FEBRUARY 16, 1993
TO: WILLIAM A. HUSTON, CITY MANAGER
FROM: PUBLIC WORKS/ENGINEERING
SUBJECT: CALIFORNIA STREET WIDENING/ RECONSTRUCTION BETWEEN THIRD STREET
AND MAIN STREET
RECOMMENDATIONS:
For consideration by the City Council, at their meeting of February 16,
1993, it is recommended that the City Council adopt the attached
resolution approving the plans and specifications for subject project
and directing the City Clerk to advertise for bids.
BACKGROUND:
This project includes the addition of portland cement concrete sidewalk,
curb and gutter, drive approaches and driveways, as well as deeplift
asphalt concrete paving to widen the street section of California
Street, between Third Street and Main Street, from an existing average
of 28 feet to a minimum of 35 feet. Due to two old, large trees and
private improvements existing within the proposed improvement site on
the westerly side of California Street, it is proposed that sidewalk be
installed solely on the easterly side. The engineer's estimate for this
project is $35,879.75.
Presently there is $28,260.00 available in the Capital Improvement
Project budget for this project. It is being anticipated that after the
bid opening, additional funding may be necessary to complete this
project.
The tentative schedule for this project is as follows:
Authorization to advertise for bids ............ February 16, 1993
First Legal Advertisement ...................... March 4, 1993
Second Legal Advertisement ..................... March 11, 1993
Bid Opening .................................... March 29, 1993
Award of Contract .............................. April 5, 1993
Robert Ledendecker Wendy E. Hallman
Director of Public Works/City Engineer Junior Civil Engineer
— RL:WEH:ccg:calstwid
Attachment
1
2
3
4
5
6
7,
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 93-15
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR
CALIFORNIA STREET WIDENING/RECONSTRUCTION BETWEEN THIRD
STREET AND MAIN STREET
WHEREAS, it is the intention of the City Council of the
City of Tustin, California to contract construction of
portland cement concrete drive aprons,sidewalk and curb and
gutter and deep lift asphalt concrete paving;
WHEREAS, the City Engineer has presented plans and
specifications for the construction of said work;
NOW, THEREFORE, BE IT RESOLVED that the plans and
specifications presented by the City Engineer be and are
hereby approved as the plans and specifications for;
California Street Widening/Reconstruction
between Third Street and Main Street
BE IT FURTHER RESOLVED that the City Clerk -is hereby
authorized and directed to advertise as required by law for
the receipt and sealed bids or proposals for the doing of the
work specified in the aforesaid plans and specifications;
BE IT FURTHER* RESOLVED that this project is categorically
exempt from the requirements of the California Environmental
Quality Act; Class I: Existing Facilities.
PASSED AND ADOPTED at a regular meeting of the City
Council of the City of Tustin held on the 16th day of
February, 1993
ATTEST:
City Clerk
Leslie Anne Pontious, Mayor