Loading...
HomeMy WebLinkAbout01 AWARD CONTRACT FOR ARMSTRONG AVE GRADING AND STORM DRAIN PROJECT�n�- Agenda Iterr. AGENDA REPORT Reviewed: City Manager Finance Director MEETING DATE: JULY 24,2013 TO: JEFFREY C. PARKER, CITY MANAGER FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER SUBJECT: AWARD CONTRACT FOR THE ARMSTRONG AVENUE, WARNER AVENUE, DISPOSITION AREA 2B, 2C, & 8 GRADING AND STORM DRAIN PROJECT (COLLECTIVELY, CIP NO. 70201, 70202, & 70222) SUMMARY Staff is requesting that the City Council award the construction contract for the Armstrong Avenue, Warner Avenue, and Disposition Area 2B, 2C, & 8 Grading and Storm Drain Project (Collectively CIP No. 70201, 70202, and 70222) to the lowest responsive/responsible bidder, Sukut Construction, Inc., and appropriate necessary project funding from Land Proceeds. RECOMMENDATION It is recommended that the City Council: Appropriate $10,700,000 from Land Proceeds (Fund No. 189) as identified in the adopted Fiscal Year 2013-2014 Capital Improvement Program; obligating $2,200,000 for Armstrong Avenue Grading and Storm Drain (CIP 70201), $500,000 for Warner Avenue Grading and Storm Drain (CIP 70202), and $8,000,000 for Disposition Area 2B, 2C, & 8 Grading (CIP 70222) covering the costs of construction, construction management and engineering, environmental mitigation monitoring/compliance, geotechnical and materials testing, archaeology and paleontology monitoring/compliance, and a fifteen (15%) construction contract contingency. Z Award the construction contract for the Armstrong Avenue, Warner Avenue, and Disposition Area 2B, 2C, & 8 Grading and Storm Drain Project (Collectively CIP No. 70201, 70202, and 70222) to the lowest responsive/responsible bidder, Sukut Construction, Inc., in the amount of $8,486,135 and authorize the Mayor and the City Clerk to execute the contract documents on behalf of the City; FISCAL IMPACT With the recommended action, sufficient funds will be available to cover project expenditures as estimated in the approved Fiscal Year 2013-2014 Capital Improvement Program for the Armstrong Avenue, Warner Avenue, and Disposition Area 2B, 2C, & 8 Grading and Storm Drain Project (Collectively CIP No. 70201, 70202, and 70222). Fund 189 will provide all necessary funding and as future development occurs within Legacy, the associated backbone fee (Fund 187) will reimburse Fund 189 for both Armstrong and Warner. DISCUSSION On May 21, 2013 City Council approved the plans and specifications and authorized the City Clerk to solicit bids. The grading of Disposition Areas 2B, 2C & 8 within Neighborhood D is split into two phases due to the existence of a temporary Irvine Ranch Water District (IRWD) sewer in the phase Award Contract for Armstrong, Warner, & Disposition 2B, 2C, & 8 Grading and Storm Drain Project July 24.2O13 Page 2 2 area which must remain in place until the permanent sewer is built along B@D3nCa Parkway and within the existing pDrbOO Of Tustin Ranch Road. This permanent sewer work is being cOOSLRJctBd as @ separate project already underway. Sukut's bid iDC|UdeS the n3rDova| of the temporary SevveF and the grading of both phases. Since the grading of this site requires imported material from the future Community Park site and also vvoU|d eliminate drainage GVVG|es and detention b@SiOS currently OO the Sbe. grading Of Warner Avenue and ArDlSt[0Og Avenue bordering this site as well as the iDSt8||GdDO Of the storm drain system within these roadways is also required. Formal bids were publicly opened on July 17' 2013 and reviewed by Public Works. Four (4) bids were received by the noticed deadline and are summarized below by order of least dollar amount: • SUkut Construction, Inc ........ ...... • McKenna General Engineering .... • Angeles Contractor, Inc ......... -- • Fleming ERV[OD[OeDt@i |OC--- -------------$ 8.488.135�00 -------------$ 8.884,471.40 ----------- $1O'932.000.00 --------- $11.387.188.00 Staff has reviewed the references and the State Contractor's License for 8ukUt Construction, Inc. and has determined that they are appropriate for the project. It is recommended that the City Council award the COnstnUCiioD contract to the k}VVeSt responsive/responsible bidder. SUhUt Construction, Inc., and 8UihO[iz8 the K8ayO[ and the City Clerk to execute the contract documents on behalf of the City. Douglas S . P.E. IPublic Works/City Engineer Attachment(s): N-O Mass Grading Index Map G:\]ty Council Items\2013 Council 8amnVwv nd of Contract for Armstrong Warner Disposition Area 2e oC 8 Grading and Smnn Drain (rev 2).docx 3SVHd 8 1 1 MMITT-V-M61 VKIOV-01UM, 91 c4 Jill," ul LUL, CO L'i uj, . . . . . .