Loading...
HomeMy WebLinkAboutCC 8 PROJ'S 600099 01-04-93CONSENT CALENDAR NO. 8 1-4-93 JAh :; ARY 4 19 9 3 � � � P � - C o � �• � , �^ ATE: f r. TO: WIL7.IAM A. HUSTON, CITY MANAGER FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE FOR SUBJECT: BIDS - WATER MAIN REPLACEMENT ON HEWES AVENUE, MURIEL PLACE, MARELL CIRCLE AND FOOTHILL BOULEVARD (PROJECT NO'S. 600099, 600104 AND 600109) RECOMMENDATION It is recommended that the Tustin City Council, at their meeting'of January 4, 1993, adopt a resolution approving the plans and specifications for subject project and direct the City Clerk to advertise for bids. BACKGROUND This project will provide replacement of deteriorated water mains on Hewes Avenue, Muriel Place, Marell Circle and Foothill Boulevard in the unincorporated territory of Orange County. The estimated cost is as follows: HewesAvenue ...........................$ 71,434 Muriel Place and Marell Circle ......... $ 50,367 Foothill Boulevard ......................$120,596 Total $242,397 There is presently a total of $216,100.00 allotted in the Fiscal Year 1992-93 budget for the above-mentioned locations. A supplemental budget appropriation may be necessary in the event that the low bid exceeds the present budge amount. Such a determination will therefore be deferred until after the project bid opening. The tentative schedule is as follows: Authorization to advertise for bids.............1/04/93 First legal advertisement .......................1/14/93 Second legal advertisement ......................1/21/93 Bidopening.....................................2/17/93 Awardcontract..................................3/01/93 Beginconstruction..............................3/15/93 Complete construction (60 working days) ......... 5/06/93 This tentati,%-e schedule is subject to adjustment pending the receipt of the Orange Count- Environmental Management Agency encroachment permit. — W, A - _/� - feRobert S. Ledendeckter irector of Public Works/ -ity Engineer RSL:ktb:ADBIDS Attachment /fav Balbas f'� Junior Civil Engineer 1 2 3 4 5 6 7 8 9 10 I1 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 93-01 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR THE REPLACEMENT, OF WATER MAINS ON HEWES AVENUE, MURIEL PLACE, MARELL CIRCLE AND FOOTHILL BOULEVARD AND AUTHORIZING. ADVERTISEMENT FOR BIDS (PROJECT NO'S. 600099, 600104 AND 600109) WHEREAS, it is the intention of.the City Council of the City of Tustin, California to contract construction for the replacement of water mains on Hewes Avenue, Muriel Place, Marell Circle, and Foothill Boulevard; and. WHEREAS, the City Engineer has presented plans and specifications for the construction of said work; NOW, THEREFORE, BE IT RESOLVED that the plans and specifications presented by the City Engineer be and are hereby approved as the plans and specifications for: Replacement of Water Mains on Hewes Avenue, Muriel Place,. Marell Circle and Foothill Boulevard (Project No's. 600099, 600104 and 600109) BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed'to advertise as required by law for the receipt of sealed bids or proposals for the doing of the work specified in the aforesaid plans and specifications; BE IT FURTHER RESOLVED that this project is categorically exempt from the requirements of the California Environmental Quality Act; Class, I: Existing Facilities. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 4th day of January, 1993. ATTEST: City Clerk Leslie Anne Pontious, Mayor