Loading...
HomeMy WebLinkAboutRPT 3 WISHING WELL 01-20-92JANUARY 20, 1992 WILLIAM A. HUSTON, CITY MANAGER CHRISTINE A. SHINGLETON, ASSISTANT CITY MANAGER WISHING WELL RECONSTRUCTION RECOMMENDATION Receive and file. DISCUSSION REPORTS NO. 3 1-20-92 Over the recent holidays, a heavy wind resulted in significant damage to the wishing well on the Civic Center site. It is proposed that the well be reconstructed in conjunction with Phase II of the Civic Center project which is estimated to begin later in the year for the following reasons: 1. Reconstruction of the well will require the work of a structural engineer to redesign the roof structure properly since posts for structure were broken off inside the walls of the well. 2. In sequencing construction, flat work, drainage work and landscaping work is proposed in the vicinity of the well. The contractor will have to get into the floor and walls of the well in order to re -plumb the filtration pump system. These items were to have been done in Phase II of construction and have to be done prior to rebuilding the roof structure. 3. The existing historical tile plaque will be part of the new work. Christine A. Shing �e�on Assistant City Manager CAS:kbc\wishwell.cas