Loading...
HomeMy WebLinkAbout08 HAUL ROUTE AGREE 06-16-97AGE N DA DATE: ~ 16, 1997 NO. 8 6-16-97 · Intor-Gom TO: FROM: SUBJECT: WILLIAM A. HUSTON, CITY MANAGER PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION APPROVAL OF A HAUL ROUTE AGREEMENT BETWEEN THE CITY OF TUSTIN AND THE TRANSPORTATION CORRIDOR AGENCY'S CONTRACTOR, SILVERADO CONSTRUCTORS RECOMMENDATION It is recommended that the City Council, at their meeting of June 16, 1997, approve and authorize -the Mayor to sign and the City Clerk to attest to the Haul Route Agreement between the City of Tustin and Silverado Constructors (Silverado). FISCAL IMPACT None. BACKGROUND Silvemdo is the contractor to the Transportation Corridor Agency (TCA) to design and construct the Eastern Transportation Corridor (ETC). The Haul Route Agreement establishes: haul routes that are safe and acceptable for transporting earth material to and from the ETC project locations; limitations of earthwork materials to be hauled; methodology and time frames for repair of any damages caused by Silverado's trucks or hauling/construction activity; and indemnification of the City against all actions, claims or damages arising out of the hauling/construction activities. Director of Public Works/City Engineer Nestor Mondok Assistant Civil Engineer TDS:NM:klb/COUNCIL:Haul Route, Agreement Wisam Altowaiji Associate Civil Engineer Attachment WI'FNESSETi'I WHI?.R. EAS, Silvcrado Constructors, hereinafter referred to as "Silverado" is thc contractor to the Foothill/Eastern Transportation Corridor Agency (TCA) to design and construct the Eastern Transportation Corridor (ETC) including those portions that lie within the jurisdictional boundaries of the City of Tustin; and WI II';RI~AS, The City ol'Tustin, "City", is a member of the 'I'C.A and recognizes tile necessity to lhcilitate the construction of the ETC; and WHEREAS, Silverado and 'City desire to minimize any detrimental impacts due to construction including earth hauling on City streets; and WHEREAS, Silverado supports the City's need to establish haul routes that are safe and ei'fi2clive Ibr the (ransporting of earth material lo and l¥orn the i~TC project location: mid . WI II!RI;AS, Silvcrmlo will not haul within local streets and weight restricted streets as indicated in the General Plan's Circulation Element, dated February, 1994. NOW, THEREFORE, IT IS AGREED by the parties hereto as follows: 1. Silverado shall: a. Work with City engineering and public safety staffto develop sate and acceptable haul routes along with documenting and inspecting with City staff; and videotaping the pre-existing condition of the haul routes wherever earth hauling is planned or required. b. Comply with City permit conditions including posting appropriate traffic regulatory and advisory signs for use of said haul routes on Jamboree Road and Edinger Avenue, and notify businesses in the area of the proposed hauling activities. The hauling will be limited to 20,000 CY of earthwork materials. The limited amount will not be exceeded without an amendment to this agreement. c. Repair damage to City streets caused by Silverado's trucks or other trucks hauling material to the ETC sites within City's jurisdiction using said haul routes. Repairs shall occur within the time frames stipulated by the City Engineer or his designee. Repairs may include pavement, striping, curbs, sweeping and cleaning. d. Notify the City Engineer, or his designee, in writing within two (2) working days of completing use of said haul routes so that the City Engineer, or his designee, shall be able to provide services to meet with Contractor to inspect damage to said haul routes caused by Silverado's hauling/construction activity. e. Indemnify the City, its officers, employees and agents against and will hold and save them and each of them harmless from any and all actions, claims, damages to persons or property, Penalties, obligations or liabilities that may be asserted or claimed by any person, firm, entity, corporation, political subdivision or other organization arising out of or in connection with the hauling construction activities of the Contractor, its agents, employees, Subcontractors, or invitees. _.. City and Contractor agree to work together in good faith in dctcrmining 'the extent of any damage to City streets caused by the hauling activity, and to make such repairs as the parties deem reasonable in connection therewith. In the event that the City and Silverado cannot agree on the extent of any damage that needs repair, the City will prevail. 3. In the event Conlraclor filils to pcrfcmn any obligalion hcrctmdcr, Contractor agrees Io pay ali costs and expenses incurred by City in securing performance of such obligations, including costs of suit and reasonable attorneys' fees. IN WITNESS WHEREOF, the parties have hereto executed this Agreement this day o1' ,19 CITY OF TUSTIN A Municipal Corporation By: ATTEST: City Clerk, City of Tustin APPROVED AS TO FORM: City Attorney, ci~ CONTRACTOR: Title: Pro'~eet Mana~e~.. ~ ~ Title: Deputy Pro~ect Manager 0 0 co Z 0 < 0 J 0