HomeMy WebLinkAbout05 2000 PLAN UPDT RPT 08-02-99 NO 5
8-2-99
I n t e r- C o m
.... ~'~.j
DATE:
AUGUST 2, 1999
TO:
FROM:
SUBJECT:
WILLIAM A. HUSTON, CITY MANAGER
FINANCE AND COMMUNITY DEVELOPMENT DEPARTMENTS
YEAR 2000 PLAN UPDATE REPORT-AUGUST
Sumtnary: City staff is cOntinubtg to work on addressfitg potetttial Y2K problems attd
equipment complianc~ Monthly status reports will be presented to the City CoUncil
summarizing new information, equipment changes and Y2K compliance progress.
RECOMMENDATION
That the City Council receive and file this report.
FISCAL IMPACT
The Electrical System Audit Report prepared for the City of Tustin Civic Center's electrical system
estimates a cost of $12,700 to improve the system reliability and performance. Further fiscal
impacts to implement Y2K compliance and equipment for the City of Tustin continue to be
undetermined at this time.
BACKGROUND AND DISCUSSION
At the April 5, 1999 City Council meeting, staff submitted a report to the Council identifying Y2K
planning activities and actions that have taken place during the past year. Staff indicated that
monthly status reports would be provided beginning in July 1999. The following are key updates
and completed tasks for the month of July 1999:
CRITICAL CITY FACILITIES/COMPONENTS
Electrical System Audit Report. Southern California Edison has completed their audit of the
Civic Center's electrical power system and distribution equipment. Special attention was given to
the emergency generator, its load and Y2K compliance. The Main Electrical Switchboard and
associated equipment was found to be in sound condition. The audit did identify possible concerns
related to the continuity of critical public services. The report provides a series of recommendations
to improve the systems performance and prolong its life. Although, Kohler, the manufacturer of the
emergency generator transfer switch and timing mechanism, has provided a letter indicating that
this equipment is Y2K compliant, the report recommends that the City test the emergency
generation system under live conditions and simulated conditions prior to January 1,2000
A copy of the final Electrical System Audit is attached as Exhibit A.
City Council Report
Year 2000 Plan Update
August 2, 1999
Page 2
City Hall Backup Generator. The City Hall backup generator will be tested in August 1999 in the
early morning hours. The test has been delayed until PacBell can install new system Y2K software
and hardware.
City Hall Building Access. Existing City Hall and Police Department building access equipment
and hardware is not Y2K compliant and cannot be upgraded. Quotes to change the current
Access Control System have been received and are being reviewed by the Police Department
Computer Systems. The Police Department has eliminated RAC ESPUL Software from their
systems because it was not Y2K compliant and will be upgrading C-STARS TRAFFIC Software for
Y2K compliance as soon as it is available from the State (Highway Patrol). The Police Department
has also received quotes for license and versions upgrades of their operating systems. The
Finance Department has replaced their Infocomp Profund Software with IFAS.
City Yard. A new fueling system, including new fuel tanks and Y2K complaint access card system
is operational.
FIRE AUTHORITY
The Orange County Fire Authority (OCFA) provides monthly Year 2000 Plan updates to the
Executive Committee. During the month of July, the Authority continued to test fire engines and
trucks for Y2K compliance; their Finance/HR System upgrade is in final stages of implementation;
work is continuing on the replacement of OCFA's Incident Reporting system; OCFA's web page is
updated monthly; and work continues on the Authority's contingency plans in coordination with the
member agencies.
A copy of the July 22, 1999, Fire Authority Year 2000 Plan Update is attached as Exhibit B
Y2K COMMUNITY CONVERSIONS
The President's Council'on Year 2000 Conversion, established on February 4, 1998, is
responsible for coordinating Federal efforts to address the Year 2000 problem. The Department of
Justice, Office of Justice Programs has contacted local authorities to make available free "toolkits"
to be used in conducting Y2K Community Conversions to inform citizens of preparations being
made at the local level for Y2K planning and readiness. At Community Conversion workshops,
citizens hear from representatives of local service providers such as banks, power, water and
telephone companies, major employers and government agencies A number of Y2K Community
Conversion workshops have been scheduled across the country. The Community Development
Department has requested copies of the "toolkit".
A copy of the Community Conversion information is attached as Exhibit C.
City Council Report
Year 2000 Plan Update
August 2, 1999
Page 3
UPDATED ASSESSMENT WORKSHEETS
City departments have submitted no new or updated assessment worksheets
Ro na~~ Na ult~~~,,~~l~.
Finance Director
E-~zabeth A. Binsack
Community Development Director
Exhibits:
A - Electrical System Audit report
B - Fire Authority, July 22, 1999 report
C- Community Conversion letter
RW/year 2000plan August update
EXHIBIT A
Electrical System
Au dit Rep ort
For
The City of Tustin Civic Center
Prepared by
EDISON
CALIFORN~ Ei)I~ON' Company
.,
ES!
EDISON
A $Ot.,~'H£RN CALI£O&¥1A £DI$ONTM Company
..
· June 16, 1999
Joseph Meyers
City of Tustin
Sen, ior Management Analyst
Public Works Department
300 Centennial Way
Tustin, CA 92780
Dear Mr.,Meyers,
Edison ESI is pleased to submit this Electrical System Audit report for the City of Tustin Civic
Center's electrical system. Edison is a wholly-owned subsidiary of Southern California Edison
company, SCE and is a recognized leader in the electrical services industry.
Our professionals have evaluated your system and opportunities for maintenance cost saving,
improved system reliability, and enhanced safety have been identified. We have also included
recommendations to improve your system's performance and prolong its life. With our
experience in the maintenance and repair 'of electrical systems, we can implement those
recommendations to minimize any impact on you operations. ·
Edison ESI thanks you for this opportunity to serve the City of Tustin. If you-need any
additional information, please contact me at (714) 895-0319.
SincerelY,
James D. Fitch
Field Engineer
Cc: Bill Sprigs, John Vines, Kim Armstrong, Mike Magin
73 00 Fenwick Lane
\Vestmins~er. CA 92683
tS00} 266-2299 (7141 895-0364
[:ax f-14) ~95-tl786
City of Tustin ( c Center
Electrical System Audit
06/28/99
TABLE OF C
1. INTRODUCTION
ONTENrS
· Scope
· Parameters
· Methods
· Priorities
· Equipment Specifications
2. EXECUTIVE SUMMARY'
· Background
· Salient Findin~
3. AUDIT REPORT AND RECOMMENDATIONS'
· . Electrical System Drawings
· Energy Management
· Power factor Correction
· Load Analysis
· Systems Studies
Transformer Evaluation
· System Operation
· Equipment Upgrading.
· Diagnostic Testing & Scheduled Maintenance
Environmental Concerns
· Y2K compliance
· Thermographic Scan
4. CONSIDERATIONS
· Reduction in Energy cost
· Emergency Plans
5. PRICE ESTIMATES
· Price Estimates
· Mana~ng costs
City of Tustin 'ic Center
Electrical System Audit
06/28/99
INTRODUCTION
SCOPE:
The low voltage electrical system'at the City of Tustin's Civic Center was examined for
reliability and economy. Special emphasis was placed on:
· Reduced down time to critical services and loads
· Y2K compliance
· · Energy and system management for operating efficiency and safety
· Identification of the load on the emergency generator system
P T RS'
The audit begins at the service point with the connections from the utility company and
continues to the sub-panels distributed throughout the building.
METHODS:
The audit information was compiled by:
· Visual inspections
· Drawin~
· Voltage and load readings
· Load.verification
· Harmonic measurements
· Manufacturer's information
· Billing information
· Interviews with maintenance personnel
The system performance was evaluated by comparing the audk f'mdings to industry
standards. Professional judgments were made from field experience to infuse site-
specific factors such as time, temperature, location, age, building techniques, design, and
equipment and material performance into the system' evaluation.
PRIORITIES'
Special attention was given to the emergency generator and its load. The system was
also checked for Y2K compliance.
City of Tustin ( c Center
Electrical System Audit
06/28/99
EQUIPMENT SPECIFICATIONS'
Main Electrical Panel and Switchboard:
· Siemens / ITEm Cat. # SD Series FCI S.O. 60-11201-SA01 'MSB'
· 1600 amp
· 600 volt
Main Switch:
· Siemens / ITE type SBS 1600
· 1600 amp / 480 volt / 3qb / 4W
· 65k amp short circuit current RMS symmetrical rating
· 100k amp 480 volt imerrupting rating
· .,No fuses are installed
· Solid state controls
Sub Mains:
· ITE Vacu-break fused switches m Cat # VTH3105
· 600volt
· 400 amp
· Fused 3qb
Standby Generator:
· Kolher Power System Fast Response
· 250kw / 313kva with .8 P.F.
· Kolher Auto transfer switch # K-166541-400 Serial # K39619
· 480volt/400amp / 3q~ / 4W / 60HZ
Transformer TI'
· Siemens Cat #3F3Y300 / serial # L103825
· 300kva / 60HZ / 3qb / 6.3% imp. / 40°C ambient / 150°C
· Type QL / class AA / type 2 enclosure
Transformer ET-I'
· Siemens Cat #3F3Y300
· 225kva/60HZ / 3~ / 5.25% imp./40°C ambient/150°C
· Type QL / class AA/type 2 enclosure
City of Tustin vic Center
Electrical System Audit
06/28/99
EXECUTIVE SUMMARY
BACKGROUND:
An audit was conducted on the electrical power system and distribution equipment in
The City of Tustin's Civic Center. The Main Electrical Switchboard and associated
equipment was found in sound condition. There were no electrical service issues
identified by the Tustin staff. The audit did identify possible concerns related to the
continuity of critical Public services. The audit also establishes maintenance levels
and recommendations for reliable service and cost control.
SALIENT FINDINGS:
· The equipment exhibits no outward signs of overheating or overloading.
· The equipment is rated to handle the available fault current.
· Voltage levels are acceptable.
RECOMMENDATIONS:
· ProVide a single line diagram in the electrical room
· Train maintenance staff personnel to operate the system.
· Perform routine maintenance on the equipment in ~.5~ electrical room
· Remove the flammables stored in the main elecLr,~... & generator rooms
· Initiate a comprehensive 'energy management plan' that would develop and ~-eview
procedures for the:
· Operation
· Maintenance
· Power quality
· Disaster preparedness
· System protection
· Energy cost
· Perform a live simulation of a power outage
· Build an inventory of fuses, spare parts, and basic equipment.
· Drawings should be updated to 'as-built' status.
· The shunt trip system for the A/C in the computer room should be identified.
· It is recommended that the breakers in the electrical room be identified with common
names.
City of Tustin C : Center
Electrical System Audit
06/28/99
AUDIT REPORT AND RECOMMENDATIONS
ELECTRICAL SYSTEM DRAWINGS
The "Construction Set of Drawings dated 8/1/91" consisted of:
E1
E2
E3
E4
E5
E6
E7
E8
E9
El0
Ell
El2
El3
El4
El5
El6
El7
El8
Lighting Fixture Schedule and Symbol List
Single Line Diagram
Panel Schedules
Panel Schedules
Panel Schedules, Details, and General Notes
Electrical Site Plan
First Floor Lighting #1
Second Floor Lighting #1 '
First Floor Power #1
Second Floor Power #1
Electrical Roof Plan Bldg.#1
First Floor Lighting Plan Bldg. #2
First Floor Power Plan Bldg. #2
Parking Garage Electrical Plan
Details, Panel Schedules .
First Floor Communications and' Security Plan Bldg. #1
Second' Floor Communication and Security Plan Bldg. #1
Plan Notes and Details
These drawing are in good order. They are the drawings that were used to construct the
building. They do not include 'as-built' modifications that took place during the
consmaction of the building or any modification or remodeling that has taken place since
the original design. They do not reflect the increased use of computers and the addition
of new appliances that have become very popular to office personnel. As an example,
the walk-in freezer that holds critical blood evidence is not on the print. A set of as-built
drawings will provide data to the engineers and planning staff on managing expansion
projects and developing emergency plans for critical public services.
It is recommended that a current one line diagram and operating procedure be developed
and posted in the Main Electrical Room. This would provide valuable information to
maintenance staff personnel during normal and emergency operating conditions. These
procedures would outline how to operate the system under various conditions such as the
resetting of a sub-main or what to check after the operation of the main breaker. A list of
phone numbers is essential. This would be part of any emergency preparedness plan.
City of Tustin '/ic Center
Electrical SyStem Audit
06/28/99
LOAD ANALYSIS
The electrical panels are operating within their rated capacities. There are no indications
of heating problems in the panels. There is a concern about the dust and contaminates
inside the panels and equipment that would prevent proper airflow inside the equipment
or provide fuel for a fire. The condition of the Electrical Rooms contributes a great deal
to the conditions inside the equipment. Regular cleaning should be planned.
· The voltage levels at the distribution panels were in the middle of the utilization
bandwidth. Maintenance personnel could not recall any voltage-associated calls or
problems.
All of the feeders and buses are operating within their rated capacities.
Harmonics were high whenever non-linear loads were present such as computers and
electronic ballast. As equipment is replaced and the addition of non-linear loads
increases, it is recommended that a plan to monitor power quality levels and alleviate
their effects be developed. The power quality issue should be incorporated into an
annual review of the system included in an energy management plan.
SYSTEM OPERATION
Normal and emergency operating procedures should be :,eveloped with the consideration
for the type of'equipment, the level of service, the skill level of the maintenanc~e staff,
and the tools available. Personnel should be trained in the safe operation of the electrical
equipment.
It is recommended that an.operating plan be developed, deployed, and posted..
City of Tustin 'c Center
Electrical System Audit
O6/28/99
o.
.-.]
Y2K COMPLIANCE
The only area where the loss of date and time at the mm of the millennium CY2K) would
become an issue with the power system is within the emergency generator transfer switch
and timing mechanism.
Kohler, the generator manufacturer, has indicated that the millennium bug will not effect
the generator or transfer switch. See the attached documentation from Kohler.
It is recommended that the system undergo a live test prior to January 1, 2000. Testing
should be performed on the emergency generation system under live conditions and
simulated conditions
'7 :'
The commercial utility power system is ahead of schedule on being Y2K compliant with
their 'mission critical systems' and plan on being completed in July of'99.
It should be noted that other equipment and systems outside of the scope of this electrical
system audit maybe subject to Y2K difficulties. A comprehensive check and test of
critical systems would be prudent These would include but not be limited to:
· SeCUrity systems
· Communication systems
· Alarm systems
· Emergency medical equipment
· Disaster plans
ENERGY MANAGEMENT
Limited billing history was available to establish historical highs, lows, and patterns but
the copies of two power bills supplied were enough to gain a picture of the billing in
relationship to weather and demand.
The demand charge is $5.40 per month per kw of demand and during the summertime
(from June 1 to October 1) there is an additional demand charge of $7.75 per kw of
demand. Energy management is restricted from shifting operating hours and reducing
the load due to public service obligations. ·
Reducing the demand is a means to lowering the cost for power. A time-of-use rate
would not be appropriate because of the hours that the building is occupied and the need
for public business during normal business hours when time-of-use rates are the highest
City of Tustin ,ic Center
Electrical System Audit
06/28/99
Reducing the 15-minute demand involves upgrading equipment or redesigning systems to
take advantage of new technologies and more efficient equipment. Installing equipment
that will coordinate the s .tarting and running of electrical loads can also provide a means
of reducing the energy costs.
It is recommended to study the loading characteristicS to determine if some of the
following equipment would reduce consumption and demand.
· Identify loads that can be interrupted for the period of the demand cycle (15
minutes)
· Identify loads that can be cycled off and on to avoid exceeding the high
demand limit
· Replace light switches with motion sensitiVe type where appropriate
High efficiency exits signs~ parking I°t lights, and a review of the heating and
ventilation system.
· Replace pieces of large equipment with several smaller ones. (especially air
conditioning units)
· Stock high efficiency replacement parts
SYSTEM OPERATION
It is recommended that an operating plan be develooed and posted in the electrical
rooms. It is also recommended that the maintenance staff personnel be trained and
equipped to operate the electrical system.
The electrical room and the generator room need to be cleared of combustible materials
and supplies stored in them. Items like spray cans, lubricants, cleaning agents should be
removed.
A key should be kept on site and available to maintenance staff personnel or the fire
deparunent.
City ofTustin C : Center
Electrical System Audit
06/28/99
SYSTEMS STUDIES
The loading patterns and equipment have changed from the original design but not
enough to overload feeder Circuits or equipment. Here is a list of studies and evaluations
that are normally performed on systems during the design stage and should be reviewed
every 3 years or whenever major changes are contemplated on the system.
· Protective Device Coordination Study- This analysis establishes setting and ratings
for breakers, relays, and fuses to limit the damage and outage area effected by a fault
to as small as possible.
· Load flow- This study examines the ability of individual circuit ratings, plus power
factor and voltage levels at various points in the system.
· Short Circuit- This series of calculations identifies equipment rating adequacy and
provide data for coordination. The two studies are normally done together.
· Device Evaluation- This will determine whether the electrical equipment matches
.with the actual service requirements.
· Surge Protection - This sm. dy will determine whether surge arresting equipment is
adequate to protect the system components from lightning and switching surges.
POWER FACTOR CORRECTION
Power factor correction is not warranted for cost savings, loading requirements, or
voltage optimization.. The billing power factor hms in the 80% to 85% range.
Power factor charges are only 0.47% of the total bill. The payback at the presefft tariff
structure would be over 20 years to improve the power factor by 50%. This would be a
saving of only $42 a month with a minimum initial cost of $10k for the upgrading of
equipment and/or the installation of static capacitors to improve system power factor.
TRANSFORMER EVALUATION
There are two transformers on the distribution system:
Transformer T-1 is a delta / wye connected 300kva dry type transformer. It shows no
signs of abuse or overload. It has adequate ventilation to prevent overheating. The
transformer losses are not significant and the savings from upgrading the transformer
would not warrant the expenditure.
City of Tustin ic Center
Electrical System Audit
06/28/99
Transformer ET-1 is a delta / wye connected 225kva dry transformer. It shows no
external sign of abuse or overload. 'It too has adequate ventilation to prevent overheating
but it is located above transformer T-1 and heat from T-1 can place ET-1 in a higher
ambient temperature. It is recommended to increase the frequency of inspections and
maintenance on transformer ET-1. Ventilation would also be improved with a cleaner
environment and forced ventilation in the electrical room.
The ET-1 transformer connection traps any harmonic currents within it and prevents
them from entering other parts of the system. This is beneficial to the system and the
generator. The harmonic loading on the transformer should be a consideration for
loading.
EQUIPMENT UPGRADING
As part of a periodic system review equipment upgrading should be considered because
of the changes that evolve in rates, incentive programs, new appliance technology,, load,
and changing work schedules.
Another approach to energy efficiency is the continual upgrade of equipment as it is
replaced. This involves making a plan to manage energy cost, identifying and stocking
energy efficient replacement parts, and a continual education on new products on the
market. This approach prevents the large capital outlay required for complete retrofit
programs and allo~ costs to be managed.
DIAGNOSTIC TESTING & SCHEDULED MAINTENANCE
Thermographic scans can' detect potential problems by sensing heat from connections
that are failing. A big advantage to thermographic scanning over torquing connections is
that it can be accomplished while energized. A thermographic scan should be included
as part of the maintenance program.
ENVIRONMENTAL CONCERNS
No Polychlorinated Biphenyl filled equipment was found. The two transformers are of
the dry type.
Consideration should be given to eneGo3, management programs and policies that would
curtail the use of power and subsequently improve the environment
10
City of Tustin C : Center
Electrical System Audit
06/28/99
CONSDERATIONS
EMERGENCY GENERATOR CAPACITY:
A review of the construction prints and field conditions indicates a revised figure for the
connected load on the emergency generator of 230kva. The generator is rated at 250kva
or 200kw ~ 80%power factor. The calculated 230kva does not allow for an estimated
demand of 70% on the system. A 70% estimated demand would place the emergency
load at 161kva on the generator. The 16Ikva will allow it to start and run easier and
more economical.
Unlike the connected load which is the sum of all of the loads on the system, the
estimated demand load can vary according to the time of day, weather, day of the week
and flow long the'power has been interrupted. Estimated demand is the loading level that
the system is expected to operate at because of various conditions. An example would be
a sump pump in the garage. If it is not raining then the sump pump would not operate.
The sump pump would not effect the estimated load on a dry day but is always calculated
into the connected load. The connected load would be the maximum load that the
generator would be required to carry.
Additional priority loads could be operated from the emergency generator system by
utilizing loading factors, and supervised load cycling. These are methods of manually or
automatically cycling the major appliances and equipment to prevent them from
operating at the same time. These 'plans should be developed prior to any anticipated
need. .
SOME AREAS OF CONCERN:
The seven refrigerators on the North wall in the evidence room are on the emergency
system but the one freeZer that is on the East wall in the evidence, storage room is not on
the emergency system. There are some options.
· Move the unit to the North wall and plug it into the outlet with the other
freezers.
· Leave the unit where' it is and nm an extension cord during prolonged
out2ges.
· Verify if the 8~ refrigerator unit is necessary. It maybe poss~le to move the
contents of the freezer and unplug it because a new walk-in unit has been
added.
11
City of Tustin ,4c Center
Electrical System Audit
06/28/99
The walk-in freezer is not on the emergency electrical system and would loose power if
an outage occurred on the commercial power grid. It is served from Panel 'P9'. Here are
possible solutions to operating the freezer and preserving critical blood evidence:
· Verify if it is possible to move the evidence to another location or to the smaller
freezers.
· Move the electrical supply for the unit to the emergency system
· Permanent basis
· Temporary basis (3 phase 120/208 volts plugs andcords)
· Provide a small portable generator to provide temporary service.
Consult the manufacturer of the freezer about the defrosting time window.
In an effort to be prepared in an. emergency, it would be prudent to perform a live
simulation of a commercial power interruption.
· Load on the generator
· Voltage levels at various points
· Power factor
· Fuel consumption
· Battery condition
· Verify at what level and how long critical public services will remain operational
.· Develop and practice an emergency plan testing equipment and training
personnel.
· Verify UPS systems
There is a need for a comprehensive energy management plan that would provide both
short term and long term plans for the operation, care, and cost controls of the electrical
system.
· Parts inventory or availability
· System capacity
· Operating instructions and .training
· Annual maintenance / testing / cleaning
· Energy management
· Load evaluation
· Power quality
· System study updates
12.
City of Tustin ( ~c Center
Electrical System Audit
06/28/99
'-2
-".i
:.]
ESTIMATES
PRICE ESTIMATES-
Activity
1. Provide a single line. diagram in the electrical room
2. Train maintenance staff personnel to operate the
system.
3. Perform maintenance.on the equipment in the electrical
room
.
·
Remove the flammables stored in the Main Electrical
& Generator Rooms
5. Initiate a comprehensive 'energy management plan'
that would develop and review procedures for the:-
· Operation
· Maintenance
· Power quality
· Disaster preparedness
· System protection
· Energy cost'
6. Perform a live simulation of a power outage
7. Build an inventory of fuses, spare parts, and basic
equipment.
8. Drawings updated to 'as-built' stares.
9. Tag and label the shunt trip system for the A/C in the
computer room.
10. It is recommended that the breakers in the electrical
room be identified with common names.
11. Complete Price
Cost
$12,700
13
March 30, ~, 998
#98-16
To: Ail Kohler ~Jales Managers and Service Manager~:
Subject: YEAR 2000 COMPLIANCF
The following products aM year 2000 compliant and will not be adver~e/y atoned when
the year changes from 1999 to 2000. Alt funcb'ons will operafe properly.
Transfer Swifche~
Generator Set Cont~ller~
There ara no other products Hat am date dependent.
M340, M340+
Decision Maker 340
$ince~ly,
P.'~duct Manag~,.-~ctrical Component~
Generator Division
EXHIBIT B
Cc,~, SENT CALENDAR-AGENDA ~ ~ ..~M # 4
EXECUTIVE COMMITTEE MEETING
July 22, 1999
TO:
FROM:
SUBJECT:
Executive Committee, Orange County Fire Authority
Hugh Wood Assistant Chief,
Technical Services Department
Year 2000 Plan Update
Summary_:
This item is submitted as an update on the Year 2000 Plan.
Recommendation:
Receive and file report.
Background:
The year 2000 issue involves systems and electronics that use calendar dates within .their
software. In the 1960's when many of the programs used today were developed, they did not
include the century when they processed information using numerical dates, such as April 1,
1966 became 040166.
OCFA has known for quite Some time that some of its key equipment and systems did have this
problem but Were able to identify solutions for each. We are in the process of completing our
programming and/or equipment replacements of those affected systems. It has also come to our
attention that some less critical equipment and systems may also be affected. We are in the
process of identifying these potential problems so that solutions can be put in place before
January 1, 2000.
The following are key updates for this month:
.
OCFA continues to test the electronics of its fire engines and trucks for Y2k compliance as
they are schedule for normal maintenance. This procedure is in addition to receiving written
confirmation fi-om Detroit Diesel, which manufactures the electronics, on their Y2K
readiness as well as a hard copy of their testing plan and results.
.
The Finance/HR System upgrade is now in its final stages of implementation and expected to
be completed by the end of July. This upgrade was recently accelerated due to Y2k problems
encountered in transitioning to the new fiscal year 99/00, beginning July 1, 1999. The back-
up system is installed with upgrades to UNIX, ORACLE, and Forms. The actual SCT Banner
Software was upgraded in late May and has been released to Finance for testing. Once
testing is completed, the databases will be synchronized and production will be rolled to the
back-up system. The process will then be repeated on the old production system so both
systems will be at the same version.
Consent Calendar-Agenda Item ~.
Executive Committee Meeting
July 22,1999 Page -2
.
The Steering Committee and Working Team continues to meet, weekly on the replacement of
OCFA's Incident Reporting System (OCFIRS), Training Records System (TRS), and
Emergency Medical System (EMS). A scope of work was developed and a formal RFP was
issued with a closing date of June 10, 1999. Responsible bidders have been evaluated and a
recommended vendor has been identified. Approval to negotiate a contract is submitted
within another agenda item of this meeting. In addition, a contingency plan is under
development to upgrade current systems should the new system not be available by 1/1/2000.
4. OCFA's Internet Webpage continues to be updated every month with our status and provides
links to other internet Y2K sites.
.
An Authority-wide contingency plan is being developed which will cover Y2K related
emergencies which may impact operations demand and external resources. A draft of this
plan will be submitted to Executive Management in July for their review. A report of this
plan will be submitted to the Executive Committee in August.
Fiscal Impact:
Capital Improvement Plan includes budgeted systems and equipment upgrades and replacements.
Staff Contact for Further Information:
Roger Stites, Manager Information Systems
(714) 744-0491
Attachments:
Year 2000 Plan, JulY 12, 1999 Update
Year 2000 Computer Systems and Equipment Inventory
EXHIBIT C
MAG~ O01/~ HightFAX
June 15, 1999
REL, EIVFr
COMMUNF¥' DEi/EL¢ :.,
Z i II
liS.. Departt of Justice
office of lUaticc
..... rlf' 0531
ACal
R~CEIvED
JOlv .~ 2' 1999
'~DMINISTRATiON
The President's Council on Year 2000 Conversion believes that individual people throughout thc
country need to have opportunities to meet with local oflSciaJs to learn first-hand what effects, if
any, they might reasonably ant/cipatc from thc Year 2000 problem. Such dialogs can go far to
dispel z~mors and communica~ facts.
Sincerely,
tralion
Attachments
Acco~inSly, the Council created a "toolkit" for local authozities to usc in conducting such
dialogs, th~ the Council is calling "Community Conversations''. The attached press release and
question-answer sheet give the information about how thc toolkit can bc obt=incd and used. Wc
cucourage you to con,ldcr using it in your community interactions during thc re. rv~inlng months'
of 1999.
.i
J
Press Re. lease
{202}~5~-?171 . PAX(20'2~456-7172
ON YEAR 2000 CONVERSION
For Immediate Release Contact: Jack Gr~ben
May 24, 1999 (202) 456.7010
WILL YOUR COMMUNITY BE READY FOR Tf~ YEAR 2000?
Cotmcal Promotea "Y2K Conunnnity Conversations" To Help Serv/c~ Providers, Citizens Prepare
at the Local Level for the Century Date Change
Strcssiag thc importance ofprcpadng at thc local lcwl for thc tr_~.~itiaa to thc Year 2000 (Y2K), thc
President's Council on Ycar 2000 Conwrsion today launchcd a nation.wide c~mpaign tn promote "Y2K
Comm-nity Conversations" about rcadineas for th~ century datc change.
With a free toolkit and cvcnts held throughout thc summer, thc Council-lcd'c=mpaignwill support and
cncouragc tl~ efforts of govcmmcnt officials, business lcadcm, and intercstcd citiz~.~ to meet thc Y2K
challeagc in communities acros~ thc country and to sharc i~formntion about thc'ir progress. Y2IC.
Comm,,-ity Conversations, which build on discuss/ohs already being held in some axe. as, give people an
opportunity to hear from kcy scrv/cc.pro.vide~on the status of efforts to preparc computcrs for thc datc
change and the work th~ remains tn bc aon~. inc gn,he..rin.gs also enable local citizens to raise conccrns
they may havc about th'c Y2K problem and work with service providers to idcntify areas where
additional _community preparation and plan~ing arc nccdcd.
"Our grcat~st domestic risks for Ycar 2000-related failurcs arc at the local level," said Council Chair
John A. Koskine~- From power and phonc cornp=,~;cs to banks and water u~i. tics, Am~c~,n,.w...ant to
know how thc important local scrviccs upon w~ch _they rcly..may bc .aJ~c. ctca by, co.m.~utcrs: ab .mty,~
proccss tl~ century datc cb=-gc. Y2_K .Co. mm,--ty .co.nv.crsauons..can nc~p ?opic o~
~rogrcss that has been r~,~_,., what the ris~ arc, aha what prccauuons may o~ appr0Pnste tn agnt
those risks."
Advisors Group to cncouragc local public officials and scrvicc proviacrs m icao or pamczpax
convcrsatioas withi~ thcir own co_mm~mltics. Senior Advisors Group org_=~izntions ~ thc American
B_~=~ccrs Association, thc Arncrican Hospital Association, and the North Amer/can Electric Reliability
Council bare announced thC/r support for thc c~m?aign and ~ as.ld~_g their ,m~. crs.t0.play, an..ac~/.'vc
role in inf~g citizcns about local Y2K readiness. Thc National Ciovcmors Assoc~auon, mc u.~.
Confcrcncc of Mayors, thc National I.cague of Cities and other members of thc Council's Sta~ and
Local Oovcmmcnt World~g Group havc also announced support for thc campai~o~-
Y2K Cor~rm~ity Ccravcrsations for thc summer ha-cc alrcady been scheduled for the following
comr--~iti~: Hartford, Con~ecticu~ C-r¢ca Bay, Wiscons/n; Frankfort, Kentucky; Columbus, Ohio;
Salt La~ City, Utah; Austin, Tcxas; Hot Springs, Ar~a~.~as; I4~mpton l~ads at-ca, Virginia; x-lncoln,
Nebraska; ~nd Dca Moines, Iowa. Pla~ are also underway for convcrsations in St. Louis, lv~souri and
Chicago, Illinois.
"In marry communities, scrvicc providcrs havc been workiz~g hard to keep citizens i~fozznccl of their
progrcss ~rl thc work that remain," said l~_o, vi~c-n. "Wc hope ,~i., campaign will sul~port their cff'orta
and encourage others to start talldng about thc Y2K ta'oblcm with their customers and constitucats,
which in somc commuaitics vAll iacrcasc thc level of effort being devoted to meeting thc Y2K
cb nll cage."
1 o.t"2
614.199 11:55 .,~'
L~.O-Ud~ 6/16/99 11'35 PAGE 003/4
RightFA×
·
h~/w~v.~go-~aew/052¢?RASA~n
Koskinen added, "Our goal is not to cheerlcad or create a false se=sc of security. Our §oal/s for
~part/cipants to share factual infmxnatian about what's been done, what rcnaMn.~ to bc doxae, and what
difional actions a commun/ty should take as a r~ult"
To help local leaders arganizc and promote events focused on local Year 2000 efforts,.the Council is
making available a free "Y2K Comrnu-ity Conversations" toolkit: The toolkit
· a gu/dcbook for putting together a mcct/ng from start to fin{~h- with suggestions for agendas,
selcct/ug formats and participants, promoting thc meeting, and follow-up;
· frequently asked questions about the Y2K problem;
· a videntapc with/ntroductory remarks from President Clinton; and
· a Y2K Community Conversations poster and other promotional ~s.
Copies of the toolkit can be ordered though the Council's frcc inform~tlon line 1-Sg~-USA-4-Y2K
(1=g88-872-4925). Local leadezs can also call thc information linc with questions about how to organiz~
and lrramote Y2K conversations/n their co ~,~ties. A text version of the guidebook is available an
the Coundl's web sit~ at www.¥2k~gov_. '
The Pr~i8--ne-s Council on Year 2000 Conversion, established on Feb. 4, 1998, by Executive Order
13073, is respons~le ,for coorcl{nating the F~deral Oovernment'_s efforts to address .~e Ye~ 2000,,
problem. Thc Council s more than 30 memb~ agencies ar.c wor~.'.n~ to pr. omo.re acttan on ?.e proomm
and to offer support to public and.private sector organizati ~ons wiih,n the~_r policy ~_e~_. %?.t the__..
Council via the Interact at www.y2.~gov. For consumer infom~tion on the Year 2000 proo;cm, can me
Council's f:rcc infat'mation linc at I-$SS-USA~Y2K.. ·
2of2
6/4/~9 11:55
Community Conversations
"We n~cd evcxy srat~ and local §ovcnnncnt. cvcry bus. ss. large ami
~11~ to work with us to make s~c that [thc] Y2K con~utcr Bug wffi
be ~~'~d a~ thc last hcadachc of thc 20th century, not thc 'first
crises of thc
- President Bill Clinton
1999 State of the Union Address
What are "Y2K Community Conversations"?
Y2K Cor~m,mity Conx~rsations are'meetings that will inform Amaricaas about the steps
that busincsscs and governments are ta_king at the local level to ensure their comm]mkies
will be ready for the Year 2000 tran.~ition- ' At these meetings, citizens will hear from
represeatatives of major local sez-~rice providers such as bank% power and telephone
companies, water authorities, and government agencies, as well as large employers aad
other organizations.
3mexican-, want to know what they can expect on and after lanuary 1, 2000 from the
iastit~ons upon which they depend. Community Conversations provide a structured
foI~m for organizations to des¢ffoe their own Year 2000 read{ness efforts, address Y2K
concerns of customers and constituents, and collaborate with business, partners on
contingency plan-ing.
What can I do ?
Lead or be part of a Comm,,nlty Conversation in your town. It's simple. 'The President's
Council on Year 200.0 Conversion has created a us er-friendlY "Community Conversations
Toolldf' to get you starred.
The molkk offers impoxiant information compiled by the Year 2000 Council that will
help you build a framework for the discussion, address frequently asked questions, and
learn from the experiences of other commu-ities addressing the Y2K problem.
Where do I get more information ?
To learn more about how you can support Cornmtln{ty Conversations in your local area,
call 1-S88=USA-4-Y2K or visit www.y~-kgov.