Loading...
HomeMy WebLinkAboutC.C. 05 BONDS T. 13835 06-15-92Arm r m r a t'_' I �5 _9a ­ CONSENT CALENDAR NO. 5 15-92, Inter -Cam , JE: JUNE 15, 1992 1. TO: WILLIAM A. HUSTON, CITY MANAGER FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJECT: REDUCTION OF IMPROVEMENT BONDS FOR TRACT NO. 13835 RECOMMENDATIONS: That the Tustin City Council authorize the release of Faithful Performance Bond No. 3SM 758 227 00 in the amount of $214,100.00 and Labor and Material Bond No. 3SM 78 227 00 in the amount of $107,050.00 subject to the posting of replacement bonds in the following amounts: Faithful Performance ........................... $53,525.00 Labor and Material ............................:. 26,762.50 The above amounts represent 250 of the original bond amounts. BACKGROUND: Recreations of California, Inc. as developer of Tract No. 13835, was required to post certain bonds to ensure the completion of all required public improvements associated with Tract No. 13835. The improvement bonds that were posted are as follows: Faithful Performance Bond No. 3SM 758 227 00 ... $214,100.00 Labor and Material Bond No. 3SM 758 2237 000 ... 107,050.00 Subdivision Warranty Bond No. 3SM 758 228 00 ... 21,410.00 Monumentation Bond No. 3SM 758 229 00 .......... 1,300.00 DISCUSSION: The developer has requested that the Faithful Performance and Labor and Materials Bonds be reduced by 75% of the existing amounts. All public improvements associated with Tract No. 13835 have been completed at this time, however, due to the remaining on-site construction it is recommended that the Faithful Performance and Labor and Materials Bonds be reduced to 25% of the existing amounts to cover the cost of any damage to the public improvements, which might be sustained until the final on-site build -out is complete. Robert Ledendecker Jer Otteson Director of Public Works/ Associate Civil Engineer. City Engineer RL:JO:ccg:13835