Loading...
HomeMy WebLinkAboutCC 10 WTR MAIN REPLAC 06-21-93CONSENT CALENDAR NO. 10 6-21-93 DATE: J,UNE .21, 1993 Inter-Com - TO: FROM: SUBJECT: WILLIAM A. HUSTON, CITY MANAGER PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION WATER MAINREPLACEMENTON MOUNTAIN VIEW DRIVE~ "A" STREET AND IRVINE BOULEVARD RECOMMENDATION For consideration by the City Council at their meeting of June 21, 1993. It is recommended that the City Council adopt the attached resolution approving the plans and specifications for subject project and directing the City Clerk to advertise for bids. FISCAL iMPACT The estimated cost of this project is $99,538.00 and has been budgeted at $103,100.00. Of this budgeted amount, $3,216.00 has been expended on topographic surveys of the areas and the preparation of base maps for desig~ completion by the City. This leaves $99,884.00 available for the project.. BACKGROUND This project includes the construction of new 6-inch diameter PVC water mains to replace existing 2-inch steel water mains on Mountain View Drive between First Street and Irvine Boulevard and "A" Street between. First Street and Irvine Boulevard and an 8 inch diameter PVC water main on Irvine Boulevard for a distance of approximately 325 feet east of Newport Avenue. A tentative schedule for this project is as follows: Authorization to Advertise for Bids ........... June 21, 1993 First Legal Advertisement ..................... June 24, 1993 Second Legal Advertisement .................... July 1, 1993 Bid Opening ................................... July 22, 1993 Award of Contract ............................. Aug. 2, 1993 Robert S. Ledendecker Director of Public Works/ City Engineer RSL:~EH:klb:wt rmain Attachment Wendy E. Hallman Junior Civil Engineer 1 2 3 5 6 7 10 11 12 13 I4 15 16 17 18 . 19 20 21 22 2.3 24 26 27 28 RESOLUTION 93-66 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR WATER MAIN REPLACEMENT ON MOUNTAIN VIEW DRIVE, STREET AND IRVINE BOULEVARD (PROJECT NO. 600104) WHEREAS, it is the intention of the City Council of the City of Tustin, California to contract for the construction of two 6- inch PVC water mains and one 8-inch PVC water main; and - WHEREAS, the city Engineer has presented plans and specifications for the construction of said work; NOW, THEREFORE, .BE IT RESOLVED that the specifications presented by the City Engineer be and approved as the plans and specifications for: plans and are hereby Water Main Replacement on Mountain View Drive, "A" Street , and Irvine Boulevard BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to advertise as required by law for the receipt and sealed bids or proposals .for the doing of the work specified in the aforesaid plans and specifications; BE IT FURTHER RESOLVED that this project is categorically exempt from the requirements of the California Environmental QuaI~ty Act; Class I: Existing Facilities. PASSED AND ADOPTED at a regular meeting of the City Council of th~ City of Tustin held on the 21st day of June, 1993. ATTEST: Jim Potts, Mayor City Clerk