Loading...
HomeMy WebLinkAbout07 AWARD OF CONTRACT - BATTERY BACKUP (PHASE 3) CIP1TY O GST1 MEETING DATE: TO: FROM: SUBJECT: AGENDA REPORT DECEMBER 3, 2013 JEFFREY C. PARKER, CITY MANAGER Agenda Item Reviewed: City Manager Finance Director DOUGLAS S. STACK. DIRECTOR OF PUBLIC WORKS /CITY ENGINEER AWARD CONTRACT FOR THE TRAFFIC SIGNAL BATTERY BACKUP SYSTEM INSTALLATIONS CIP 40079 (PHASE 3) SUMMARY Staff is requesting that the City Council award the construction contract for the Traffic Signal Battery Backup System Installations CIP 40079 (Phase 3) to the lowest responsive /responsible bidder. RECOMMENDATION It is recommended that the City Council award the construction contract for the Battery Backup System Installations CIP 40079 (Phase 3) to the lowest responsive /responsible bidder, Pelagic Engineering, in the amount of $169,614.00, and authorize the Mayor and the City Clerk to execute the contract documents on behalf of the City. FISCAL IMPACT Sufficient funds have been budgeted and appropriated in this fiscal year's Capital Improvement Program utilizing Measure M2 — Fair Share (Fund 139) in the amount $235,000 for CIP 40079 (Phase 3). CORRELATION TO THE STRATEGIC PLAN The installation of Battery Backup Systems at traffic signals contributes to the fulfillment of the City's Strategic Plan Goal B: Public Safety and Protection of Assets. Specifically, the project implements or fosters the implementation of strategy #3, which among other items, is to ensure continuous maintenance and improvement of traffic control and transportation facilities. DISCUSSION AND BACKGROUND The installation of Battery Backup Systems (BBS's) at traffic signals is desired in order to maintain safe, normal vehicular operations when planned or unplanned electrical interruptions occur. Although BBS's are currently being installed with all new traffic signals, there is a need to install them at older traffic signals through a retrofit process. The project currently shown in the Capital Improvement Program (CIP) includes four phases spread over four (4) successive fiscal years, thereby ensuring that all City- maintained traffic signals have operational battery backup systems. CIP 40079 Phases 1 and 2 are now complete with the installation of BBS's at 33 traffic signals on Irvine Boulevard, Tustin Ranch Road, Newport Avenue, Edinger Avenue and Seventeenth Street. Phase 3 of CIP 40079 consists of BBS installations at eighteen (18) intersections, including the intersection of Walnut Avenue /Browning Avenue, five (5) intersections on First Street, five (5) Battery Backup Installations December 3, 2013 Page 2 intersections on McFadden Avenue, and seven (7) intersections on Red Hill Avenue, as shown on the attached location map. Upon completion of Phase 3, all existing traffic signals on First Street, McFadden Avenue and Red Hill Avenue will have BBS protection. Formal bids were publicly opened on November 12, 2013. The engineer's estimate was $164,000. There were five (5) bids received and the results are summarized below by order of least dollar amount as follows: Pelagic Engineering ...................................... ............................... $169,614.00 • Steiny and Company, Inc ............................. ............................... $180,369.00 • Siemens ........................................................ ............................... $197,600.00 • Asplundh Construction Corp ........................ ............................... $211,440.00 • Select Electric, Inc ....................................... ............................... $274,702.00 The State Contractor's License, bid bond and professional references for Pelagic Engineering have been verified and are appropriate for the project. ack, P.E. blic Works /City Engineer Attachment: Location Map S: \City Council Items\2013 Council Items\Award of Contract for BBS Installations(CIP 40079) -Phase 3 .docx ATTACHMENT Location Map TRAFFIC SIGNAL BATTERY BACKUP SYSTEM CIP NO. 40079 (PHASE 3) LOCATION MAP „mm