HomeMy WebLinkAbout07 PETERS CNYN TRAIL 12-01-97kGE .DA
DATE:
DECEMBER 1, 1997
TO:
FROM:
SUBJECT:
WILLIAM A. HUSTON, CITY MANAGER
COMMUNITY DEVELOPMENT DEPARTMENT
PETERS CANYON HIKING AND RIDING TRAIL
RECOMMENDATION
Receive and file.
BACKGROUND
At the. November 3, 1997 City Council meeting, Councilman Potts
requested a status update on the Peters Canyon Regional Park and
Peters Canyon Hiking and Riding Trail.
In April 1995, the County of Orange adopted the Lower Peters Canyon
Specific Plan. As an environmental Mitigation Measure of the
Specific Plan, developers are required to dedicate and construct a
portion of the permanent Peters Canyon Regional trail as part of
any development located adjacent to the trail. In April 1997, the
City of Irvine annexed the Lower Peters Canyon area and adopted all
mitigation measures contained in the Lower Peters Canyon Specific
Plan including the requirements for the construction of the Peters
Canyon Hiking'& Riding trail. The trail will generally follow the
alignment set by the Lower Peters Canyon Specific Plan through the
City of Irvine (Exhibit B).
Except where dates are identified, much of the construction of the
trail is dependent on the phasing of future development.
The following is status information on trail facilities by trail
linkages:
City Council Report
Peters Canyon Regional Riding and Hiking Trail
December 1, 1997
Page 2
Irvine Regional Park through the City of Tustin
Ail portions of the trail from Irvine Regional Park through the
City of Tustin have been constructed. The County has informed the
City that they will be replacing the wood chips that are presently
along a portion of the trail with decomposed granite. The portion
of trail under Jamboree Road has been designed and is presently
being processed through plan check.
East of Jamboree Road undercrossing (City of Irvine)
The design of the trail has been completed for Planning Areas 2 &
3 of Lower Peters Canyon. Planning Area 2 is located generally
between Portola Parkway and Irvine Boulevard on the east side of
Jamboree Road, Planning Area 3 is south of Irvine Boulevard and
north of Bryan Avenue approximately 1000 feet east of Jamboree
Road. The actual trail will be constructed in phases/segments along
with approved residential development.
This portion of the trail will start at the Jamboree Road
undercrossing, curve around the existing IRWD pump station (Exhibit
C), then head south to the future 6 acre neighborhood par~ at
Trevino/Jamboree. The trail segment is anticipated to be completed
in February/March 1998.
From the future park at Trevino/Jamboree, the trail continues south
along the east side of Jamboree Road into the existing Irvine
Agricultural Headquarters in the vicinity of Irvine Bird/Jamboree
Road. The Irvine Family.Homestead Garden and Ranch Headquarters
buildings at the Irvine Company Agricultural Headquarters will be
retained and incorporated into a 16 1/2 acre Special Use Park. The
Irvine Company estimates that the trail to the Agricultural
Headquarters will be constructed by December 1998.
From the Agricultural Headquarters the trail continues south to
Irvine Boulevard.
Irvine Boulevard to Interstate 5 (City of Irvine)
There will be a grade separated trail undercrossing which is
presently under construction located approximately 1/2 mile east of
Jamboree Road at Irvine Boulevard. South of Irvine Boulevard the
trail will be at grade and turn. easterly toward the Transportation
Corridor. The trail will be constructed as an overpass over the
Corridor to Peters Canyon Channel where the trail will separate,
City Council Report
Peters Canyon Regional Riding and Hiking Trail
December 1, 1997
Page 3
with the bikeway on the east side of the channel and the
hiking/riding trail on the west of the channel.
The Transportation Corridor Agency will be responsible to construct
the Transportation Corridor overpass and a trail undercrossing at
Bryan Avenue. From Bryan Avenue the trail will be above grade
behind "The Marketplace".
The design and location for the section of trail between E1 Camino
Real and Interstate 5 is unknown at this time.
The design for an undercrossing of the trail at the I-5 has been
completed.
Interstate 5 to A.T.S.F. Rail line (City of Irvine)
After exiting the I-5 underpass the trail will pass through
Planning Area (PA) 10 (West). Planning Area 10-West is bounded by
Jamboree Road on the west, existing residential development on the
east,Interstate 5 on the north and Walnut Avenue on the south. Two-
thirds (2/3) of the trail ramps are constructed as part of the
development occurring in PA 10. The bikeway located on .-the
easterly side of the Peters Canyon Channel will be constructed
first, the hiking' trail on the west will be constructed later with
the development on the west side of the channel.
There is a planned undercrossing at Walnut Avenue. Plans for an
undercrossing at the A.T.S.F. rail line have been reviewed and
approved by the County.
A.T.S.F. Rail line to Warner Avenue (MCAS, Tustin)
At this time there are no plans for trail crossings at Edinger
Avenue.
The trail follows the Peters Canyon Channel through the base
(Exhibit D). As part of the Mitigation Measures for the MCAS
Tustin base reuse, applicants for private development projects are
required to enter into an agreement with the City of Tustin or
Irvine, as applicable, to establish a fair-share funding mechanism
to fund the Peters Canyon bike trail. The City of Tustin will
consult and coordinate with the County of Orange Harbors, Beaches
and Parks in the preparation of trail designs for the Peters Canyon
Trail within the Specific Plan area. Improvements for the trail
will be installed upon '.completion of flood control channel
City Council Report
Peters Canyon Regional Riding and Hiking Trail
December 1, 1997
Page 4
improvements and approval of their joint use by the Orange County
Flood Control District. It is anticipated that the Class 1 Peters
CanyOn Regional bikeway trail will be completed in Phase 1 of the
MCAS Reuse.
Warner Avenue to Newport Back Bay
The bikeway and trail at Warner Avenue is existing. The City of
Irvine will condition development for a future undercrossing at
Barranca Parkway. South of Barranca Parkway the Peters Canyon
Channel ends and the trail continues south along the San Diego
Creek Channel. Although portions of the trail between Barranca and
1-405 are in place, sections of trail between Main Street and
Michelson Drive are still in an interim condition.
The trail splits south of Micheison and heads northerly to the
Newport Back Bay. The County has obtained a five (5) year
recreational license to allow an interim trail over private and
public property in the City of Newport Beach.
The Community Development Department will continue to monitor the
implementation of the Peters Canyon Regional Riding and Hi~ing
Trail. As new information becomes available the staff will report
back to the City Council.
If more information is desired, Mr. Jeff Dickman, County of Orange
Harbors, Beaches and Parks, Trail Planning and Implementation
Section Chief, has offered to make a presentation to the City
Council.
Assistant Director
lizabeth Binsack
Director, Community Development
rita\rdhiktrl, cc
Attachments:
Exhibit A - Master Plan of Regional Riding/Hiking
Trails
Exhibit B - Lower Peters Canyon Specific Plan
Exhibit C - Trail Undercrossing at Jamboree
Exhibit D - MCAS, Tustin Bikeway Trail
PORTOLA
PARKWAY
n-
CHAMPION
WAY ~~_
TRE%flNO//
DRIVE
Ill
III
ROBINSON
III II I
~OOClClOD
IRVINE
BLVD.
·
·
·
·
Planning Area 9
No! a Port
of this Area Plan
Planning Area 10
Not a Part
of this Area Plan
PORTOLA
LEGEND
PARKWAY
iODDCl
1TRAL~
REGIONAL TRAIL UNDERCRO~*NG TO
CONNECT ~1'11.i
TRA~L. ~"~M [~.E NOT[ ON S~C"JlON
12. EXHIBIT
TO BE-BUtLT BY TN£ TRANS~OJ~TATIC~i
CORRIDOR AG[NCY.
TO BE BUILT BY THE 'rRAN~PORTAT~OI~I
C~RRIDOR A~NCY.
ICLASS ! (~ ~)
WAY
11) ·
Ruegio..noi T~oils .Traverse Special .
se ~'ork (SUP). Precise Alignment
to be Established in Coniunction
with the Area Plan for P'A-9 and
the General Development Plan for
the SUP to be Prepared by
County of Orange.
BLVD.
BRYAN
AVE.
LOWER PETERS
~-~PECIFIC PLAN
· Reg;onol TroR
to Connect with
Planned Regional
Trail System
OPEN SPACE SPINE AND
REGIONAL TRAIL SYSTEM
CANYON.
EXHIBIT B
jAMBOREE RD. 1 '
IRWD PUI, fP STATION
10' BIKEWAY #40
4
REGIONAl. TRAIL
PARK
s ~c-F I-O_N, :,A
_ .
PLAN
LOWER PETERS
SPECIFIC PLAN
CANYON
REGIONAL TRAIL UNDER~;ROSSING
AT IRWD PUMP STATION~
-
NOT TO
EXHIBIT C
Figure ~.~-!
Propose Recreational Bikeway/Trai] Concept ]>lan
SCRRA/OCTA
RA I L ROAD
AVE
VALENCIA
AVE
WARNER
AVE
z
..
ruIu~E 7US~H CO~UT£a__
wEST CONNECTOR
SANTA ANA/SAN1A rE CHANNEL
!
i
/
/
/
/
!
V~
'...
PKWY ~ ~w~
Class I- Existing OCEMA
~ Class I- Proposed OCEMA
Class l. Existing Tustin
Class I- Proposed Tustin
I-
~ -- Class I1- Existing OCEMA
~,,~;':~T~ Class II-.Existing Tustin
~ Class II - Proposed Tustin
llal$ is o graphic fol~esentolion of o I:~onnlnglengtneedng conc_epL
Final Oesign solutions (lOCol~n OhO sizing) wi~ be l~oposecl
tev~,,,eo os ~ of sul:~ue, nl op~ovoL, s. neeOeo by I~e ~especllve
agency with ~isOiCtiOn.
i'~''' ""~ Class II- Existing Irvine
._
~'~"':'"1 Class II- Proposed Irvine
· ~5~)t~ County Route Number
ETC Transition Area/Grade Separated Interchange
~ Interchange/Overpass
Base Boundary
I S
pecific Plan Boundary
Irvine/Tustin Boundary
* Base boundary along Ihe Sanla Ana/ Sanla Fe Channel .
is along Ihe nodh side ol Ihe channel belween Edinge~
and Ihe Channel,
Not TO Scale
4.4-12
EXHIBIT D