power to essential station appliances and equipment
(fuel pumps, radios, paging system, alarm system, telephones, apparatus doors, lights,
kitchen appliances, hot water heater, computers, security gates, etc.) - Au__mast/September
· Ensure adequate supplies of essential equipment, parts, supplies, mater/als (medical,
automotive, station, etc.) - August/September
· Identi~y potential problem areas, locations, and facilities that may require special
operational considerations based on loss of infrastructure capability, such as water (hard
suction hose and/or Floto Pumps on engines) - September/October
Personnel · Provide for family preparations and home safety (refer to Surviving the Earthquake,
Home Tips/PlO - send home with Pay checks during the Summer)
· Anticipate possible call-back or holdover (Dec 24th- Jan 7th)
· Advise supervisor of availability (Dec 24* - Jan 7th)
· All Career personnel to take safety gear home and be prepared to report to their Div
location if called back from home. (Dec 23~d- Jan 7~h)
10
DUTY OFFICER GUIDELINES
INTENT
Provide a "phased" Operational Response and Staffing Plan. The plan outlines actions to be
implemented based on the possible impacts caused by Year 2000 (Y2K). It is designed to ensure
that appropriate levels of Fire and Rescue response capability are maintained. Response levels
are dynamic based on local conditions and activity levels.
PROCEDURES
Information/Data Sources
ECC supervisors will monitor activity levels and potential response impacts. This may be
accomplished by ensuring that periodic media reports (TV, radio, PlO, etc.), intelligence
information from Law Enforcement (local, state & federal), reports from the field, and other
sources of data (i.e., infrastructure providers such as utility companies) is regularly monitored.
This current information and updated projections of local conditions, along with Regional, Area,
and Local emergency activity levels, will be used to determine the most appropriate staffing
level. The County will be divided in to geographic areas staffed with two Duty Officers, Branch
I (Divisions l&4) and Branch II (Divisions 2&3)
Existina Response Plans
In addition to special planning efforts at the time of the incident, there are existing response plans
that can be applied to handle possible impacts. Some of these plans include the Civil Unrest
Tactical Plan, Earthquake Handbook, Orange County Fire Services Operational Area Plan and
Plan Annex, Hazardous Materials Emergency Response Plan, Orange County Operational Area
Emergency Response .Plan, City Emergency Plans, and the Y2K Operations Contingency
Staffing Plan.
Plan Imt)lementation and Termination Criteria
The plan will be activated and terminated at the direction of the Duty Officer. The decision to
activate all, or a potion, of the plan is based upon an assessment of current and potential impacts
on service delivery capability and firefighter safety.
DUTY
OFFICER CHECKLIST - General
Coordinate information, planning efforts and response actions with corresponding Branch
Formulate a response plan for emergency equipment if communications systems are
partially or completely non-functional
Formulate a plan for dispatching resources if communications systems are partially or
completely non-functional
· Relocate resources to better meet deployment or communications needs
· Ddtermine the need for additional or specialized resources
· Keep the Operations Chief informed of overall situation and resource status and
availability
· Coordinate with responsible party for supporting critical operations (ECC, logistics
support)
11
· Provide information to ail battalions, stations, area Fire Departments, City and County
EOCs, and OES Region based on "the need to know"
· Notify the OCFA Y2K Business Continuation Kecovery Team Leader if appropriate
· Ensure all essential facilities and equipment are scheduled for testing of functionality on
January 1, 2000, and that information is communicated to ECC, or DOC if activated,
throu~.h normal communications or pre-determined backup communications
12
STAFFING LEVELS
LEVEL I Intermittent interruptions of infrastructure services and
moderate emergency activity level, and a potential for increased
service demands.
ECC Supervisor- Notify the Duty Officers, EPA CBC, and ECC BC that
conditions meet Level I criteria.
Duty Officers- Authorize Level I Staffing Plan to be implemented by
Branch.
Duty Officers - Consider authorizing a fourth engine,' or water tender,
respond to all confirmed structure fires based on water delivery
cap ab ility/reli ab i lity.
Duty Officers - Consider staffing needs for specialized equipment.
ECC Page and advise Executive Management, Division Chiefs, all BCs,
PIO, and Y2K Business Continuation Recover Team Leader when any
level of the plan is implemented.
ECC - Confirm availability of all Chief Officers (ACs, DCs, Staff & Field
BCs), advise the Duty Officers, and maintain a current list for the duration
of the plan.
ECC - Place OCFA in a "Special Staffing and Response Level" and advise
other Fire and Law Enforcement dispatch agencies in the operational area.
ECC Battalion Chief- Confirm availability of off-duty dispatchers and
switchboard, and place appropriate number of staff on call.
Battalion Chiefs - Staff/hard-cover one (1) engine at stand alone Reserve
stations (e.g., 1, 3, 11, 12, 14, 16, and 25).
Battalion Chiefs - Ensure "DATS Relief" in CAD is current for all units
and confirm that Relief/Reserve equipment is prepared to be placed in.
service.
EPAC Battalion Chief-Confirm staff to respond to the DOC and place on
call.
EPAC Battalion Chief- Notify the Operational Area EOC of the "Special
Staffing and Response Level" and determine if other EOCs are activated.
13
Special Operations Battalion Chief- Ensure one (1) helicopter is in
service, stage in appropriate location based on situation (observation,
medical transport, and/or water dropping) and advise ECC and Law
Enforcement.
LEVEL II Sustained interruptions of infrastructure ser~'ices and
potential for increased service demands, or moderate emergency
activity, within the Area and/or Region and potential for requests for
out of county/Area resources.
ECC Supervisor- Notify the Duty Officers, EPA CBC, and ECC BC that
conditions meet Level II criteria.
Duty Officers - Ensure Operations Chief is briefed of situation and needs.
Duty Officers - Ensure Level I items have been implemented and approve
implementation of Level II Staffing Plan.
Duty Officers- Place one Incident Management Team "on-call" v~irh
vehicles (advise ECC, confirm/notify IMT members). ·
IC Division Chief
OPS Battalion Chief
Plans Assigned by the Duty Officer*
Logistics Assigned by the Duty Officer*
Div Sups (2) Assigned by the Duty Officer*
BC (Staff/field) supplemented when IMT is dispatched)*
Duty Officer - Confirm staff to respond to City/County EOCs if requested
and advise ECC.
Duty Officer- Authorize ECC staff, PIOs, Safety Officers, Mechanics,
Service Center staff, or other appropriate support staff to be placed "om
call" as needed.
ECC Battalion Chief- Staff additional ECC personnel, w/th Duty
Officeffs approval.
ECC Battalion Chief-Consider discontinue Emergency Medical Dispatch
(EMD).
ECC Battalion Chief- Consider reducing responses to Automatic Alarms
to one unit.
ECC Battalion Chief- Consider discontinue Service Calls.
14
· ECC - Confirm immediate response availability of Fire Command 1 & 2.
Battalion Chiefs- Direct MPCs to staff/hard-cover all units at all stand-
alone Reserve stations (e.g., 1, 3, 11, 12, 14, 16, and 25), and all Reserve
units and Career stations.
Battalion Chiefs - Confirm crew strength, and availability of Reserve
Handcrews (e.g., Crews 28 & 57) responding from home and advise ECC.
EPAC Battalion Chief- Determine status of the Operational Area and City
EOCs, and advise the Duty Officers, who will assign Agency Reps, as
requested.
EPAC Battalion Chief- Activate the DOC to Level I and advise ECC.
EPAC Battalion Chief- Serve as the central coordination point for
gathering, analyzing, and disseminating internal and external emergency
information.
EPAC Battalion Chief- Maintain and display current and accurate
incident situation and resource status information and provide periodic
briefings.
PIO - Ensure availability of PIOs for immediate response to the Media
Center and to incidents, and advise ECC of contact info.
Special Operations Battalion Chief- Ensure helicopter availability and -
advise ECC of contact info.
Training/Safety Battalion Chief- Confirm additional Safety Officer
availability and advise ECC of contact info.
Automotive/Service Center BC - Confirm availability of Automotive and
Service Center staff and advise ECC of contact info.
Company Officers - Prepare station, personnel, apparatus and equipment
to respond immediately to numerous or extended incidentsl both in and
out-of-County/Area.
Weather Coordinator - Provide periodic weather updates to Duty Officers,
Division Chiefs, EPAC BC, field and staff BCs, and ECC, if weather
conditions could impact response capability.
15
LEVEL III Sustained interruptions of infrastructure services and
significant service demands, or high emergency activity, level within
the Area with several large incidents/fires within the Area, or a large
commitment of Out of Area resources to major incidents in the
Region with the potential to bring Area to "draw-down" levels.
ECC Supervisor - Notify the DuO2 Officers, EPA CBC, and ECC BC that
conditions meet Level III criteria.
Duty Officers- Ensure Level II items have been implemented and approve
implementation of Level III Staffing Plan.
Duty Officers- Staff Incident Management Team with vehicles (advise
ECC, confirm/notify IMT members) and stage at Headquarters.
Duty Officers - Assign staff to affected City/County EOCs and advise
ECC/DOC of contact information.
Duty Officers - Evaluate the need to staff-up units (engines and/or trucks)
with additional personnel.
Duty Officers- Evaluate hiring off-duty personnel to staff additional
engines and equipment in Career stations (e.g., Type III Engines, Relief
Engines, etc.).
Division Chiefs- Prepare for possible "Decentralized" operations.
Battalion Chiefs - Convert pre-identified medic engines to medic vans and
hire back personnel to staff as regular engines with three (3) personnel.
Battalion Chiefs - Hardcover all Reserve engines (includes Reserve
engines in combination stations, second roll engines in Reserve stations).
Battalion Chiefs - Staff Water Tenders with two (2) Reserves.
Battalion Chiefs - Staff all Patrol Units with minimum of three (3)
Reserves to supplement existing, or to handle additional, responses.
Battalion Chiefs - Hardcover Reserve Handcrews (e.g., Crews 28 & 57).
Battalion Chiefs - Prepare for possible "Decentralized" operations, based
on activity levels.
Battalion Chiefs - Authorized Reserve drivers for field BCs.
16
EPAC Battalion Chief- Activate the DOC to Level II and advise ECC and
other EOCs.
EPAC Battalion Chief- Coordinate information between OCFA DOC and
City/County EOCs, and other outside agencies and departments.
EPAC Battalion Chief- Establish and maintain Agency Liaison functions
with other departments/agencies, and Mutual Aid resources.
EPAC Battalion Chief- Coordinate Operational Area Fire and Rescue
Mutual Aid resource requests.
EPAC Battalion Chief- Serve as ~the central contact point for the Incident
Management Team and/or the Agency Representatives.
EPAC Battalion Chief- Provide coordination to expanded emergency
incidents to ensure rapid and appropriate logistical support.
· PIO - Staff additional PIOs and advise ECC.
Special Operations Battalion Chief - Ensure Helicopter Fuel Tender and
Support vehicles staffed with Reserves.
Training/Safety Battalion Chief- Staff additional Safety Officers per Duty
Officer direction, advise ECC.
Automotive/Service Center Battalion Chief- Staff Automotive & Service
Center to handle possible emergency needs and advise ECC.
LEVEL IV Sustained disruption of infrastructure services and
extremely high emergency activity level within the Area with several
major incidents or fires within the Area/Region, or a heavy
commitment of Out of Area resources brining Area to "draw-down"
levels.
ECC Supervisor- Notify the Duty Officers, EPA CBC, and ECC BC that
conditions meet Level IV criteria.
Duty Officers - Ensure Level III items have been implemented and
approve implementation of Level IV Staffing Plan.
· Duty Officers -"De-centralize" operations based on activity levels.
· ECC - Staff/hard-cover all equipment (e.g. Utilities, Rehab, etc.)
17
POST INCIDENT ASSESSMENT
Equipment Testing Matrix
This form shall be completed for all OCFA Apparatus, Vehicles, and Equipment after January 1, 2000, as
scheduled by the Battalion Chief or Station Captain.
Apparatus/Vehicle Call Number and ID Number and Location:
Assigned Date and
Time of Check Out:
Vehicle Check Out:
Engine Ignition
Pump
Radios
CAD
Lights
'.;ode Three Equip.
Heating/Air
Working
Partially lOut Of
Working IService
Check Out
Assigned To:
Equipment Check Out:
Resuscitator
Breathing Apparatus
IDefibrillators
JAWS
Generators
Smoke Ejector
Foam System
Working
Assignment
Made By:
Partially
Working
Mobile Telephone 4-VVheel Drive
Intercom i Breaks/Retarders -
:Handitalkies i "
~Others IOthers
Notes:
Information Forwarded To: Date: iTime:
I
Report Prepared. By: Assigned Location:
Out Of
Service
All essential systems, facilities apparatus, equipment, and staff vehicles shall have a predetermined location for
'~nuary 1, 2000. Qualified personnel shall be assigned to check out specific items. The results should be reported
) the Battalion Chief at a designated time. If all conventional communication systems fail, personnel shall check
18
,
the Plan to determine the appropriate action of reporting the results and continuing essential services. Battalion
hiefs should report results to appropriate support department or section.
. acility Testing Matrix
This form shall be completed for all OCFA Apparatus, Vehicles, and Equipment a~ter January 1, 2000, as
scheduled by the Battalion Chief or Station Captain.
Facility Number and Location
Assigned Date and
Time of Check Out:
Check Out
Assigned To:
Assignment
Made By:
Utilities: Facility Equipment: I
Working Partially :Out Of Working Partially lout Of
I
Working Service Working IService
Electricity I Base Radio
Gas Quick Call
Water tComputer
Telephone
Cable
IElectrical Garage Door
tPortable Generator
IPower Tools
ISecurity Gates
Appliances
Refrigerator
IHeating/Cooling
tDish Washer
Others
ITelevision
Notes:
Information Forwarded To: Date: ITime:
Report Prepared By: Assigned Location:
All essential systems, facilities apparatus, equipment, and staff vehicles shall iiave a pre-determined
location for January 1, 2000. Qualified personnel shall be assigned to check out specific items. The
results should be reported to the Battalion Chief at a designated time. If all conventional Communication
systems fail, personnel shall check the Plan to determine the appropriate action of reporting the results
19
and continuing essential services. Battalion Chiefs should report results to appropriate support
department or section.
20
Y2K BUSINESS CONTINUATION PLAN AND
RECOVERY TEAM
I. Purpose
The purpose of this Y2K Business Continuation Plan is to describe the roles and
responsibilities associated with all of the OCFA non-fire suppression contingencies
associated with OCFA business services disruptions as a result to issues/impacts related
to or as a result of any Y2K issues.
Basic Y2K Assumptions:
· Loss of commercial power for up to 72 hours.
Some OCFA facilities may have to rely on generator power
· Potential interruptions of internal and external communications
· Shortage of fuel and emergency supplies
· Disruption of food supply and distribution
· Lack of drinking water
· Sewage treatment failures and resulting releases
· Hazardous material releases and other emergency incidents
· Medical equipment and medical device failures (e.g. pacemakers, defibrillators)
· OCFA members may be unable to report to work due to Y2K complications.
II. Organization and Assignment of Recovery Team Responsibilities
The recovery team will consist of a member from key organizational support
functions. These team members will be responsible for the initiation, implementation
and maintenance of recovery efforts associated with business disruptions created by
any Y2K issues/impacts.
A. Recovery Team Members
Recovery Team Rer)resentatives
· Executive Management
· Property Management
· Information Systems
· Risk Management
· Operations
· Finance (payroll/cost recovery)
· Purchasing
· Automotive
· Public Information Office
B. Team Leadership & Responsibilities
Recovery Team Leader- Joan Steiner (Alternate Hugh Wood) · Has overall executive recovery responsibility and approval to initiate
necessary recovery response both in supplies/services and staffing
· Responsible for coordinating recovery activities with Duty Officer, Fire
Chief or designated incident IC.
· Direct the Recovery Coordinator in the development and implementation
of recovery administrative procedures for use during recovery period.
· Implementation of Recovery Plan
Recovery Coordinator- Fausto Reyes, (Alternate Roger Stites)
· Responsible for assisting Recovery Team Leader in the coordination,
platting and implementation of all recovery activities.
· Responsible for the development of an .action plan for recovery activities
which include:
Assessment of Y2K business interruptions
Establishment of a recovery period
Restoration and maintenance of essential facilities and utilities
Addressing any employee health and safety issues
Cost Recovery
Recovery staffing requirements
Responsible for formal documentation process to document and track Y2K
business interruptions and recovery activities
Establish ongoing employee communication on Y2K status
ResponSible for the development of an "after action" recovery report
listing all recovery activities and costs associated.
Cost Recovery Coordinator- Stephan Hamilton (Alternate Theresa Yu) · Responsible for gathering and analyzing information on cost recovery
issues, expenditures, revenues and reimbursement and mitigation pro.am
applications and grants.
· Advise the Finance Manager on cost recovery issues
· Assist with damage repair/reconstruction/replacement/recovery estimates
· Coordinate with Purchasing in processing purchase order and contracts
requests necessary for recovery
· Track and record all OCFA staff time
Public Information Coordinator-
(in development)
C. Team Responsibilities
Ail team members shall be responsible for their specific functional areas of responsibility,
and as part of this recovery team be able to preplan and anticipate specific functional
information that will be necessary in coordinating OCFA Y2K business intem~ptions.
Examples of such preplanning include:
· Key contacts and emergency vendor lists
· Staffing necessary for assisting the overall OCFA business interruption recovery
efforts including staff after hour/pager numbers
· Develop specific functional (section/division) assessment and preplan as a
contingency should a need arise to activate the recovery team and require specific
section/division assistance in responding to Y2K impact.
· Documentation of specific functional activities necessary to respond to Y2K
interruptions
· Follow news/media coverage of Y2K impacts
· Other
III. Recovery Team Activation
The Recovery Team will be activated via pager or phone by ECC when the
Duty Officer in consultati6n with the Recovery Team Leader determine the .need to
activate the recovery team. The activation of the recovery team will be determined by the
following incident levels described in the Y2K Operations Contingency plan.
Note: While the focus is the oeriod between December 31.1999 and January 1. 2000. this
recovery team may be activated at any time between now and the first business day of
the year 2000.
Recall Procedure:
All designated recovery team members will be accessible and available by home phone
and/or pager between December 31, 1999 and the first business day of January 2000.
When contacted, team members will be instructed on where the recovery team will meet.
Notification Only to Recovery Team Leader
Level I - Intermittent interruptions of infrastructure services and moderate emergency
activity level, and a potential for increased service demands.
Activate Recovery Team
Level II - Sustained interruptions of infrastructure services and potential for increased
service demands, or moderate emergency activity within the Area and/or RegiOn and
potential' for requests for out of county/Area 'resources.
III. Business Continuation Objectives
A. Assess extent and level of business disruption
B. As a priority, mitigate/correct all business interruptions associated directly with fire,
rescue, and emergency medical operations.
C. Ensure that all financial business systems, are operational.
D. Ensure ongoing communication with all OCFA members, particularly information
with respect to Y2K impacts affecting their respective worksites.
E. Ensure that all OCFA facilities are safe from any potential hazards.
F. Provide method of communication to OCFA family members on Y2K impacts and
OCFA involvement
Recovery Team Roster
Role Name
Team Leader Joan Steiner
Alternate Hugh Wood
Home Phone
Paeer# Cell #
3015 293-4069
3006 743-6483
Rec. Coord. Fausto Reyes.
Alternate Roger Stites
949-858-4520
3070
Cost Coord. Stephan Hamilton
Alternate Theresa Yu
909-923-7020
714-968-3540
3236
3081
Prpty Mgmt Karen Peters
Alternate Helen Lind
714-637-8533
714-964-4392
3O8O
3019
Fin/Payroll Linda Cable
Alternate
Operations
Alternate
Purchasing Bob Laporte
'Alternate Marilyn Pizza
Warehousing Dennis Trone
714-528-1866
714-744-4986
3074
3059
Automotive Mike Burnett
Alternate Rick Oborny
PIO
BUSINESS INTERRUPTION
Y2K CONTINGENCY PLANNING
RESPONSE AND CONTINGENCY PLAN - Y2K SCENARIOS
CRITICAL COMPUTER SYSTEMS
FUNCTION /
SERVICES
Computer Aided Dispatch
(CAD)
Y2K POTENTIAL
I. Power Failure and CAD
is not operational
2. Computer System Failure
and CAD is not operational
RESPONSE
1. Initially roll to Battery
Back-up (immediate)
If power is not available
Then roll to primary
generator (15-20 sec)
If primary fails, install
Secondary Generator
(l hour)
If all fail, CAD is down
move to decentralized
dispatching at each Battalion
2. Roll to Secondary Back-
up Computer System
If secondary system fails
then use PC back-up
systems
If PC back-up systems fail
go to manual dispatching
CONTINGENCY
PLAN
l.Ensure Battery. Backup
systems are functional.
Ensure Generator Systems
are functional
Validate Operational Plans
are in place for dispatching
in the field.
Schedule for technical staff
to be on-site during
transition to year 2000
2. Ensure Back-up computer
system is functional
Update PC stand alone
systems have updated
databases from CAD
Schedule for technical staff
to be on-site during
transition to year 2000
BUSINESS INTERRUPTION
Y2K CONTINGENCY PLANNING
RESPONSE AND CONTINGENCY PLAN - Y2K SCENARIOS
CRITICAL COMPUTER SYSTEbIS
FUNCTION /
SERVICES
FINANCE/HR SYSTEM
Y2K POTENTIAL
1. Power Failure and system
is not operational
2. Computer System Failure
and system isn't operational
RESPONSE
1. Computer Room will
Initially roil to Battery
Back-up (immediate)
If power is not available
then primary generator
will automatically start
(15-20 sec)
If primary fails, install
Secondary Generator
(I hour)
If all fail then system is not
operational and extended
outage assessment is needed
Payroll can be duplicated by
the Bank and reconciled
once the system is available.
If the Bank isn't operational
then Payroll checks could be
produced manually if
needed
2. Roll to Secondary Back-
up Computer System
If secondary system fails
CONTINGENCY
PLAN
l.Ensure Battery Backup
systems are functional.
Ensure Generator Systems
are functional
Validate operational plans
are in place for assessing
extended outages
Schedule for technical staff
to be on-site during
transition to year 2000
2. Ensure Back-up computer
system is functional
Check with Bank to ensure
then utilize method for
determining a course of
action for an extended
outage.
3. Telephone link to Bank
and/or program for
Electronic Bank Transfer
isn't operational
3. Produce tape and/or
diskette and transport to
Bank for up-loading
procedures are in place to
re-run payroll.
Schedule for tec,hnical staff
to be on-site during
transition to year 2000
3. Ensure process of
producing a tape/diskette is
functioning.
BUSINESS INTERRUPTION
Y2K CONTINGENCY PLANNING
RESPONSE AND CONTINGENCY PLAN - Y2K SCENARIOS
CRITICAL COMPUTER SYSTEMS
FUNCTION /
SERVICES
INTEGRATED FIRE
PREVENTION SYSTEM
Y2K POTENTIAL
1. Power Failure and system
is not operational
RESPONSE
I. Battery back-up is good '
only for about 15 minutes
for a proper shut down
If power, is not available for
an extended period (5-10
Days) then the system
would be relocated to the
Support Building for power
and then resume operation
CONTINGENCY
PLAN
1. Prepare for manual
operation if necessary
during extended outage
Notify headquarters staff
and public of extended
outage.
Hold any payments and/or
invoicing until system is
made available.
BUSINESS INTERRUPTION
Y2K CONTINGENCY PLANNING
RESPONSE AND CONTINGENCY PLAN - Y2K SCENARIOS
CRITICAL COMPUTER SYSTEMS
FUNCTION I
sEP, VICES
ORANGE COUNTY FIRE
INCIDENT REPORTING
SYSTEM (OCFIRS) and
TRAINING RECORDS
SYSTEM (TRS)
Y2K POTENTIAL
I. Power Failure and
OCFIRS and/or TRS is not
operational
2. Computer System Failure
and OCFIRSFrRS is not
operational
RESPONSE
1. Initially roll to Battery
Back-up (immediate)
If power not available then
roll to primary generator
(15-20 sec)
If primarY fails install
Secondary Generator
(I hour)
If all fail, OCFIRS will be
down until power is
restored.
2. Roll to Secondary Back-
up Computer System
If secondary system fails
then systems Will be down
until systems are repaired
CONTINGENCY
PLAN
l.Ensure Battery Backup
systems are functional.
Ensure Generator Systems
are .functional
Schedule for technical staff
to be on-site during
transition to year 2000
2. Ensure Back-up computer
system is functional
Schedule for technical staff
to be on-site during
transition to year 2000
BUSINESS INTERRUPTION
Y2K CONTINGENCY PLANNING
RESPONSE AND CONTINGENCY PLAN - Y2K SCENARIOS
CRITICAL COMPUTER SYSTEMS
FUNCTION /
SERVICES
TIMEKEEPING AND
STAFFING DESK
SYSTEMS
Y2K POTENTIAL
1. Power Failure and system
is not operational
2. Computer System Failure
and system isn't operational
RESPONSE
1. Battery back-up is good
only for about 15 minutes
for a proper shut down.
Depend. ing upon the length
of an extended outage the
systems would be relocated
to the Support Building for
power and system operation.
(2-3 hours)
2. Load software and
database onto another server
and resume operations
( possible 2-6 hour outage)
CONTINGENCY
PLAN
1. Prepare for manual
operation during extended
outage and then reconcile
after system is available
If power is not available for
an extended period and
another payroll run is
necessary then the previous
week's total would be used
and then reconciled when
the system is available.
Identify and prepare Support
Building re-location site.
Schedule for technical staff
to be on-site during
transition to year 2000
2.Identify secondary
system that can be used to
re-load software and resume
operation.
Prepared for manual
tracking from hardcopy
Schedule for technical staff
to be on-site during
transition to year 2000
EXHIBIT C
OCFA- 10/99 Year 2000 ~' 'te 'Page 1 of 2
CONSENT C'ALENDAR-AGENDA ITEM
EXECUTIVE COMMITTEE MEETING
October 28, 1999
TO:
Executive Committee, Orange County Fire Authority
FROM:
Hugh Wood
Chief, Technical Services Department
SUBJECT: Year 2000 Plan Update Report
Summary_:
This item is submitted as an update on the Year 2000 Plan.
Recommendation:
Receive and file report.
Back~ound:
The year 2000 issue involves systems and electronics that use calendar dates within their software. In
the 1960's when many of the programs used today were developed, they did not include the century
when they processed information using numerical dates, such as April 1, 1966 became 040166.
OCFA has known for quite some time that some of its key equipment and systems did have this
problem but were able to identify solutions for each. We are in the process of completing our
programming and/or equipment replacements of those affected systems. It has also come to our
attention that some less critical equipment and systems may also be affected. We are in the process of
identifying these potential problems s6 that solutions can be put in place before January 1, 2000.
The following are key updates for this month:
1. OCFA's Microsoft Exchange Server and E-Mail System was upgraded in October to be Year
2000 compliant.
.
OCFA continues to test the electronics of its fire engines and trucks for Y2k compliance as they
are scheduled for normal maintenance. The testing of the fleet should be completed within the
next three weeks. This procedure is in addition to receiving written confirmation from Detroit
Diesel, which manufactures the electronics, on their Y2K readiness as well as a hard copy of
their testing plan and results.
3. The Finance/HR back-up system upgrade is in progress and scheduled for completion in
October.
.
The Accounts Receivables (AR) system migration to the Finance/HR Banner system was
completed in August. The conversion of historical data from the old AR Prophecy system to an
Oracle based system was completed in October.
5. The replacement system for OCFA's Incident Reporting system (OCFIRS), Training Records
System (TRS), and Emergency Medical System (EMS) is on schedule for implementation prior
http://www.ocfa, org/docs/y2k-oct.htm 10/22/1999
OCFA- 10/99 Year 2000 Updat- Page 2 of 2
to January 1, 2000. A contract was awarded to SunPro Inc. in July and system requirements
with the individual OCFA sections were finalized in September. The initial release of the new
OCFIRS system was installed in October for preliminary system testing. Training for OCFA
personnel is scheduled for mid-November through December with production release on
January 1, 2000.
6. OCFA's Internet Webpage continues to be updated every month with our status and provides
links to other Internet Y2K sites.
o
An Authority-wide contingency plan was developed to cover Y2K related situations, which
may impact operations demand and external resources. A final draf~ of this plan was submitted
to Executive Management in September.
Fiscal Impact:
Capital Improvement Plan includes budgeted systems and equipment upgrades and replacements.
Staff Contact for Further Information:
Roger Stites, Manager Information Systems
Attachments:
Year 2000 Plan, October 15, 1999 Update
http ://www. oc fa. org/docs/y2k-oct.htm 10/22/1999