Loading...
HomeMy WebLinkAboutRPT 2 FWY CONST. RPT 04-06-92ErKInA 0 n' REPORTS NO. 2 4-6-92 inter -Com ATE: MARCH 30, 1992 t, TO: WILLIAM A. HUSTON, CITY MANAGER FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJECT: FREEWAY CONSTRUCTION STATUS REPORT RECOMMENDATION Receive and file. BACKGROUND Following information relates to both freeway and local street closures as they relate to the Tustin area. • Route 55 northbound off -ramp to Irvine Boulevard/4th Street tentatively scheduled to open mid-December, 1992. ° Route 55 southbound on-ramp from Irvine Boulevard/4th Street to open in late April, 1992 for a period of three months during reconstruction of Seventeenth Street southbound on-ramp to Route 55.* ° Route 55 southbound on-ramp from Seventeenth Street to close for three months from late April, 1992 to late July, 1992 for reconstruction. ° Route 55 southbound on-ramp from Irvine Boulevard/4th Street to re -close after the opening of the Seventeenth Street southbound ramps in late July, 1992 for a period of one year. ° Main Street closure No. 1 between Williams Street and driveway of St. Jeannes School tentatively scheduled between mid-April, 1992 and early 1993. ° Main Street closure No. 2 between Myrtle Avenue and Stoneglass tentatively scheduled between early -1993 and late -1993 (7 months). This closure will not be implemented until closure No. 1 is opened to traffic. ° First Street bridge across Route 55 is scheduled for opening March, 1993. • Nisson Road was closed to through traffic on March 18, 1992 for five months. Local residential traffic can access from either "B" Street from the east or Pasadena Avenue from the west. ° Red Hill Avenue between Nisson Road and El Camino Real is scheduled for final paving and pavement marking by May 1, 1992. The above schedule was furnished. by the Caltrans Resident Engineers and is subject to weather conditions. A,' "-. z , " Z' Mr)bert S. Ledendecker rector of Public Works/City Engineer RSL:kIb:SCHEDULE