HomeMy WebLinkAbout05 ACCEPT PUBLIC IMPROVEMENTS: MCFADDEN AVE (CIP 70213) AND IRVINE BLVD (CIP 70218) °' 't AGENDA REPORT Reviewed:im 5
City Manager
GS-T8-
Finance Director NA
MEETING DATE: SEPTEMBER 2, 2014
TO: JEFFREY C. PARKER, CITY MANAGER
FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
SUBJECT: ADOPT RESOLUTION NO. 14-57 TO ACCEPT IMPROVEMENTS FOR THE
MCFADDEN AVENUE REHABILITATION BETWEEN MANTLE LANE AND
PASADENA AVENUE PROJECT (CIP 70213) AND THE IRVINE BOULEVARD
REHABILITATION BETWEEN PROSPECT AVENUE AND HOLT AVENUE
PROJECT (CIP 70218)
SUMMARY
Construction of the McFadden Avenue Pavement Rehabilitation Project between Mantle Lane and
Pasadena Avenue Project (CIP 70213) and the Irvine Boulevard Pavement Rehabilitation between
Prospect Avenue and Holt Avenue Project (CIP 70218) have been completed to the satisfaction of
the City Engineer and the projects are now ready for City Council acceptance.
RECOMMENDATION
It is recommended that the City Council:
1. Adopt Resolution No. 14-57 accepting the construction of the McFadden Avenue
Rehabilitation between Mantle Lane and Pasadena Avenue Project (CIP 70213) and the
Irvine Boulevard Rehabilitation between Prospect Avenue and Holt Avenue Project (CIP
70218); and
2. Authorize the City Engineer to execute and file the Notice of Completion with the County
Recorder's Office.
FISCAL IMPACT
The construction budget for the McFadden Avenue Rehabilitation between Mantle Lane and
Pasadena Avenue Project (CIP 70213) and the Irvine Boulevard Rehabilitation between Prospect
Avenue and Holt Avenue Project (CIP 70218) was $867,000. The final construction cost for these
projects is $819,125. The projects were funded through a combination of sources that included
State Proposition 1B SLPP Formula Grant funds and matching dollar-for-dollar Measure M1
Turnback / M2 Fair Share funds. In addition, $73,500 of General CIP Funds were used to cover
the up-front costs of the City of Santa Ana's match for the McFadden Avenue Rehabilitation
Project, which will be reimbursed under a cooperative agreement with the City of Santa Ana.
CORRELATION TO THE STRATEGIC PLAN
Rehabilitation of the streets contributes to the fulfillment of the City's Strategic Plan Goal B: Public
Safety and Protection of Assets. Specifically, the project implements Strategy#3(b), which among
other items, is to ensure continuous maintenance and improvement of public facilities.
Notice of Completion for McFadden Avenue and Irvine Boulevard Rehabilitation Projects
September 2, 2014
Page 2
•
DISCUSSION
The project consisted of localized removal and replacement of severely distressed asphalt paving;
grinding of existing asphalt paving along roadway edges; construction of a new asphalt rubber hot
mix (ARHM) overlay; removal and replacement of damaged curb & gutter and sidewalks;
replacement of existing curb ramps to be in compliance with the current federal Americans with
Disabilities Act (ADA) requirements; replacement of traffic signal detector loops; replacement of
striping and pavement markings; and adjustment of manhole rims and valve boxes to grade.
Construction of the project is deemed complete to the satisfaction of the City Engineer and is now
ready for City Council acceptance.lit/A4'
I. • - ' Stack, P.E.
u o • Public Works/City Engineer
•
•
Attachment(s): 1. Resolution No. 14-57
2. Location Maps
•
•
•
S:\City Council Items\20I4 Council Items\09-02-2014\NOC for McFadden_Irvine Rehab\NOC McFadden_Irvine Rehab(CIP No.
702 13 70218).docx
ATTACHMENT 1
RESOLUTION NO. 14-57
RESOLUTION NO. 14-57
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA, ACCEPTING THE WORKS OF IMPROVEMENT AND
AUTHORIZING THE RECORDATION OF THE NOTICE OF
COMPLETION FOR THE MCFADDEN AVENUE REHABILITATION
BETWEEN MANTLE LANE AND PASADENA AVENUE PROJECT (CIP
70213) AND THE IRVINE BOULEVARD REHABILITATION BETWEEN
PROSPECT AVENUE AND HOLT AVENUE PROJECT (CIP 70218)
WHEREAS, Sequel Contractors, Inc., having a contract with the City of Tustin to
construct the hereinafter described public works and improvement; and
WHEREAS, • the City Engineer has duly certified to the construction and
completion of said public improvement hereinafter mentioned in a manner satisfactory
to the City Council of the City of Tustin; and
WHEREAS, the City Council finds that said contractor has completed said public
improvement hereinafter more particularly described in accordance with the provisions
of the contract documents and the Notice of Completion, and acceptance of said public
works and improvement should be filed and payment of the balance due said contract
authorized in accordance with the contract documents;
• NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin
that said public works and improvement is found to be complete, and the same is
hereby accepted.
Said public works and improvement is more particularly described as follows:
McFadden Avenue Rehabilitation between Mantle Lane and Pasadena Avenue Project
(CIP 70213) and the Irvine Boulevard Rehabilitation between Prospect Avenue and
Holt Avenue Project (CIP 70218)
BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin is
hereby authorized to execute and file a Notice of Completion for the acceptance of said
public works and improvement described herein as required by law.
Resolution 14-57
Page 1 of 2
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Tustin held on the 2nd day of September 2014.
Elwyn A. Murray, Mayor
ATTEST:
Jeffrey C. Parker
City Clerk
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN
I, Jeffrey C. Parker, City Clerk of the City Council of the City of Tustin, California, do
hereby certify that the whole number of the members of the City Council is five; that the
above and foregoing Resolution No. 14-57 was duly and regularly passed and adopted
at a regular meeting of the City Council held on the 2"d day of September, 2014 by the
following vote:
COUNCILMEMBER AYES:
COUNCILMEMBER NOES:
COUNCILMEMBER ABSTAINED:
COUNCILMEMBER ABSENT:
JEFFREY C. PARKER
City Clerk
Resolution 14-57
Page 2 of 2
ATTACHMENT 2
LOCATION MAPS
i Ca
ti .i u L ../< -
�,�- 0N3Atl 3l1tlAW _ /) ,`�- W Z
1
U
I :
e
- 3N3Atl tl3Sd Z
ILI
1 1 ��. i I 1 1 Q to
.uS�40.0.0 oL tal
_..._..._..._..._..._..._..._. o
AtlM331:11 tl53111 V1500 l991tl57 /% MY view 40 utl 2
CX
Z / 1 Z
r 5 LLI
:' j a
— - --' - -.._.1 .. .�
LtlM 39tl lIA NI15 LL � VM 39tl lIA ) Z
--' W
%SO
i W O i /i i
� I I 0 a w w
% Z I wQ U i / !/ o
CO
a.0 Ozas U /ar J / !//j %
i.0 / / w%
II r %/ to
w
133tl1S SWtlIIIIM ra- 1331:11S SWtl■IIIM 2 tal
r a
•
r z
p
v / v
! /
Vs/ 133tl1S A3NOlItl 2
.
.. /// W
w
.-�5\ / a
W::Mni icos irrulivrr.ar C+
rry vivs w Alb y
LANE, q O
AM 2 s ; i
a
d
{3 Y
5'
13
l
i
1
I
` / co
rr`• rr` '• A
I r•`. Z
d
.J % `el U
Z/ LLI
I w
cz
U
K o
I vss.„. ____,...._
_ rar-5-rwrel—Frea.- —no. . 0
cc
w
z
liv .1r_ w
n U,d N031 li\ w N ~
sIp w
N F ldZNVWON � N 0
qx R cit> ft
CD P 3 Id V030NV0 I \ N W
LT Z
W
L Z ` 15 7 sa: I NOIHSVJ
ON OH �•• •rLrr—Z AN.Itl INN3LN30 m
cc
J wI > a� a in 'en
a
! O� z L 3la3ad m
e 0] u 11;c7 IIVH d _
° I �3r w CC
3f1N3AV °u gal g c,
103dS0ad ct
a tS Ill
-a3awv
N1 I ® 3 r � 0
E E - ; I i rc W E i CO
o Z 'tl10 a J 5 '15 .0.
rc NOl �
6 wS f xx 15 .0, 'N W
_`, In""1 J l \ C p 1{� < ` Z
'15 .B. 'N '1S .O. 'N f'
.a rya 15 .0. j W
�� II,��JVI�v�V '�' o� E 1�N f
& 9 5°� a _ C!_ r 15 .V. N I ( '15 II V. I d
1
i
1
I e