Loading...
HomeMy WebLinkAboutRPT 2 MAINT PKWAYS 01-06-92REPORTS NO. 2 ADA _;0,9 of -1-6-92 GE N DATE: DECEMBER 10 1991 11-1 t E, r- C 0 lig \`••.?•J, ti ;, ��' TO: WILLIAM A. HUSTON, CITY MANAGER FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJECT: MAINTENANCE OF PARKWAYS ON WALLED ARTERIAL ROADWAYS RECOMMENDATIONS: Receive and file. BACKGROUND: At a previous City Council meeting the City Council raised a concern about the maintenance of the parkway areas on arterial roadways that are bordered by concrete walls and have no residences fronting on the streets. A few typical examples of this type of area would occur on the following roadways: - Bryan Avenue between Red Hill Avenue and Browning. Avenue * Segments of Yorba Street between Vinewood Avenue and Jacaranda Avenue * Segments of Prospect Avenue between Irvine and Seventeenth Street From time to time the parkway areas, will accumulate leaves from either the City street trees or adjacent private property trees and some routine litter. Many of the adjacent residences either have their backyards or sideyards adjacent to the arterial roadways and in most instances are buffered with a concrete blockwall or wood fence with no access from the residence to the street. DISCUSSION: The City staff routinely maintains these isolated parkway areas on a quarterly basis and on a more frequent basis when needed, as a result of public complaints or routine inspections. In order to address the Council concern, staff will accelerate the parkway maintenance program on arterial roadways from a quarterly basis to a bi-monthly program and if this scheduling does not meet the community needs, it can be readjusted in the future. Robert Ledendecker Director of Public Works/City Engineer RL:ccg:maintpkw