HomeMy WebLinkAbout12 PROJECT 400042 08-17-98DATE: AUGUST 17, 1998 NO. 12 8-17-98 Inter C o/ TO: FROM: SUBJECT: WILLIAM A. HUSTON, CITY MANAGER PATRICK SANCHEZ, DIRECTOR, PARKS AND RECREATION SERVICES PROGRESS REPORT: CEDAR GROVE PARK (PROJECT NO. 400041) AND HERITAGE PARK (PROJECT NO. 400042) ISIJMMARY:. City .Council has requested, monthly progress,.reports on Cedar Grove and Heritage Parks. ~ RECOMMENDATION: Receive and file. BACKGROUND: City Council has requested monthly progress reports on the status of Cedar Grove and Heritage Parks. As of this date the parks are proceeding as follows: Cedar Grove Park .(Project No. 400041) The project is approximately 100% complete. All that remains are the following: · Completion of the punch list inspection · Re-circuiting of the flagpole light circuits (to leave flagpole lights on all night) · Repair of the drinking fountain · Irrigation repairs · The remainder of the 90-day maintenance period Maintenance period to conclude on September 1 st Repairs have been made to the tot lot area to repair two hazards that have been noticed since the park opened. Heritage Park (Project No. 400042) · The overall project is 70% com!21ete. · The hockey rink concrete has been poured; concrete walkways around hockey rink are complete. · The underground drainage system is 95% complete, and all the drain structures have been installed. · The restroom building is 95% complete. · The basketball court slab is complete. · The curb and gutter on-site are 90% complete. · Installation of valves, laterals and electric conduit is in place for the irrigation sYstem. · The excess dirt has been hauled away and fmal grading is underway. · Recent inspections of the tot lot fall zones found that the exact dimension specifications for toys are in order. · Parking lot approaches have been poured. · The walkway parallel to Tustin Ranch Road is 100% poured. · Demolition on Kinsman Circle and Heritage Way is complete. Concrete has been poured. · Re-cutting of tot-lot is complete, and boulder placement is in progress. · Monument sign is 95% complete. · Tree planting is in progress. Park Dedication is scheduled for September 19, 1998. Respectfully submitted, Patrick Sanchez Director, Parks and Recreation Services SC CC: Gary Magill, Recreation Superintendent e/mydocs/PS/Staff Reports/Progress Report CGP & HP.doc