Loading...
HomeMy WebLinkAbout04 ADOPT RESOLUTION 13-77; PEDESTRIAN ENHANCEMENTSAGENDA REPORT Reeeweldm 4 0 City Manager Finance Director MEETING DATE: OCTOBER 15, 2013 TO: JEFFREY C. PARKER, CITY MANAGER FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS /CITY ENGINEER SUBJECT: ADOPT RESOLUTION NO. 13 -77 TO ACCEPT IMPROVEMENTS FOR THE ROBINSON DRIVE / KELLER DRIVE PEDESTRIAN ENHANCEMENTS (CIP 40083) AND BROWNING AVENUE / PARKVIEW WAY PEDESTRIAN ENHANCEMENTS (CIP 40084) SUMMARY Construction of the Robinson Drive /Keller Drive Pedestrian Enhancements (CIP 40083) and Browning Avenue /Parkview Way Pedestrian Enhancements (CIP 40084) has been completed to the satisfaction of the City Engineer and the projects are now ready for City Council acceptance. RECOMMENDATION It is recommended that the City Council: Adopt Resolution No. 13 -77 accepting the construction of the Robinson Drive /Keller Drive Pedestrian Enhancements (CIP 40083) and the Browning Avenue /Parkview Way Pedestrian Enhancements (CIP 40084); and 2. Authorize the City Engineer to execute and file the Notice of Completion with the County Recorder's Office. FISCAL IMPACT The final construction cost for the Robinson Drive /Keller Drive Pedestrian Enhancements (CIP 40083) is $103,994 and the cost for the Browning Avenue /Parkview Way Pedestrian Enhancements (CIP 40084) is $133,829, for a total construction cost of $237,823. Construction funds are available through a State Safe Routes to Schools (SR2S) grant for a maximum of $251,310, or 90% of the actual project cost, whichever is less. Ninety percent (90 %) of the total construction cost is $214,040 for which a reimbursement will be requested from the State. The City's ten percent (10 %) share of the construction costs will be paid from gas tax funds which have been appropriated for the two projects within the adopted Capital Improvement Program. CORRELATION TO THE STRATEGIC PLAN The installation of pedestrian enhancements contributes to the fulfillment of the City's Strategic Plan Goal A: Economic and Neighborhood Development, strategy #7 creating linkage between parts of the community and Plan Goal B: Public Safety and Protection of Assets; specifically, the project implements or fosters the implementation of strategy #3(b) which, among other items, is to ensure continuous maintenance and improvement of traffic control and transportation facilities. Notice of Completion for Pedestrian Enhancements (CIP 40083 & 40084) October 15, 2013 Page 2 DISCUSSION The work included installation of In- Roadway Warning Lights (IRWL's) on Robinson Drive at Keller Drive, adjacent to Tustin Ranch Elementary School, and on Browning Avenue at Parkview Way, adjacent to Utt Middle School. It also included flashers, signs, sidewalk, curb & gutter, and ADA ramp improvements. Power is being delivered at each location using solar panels. Work on CIP's 40083 and 40084 was performed simultaneously by one contractor due to the similar nature of the work and the efficiency of utilizing the same contractor. Construction of these projects is deemed complete to the satisfaction of the City Engineer and is now ready for City Council acceptance. S. Stack, P.E. Df ublic Works /City Engineer Attachment(s): 1. Resolution No. 13 -77 2. Location Maps S:\City Council Ilems\2013 Council Items \NOC Pedestrian Enhancements at Robinson Dr.- Keller Dr. (CIP No. 40083) and Browning Ave. - Parlsview Way (CIP No. 40084) .does ATTACHMENT 1 Resolution No. 13 -77 RESOLUTION NO. 13 -77 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, ACCEPTING THE WORKS OF IMPROVEMENT AND AUTHORIZING THE RECORDATION OF THE NOTICE OF COMPLETION FOR THE ROBINSON DRIVE / KELLER DRIVE PEDESTRIAN ENHANCEMENTS (CIP 40083) AND THE BROWNING AVENUE / PARKVIEW WAY PEDESTRIAN ENHANCEMENTS (CIP 40084) WHEREAS, Asplundh Construction Company, having a contract with the City of Tustin to construct the hereinafter described public works and improvement; and WHEREAS, the City Engineer has duly certified to the construction and completion of said public improvement hereinafter mentioned in a manner satisfactory to the City Council of the City of Tustin; and WHEREAS, the City Council finds that said contractor has completed said public improvement hereinafter more particularly described in accordance with the provisions of the contract documents and the Notice of Completion, and acceptance of said public works and improvement should be filed and payment of the balance due said contract authorized in accordance with the contract documents; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin that said public works and improvement is found to be complete, and the same is hereby accepted. Said public works and improvement is more particularly described as follows: • Robinson Drive / Keller Drive Pedestrian Enhancements (CIP 40083) • Browning Avenue/ Parkview Way Pedestrian Enhancements (CIP 40084) BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin is hereby authorized to execute and file a Notice of Completion for the acceptance of said public works and improvement described herein as required by law. Resolution 13 -77 Page 1 of 2 PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 15th day of October 2013. Elwyn A. Murray, Mayor r_IIIIIIr *111111 Jeffrey C. Parker City Clerk STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS CITY OF TUSTIN ) I, Jeffrey C. Parker, City Clerk of the City Council of the City of Tustin, California, do hereby certify that the whole number of the members of the City Council is five; that the above and foregoing Resolution No. 13 -77 was duly and regularly passed and adopted at a regular meeting of the City Council held on the 15th day of October, 2013 by the following vote: COUNCILMEMBER AYES: COUNCILMEMBER NOES: COUNCILMEMBER ABSTAINED: COUNCILMEMBER ABSENT: JEFFREY C. PARKER City Clerk Resolution 13 -77 Page 2 of 2 ATTACHMENT 2 Location Maps VICINITY MAP Robinson Drive / Keller Drive r Pedestrian Enhancements I (CIP No. 40083) ® y° 1 � � I 7� 7 Y r • MSnN RANCH ° a 9 �F_ a � i a 'Y i .F TUSTIN LEGACY Y A NO SCALE PROJECT LOCATION Robinson Drive & ROBlNSolv Keller Drive DR/V�F W O TUSTIN w RANCH MAJESTIC DRIVE W ELEMENTARY Y FILE CIP - ROBINSON k KELLER- NCINITYAWI, VICINITY MAP Browning Avenue / Parkview Way Pedestrian Enhancements d (CIP No. 40084) a { r t y o r e lVSnN e ,V 1' RPNCH • s- 't s .t y • r 't TUSTIN LEGACY NO SCALE UTT �J MIDDLE P� SCHOOL 0 QJ PROJECT LOCATION — Browning Avenue & Parkview Way A �\\� ��•rL G,r\QQ��P oQJ\o �'L PILE: CIP - BROWNING k PMKVIEW- NCINRY.Evq