HomeMy WebLinkAboutRPT 8 OVERHD UTIL RPT 11-16-92REPORTS NO. 8 _., 11-16-92 A 4fti N U 4� G . SATE: NOVEMBER 16, 1992 Inter -Com 1 S T 8: TO: WILLIAM A. HUSTON, CITY MANAGER FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJECT: STATUS REPORT OVERHEAD UTILITY CONCERNS AT BROWNING AND WALNUT AVENUES (FILE NO. 2720) RECOMMENDATIONS: Receive and file. BACKGROUND; At the August 25, 1992 Town Hall meeting, a resident inquired as to the safety of the overhead Edison Company facilities adjacent to the Nelson School site on Browning Avenue, northerly of Walnut Avenue. Further follow-up with Ms. Marge Kasalek defined the concerns as follows: 1. The stability of the overhead facilities that hold the transformer units adjacent to the school, parking lot and public sidewalk in front of the school. This overhead structure swayed and vibrated under windy conditions. 2. The stability of the 66,000 volt and 12,000 volt overhead conductors under windy and/or earthquake conditions. DISCUSSION: Staff has forwarded these evaluation and response. I requested to provide an esti these overhead facilities. completed their evaluation. they are field checking the ensure that all transformers structure and that the supl deteriorated condition. concerns for the Edison Company's n addition, the Edison Company was mate of cost to underground each of As of this date, Edison has not However, Edison has indicated that overhead transformer facilities to are securely bolted to the overhead orting utility poles are not in a The results of this field review of the Edison Company facilities the estimates of cost for undergrounding the overhead facilities should be available in December 1992. This information along with the City's current policy/criteria will be forwarded to the City Council, at that time. Robert Ledendecker Director of Public Works/City Engineer RL:ccg:overhead