Loading...
HomeMy WebLinkAboutRDA CIVIC CTR COSTS 12-21-92• --�: RDA N0. 5 r 12-21-92 E N D Aizat�,—,::::;, Inter -Com l. ATE: December 21, 1_992 TO: WILLIAM A. HUSTON, EXECUTIVE DIRECTOR FROM: COMMUNITY DEVELOPMENT DEPARTMENT SUBJECT: TUSTIN CIVIC CENTER/ PHASE II TESTING COSTS RECOMMENDATION: Due to the additional Phase II soils testing/engineering required and the asphalt testing inspections, --7-NTB requests the City to allow a change order to Wyman not to exceed $7,000. BACKGROUND: 11.NTB has reviewed the City's contract with Wyman Testing Laboratories and found that the original contract is based on hourly rates not to exceed $50,000. Subsequently, a contract change order was issued in the amount of $13,250 due to the unusual and extreme Phase T_ soils testing/engineering required due to the poor so+1 conditions. There are also additional testing services provided by Wyman that were not originally budgeted but were required due to unforseen Phase II soils conditions,- and an oversight to include as*ohalt Paving inspections for compaction requirements per contract documents. The previously a^budgeted associated costs to date are as follows: Asphalt paving inspections $1,700 mase I+ Soils/Engineering Foundation redesign 2,600 Phase II Soil at Canopy footings outside of com.-Dacted mat 900 TOTAL $5,200 In conclusion, HNTB requests a budget increase of $7,000 to cover the above costs, and cor_tingencies. Christine Shinglet �_ Edward E'lowe Asst. City Manag Project Manager I.F.1]TESTCOST.CS