2: MEMOSPCV
Eqs.` �'
7-7 -y
•
NO 20
7 -7 -97
DATE.
TO.
FROM:
SUBJECT
July 2, 1997
William A. Huston, City Manager
Mike Henley, Director of Community Services
Inter -Corn
APPROVED STAFF RECOMMENDATION
CONTRACT AMENDMENT FOR FRONTIER PARK RESTROOM
REHABILITATION
SUMMARY ,Staff is requestingCity Council authorization t� amend the. professional
seivices'codtract to Provide additional design services.
BACKGROUND' BOA Architecture has been under contract with the City for the
design, preparation of construction documents and construction administration for the
restroom rehabilitation at Frontier Park. The value of the contract is $21,420 00
Pinetree Park and Magnolia Tree Park restroom rehabilitations are currently scheduled,
and funding is appropriated in the Capital Improvement Program. Design has yet to
begin on either
Staff is recommending that BOA's current contract be amended to provide additional
design services for Pinetree Park and Magnolia Tree Park restroom rehabilitation.
Benefits of this strategy include:
1 The Frontier Park restroom will serve as a prototype design. This will minimize
the design time and construction. Magnolia Tree Park will require a longer design
process, because the program requires relocation of the restroom to a central
location in the park and at least one meeting each before the Parks and Recreation
Commission, the Planning Commission and the City Council. The architect can
begin the design process now, funding for construction is not available until FY
1998 -99
By bidding Pinetree Park and Frontier Park as one project, the City should benefit
from better unit costs on building materials.
Bidding the construction of Pinetree Park and Frontier Park together, planned for
early fall, will require managing the project as a CDBG project. Compliance to
Davis -Bacon can escalate labor costs.
mam',ad i1Iuoid — pumtl pe4UO3fOc: FNM /FNyV/PM
sluautgoeuy
tunututoj to ioloanQ
AaluaH ax?Y1
i
XTOA?laadsai;it €Z$ pug Ss-Z` $ paa0xa- of -lou 100..1 lot 'I d 0011, e?I01.12B
pue ved aaulau?d tot saowas Iemlaaugale apnioun 01 uoueupgega)i woollsag )P d
latluol3 aql 01 sluauupuatue aql alnaaxa pue ale ?loau o1 iageueyq Alp agl azuoglny
MOItvalsahILUOOg2I
,Cauionv Xuo alp paMatnal uaaq seq X alells sun urns laegluoa Ieutguo
aglto ( %o I) luaond ua13o ssaoxa to luatuaalfe alp 01 sao?MMas Ieuo?uppe anoldde aeo
ladeueyq!u3 aql AgalagM suo ?s ?void seq alttlaaugaly yog gltM luauuaal2e 1uauno ag1,
S I Z`£Z$
SSZ`£IS
>Ind aau egou8eyl
And 0011 atnd
an soobuas Ieml0augale tot saaj pasodold -nodal scup 01 pagoeuu
ale Xagy And 0011, eioudeyg pue i1ed aallautd .tot siesodold pallttugns seq VOg
• •
279th
279 Pedro, C 31-33
San Fetlw, CP 90131-3321
Telepnone 310/832 -2681
Facsimile 310/831 -4656
Ed -Elowe Project Manager
�.
City of Tustin Community Services Dept.
300 Centennial Way
Tustin, California 92680 3%7
June 18 1997
Re. Pine Tree Park Restroom Rehabilitation
Dear Ed
We are pleased to submit the following Fee Proposal to provide design services for the subject
project. Please note the attached Fixed Fee spreadsheet which provides a cost for each task.
DESCRIPTION OF SERVICES
PRE - DESIGN-
1 Ascertain as -built drawings and site analysis.
SCHEMATIC DESIGN & DESIGN DEVELOPMENT
1 Review with client the entire scope of work and general design direction
2. Review requirements and space required for all areas.
3 Establish all special equipment or services, such as: lighting, electrical, etc.
4 Develop two (2) concept studies of the site plan, for review with client.
5 Community Outreach meeting. none required
6 Refinement of Schematic Design with input from consultants.
CONSTRUCTION DOCUMENT
1 Prepare construction document for Bldg Dept. approval and bidding purposes inclusive of
a. Architectural drawings and specifications.
b Structural drawings and specifications.
c. Plumbing and electrical drawings, energy calculations and specifications.
d. Landscape drawings and specifications for area disturbed by demolition only
e Drainage (only) drawings and specifications for area disturbed by demolition only
2. It is our understanding that Bldg. Dept and internal plancheck will be at a minimal because of
the re -use of the prototype restroom building for Frontier Park.
BIDDING SERVICES- charged on a Time & Material basis
1 Assist client in evaluation of bids
2. Issue addendum and clarifications during bidding
CONSTRUCTION ADMINISTRATION charged on a Time & Material basis
1 Review shop drawing submittal and samples
2. Visitations to the site during time of construction
3 Inspect completed facility and prepare a list of omissions and corrections
•
COMPENSATION- see attached Fixed Fee spreadsheet.
HOURLY RATE SCHEDULE.
Following are our current hourly rates:
TITLE HOURLY RATES
Principal $130 00
Project Architect $ 90 00
Project Designer $ 85 00
Specification Writer $ 75 00
CADD senior tech $ 70 00
CADD tech. $ 60 00
Senior Administrator $ 50 00
Intern $ 30 00
REIMBURSABLE EXPENSES.
The following items are to be considered reimbursable and are not included in the basic scope
of services:
1 Reproduction costs for additional blueprinting, photocopies, and photography billed
at 1 15 times cost.
2. Construction of any models or prototypes, as requested by the Client to be billed at
1 15 times cost.
3 Fees incurred by other consultants as approved by the Client, to be billed at 1 15
times cost.
4 Any permits and fees paid to government agencies billed at 1 15 times cost.
5 Preparation of perspective renderings.
6 Additional Community Outreach meetings.
ADDITIONAL SERVICES.
1 Changes requested by client to work that has previously been approved
2. Soils and Geology Reports.
3 Traffic Studies.
4 Topographic Survey and As -built drawings
5 Asbestos Abatement
6 Acoustical Engineering
7 Record Drawings
8 Handicap Special Consultant
Ed thank you again for considering our firm and we look forward to working with you and City
We will begin schematic design as soon as we receive the as -built drawings from you
Construction Documents should be complete for bidding and plancheck in 5 to 7 weeks.
BOA Architecture
Edward Lok Ng; cllite
rcr67 fop. ?)/ i
• •
FEE - Restroom Rehao for Pine Tree Park
To: Ed Elowe, Project Manager
From. Edward Lok Ng, Architect
BOA Architecture Job # 97 1594
date: 6/18/97
HOURS UNIT HR RATE COST TOTAL
PRE - DESIGN
meetings -1 and start -up, procure as- builts 3 hrs 90 270
270
SCHEMATIC DESIGN
meetings with client -1 2 hrs 90 180
site plan design -1 option for Pine Tree Park 4 hrs 85 340
floor plan design -no changes to Frontier Park 0 hrs 85 0
exterior elevation design -no changes to Frontier Park 0 hrs 85 0
CADD 4 hrs 65 260
principal input for all phases of project 1 hrs 125 125
color presentation dwg boards &material bd. -none 0 hrs 75 0
community outreach meeting -none 0 hrs 85 0
905
DESIGN DEVELOPMENT
meetings with client -0 0 hrs 90 0
refine site plan design 1 hrs 85 85
project management,consultant coordination 2 hrs 85 170
CADD 2 hrs 65 130
cost estimate -for restroom project 3 hrs 85 255
640
CONSTRUCTION DOCUMENTS
Al sheet30x42 general notes 4 hrs 65 260
A2 sheet30x42 ,demo. plan,site plan,ADA transition 30 hrs 65 1,950
A3 sheet30x42 floor plan, schedules 5 hrs 65 325
A4 sheet 30x42, elevations, sections 4 hrs 65 260
AS sheet 30x42, details 3 hrs 65 195
project management, consultant coordination 4 hrs 85 340
specifications 4 hrs 85 340
bldg dept corrections (assumed minimal corrections) 6 hrs 85 510
meetings with client -1 3 hrs 90 270
cost estimate -for restroom project 3 hrs 85 255
modify structural dwg; titles,delete items not applicable 3 hrs 65 195
4,900
CONSULTANTS FEE FACTOR
structural 600 1 15 690
electrical 800 1 15 920
piumbing 300 115 345
civil hardscape drainage only 700 1 15 805
landscape 700 1 15 805
3,565
BIDDING TIME & MATERIAL
addendems &clarifications (no meetings) 7 hrs 85 595
CONSTRUCTION ADMIN TIME & MATERIAL
field mtgs(1) on as -need basis,shop dwgs, RFI 28 hrs 85 2,380
TOTAL $13,255
1 Preliminary fee for a Soils Report range from $1700 to $2400. This will be performed as a reimbursable item.
2. BOA fee based on both Magnolia & Pine Tree parks projects performed concurrently
3 If delete ADA transition plan retrofit, site items, then subtract $350
Ed Elowe, Project Manager
City of Tustin, Community Services Dept.
300 Centennial Way
Tustin, California 92680 -774?
Arch�'9 West , e. . Street
San Pedro, CP 907'1 3321
Telephone 310/832 -2681
Facsimile 3101831 -4656
•
June18 1995
Re Magnolia Tree Park Restroom Rehabilitation
Dear Ed
We are pleased to submit the following Fee Proposal to provide design services for the subject
project. Please note the attached Fixed Fee spreadsheet which provides a cost for each task.
DESCRIPTION OF SERVICES
PRE - DESIGN
1 Ascertain as -built drawings and site analysis.
SCHEMATIC DESIGN & DESIGN DEVELOPMENT
1 Review with client the entire scope of work and general design direction.
2. Review requirements and space required for all areas.
3 Establish all special equipment or services, such as: lighting electrical, etc.
4 Develop two (2) concept studies of the site plan, for review with client.
5. Community Outreach one (1) meeting
6 Refinement of Schematic Design with input from consultants.
CONSTRUCTION DOCUMENT
1 Prepare construction document for Bldg Dept. approval and bidding purposes inclusive of
a. Architectural drawings and specifications.
b Structural drawings and specifications.
c. Plumbing and electrical drawings, energy calculations and specifications
d. Landscape drawings and specifications for area disturbed by demolition only
e Civil and Drainage drawings and specifications for area disturbed by demolition only
2. It is our understanding that Bldg. Dept. and internal plancheck will be at a minimal because of
the re -use of the prototype restroom building for Frontier Park.
BIDDING SERVICES- charged on a Time & Material basis
1 Assist client in evaluation of bids.
2. Issue addendum, and clarifications during bidding
CONSTRUCTION ADMINISTRATION charged on a Time & Material basis
1 Review shop drawing submittal and samples.
2. Visitations to the site during time of construction.
3 Inspect completed facility and prepare a list of omissions and corrections
• •
COMPENSATION- see attached Fixed Fee spreadsheet.
HOURLY RATE SCHEDULE
Following are our current hourly rates:
TITLE HOURLY RATES
Principal $130 00
Project Architect $ 90 00
Project Designer $ 85 00
Specification Writer $ 75 00
CADD senior tech $ 70 00
CADD tech. $ 60 00
Senior Administrator $ 50 00
Intern $ 30 00
REIMBURSABLE EXPENSES:
The following items are to be considered reimbursable and are not included in the basic scope
of services:
1 Reproduction costs for additional blueprinting, photocopies, and photography billed
at 1 15 times cost.
2. Construction of any models or prototypes, as requested by the Client to be billed at
1 15 times cost.
3 Fees incurred by other consultants as approved by the Client, to be billed at 1 15
times cost.
4 Any permits and fees paid to government agencies billed at 1 15 times cost.
5 Preparation of perspective renderings.
6 Additional Community Outreach meetings.
ADDITIONAL SERVICES:
1 Changes requested by client to work that has previously been approved.
2. Soils and Geology Reports.
3. Traffic Studies.
4 Topographic Survey and As -built drawings
5. Asbestos Abatement
6 Acoustical Engineering
7 Record Drawings
8. Handicap Special Consultant
Ed thank you again for considering our firm and we look forward to working with you and City
We will begin schematic design as soon as we receive the as -built drawings from you
Construction Documents should be complete for bidding and plancheck in 5 to 7 weeks
BOA Architecture
Edward Lok I /Ar hit ct
idV& / erlietmL Te -657 (c
•
FEE - Restroom Rehab for Magnolia Tree Park
To Ed Elowe, Project Manager
From: Edward Lok Ng, Architect
PRE - DESIGN
meetings -1 and start -up, procure as- builts
BOA Architecture Job # 97 1594
date: 6/18/97
HOURS UNIT HR RATE COST TOTAL
5 hrs 90 450
SCHEMATIC DESIGN
meetings with client -1 4 hrs 90 360
site plan design -3 options for Magnolia Tree Park 10 hrs 85 850
floor plan design -no changes to Frontier Park 0 hrs 85 0
exterior elevation design -no changes to Frontier Park 0 hrs 85 0
CADD 8 hrs 65 520
principal input for all phases of project 1 hrs 125 125
color presentation dwg boards &material boards 6 hrs 75 450
community outreach meeting -1 meeting 3 hrs 85 255
DESIGN DEVELOPMENT
meetings with client -0 0 hrs 90 0
refine site plan design 5 hrs 85 425
project management,consultant coordination 4 hrs 85 340
CADD 4 hrs 65 260
cost estimate -for restroom project 3 hrs 85 255
CONSTRUCTION DOCUMENTS
Al sheet30x42 general notes 4 hrs 65 260
A2 sheet30x42 ,demo. plan,site plan,ADA transition 60 hrs 65 3,900
A3 sheet30x42 floor plan, schedules 9 hrs 65 585
A4 sheet 30x42, elevations, sections 6 hrs 65 390
AS sheet 30x42, details 7 hrs 65 455
project management, consultant coordination 12 hrs 85 1,020
specifications 6 hrs 85 510
bldg dept corrections (assumed minimal corrections) 8 hrs 85 680
meetings with client -1 5 hrs 90 450
cost estimate -for restroom project 5 hrs 85 425
modify structural dwg; titles,delete items not applicable 3 hrs 65 195
CONSULTANTS FEE FACTOR
structural 600 115 690
electrical 600 115 690
plumbing 700 115 805
civil utilities, hardscape drainage 1500 1 15 1 725
landscape 1500 1 15 1 725
BIDDING TIME & MATERIAL
addendems &clarifications (no meetings)
CONSTRUCTION ADMIN TIME & MATERIAL
field mtgs(2) on as -need basis,shop dwgs, RFI
450
2,560
1,280
8,870
5,635
12 hrs 85 1,020
40 hrs 85 3,400
TOTAL $23,215
1 Preliminary fee for a Soils Report range from $1700 to $2400 This will be performed as a reimbursable item
2. BOA fee based on both Magnolia & Pine Tree parks projects performed concurrently
3. If delete ADA transition plan retrofit, site items, then subtract $1 100