Loading...
HomeMy WebLinkAbout09 TRAFF SIG UPGD 12-06-99NO. 9 12-06-99 DATE: DECEMBER 6, 1999 TO: FROM: SUBJECT: WILLIAM A. HUSTON, CITY MANAGER PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION APPROVAL OF PLANS AND SPECIFICATIONS AND 'AUTHORIZATION TO ADVERTISE FOR BIDS - TRAFFIC SIGNAL UPGRADE AT FIRST STREET AND PROSPECT AVENUE (CIP NO. 4058) SUMMARY This project will upgrade the existing traffic signal at First Street and Prospect Avenue by installing fully protected left-turn phasing in both, the Prospect Avenue direction and the First Street direction. This upgrade will alleviate left-turn related accidents at this location. RECOMMENDATION It is recommended that the City Council adopt Resolution No. 99-104 approving the plans and specifications for the traffic signal upgrade at the intersection of First Street and Prospect Avenue, and authorizing the City Clerk to advertise for bids. FISCAL IMPACT The Engineer's estimate for this project is $91,100.00 and will be funded through the City's FY 1999/2000 Capital Improvement Program (CIP) budget. BACKGROUND AND DISCUSSION The traffic signal at the noted intersection currently operates as a two phase signal serving all through and turning traffic in the east-west direction as one phase, and all through and turning traffic in the north-south direction as the second phase. Left-turn pockets are provided in all directions as storage areas for left turning traffic, however, the left-turn movements are permitted during the through traffic phases. In addition, the intersection is offset in the north-south Prospect Avenue direction causing a misalignment for vehicles travelling through and turning left at this location. Due to an increase in congestion and accidents, a review of the traffic conditions at the First Street/Prospect Avenue intersection was conducted to evaluate operating conditions. An accident analysis for the last three years determined there were left-turn type accidents at the intersection that could be eliminated with the installation of fully protected left-turn phasing. Recent traffic counts at the intersection indicates there is a heavy southbound left-turn movement in the a.m., noon, and p.m. peak hours. During the noon and p.m. peak hours southbound left- turning traffic backs out of the pocket and impedes the southbound through traffic. To alleviate the backup and better serve the left-turn demands, the north-south phasing will be split to provide more efficient timing for the turning traffic. Approval of Plans and Specifications and Authorization to Advertise for Bid~ - Traffic Signal Upgrade at First Street and Prospect Avenue (CIP No. 4058) December 6, 1999 Page 2 Based upon the evaluation, the traffic signal has been designed to provide fully protected left-turn phasing in all directions. The project will include rewiring the traffic signal system, upgrading the signal equipment and installing protected left-turn phasing. The work will include all labor, materials, tools, equipment, appurtenances, and incidentals for the subject project as detailed on the plans and specifications for this project. The tentative schedule for this project is as follows: Authorization to advertise for bids ...................................................... 12/06/99 First legal advertisement ....................... ............................................. 12/10/99 Second legal advertisement ........................................................... .... 12/17/99 Bid opening ........................................................................................ 01/05/00 Award of contract ............................................................................... 01/18/00 Commence construction .................................................................. .... 03/06/00 Complete construction ........................................................................ 06/02/00 Director of Public Works/City Engineer TDS:DA:Traffic Sig upgrade 1st & Prospect & Reso 99-104.doc Attachments Dougl~rs R. Anderson Senior Project Manager-Transportation 1 i0 !! i2 !3 15 18 20 2! 24 2~ 27 RESOLUTION NO. 99-104 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR TRAFFIC SIGNAL UPGRADE AT FIRST STREET AND PROSPECT AVENUE (ClP No. 4058) WHEREAS, it is the intention of the City Council of the City of Tustin, California to contract for the construction of traffic signal upgrades at First Street and Prospect Avenue; and WHEREAS, the City Engineer has presented plans and specifications for the construction of said works; and NOW, THEREFORE, BE IT RESOLVED that the plans and specifications presented by the City Engineer be and are hereby approved as the plans and specifications for; Traffic Signal Upgrade at First Street and Prospect Avenue (CIP No 4058) BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to advertise, as reqUired by law, for the receipt of sealed bids or proposals for the performance of the work specified in the plans and specifications; and BE IT FURTHER RESOLVED that this project is categorically exempt from the requirements of the California Environmental Quality Act: Class I: Existing Facilities. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 6th of December 1999. Tracy Wills Worley, Mayor ATTEST: City Clerk Z i co -IV-H_~ ONltq¥O ~ il I ' ] f i I : k l \