SUMMARY
Construction of the Traffic Signal Battery Backup System Installations — Phase 2 CIP 40079 and
the Traffic Signal Controller Equipment Upgrades /Replacements — Phase 2 CIP 40080 have been
completed to the satisfaction of the City Engineer and the projects are now ready for City Council
acceptance.
RECOMMENDATION
It is recommended that the City Council:
Adopt Resolution No. 13 -73 accepting the construction of the Traffic Signal Battery Backup
System Installations — Phase 2 CIP 40079 and the Traffic Signal Controller Equipment
Upgrades /Replacements — Phase 2 CIP 40080; and
2. Authorize the City Engineer to execute and file the Notice of Completion with the County
Recorder's Office.
FISCAL IMPACT
The final construction cost for the Traffic Signal Battery Backup System Installations — Phase 2 CIP
40079 is $125,930 and the Traffic Signal Controller Equipment Upgrades /Replacements — Phase 2
CIP 40080 is $139,070 for a total cost of $265,000. Measure M2 Fair Share Funds were
appropriated for the projects in the City's FY 2012/13 Capital Improvement Program in the amount
of $390,000. CIP's 40079 and 40080 are being constructed in multiple phases and remaining
funds will be applied to upcoming phases.
CORRELATION TO THE STRATEGIC PLAN
The installation of Battery Backup Systems at traffic signals contributes to the fulfillment of the
City's Strategic Plan Goal B: Public Safety and Protection of Assets. Specifically, the project
implements or fosters the implementation of strategy #3(b) which, among other items, is to ensure
continuous maintenance and improvement of traffic control and transportation facilities.
DISCUSSION
The installation of Battery Backup Systems (BBS's) at traffic signals is desired in order to maintain
safe, normal vehicular operations when planned or unplanned electrical interruptions occur.
Although BBS's are currently being installed at all new traffic signals, there is a need to install them
Battery Backup Installations and Traffic Signal Controller Upgrades — Phase 2
October 15, 2013
Page 2
at older traffic signals through a retrofit process. Within the current City's Capital Improvement
Program CIP 40079 provides four phases of BBS installations spread over four (4) successive
fiscal years, thereby ensuring that all city- maintained traffic signals ultimately have operational
battery backup systems.
Phase 2 of CIP 40079 consisted of thirteen (13) traffic signals along Newport Avenue from Old
Irvine Boulevard to Valencia Avenue, excluding Newport Avenue at Irvine Boulevard which has a
BBS installed under Phase 1. The project also included installation of three (3) new BBS's on
Edinger Avenue and one new BBS on Seventeenth Street. All signals on these three arterial
highways now have operational BBS's.
CIP 40080 consists of three phases of upgrades or replacements for existing traffic signal
controller equipment spread over three (3) fiscal years. Phase 2 of CIP 40080 consisted of the
replacement or upgrades of controllers at fifteen (15) intersections along Red Hill Avenue, Newport
Avenue, Bryan Avenue, Walnut Avenue and Edinger Avenue.
Work on Phase 2 of CIP's 40079 and 40080 was performed simultaneously by one contractor due
to the similar nature of the work and the efficiency of utilizing the same contractor. Construction of
these projects is deemed complete to the satisfaction of the City Engineer and is now ready for
City Council acceptance.
Stack, P.E.
'ublic Works /City Engineer
Attachment(s): 1. Resolution No. 13 -73
2. Location Maps
S: \City Council Items\2013 Council Items \NOC BBS Installations -Phase 2 (CIP 40079) & Signal Controller Upgrades -Phase 2 (CIP
40080).docx
ATTACHMENT 1
Resolution No. 13 -73
RESOLUTION NO. 13 -73
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA, ACCEPTING THE WORKS OF IMPROVEMENT AND
AUTHORIZING THE RECORDATION OF THE NOTICE OF
COMPLETION FOR THE TRAFFIC SIGNAL BATTERY BACKUP
SYSTEM INSTALLATIONS — PHASE 2 CIP 40079 AND THE TRAFFIC
SIGNAL CONTROLLER EQUIPMENT UPGRADES /REPLACEMENTS —
PHASE 2 CIP 40080
WHEREAS, Pelagic Engineering, having a contract with the City of Tustin to
construct the hereinafter described public works and improvement; and
WHEREAS, the City Engineer has duly certified to the construction and
completion of said public improvement hereinafter mentioned in a manner satisfactory
to the City Council of the City of Tustin; and
WHEREAS, the City Council finds that said contractor has completed said public
improvement hereinafter more particularly described in accordance with the provisions
of the contract documents and the Notice of Completion, and acceptance of said public
works and improvement should be filed and payment of the balance due said contract
authorized in accordance with the contract documents;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin
that said public works and improvement is found to be complete, and the same is
hereby accepted.
Said public works and improvement is more particularly described as follows:
• Traffic Signal Battery Backup System Installations — Phase 2 CIP 40079
Traffic Signal Controller Equipment Upgrades /Replacements — Phase 2
CIP 40080
BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin is
hereby authorized to execute and file a Notice of Completion for the acceptance of said
public works and improvement described herein as required by law.
Resolution 13 -73
Page 1 of 2
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Tustin held on the 15th day of October, 2013.
Elwyn A. Murray, Mayor
ATTEST:
Jeffrey C. Parker
City Clerk
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
I, Jeffrey C. Parker, City Clerk of the City Council of the City of Tustin, California, do
hereby certify that the whole number of the members of the City Council is five; that the
above and foregoing Resolution No. 13 -73 was duly and regularly passed and adopted
at a regular meeting of the City Council held on the 15th day of October, 2013 by the
following vote:
COUNCILMEMBER AYES:
COUNCILMEMBER NOES:
COUNCILMEMBER ABSTAINED:
COUNCILMEMBER ABSENT:
JEFFREY C. PARKER
City Clerk
Resolution 13 -73
Page 2 of 2
ATTACHMENT 2
Location Maps
TRAFFIC SIGNAL BATTERY BACKUP SYSTEM
CIP NO. 40079 (PHASE 2)
�1 M nlRt
y
MRlml' ui « i
` 55
.a�M me* •v2 ago � O � P
5 '
d� E
asr fm[t � A
G } p/ 2 P•
•rn
Gp 24 4
i '4ay •osmi
/I
s
TVSTIN LECACY `
vim'• � � LEGEND:
i. 'b � � • =Y�� nSW .61IW1TS M�6W
Ji
•t
LOCATION MAP
.uam a mu
SIGNAL CABINET ASSEMBLY REPLACEMENTS 8L
SIGNAL EQUIPMENT UPGRADES
CIP NO. 40080 (PHASE 2)
55 � rummc W.� y
5 ,Y
s
ws, L� VV
55
'YL ♦ �'4¢a mar a
G +�
Lnrm .aur pj,'4
♦ F � 4 W,P � 6 F
�P � ♦ �� '� �� 4 wr ro Lout
TUSTIN LEGACY "Y\
wlr t+°` • \y,�� L E G E N D:
'« � � � `1• • . dY CBCi.RY6r 101/mUrR
�♦ b p tY/F �' yyMi ` f`jj � t . ' OVl LPMII IR.m
O'B �` 1 �� ♦ . NNf d04Y
Y t
LOCATION MAP ,� a