HomeMy WebLinkAboutPH 3 Z.C. 92-003 04-05-934 0
DATE: APRIL 5, 1-597% �-
TO: WILLIAM A. HUSTON, CITY MANAGER
FROM: COMMUNITY DEVELOPMENT DEPARTMENT
SUBJECT. ZONE CHANGE 92-003 (FRONTRUNNER HOMES)
RECOMMENDATION
PUBLIC HEARING N0. 3
4-5-93
Inter -Com \�=
It is recommended that the City Council take the following
actions:
1. Certify the Negative Declaration as adequate by adopting
Resolution No. 93-35; and
2. Have first reading by title only and introduction of
Ordinance No. 1105 approving Zone Change 92-003, as
submitted or revised.
FISCAL IMPACT
This project was initiated by the applicant and involves the zone
change of a vacant parcel from one commercial zoning designation
to another commercial zoning designation. There are no known
negative fiscal impacts to the City associated with the project.
BACKGROUND
The applicant is requesting a Zone Change for a vacant site
located on the southerly side of E1 Camino Real, approximately
450 feet east of Newport Avenue to accommodate the development of
a self -serve, coin-operated car wash (see location map included
as Attachment A). In addition, the property owner is also
requesting that a small twenty foot wide remaining remnant north
of the proposed car wash site be also rezoned to Commercial
General (CG).
At their meeting on March 22, 1993, the Planning Commission
adopted Resolution No. 3131 recommending to the City Council
approval of Zone Change 92-003 and adopted Resolution No. 3132
approving Conditional Use Permit 92-038, a related application by
the applicant to request the establishment of a self -serve, coin-
operated car wash. The Planning Commission's action on the
Conditional Use Permit 92-038 was conditional subject to City
Council approval of Zone Change 92-003.
The subject site for the proposed car wash is currently located
in two (2) Zoning Districts. The easterly 2/3 of the site is
located within the Commercial General (CG) District and the
remaining westerly 1/3 of the site is located within the Central
City Council Report
Zone Change 92-003 :Frontrunner Homes)
April 5, 1993
Page 2
Commercial (C-2) District. Pursuant to the City of Tustin Zoning
Code, car washes are not permitted within the C-2 District. The
proposed Zone Change would rezone the westerly portion of the
subject site from Central Commercial (C-2) to Commercial General
(CG), which allows the establishment and operation of car washes
subject to approval by the Planning Commission of a Conditional
Use Permit.
The subject site is also located within the Town Center
Redevelopment Area. The applicant is concurrently processing a
Design Review for t'.e proposed car wash facility and associated
site improvements, which requires review and approval by the City
of Tustin Redevelop-,ent Agency. Any approval of the requested
Design Reveiw would be contingent on final approval of the
requested Zone Change.
Surrounding uses to the site include the following: Tustin Lanai
Apartments and a small office complex across E1 Camino Real to
the north; Tustin High School further east on the north side of
E1 Camino Real; and a Pet Hospital to the east. The Santa Ana
(I-5) freeway right-of-way to the south; and a vacant property
currently zoned Retail Commercial (C-1) to the west. Sizzler and
Jack In The Box restaurants are located further to the west
adjacent to Newport Avenue. A vacant Commercial General (CG)
zoned parcel, is located to the northwest across E1 Camino Real.
A public hearing notice identifying the time, date and location
of the public hearing on this project was published in the Tustin
News. Property owners within 300 feet of the site were notified
of the hearing by mail and notices were posted on the site, at
the Senior Center and at the Police Department. The 'applicant
was informed of the availability of the agenda and staff report
for this item.
DISCUSSION
The Zoning Code sets forth a district hierarchy of four (4)
commercial classifications. The location, surrounding uses, and
potential impact of the permitted uses within each District
should determine where each Zoning District is located.
The permitted uses and conditionally permitted uses of each of
the Zoning Districts vary according to the characteristics of the
proposed use. From. the least intense of uses to the most intense
uses, the districts are as follows, Retail Commercial (C-1),
Central Commercial 'C-2), Commercial General (CG), and Heavy
Commercial (C-3). ?he C-1 District is primarily aimed at
providing a variety of retail, service and office uses. The C-2
City Council Report
Zone Change 92-003 (Frontrunner Homes)
April 5, 1993
Page 3
District incorporates the permitted uses of the C-1 District and
provides for the establishment of additional uses such as service
uses with fairly intense operational characteristics. Those uses
include automotive repair shops, service stations, and drive-thru
establishments. In the CG District, uses permitted within both
the C-1 and C-2 Districts are allowed in addition to more intense
uses such as automobile supplies and services. The combined uses
provides for a wider variety of goods and services (ie: retail
and services). Pursuant to Section 9235c(d) of the Zoning Code,
an automobile supplies and services use is a conditionally
permitted use within the CG Zoning District. Based on City of
Tustin historic files, the Planning Commission and City Council
have determined that a car wash use is a similar use which may be
permitted subject to approval of a Conditional Use Permit.
Generally the zoning designation directly adjacent to the Santa
Ana (I-5) Freeway falls within the Commercial categories which
includes the C -G and C-1, C-2 and PC -Commercial Districts. The
General Commercial (CG) District offers the greatest diversity of
uses which generally can utilize freeway exposure such as service
stations and other auto related uses (Attachment B).
Surrounding Zoning Districts to the proposed Zone Change
(Attachment A) include the following: Retail Commercial (C-1)
across E1 Camino Real to the immediate north, Public and
Institutional (P&I) at the northeast corner of El Camino Real and
Orange Street; C-1 property to the east (Pet Hospital) and C-1
properties to the west. The vacant property to the west of the
subject site is currently zoned Retail Commercial (C-1). Sizzler
and Jack In The Box restaurants, zoned Central Commercial (C-2),
are located further to the west adjacent to Newport Avenue. The
vacant parcel located to the northwest across E1 Camino Real is
zoned Commercial General (CG). In light of surrounding zoning,
the existing C-2 designation of the site seems like spot zoning
and rezoning would place a more logical zoning pattern in place.
The General Plan designates the proposed rezoning site within a
commercial (C) designation. Given the existing CG District on a
portion of this site and the orientation to the freeway, the
proposal would seem consistent with the General Plan and would
provide for uses associated with the freeway (Attachment C).
In summary, the rezoning of the subject property from Central
Commercial (C-2) to Commercial General (CG) could be considered
logical and appropriate given established land use patterns along
the freeway and compliance with the General Plan. Analysis would
City Council Report
Zone Change 92-003 (Frontrunner Homes)
April 5, 1993
Page 4
support the proposed Zone Change, as it will not significantly
impact the surrounding area due to built-in use controls of the
Commercial General (CG) District, similarities with the
surrounding commercial Districts, and existing zoning
configuration already established in the City (Attachment D).
ENVIRONMENTAL ANALYSIS
A Negative Declaration has been prepared for the project pursuant
to the requirements of the California Environmental Quality Act
which would need to be considered should the Council desire to
take a positive action on the project. The mitigation measures
identified throughout the Initial Study have either been
incorporated into the plans or would be imposed as conditions of
approval mitigating the potential impacts that this project could
have to a level of insignificance (Attachment E). Any changes or
elimination of the measures identified and imposed on the project
would require re-evaluation of the Initial Study.
CONCLUSION
Based upon the above analysis, it
Council approve Zone Change 92-003
Declaration as adequate.
Joann Sc ilke Lehmer
Associate Planner
CAS:JP:br/zc92-003.j1
Enclosures: Attachment
Attachment
Attachment
Attachment
Attachment
Attachment
Attachment
Attachment
Resolution
Ordinance
is recommended that the City
and certify the Negative
Christine A. Sh.Vigleton
Assistant City Manager
A - Existing Zoning Districts
B - Surrounding and Freeway Corridor
Zoning Districts
C - Surrounding and Freeway Corridor
Land Use Designations
D - Proposed Zoning Districts
E - Negative Declaration and Initial
Study
F - March 22, 1993 Planning Commission
Report
G - Minutes from March 22, 1993
Planning Commission meeting
H - Planning Commission Resolution No.s
3131 and 3132
No. 93-35
No. 1105
26
27 u,
z\
;)2 Bo tl o
0 0�
J' AVENUE
c�.ro'. vass'
wa.ern
�n
13
II c 12
C -2P
PC - co "rf
4o1-64
AVENUE NEWPORT
n'
�I^MART _ S
�w. zo-z P. u. ze- ax ��o�r I r• OIC , nc_, o � �O,
I J4
JACK I `o7 '
7
IZZLER IN T E BOX --ICY'
V
Q BLK. C O�
_1651
9
v
I7 P
Os
P0.4. LOT J3 I b
l
Ua,fl 13�
4
zoZi i --
Z \ = o I c
: I O ✓ z, --
7 I ins
u a
+' Pu�i06-19
Nor-
�. xo
�--" - ORANGE
O PET HOSPIT
PN. 9e_JS Bo'
\. MARCH /983
POR. L 53 W F4-1
3 BLK.
W
iL
4
j •°I 16 h. C la °\ \
III^ °...+ce •• +� 1
NO SCALE
EXISTING ZONING DISTRICTS
ATTACHMENT A
�•
o
064
V
PAR
\SU,5
<
e
V
Bo
W
NO SCALE
EXISTING ZONING DISTRICTS
ATTACHMENT A
C/
100
5 'R4
R4
4000 R
20
2000
ltd I
R4 PD
6000
l3
350
SURROUNDING AND FREEWAY CORRIDOR
ZONING DISTRICTS
CITY OF TUSTIN ZONING EXHIBIT
NO SCALE
ATTACHMENT R
SURROUNDING AND FREEWAY CORRIDOR
LAND USE DESIGNATIONS
CITY OF TUSTIN GENERAL PLAN EXHIBIT NO SCALE
ATTACHMENT C
C -2P
4, _ 64
S
AVENUE
`e M-
�M.N—>
W
JACK e
IZZLER IN TV BOX
2
POR LOT 33 J
e NEWPORT
ATTACHMENT o
�
- G
� T
Q
•_ P.N 106-19
i-�y
11
/Be.az•
1
ORANGE
2
PET
HOSPI
L
MARCH /983
AVENUE `
POR. L J!
pi i-
8L K.
>ai
+ 13
V]
¢
PIR.
II
i 12
'36 ° 37 38
064
33
cc
l� a
lO 1J
I
F>P Z
O
O
AVENUE
RIB
cAVENUE
GO
G
Z
B°
G
N
Y4
NQ-., 747
a
c
>e' e2 :e' <> rz' on as .a.>e'
ATTACHMENT o
�L
NEGATIVE DECLARATION
CITY OF TUSTIN
300 CENTENNIAL WAY, TUSTIN, CA. 92680
Project Title: ZONE CHANGE 92-005, File No.
DESIGN REVIEW 92-050, AND CONDITIONAL USE PERMIT 92-038
Project Location: SOUTHERLY SIDE OF EL CAMINO REAL, EAST OF NEWPORT AVENUE
SEE.ATTACHED PUBLIC NOTICE FOR FURTHER INFORMATION
Project Description: REQUEST TO CHANGE THE ZONING DISTRICT CLASIFICATION
FROM C-2 TO CG; AND TO DEVELOP. -AND OPERATE A SELF SERVE CAR WASH
Project Proponent: FRONTRUNNER HOMES
Contact Person:JOANN M -S. PERRY Telephone: 714/544-8890 Ext. 478
The Community Development Department has conducted an initial study for the
above project in accordance with the City of Tustin's procedures regarding
implementation of the California Environmental Quality Act, and on the basis of
that study hereby find:
a That there is no substantial evidence that the project may have a
significant effect on the environment_
(-j That potential significant affects were identified, but revisions have
xl been included in the project plans and agreed to by the applicant that
— would avoid or mitigate the affects to a point where clearly no
significant effects would occur. Said revisions are attached to and
hereby made a part of this Negative Declaration.
Therefore, the preparation of an Environmental Impact Report is not required.
The initial study which provides the basis for this determination is on
file at the Community Development Department, City of Tustin. The public
is invited to comment on the appropriateness of this Negative Declaration
during the review period, which begins with the public notice of a
Negative Declaration and extends for seven calendar days. Upon review by
the Community Development Director, this review period may be extended if
deemed necessary.
REVIEW PERIOD ENDS 4:30 p.m. on MARCH 22, 1993
UAfED: FEBRUARY 25, 1993 �
Community Development -L)"- C
ATTACHMENT E
DISCUSSION OF ENVIRONMENTAL EVALUATION
ZONE CHANGE 92-005, CONDITIONAL USE PERMIT 92-038
AND DESIGN REVIEW 92-050
FEBRUARY 25, 1993
PROJECT DESCRIPTION
The proposed project is a request for Zone Change 92-005 from the
Central Commercial (C-2) District to the Commercial General (CG)
District. The applicant is also processing concurrently
Conditional Use Permit 92-038 to permit the construction and
operation of a self -serve car wash in the Commercial General (CG)
District; and Design Review 92-050 for the review of the physical
development related to the proposed self -serve car wash. The Zone
Change is subject to City Council review and approval. The
Conditional Use Permit is subject to Planning Commission approval
and the Design Review is subject to approval by the Community
Development Department.
The project site, a .40 acre parcel located on the southerly side
of E1 Camino Real, east of Newport Avenue (see location map).
The site is presently vacant. Surrounding uses to the site include
the Tustin Lanai Apartments and an small office complex across E1
Camino Real to the north, Tustin High School further east on E1
Camino Real, and the Tustana Pet Hospital to the east. Located
south of the subject site is the Interstate 5 Newport Avenue
northbound off ramp and vacant property zoned C-1 to the west.
Sizzler and Jack In The Box restaurants are located further to the
west adjacent Newport Avenue. A vacant parcel, zoned Commercial
General (CG), is located to the northwest across E1 Camino Real.
1. Earth - B "Yes" A C through G "No" - The subject site is
currently vacant and is relatively flat in its topographical
features. Any development of the site would require minor
grading activity, compaction of the soil and the overcovering
of the soil to create building pads and parking areas.
Appropriate grading plans and soil reports would be required
as part of the City's review and Building Permit plan check
process.
Sources: Field Observations, Submitted Development Plans,
City of Tustin Community Development Department.
Mitigation/Monitoring: The applicant would be required to
submit a soils report completed within 12 months prior to
Building Permit Plan Check. The soils report shall provide
expanded information regarding the levels of hydrocarbons and
around water contamination found on site. The applicant shall
also submit a letter stating hazardous material clearance of
the site from the Orange County Health Department. The
applicant would be required to submit grading plans
identifying the scope of work at Building Permit Plan Check.
I11 work shall be done in conformance with the Uniform
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 2
Building Code, Grading Code and Grading Manual as required by
the Building Official.
Air - A through C "No" - The proposed project would not result
in any long term degradation to the existing air quality.
However, with construction there will be short term air
quality pollutants as dust particles will be omitted into the
air. No significant impacts are expected.
Source: Submitted Development Plans, South Coast Air Quality
Management District, City of Tustin Community Development
Department
Mitigation/Monitoring: The site will be required to comply
with grading plan approvals with regard to dust control, which
requires the applicant to apply water to the site as specified
in the Grading Code and Grading Manual. This will be
monitored by the Building Division when construction
commences.
3. Water - B "Yes" E "Maybe" A C D & F through I - "No" - The
proposed project would add impervious surfaces to the site
which would effect drainage and run off. As proposed, the
parking and vacuum areas of the project will surface drain
into the existing storm drain system. It is not anticipated
that this project will substantially contribute to the
drainage flow and is in compliance with the Drainage Area
Management Plan for the City of Tustin as designated by the
Regional Water Quality Control Board. The project is also
designed so that the washing bay areas surface will drain into
water recycling catch basis which recycle approximately 25
percent of the daily water usage of the project. The
remainder of. the water will be deposited into the sanitary
sewer system for treatment which is in compliance with the
Orange County Sanitation District requirements. Currently,
neither the City of Tustin Water Department, the Regional
Water Quality Control Board nor the Orange County Sanitation
District would require the applicant to provide a water
recycling system for the project, the feature of the project
is a voluntary action by the applicant. The subject site is
not located near any standing or moving bodies of water.
Source: Field Observations, City of Tustin Community
Development Department, City of Tustin Public Works
Department, Orange County Sanitation District, Regional Water
Quality Control Board
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 3
Mitigation/Monitoring: The site will be designed so that all
parking and vacuum area surface run off is directed to and
picked up by the storm drain system. The site will be
designed so that all washing bay water be collected on site
and tied into the sanitary sewer system, either with or
without a water recycling system. All grading and drainage
plans shall be subject to review and approval by the City of
Tustin's Building Division and the Public Works Department to
confirm compliance with Drainage Area Management Plan prior to
construction. Alterations to the drainage would be subject to
further review and approval by the City of Tustin Community
Development and Public Works Departments.
4. Plant Life - A through D - "No" - The project site is free
from any unique, rare or endangered species of plant life.
The proposed project would introduce landscape and specimen
trees on to the site in conformance with the requirements of
the City of Tustin's Landscape and Irrigation Guidelines.
source: Field Observations, Proposed Development Plans
Mitigation/Monitoring: None Required.
5. Animal Life - A through D - "No" - The subject site is located
within an urban area and was previously developed with a
commercial uses. The site is not inhabited by any known
species of animals. Installation of the proposed project
would have no impacts on animal populations, diversity of
species or migratory patterns.
source: Field Observations
Hitigation/Monitoring: None Required.
6. Noise - A "Yes", B - "No" - The proposed project would add new
noise sources into the area since the property is presently
undeveloped. The development of the project will result in
short term construction noise impacts which will require
compliance with the City's Noise Ordinance. As designed, the
water recycling equipment and washing equipment pumps will be
housed within the car wash building in the central utility
room. The project proposes to locate the vacuum pumps to the
rear of the site, adjacent to the I-5 Newport Avenue off -ramp
wall. In this location, the noise emitted from the vacuums
will be attenuated over the full depth of the site. Given the
existing noise levels of 65 to 70 dBa in the area generated by
the I-5 Freeway and surrounding street system (El Camino Real
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 4
and Newport Avenue), the proposed project is not expected to
impact the ambient noise levels in the area. The proposed
project would be potentially operating 24 hours/day. The
equipment will be required to conform to the City's Noise
Ordinance, which applies to commercial zones at a standard
level of 60 dBA.
Source: Frontrunner Homes, Community Development Department,
Field Observations
Mitigation/Monitoring: All development related noise
generated shall be in accordance with the City of Tustin Noise
Ordinance which, in part, limits noise generation to a maximum
of 60 dBa and restricts construction hours, which would be
verified by the Community Development Department.
7. Light and Glare - "Yes" - Since the project site is vacant,
any development would add new lighting into the area. The
proposed project would be potentially operating 24 hours/day.
The applicant proposes to install timing devices on the light
fixtures which will turn off approximately 300 of the lights
in the later hours of the night, reducing the overall light
generated on site. Any exterior lighting that would be
provide would comply with the City of Tustin Security
Ordinance.
Source: Field Observations, Proposed Development Plans
Mitigation/Monitoring: The applicant shall provide a
photometric study showing the location and anticipated
distribution pattern of light of all proposed fixtures. All
exterior lighting shall be designed and arranged so not to
direct light .or glare onto adjacent properties; including the
adjacent I-5 'Freeway. All lighting shall be developed to
provide a minimum of one (1) footcandle of light coverage, in
accordance with the City's Security Code.
S. Land Use - "No" - The subject site currentlly stradles two
zoning districts, Central Commercial (C-2) District and
Commercial General (CG) District. The proposed project is to
rezone the westerly portion of the site from Central
Commercial (C-2) District to Commercial General (CG) District
and to develop a self -serve coin operated car wash at the
site. Generally the zoning designation directly adjacent to
the I-5 Freeway fall within the Commercial, and Industrial
categories which includes the CG and C-1, C-2 and PM
Districts. Additionally, the General Commercial (CG) District
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 5
is appropriate when adjacent to the freeway as it offers a
greater diversity of uses which generally can utilize the
freeway exposure such as, but not limited to, service stations
and other auto related uses.
Surrounding Zoning Districts to the subject site include
Retail Commercial (C-1) across E1 Camino Real to the north,
Public and Institutional (P&I) east on E1 Camino Real, and to
the west of the subject property is the Tustana Pet Hospital
which is zoned C-1. There are no uses on the south side of
the subject property as the property abuts the Santa Ana (I-5)
Freeway Newport Avenue off ramp. The vacant property to the
west of the subject site is zoned Retail Commercial (C-1) .
Sizzler and Jack In The Box restaurants, zoned Central
Commercial (C-2), are located further to the west adjacent to
Newport Avenue. The vacant parcel located to the northwest
across E1 Camino Real is zoned Commercial General (CG).
The development of the property would be in compliance with
the planned commercial use of the area as specified on the
General Plan Land Use Map.
Source: Proposed Development Plans, City of Tustin Community
Development Department
Mitigation/Monitoring: None Required.
9. Natural Resources - A and B - "No" - The proposed project
would result in construction use of materials that are non-
renewable. However, the usage will be minimal given the scale
of the project. The applicant proposes to install timing
devices on the light fixtures which will turn off
approximately 300 of the lights in the later hours of the
night, reducing the overall electrical energy consumption of
the project. The project will use a gas water heater.
Source: Proposed Development Plans, City of Tustin Community
Development and Public Works Departments
Mitigation/Monitoring: The applicant shall utilize recycled
materials where appropriate.
10. Risk of Upset - "No" - The proposed project would not result
in any significant risk of upset (i.e. explosion, etc.) given
the scope and nature of the proposed use. All mechanical and
electrical equipment associated with the carwash would comply
with Uniform Building and Fire Codes.
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 6
Source: Orange County Fire Department, Proposed Development
Plans, City of Tustin Community Development Department
Mitigation/Monitoring: All construction shall be in
accordance with applicable Uniform Building and Fire Codes.
Such compliance shall be verified during the plan check
process prior to the issuance of any Building permits.
11. Population - "No" - The proposed project is a commercial
infill project and would not result in any direct increase in
population in that no addition dwelling units would be
created. This small scale project would be designed to meet
the needs of the existing residents and businesses of the
community. The project would have no impact of the location,
growth, distribution or density of the population in the
surrounding area.
Source: City of Tustin Community Development Department
Mitigation/Monitoring: None Required.
12. Housing - "No" - The proposed project
project and would not result in a.
population in that no addition dwo
created. This small scale project wo
the needs of the existing residents
community. The project would have no
growth, distribution or density of
surrounding area.
is a commercial infill
ny direct increase in
alling units would be
ald be designed to meet
and businesses of the
impact of the location,
the population in the
Source: City of Tustin Community Development Department
Mitigation/Monitoring: None Required.
13. Transportation /Circulation - B "Yes", A, C, D, and F "Maybe";
E "No" - Since the site is vacant, any development would
generate additional vehicular trips to the site and the need
for additional parking facilities. The proposed project
provides for the needed parking on site.
Due to the site close proximity to the Orange Street
intersection, location of an existing driveway adjacent to the
easterly property line (Tustana Pet Hospital) and comments
provided by the City of Tustin Community Development and
Public Works Departments, the applicant has proposed that a
single, 30 foot wide; driveway apron be located adjacent to
the westerly property line. At this location traffic entering
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 7
and existing the site will not reduce the efficiency of the
existing left turning movements from E1 Camino Real onto
Orange Street or Newport Avenue. Along the project frontage,
E1 Camino Real has a straight roadway section with no
horizontal or vertical curvature, therefore the proposed
driveway will not be subject to reduced sight visibility. The
westerly location also provides the opportunity for a joint
driveway in the event of future development on the adjacent
vacant property. A potential of a joint driveway between the
subject site and adjacent future development may potentially
reduce the impact of future traffic.
Based on the submitted development plans and the .1993
Institute of Traffic Engineering (ITE) Trip Generation Manual,
it is anticipated that the peak traffic generation times
(greatest traffic activity generated) for the project will
occur Saturday and Sunday with approximately 212 trips per day
(106 inbound and 106 outbound). It is anticipated that the
project will generate approximately 48 trips per day (24
inbound and 24 outbound) during the weekday P.M. peak -hours of
4:00-6:00 pm. The critical impact periods (worse case
scenario times) for the E1 Camino Real and Newport Avenue
intersection occur at 7:00 to 9:00 AM and 4:00 to 6:00 PM.
The peak traffic generation times for the proposed project
occur outside of the normal weekday AM -PM peak -hour window and
therefore the project will not have a significant impact the
AM and PM peak -hour weekday traffic operation.
In conjunction with the Caltrans, Santa Ana (I-5) Freeway
widening project in this area, additional travel lanes (an
eastbound and westbound travel lane) were added to E1 Camino
Real. This improvement implemented the master planned status
of the street tc a secondary arterial highway, thus increasing
the carrying capacity of El Camino Real from 11,300 ACT to
22,500 ACT at a level of service D. El Camino Real is
currently operating at a level of service A (11,720 ACT)
between Red Hill Avenue and Newport based on the City of
Tustin Public Works Department November 20,1992 traffic
counts.
Based on the above information, it is determined that the
proposed project will not have significant traffic impacts
upon the circulation system and will not have a significant
impact to the area in the form of cumulative negative
circulation impacts.
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 8
Source: City of Tustin Community Development and Public. Works
Departments, Field Observations, proposed Development Plans
Mitigation/Monitoring: The driveway apron shall be designed
at a 30 foot width at the westerly property line to provide
the potential for a joint driveway arrangement with future
adjacent development. The proposed landscape adjacent to the
driveway shall comply with sight visibility requirements.
14. Public Services - A through C "Maybe", D through F - "No" -
Since the project site is vacant, any development would
require the services of the Fire and Police Departments. The
City of Tustin Police Department has identified the need for
visibility into the site for security measures and the need to
reduce the opportunities for graffiti and vandalism. The
applicant has sited the car wash building with the washing
bays open to the public right-of-way to increase the ability
for surveillance to the rear portion of the site. The
applicant has also proposed to paint the wall surfaces with an
"anti -graffiti" coating and to provided landscape planting
areas adjacent to exposed wall areas to reduce the
opportunities for graffiti and vandalism. It is not expected
that the project would create demands for additional service
on schools, parks, maintenance of public facilities or other
governmental service.
Source: Orange County Fire Department, City of Tustin Police
Department, Community Development and Public Works Departments
Mitigation/Monitoring: The project landscape and grading
shall be designed to provide security surveillance into the
project. The development plans shall be verified for
compliance at Building Permit plan. check. The applicant shall
be required to pay school district fees to Tustin Unified
School District.
15. Energy - A and B - "No" - The proposed project would not
result in any "significant" change in the current use of
energy given the scale of new development but will require new
services as is customary with new construction. The applicant
proposes to install timing devices on the light fixtures which
will turn off approximately 30% of the lights in the later
hours of the night, thus reducing the overall electrical
energy consumption. Any exterior lighting that would be
provide would comply with the City of Tustin Security
Ordinance. Electrical and Gas capacities required for the
project are existing and have been designed to accommodate
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 9
future commercial projects on this parcel and are therefore
adequate to serve the proposed project.
source: Southern California
odes Development California Gas,
Public Works Department, p P
Mitigation/Monitoring: The applicant shall. comply with Title
24 in regard to energy conservation. This shall be verified
compliancefor Permit plan Check. The c
ant
shallresearch the possib Building possibility of reduce energy lamps for all
light fixtures.
16. Utilities - A through F - "No" - The project site is located
within an existing commercial area with all utilities
available to the site from E1 Camino Real. Sanitary sewer,
storm drain and water capacities required for the project are
existing and have been designed to accommodate future
commercial projects, such as a self -serve car wash, on this
parcel and are therefore adequate to serve the proposed
Project. The proposed project would not required the need for
additional utilities to serve the site. The County of orange
tahas
has established goals to conserve water, the app
voluntarily proposed to install a water recycling system in
conjunction with the car wash operation system. It is
anticipated that the system will recycle approximately 25
percent of the daily water consumption for the project.
Source: City of Tustin Public Works Department
Mitigation/Monitoring: The applicant shall utilize a water
reclamation system. It shall be identified on the
construction plans prior to issuance of building permits.
1;. Human Health _ A and B - "No" - The proposed project would not
result in any effect on human health. The proposed use as a
self -serve car wash would not create conditions that
negatively effect human health. Currently there exist four
soil/ground water reclamation projects within one mile of the
subject site, being observed by the Orange County Health
Department, Environmental Division. The closest soil
reclamation site is a monitoring and vapor extraction well is
located at the northeast corner of Newport Avenue and E1
Camino Real, northwest of the subject site. This site has an
existing free product plume which extends to the southwest of
site. Based on 4th Quarter monitoring reports conducted by
Applied Geosciences, Inc. for the Southern Counties oil
Company, monitoring wells closest to .the proposed car wash
Discussion of Environmental Evaluation
Zone Change 93-005., Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 10
site indicate that neither free product nor extensions of the
existing plume have been detected. Based on past historic
records of the Orange County Health Departments, the subject
site has no records showing the need for soil/ground water
reclamation systems.
Source: Proposed Development Plans, City of Tustin Community
Development Department, Orange County Health Department
Mitigation/Monitoring: The applicant would be required to
submit a soils report completed within 12 months prior to
Building Permit Plan Check. The soils report shall provide
expanded information regarding the levels of hydrocarbons and
ground water contamination found on site.
18. solid paste - "Maybe" - Since the site is vacant, any
development would generate additional solid waste requiring
disposal by the City. The applicant proposes to provide trash
receptacle of sufficient capacity to accommodate the proposed
carwash use. Pursuant to the City of Tustin Municipal Code,
the applicant is required to contract for trash removal
services with the City's contracted hauler. The solid waste
product is transported by the hauler to the Material Recovery
Facility (MRF). Once at the MRF, the waste is manually and
mechanically separated and the recyclable materials are
recovered. This program has been implemented by the City in
effort to meet the States requirements identified in the
Source Reduction and Recycling Element related to the 25 and
50 percent diversion requirements.
Due to the size and the type of use of the proposed project,
it is anticipated that the amount of solid waste will be
accommodated within the City's existing solid waste handling
programs and will not have a significant impact or. the City's
Solid Waste Handling services. The City's existing solid waste
handling program and contracts have been established to
accommodate the development and expansion of new businesses
within the City.
Source: Proposed Development Plans, City of Tustin Public
Works Department, Great Western Reclamation, Inc.
Mitigation/Monitoring: The applicant will be required to
contract for a fee with the City' contracted solid waste
hauler. The applicant shall provide a trash receptacle which
comply with the requirements of the City of Tustin's contract
hauler's specifications. Compliance shall be verified at
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and Carwash
Conditional Use Permit 92-038 (Mayell/King's Hwy. )
February 25, 1993
Page 11
Building Permit plan check.
19. Aesthetics - "Maybe" - The City of Tustin Community
Development Department has identified that the orientation of
the washing bays to the E1 Camino Real frontage does not
comply with the City of Tustin Handbook for Planning, Zoning
and Development Guidelines, which requires service bays to be
oriented so as not to be visible from public right-of-way
view. As proposed, the orientation of the open bays are
identified as a negative impact to the public view. The
applicant has stated that a site design which orients the
washing bay openings away from the street frontage and public
right-of-way view would not only reduce the economic viability
of facility but also would restrict the views into the
interior of the site and compromise the feeling of security
and safety. The applicant has proposed to provide a
combination of solid wall and decorative metal fence with
decorative masonry columns along the easterly property line.
The solid wall will be located in the front portion of the
site to mitigate the visual impact of the proposed structure.
The decorative metal fencing will be located to the rear
portion of the site to permit visual survaillance of the rear
portion of the site. The applicant is also proposing to
increase the planting at the westerly line to limit the public
right-of-way views to the immediate project frontage. The
landscape along the immediate frontage will consist of canopy
trees and earth berming designed to limit the visual impact of
the structure and paving areas but at the same time providing
a unobstructed window into the project for surveillance and
security. Vine planting pockets are proposed to be located
adjacent to the columns of the structure to further provide
planting to soften the expanse of the structure.
source: Proposed Development Plans, Field observations
Monitoring: The site will be designed to provide landscape
and hardscape screening along the easterly and westerly
property lines as described above. P. visual buffer consisting
of landscaping and earth berms shall be provided along the E1
Camino Real Frontage in accordance with the City of Tustin
Landscape and Irrigation Guidelines. Such compliance shall be
verified during the plan check process prior to the issuance
of any building permits.
20. Recreation - "No" - The project is non-residential in nature
and is not located in proximity to recreational facilities.
It will have no impact on quality of recreation opportunities
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-035 (Mayell/King's
February 25, 1993
Page 12
in the community.
Hwy. Carwash)
Source: City of Tustin Community services Department, City of
Tustin General Plan Land Use Element
Mitigation/Monitoring: None Required.
21. Cultural Resources - A Throu h D "No" - The subject property
is not located within the City's Cultural Resources Overlay
District, nor are there any identified cultural, historic or
archaeological resources identified on or around the site.
The project will would have no impacts on cultural resources
Source: City of Tustin Historical Resources Survey, City of
Tustin General Plan, City of Tustin Community Development
Department
Mitigation/Monitoring: None Required.
22. Mandatory Findings of Significance - As discussed above, the
proposed project involves the construction and operation of a
self-service, coin-operated car wash. The construction of the
proposed project could result in potential impacts to the
environment in the areas of water, noise, light and glare,
transportation and circulation, and aesthetics. However, due
to the project design and conditions imposed, the potential
impacts would be reduced to a level of insignificant.
Item a - "No": Based upon the responses to Items 1 - 21 in
this Initial Study, the review of City files, records and
documents and the nature of the project, the project is not
anticipated to significantly impact wildlife, fish, flora,
fauna or cultura'1 resoL_ces.
Item b "Maybe 1.-4thout the mitagation measures and
monitoring provided herein, the project may achieve short. -term
goals to the disadvantage of long term, evironmental goals,
specifically with regard to traffic and circulation, water and
light and glare. However, due to the project design and
conditions imposed, such as relocation of the driveway apron,
water recycling syster.r and the potential impacts would be
reduced to a level of insignificant. Therefore, as designed
and with the imposed mitagation measures, the project does not
achieve short-term goal, to the disadvantage of long-term,
environmental goals.
C
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 13
Item c -
"No:" In reference to the project background
discussion provided herein, the project will not contribute to
the demand individually and will have limited impacts
cumulatively.
Item d - "No"• As a result of the preparation of and as
discussed in this Initial Study, mitigation measures have been
identified and have either been implemented in the project's
design or will become Conditions of Approval. Any possible
impacts associated with this project have been mitigated to a
level of insignificance.
Sources: All sources listed in items 1
- 21 of this Initial
licable City and State
Study, Submitted development plans, App
Codes.
Mitigation/Monitoring: As stated above, mitigation measures
have been identifed in Items 1 - 21 of this Inital Study and
have either been implementedin the project's design or will
become Conditions of App
JP:br/cup92-038.env
I. Background
II
CITY OF TUSTIN
Community Development Department
ENVIRONMENTAL INITIAL STUDY FORM
1. Name of Proponent Mr. L. Vincent Mayell representing Frontrunner Homes
2. Address and Phone Number of Proponent
1200 Quail Street, Suite 100
Newport Beach, CA 92660 (714) 833-3340
3. Date of Checklist Submitted February 25, 1993
4. Agency Requiring Checklist City of Tustin Planning Commission
5. Name of Proposal, if applicable Zone Change 93-005, Design Review 93-05(
and Conditional Use Permit 93-038
Environmental Impacts
(Explanations of all "yes" and "maybe" answers are required on
attached sheets.)
Yes Maybe No
1. Earth. Will the proposal result in:
a. Unstable earth conditions or in
changes in geologic substructures? X
b. Disruptions, displacements, compaction
or overcovering of the soil? X _
C. Change in topography or ground surface
relief features? X
d. The destruction, covering or
ncdification of any unique geologic
or physical features? X
e. Any increase in wind or water erosion
of soils, either on or off the site? X
f. Changes in deposition or erosion of
beach sands, or changes in siltation,
deposition or erosion which may modify
the channel of a river or stream or the
bed of the ocean or any ban, inlet or
lake? X
Exposure of people or property to
geologic hazards such as earthquakes,
landslides, mudslides, ground failure,
or similar hazards?
Will the proposal result in:
Substantial air emission or
deterioration of ambient air quality?
The creation of objectionable odors?
Alteration of air movement, moisture,
or temperatures, or any change in
climate, either locally or regionally?
3. Water. Will the proposal result in:
h.
Changes in currents, or the course
of direction of water movements,
in either marine or fresh water?
Changes in absorption rates,
drainage patterns, or the rate and
amount of surface runoff?
Alterations to the -course or flow
of flood waters?
Change in the amount of surface
water in any water body?
Discharge into surface waters,
or in any alteration of surface water
quality, including but not limited
to temperature, dissolved oxygen or
turbidity?
Alteration of the direction or rate
of flow of ground waters?
Change in the'quantity of ground
waters, either through direct additions
or withdrawals, or through interception
of an aquifer by cuts or excavations?
Substantial reduction in the amount of
water otherwise available for public
water supplies?
Yes Maybe No
X
_
X
X
X
X
X
X
X
X
X
X
X
4.
5.
FM
7
Yes Maybe No
i.
Exposure of people or property to
water related hazards such as flooding
or tidal waves?
X
Plant Life. Will.the proposal result in:
a.
Change in the diversity of species, or
number of any species of plants (including
trees, shrubs,' grass; crops, and aquatic
plants)?
b.
Reduction of the numbers of any unique,
rare or endangered species of plants?
X
C.
Introduction of new species of plants
into an area, or in a barrier to the
normal replenishment of existing
species?
X
d.
Reduction in acreage of any
agricultural crop?
X
Animal Life. Will the proposal result in:
a.
Change in the diversity of species, or
numbers of any species of animals (birds,
land animals including reptiles, fish and
shellfish, benthic organisms or insects)?
X
b.
Reduction of the numbers of any unique,
rare or endangered species of animals?
X
C.
Introduction of new species of animals
into an area, or result in a barrier to
the migration or movement of animals?
X
d.
Deterioration to existing fish or
wildlife habitat?
X
Noise. Will the proposal result in:
a.
increases in existing noise levels? X
b.
Exposure of people to severe noise
levels?
X
Light and Glare. Will the proposal produce
new
light or glare? X
Yes Maybe No
g. Land Use. will the proposal result in
a substantial alteration of the present
or planned land use of an area? -X
9. Natural Resources. will the proposal
result in:
a. Increase in the rate of use of any
X
natural resources?
b. substantial depletion of any
x
nonrenewable natural resource?
lo.
Risk of Upset. will the proposal involve:
a. A risk of an explosion or the release
of hazardous substances (including, but
not limited to, oil, pesticides, chemicals
or radiation) in the event of an accident
X
or upset conditions?
—
b. Possible interference with an
emergency response plan or an
X
emergency evacuation plan?
—
11.
Population. Will the proposal alter
the location, distribution, density, or
growth rate of the human population of
X
an area?
—
12.
Housing. Will the proposal affect
existing housing, or create a demand
X
for additional housing?
—
13.
Transportation/Circulation. Will the
proposal result in:
a. Generation of substantial additional
vehicular movement?
a —
b. Effects on existing parking facilities,
or demand for new parking? R
-- —
C. Substantial impact upon existing
transportation systems?
X —
d. Alterations to present patterns of
circulation or movement of people
and/or goods?
X —
Yes Mavbe No
e.
Alterations to waterborne, rail or
X
b.
Communications systems?
air traffic?
C.
X
f.
Increase in traffic hazards to motor
Sewer or septic tanks?
X
e.
vehicles, bicyclists or pedestrians?
X
_
14. Public
Services. Will the proposal have
an
effect upon, or result in a need for new
or
altered governmental services in any of
the
following areas: "
a.
Fire protection?
X
b.
Police protection?
X
_
C.
Schools?
X
—
d.
Parks or other recreational facilities?
X
e.
Maintenance of public facilities,
including roads?
X
f.
Other governmental services?
X
15. Energy.
Will the proposal result in:
a.
Use of substantial amounts of fuel or
energy?
a
b.
Substantial increase in demand upon
existing sources of energy, or require
the development of new sources of
energy?
X
16. Utilities. Will the proposal result in a
need for new systems, or substantial
alterations to the following utilities:
a.
Power or natural gas?
X
b.
Communications systems?
a
C.
Water?
X
d.
Sewer or septic tanks?
X
e.
Storm water drainage?
X
f.
Solid waste and disposal?
X
Yes Maybe No
17. Human Health. Will the proposal
result in:
a. Creation of any health hazard or
potential health hazard (excluding
mental health)? X
b. Exposure of people to potential
health hazards? X
18. Solid Waste. Will the proposal create
additional solid waste requiring disposal
by the City? X —
19. Aesthetics. Will the proposal result in
the obstruction of any scenic vista or view
open to the public, or will the proposal
result in the creation of an aesthetically
offensive site open to public view? X —
20. Recreation. Will the proposal result in an
impact upon the quality or quantity of
existing recreational opportunities? X
21. Cultural Resources
a. Will the proposal result in the
alteration of or the destruction of
a prehistoric or historic archaeological
site? X
b. Will the proposal result in adverse
physical or aesthetic effects to a
prehistoric or historic building,
structure, or object? x
C. Does the proposal have the potential
to cause a physical change which
would affect unique ethnic cultural
values? --
d. Will the proposal restrict existing
religious or sacred uses within the
potential impact area? x
Yes Maybe No
22. Mandatory Findings of Significance.
a. Does the project have the potential to
degrade the quality of the environment
substantially reduce the habitat of a
fish or wildlife species, cause a fish or
wildlife population to drop below self
sustaining levels, threaten to eliminate
a plant or animal community, reduce the
number or restrict the range of a rare or
endangered plant or animal or eliminate
important examples of the major periods
of California history or prehistory? X
b. Does the project have the potential to
achieve short-term, to the disadvantage of
long-term, environmental goals? (A short-
term impact on the environment is one
which occurs in a relatively brief, definitive
period of time while long-term impacts will
endure well into the future). X
C. Does the project have impacts which are
individually limited, but cumulatively con-
siderable? (A project may impact on two
or more'separate resources where the impact
on each resource is relatively small, but
where the effect of the total of those
impacts on the environment is significant.)
X
d. Does the project have environmental effects
which will cause substantial adverse effects
on human beings, either directly or
indirectly? X
III. Discussion of Environmental Evaluation
IV. Determination
(To be completed by the Lead Agency)
On the basis of this initial evaluation:
I find that the proposed project COULD NOT have a
significant effect on the environment, and a
NEGATIVE DECLARATION will be prepared.
I find that although the proposed project could have
a significant effect on the environment, there will
not be a significant effect in this case because the
mitigation measure described on an attached sheet have
been added to the project. A NEGATIVE DECLARATION WILL %
BE PREPARED
I find the proposed project MAY have a significant effect
on the environment, and an ENVIRONMENTAL IMPACT REPORT
.is required.
FEBRUARY 25 1993 c V
Signat
Dateure
ITEM N0. 6
C/
�Rtz;port to the
planning Commission
DATE. MARCH 22, 1993
SUBJECT:
ZONE CHANGE 92-003, CONDITIONAL USE PERMIT 92-038
AND DESIGN REVIEW 92-050
APPLICANT:
FRONTRUNNER HOMES
1200 QUAIL STREET, SUITE 100
NEWPORT BEACH, CA 92660
LANDOWNER:
FRANAGOFIN, A LIMITED PARTNERSHIP
505 N. TUSTIN AVENUE
TUSTIN, CA 92705
LOCATION:
THE SOUTHERLY SIDE OF EL CAMINO REAL, APPROXIMATELY
450 FEET EAST OF NEWPORT AVENUE
ZONING:
CENTRAL COMMERCIAL (C-2) AND COMMERCIAL GENERAL
(CG) DISTRICTS
ENVIRONMENTAL
_ STATUS:
A NEGATIVE DECLARATION HAS BEEN PREPARED IN
ACCORDANCE WITH THE PROVISIONS OF THE CALIFORNIA
ENVIRONMENTAL QUALITY ACT.
REQUEST:
1. TO AUTHORIZE A ZONE CHANGE FROM CENTRAL
COMMERCIAL (C-2) TO COMMERCIAL GENERAL (CG)
DISTRICT;
2. TO AUTHORIZE A CONDITIONAL USE PERMIT FOR THE
ESTABLISHMENT AND OPERATION OF A SELF -SERVE,
COIN-OPERATED CAR WASH WITHIN THE COMMERCIAL
GENERAL (CG) DISTRICT; AND
3. TO APPROVE THE DESIGN REVIEW OF THE PROPOSED
CAR WASH FACILITY AND SITE IMPROVEMENTS.
RECOMMENDATION
It is recommended that the Planning Commission take the following
actions:
1. Approve the
Environmental Determination for the project by
adopting Resolution No. 3130;
2. Recommend
to the City Council approval of Zone Change 92-003
by adopting Resolution No. 3131, as submitted or revised;
3. Approve
Conditional Use Permit 92-038 by adoption of
_
Resolution
No. 3132, as submitted or revised; and
4. Recommend
to the Redevelopment Agency approval of Design
Review 92-050
by adopting Resolution No. 3133, as submitted or
revised.
ATTACHMENT
F
Planning Ccmmission Report
Conditional Use Permit 92-038,
Zone Chance 92-003, and Design Review 92-050
March 22, "_993
Page 2
The applicant is requesting a Zone Change for a vacant site located
on the southerly side of E1 Camino Real, approximately 450 feet
east of Neo:oort Avenue to accommodate the development of a self -
serve, coin-operated car wash (see location map included as
Attachment TI). In addition, the property owner is also requesting
that a small twenty foot wide remaining remnant north of the
proposed car wash site be also rezoned to CG.
The subject site for the proposed car wash is currently located in
two (2) Zor_ing Districts. The easterly 2/3 of the site is located
within the Commercial General (CG) District and the remaining
westerly 1;3 of the site is located within the Central Commercial
(C-2) District. Pursuant to the City of Tustin Zoning Code, car
washes are not permitted within the C-2 District. The proposed
Zone Change would rezone the westerly portion of the subject site
from Central Commercial (C-2) to Commercial General (CG), which
allows the establishment and operation of car washes subject to
approval by the Planning Commission of a Conditional Use Permit.
In the event that the Planning Commission recommends to the City
Council approval of the subject Zone Change, the applicant is
concurrently processing a Conditional Use Permit to permit the
establishment and operation of a self -serve, coin-operated car
wash.
The subject site is also located within the Town Center
Redevelopment Area. The applicant is also concurrently processing
a Design Review for the proposed car wash facility and associated
site improvements, which requires review and approval by the City
of Tustin redevelopment Agency. Any approval of the requested
Conditional Use Permit would be contingent on final approval of the
requested Zone Change by the City Council and the requested Design
Review by t_:e Redevelopment Agency.
Surroundinc_ uses to the site include the following: Tustin Lanai
Apartments and an small office complex across E1 Camino Real to the
north; Tustin High School further east on the north side of El
Camino Rea.; and a Pet Hospital to the east. The Santa Ana (I-5)
freeway riot -of -way to the south; and a vacant property currently
zoned Retail Commercial (C-1) to the west. Sizzler and Jack In The
Box restaurants are located further to the west adjacent to Newport
Avenue. A vacant Commercial General (CG) zoned parcel, is located
to the nort^west across El Camino Real.
Planning Commission Report
Conditional Use Permit 92-038,
Zone Change 92-003, and Design Review 92-050
March 22, 1993
Page 3
A public hearing notice identifying the time, date and location of
the public hearing on this project was published in the Tustin
News. Property owners within 300 feet of the site were notified of
the hearing by mail and notices were posted on the site, at the
Senior Center and at the Police Department. The applicant was
informed of the availability of the agenda and staff report for
this item.
DISCUSSION
Zone Change
The Zoning Code sets forth a district hierarchy of four (4)
commercial classifications. The location, surrounding uses, and
potential impact of the permitted uses within each District should
determine where each Zoning District is located.
The permitted uses and conditionally permitted uses of each of the
Zoning Districts vary according to the characteristics of the
proposed use. From the least intense of uses to the most intense
uses, the districts are as follows, Retail Commercial (C-1),
Central Commercial (C-2), Commercial General (CG), and Heavy
Commercial (C-3). The C-1 District is primarily aimed at providing
a variety of retail, service and office uses. The C-2 District
incorporates the permitted uses of the C-1 District and provides
for the establishment of additional uses such as service uses with
fairly intense operational characteristics. Those uses include
automotive repair shops, service stations, and drive-thru
establishments. In the CG District, uses permitted within both the
C-1 and C-2 Districts are allowed in addition to more intense uses
such as automobile supplies and services. The combined uses
provides for a wider variety of goods and services (ie: retail and
services). Pursuant to Section 9235c(d) of the Zoning Code, a
automobile supplies and services use is a conditionally permitted
use within the CG Zoning District. Based on City of Tustin
historic files, the Planning Commission and City Council has
determined that a car wash use is a similar use which may be
permitted subject to approval of a Conditional Use Permit.
Generally the zoning designation directly adjacent to the Santa Ana
_ (I-5) Freeway falls within the Commercial categories which includes
the C -G and C-1, C-2 and PC -Commercial Districts. The General
Commercial (CG) District offers the greatest diversity of uses
which generally can utilize freeway exposure such as service
stations and other auto related uses (Attachment B).
Planning Commission Report
Cond_=ional Use Permit 92-038,
Zone Change 92-003, and Design Review 92-050
March 22, 1993
Page 4
Surrounding Zoning Districts to the proposed Zone Change
(Attachment A) include the following: Retail Commercial (C-1)
across E1 Camino Real to the immediate north, Public and
Institutional (P&I) at the northeast corner of E1 Camino Real and
Oranc=_ Street; C-1 property to the east (Pet Hospital) and C-1
properties to the west. The vacant property to the west of the
subject site is currently zoned Retail Commercial (C-1). Sizzler
and :ack In The Box restaurants, zoned Central Commercial (C-2),
are _ocated further to the west adjacent to Newport Avenue. The
vacan= parcel located to the northwest across E1 Camino Real is
zoned Commercial General (CG). In light of surrounding zoning, the
existing C-2 designation of the site seems like spot zoning and
rezoning would place a more logical zoning pattern in place.
The General Plan designates the proposed rezoning site within a
Commercial (c) designation. Given the existing CG District on a
portion of this site and given the orientation to the freeway, the
proposal would seem consistent with the General Plan and would
provide for uses more associated with the motoring public
(Attachment C).
In summary, the rezoning of the subject property from Central
Commercial (C-2) to Commercial General (CG) could be considered
logical and appropriate given established land use patterns along
the freeway and compliance with the General Plan. Analysis would
support the proposed Zone Change, as it will not significantly
impact the surrounding area due to built-in use controls of the
Commercial General (CG) District, similarities with the surrounding
commercial Districts, and existing zoning configuration already
established in the City (Attachment D).
Desicn Review and Conditional Use Permit
Should the Planning Commission recommend approval of the Zone
Chance, the applicant is requesting concurrent review of a Design
Review and Conditional Use Permit to permit the construction of a
self -serve, coin-operated car wash with six (6) washing bays and
four (4) vacuum pumps (Attachment E). The 2,933 square foot car
wash building is proposed to be located centrally on a proposed .40
acre site. The building is to be 27'-0" in height with a central
tower element which is 34'-0" in height. The maximum height
perm'-tted within the Commercial General (CG) District is 35'-011.
The architecture is a utilizes clean lines and simple detailing
fitting for the functional nature of the building. The proposed
colors and finishes for the car wash building are to be an off -
whit= (pacific sand) stucco with a terra cotta stucco base. The
facia above the washing bays is proposed to be a light aqua colored
Planning Commission Report
Conditional Use Permit 92-038,
Zone Change 92-003, and Design Review 92-050
March 22, 1993
Page 5
stucco with dark aqua colored tile accents. The interior of the
washing bays is proposed to be finished in an anti -graffiti
coating, which is off-white in color. Staff is also proposing an
anti -graffiti coating of all accessible wall surfaces. The car
wash building is proposed to have a soft terra cotta colored tile
roof.
The building is proposed to consist of six (6) washing bays. The
orientation of the washing bays facing E1 Camino Real frontage does
not comply with the City of Tustin Handbook for Planning, Zoning
and Development Guidelines, which requires service bays to be
oriented so as not to be visible from public right-of-way view.
The applicant has stated that a site design which orients the
washing bay openings away from the street frontage and public
right-of-way view would not only reduce the economic viability of
facility but also would restrict the views into the interior of the
site and compromise the feeling of security and safety.
The Community Development and Police Departments recognize the need
for security. As mitigation measures for the service bay
orientation, the applicant is proposing to provide a combination of
solid wall and decorative metal fence with decorative masonry
columns along the westerly property line. The solid wall will be
located in the front portion of the site to mitigate the visual
impact of the proposed structure. The decorative metal fencing
will be located to the rear portion of the site to permit visual
surveillance of the rear portion of the site. The applicant is
also proposing to increase planting at the westerly line thus
limiting the public right-of-way views to the immediate project
frontage. The landscape along the immediate frontage will consist
of canopy trees and earth berming with low shrubs and groundcover
designed to limit the visual impact of the structure and paving
areas but at the same time providing a unobstructed window into the
project for surveillance and security between the lower tree limbs
and the planting at the around level. Vine planting landscape
areas are proposed to be located adjacent to the columns of the
structure to further soften the expanse of the structure's facade.
conditions of approval have been included in the provided
Conditional Use Permit resolution with regard to the increased
landscape and. proposed fencing treatment.
The site has been designed so that vehicles entering the site may
drive directly into the washing bays or may drive around the car
wash building to vacuum pump islands. The vacuum pump islands and
their associated parking spaces are oriented at the rear of the
property adjacent to the Santa Ana (I-5) freeway. It is
anticipated that the proposed vacuum pumps will not produce noise
Planning Commission Report
Conditional Use Permit 92-038,
Zone Change 92-003, and Design Review 92-050
March 22, 1993
Page 6
in excess of the City's Noise Ordinance during operation.
Manufacturer information regarding the vacuum pumps states that the
calculated sound level will be approximately 52 dBA and 60 feet
from the unit. In this location, approximately 95 feet from the
public right-of-way, the noise anticipated from the proposed
vacuums will be attenuated by the distance, the proposed building,
and landscape. A condition of approval has been included requiring
the project to comply to the City's Noise Ordinance.
Access to the site is proposed from a single 35 -foot wide driveway
apron along E1 Camino Real. The Public Works Department has
indicated that a 30 -foot wide driveway apron would be adequate for
the proposed project. The 30 -foot driveway apron would be located
adjacent to the westerly property line and would be as far away as
possible from the intersection of E1 Camino Real and Orange Street.
This location will reduce potential conflicts between on-site and
street vehicular circulation. The existing driveway approach
located at the easterly portion of the site will be removed.
conditions of approval have been included in the provided
Conditional Use Permit resolution with regard to the required
decreased width of the drive apron and the removal of the existing
driveway apron.
In previous similar applications for car wash facilities, the
Planning Commission and the City Council has expressed concerns
regarding traffic and circulation impacts. Since the subject site
is currently vacant, any development would generate additional
vehicular trips to the site and the need for additional parking
facilities.
Due to the site close proximity to the Orange Street intersection,
the location of an existing driveway adjacent to the easterly
property line (Pet hospital) and comments provided by the City of
Tustin Community Development and Public Works Departments; a single
driveway apron is proposed to be located adjacent to the westerly
property line. At this location vehicles entering and exiting the
site will not reduce the efficiency of existing left turning
movements from E1 Camino Real onto Orange Street or Newport Avenue.
Along the project frontage, E1 Camino Real has a straight roadway
section with no horizontal or vertical curvature, therefore the
proposed driveway will not be subject to reduced sight visibility.
The westerly location also provides the opportunity for a joint
driveway in the event of future development on the adjacent vacant
property. A potential of a joint driveway between the subject site
and adjacent future development may potentially reduce the impact
of future traffic.
Planning Commission Report
Conditional Use Permit 92-038,
Zone Change 92-003, and Design Review 92-050
March 22, 1993
Page 7
Based on the submitted development plans and the 1993 Institute of
Traffic Engineering (-TE) Trip Generation Manual, it is anticipated
that the peak traffic generation times (greatest traffic activity
generated) for the rroject will occur Saturday and Sunday with
approximately 212 tris per day (106 inbound and 106 outbound). It
is anticipated that the project will generate approximately 48
trips per day (24 inbound and 24 outbound) during the weekday P.M.
peak -hours of 4:00-6:00 pm. The critical impact periods (worse
case scenario times) for the E1 Camino Real and Newport Avenue
intersection occur weekdays at 7:00 to 9:00 AM and 4:0& to 6:00 PM.
The peak traffic generation times for the proposed project occur
outside of the normal weekday AM -PM peak -hour window and therefore
the project will not have a significant impact on the AM and PM
peak -hour weekday traffic operation
In conjunction with the Caltrans, Santa Ana (I-5) Freeway widening
project in this area, additional travel lanes (an eastbound and
westbound travel lane) were added to E1 Camino Real. This
improvement implemented the master planned status of the street to
a secondary arterial highway, thus increasing the carrying capacity
of El Camino Real from 11,300 ACT to 22,500 ACT at a level of
service D. E1 Camino Real is currently operating at a level of
service A (11,720 ACT' between Red Hill Avenue and Newport based on
the City of Tustin Public Works Department November 20, 1992
traffic counts.
Based on the above information, it is determined that the proposed
project will not have significant traffic impacts upon the
circulation system and will not have a significant impact to the
area in the form of cumulative negative circulation impacts.
Circulation and parking areas on the site are largely proposed to
be concrete pavement to facilitate the necessary parking and on-
site circulation. Tae applicant is also proposing accent paving
bands of exposed aggregate concrete in a terra cotta color to match
the proposed buildinc base color stucco.
The applicant has proposed at this time to only provide a six (6)
foot wide landscape setback area along the site's El Camino Real
frontage. Section 9235f(2) (a) of the Tustin Zoning Code and
Section I.B.2a of the City of Tustin Landscape and Irrigation
Guidelines would require a ten foot landscape area. However, the
applicant has designed the six foot setback area in order to
accommodate a 31 -foci wide on-site drive aisle in front of the
proposed building facing E1 Camino Real. The applicant has stated
that the increased d=ive aisle width is necessary to accommodate
the turning radii c- patron's vehicles (cars, trucks, campers,
Planning Commission Report
Conditional Use Permit 92-038,
Zone Change 92-003, and Design Review 92-050
March 22, 1993
Page 8
recreational vehicles) and on-site circulation of the facility.
Staff is recommending that the landscape setback area along the El
Camino Real frontage be increased to ten (10) feet in width. This
would result in reduction of the subject on-site drive aisle to 27 -
feet in width which complies with the City's minimum 25 -foot width
drive aisle requirement. The City's standard requirements have
been developed to accommodate various types of vehicles and the_r
turning movements. A condition of approval has been included _-n
the provided Conditional Use Permit resolution requiring the
landscape setback area along E1 Camino Real to be increased to =0
feet in width.
The applicant is proposing that the car wash facility be available
for use 24 hours a day. The applicant has stated that a part-time
employee will be on-site during the peak hours of operation to
provide assistance to patrons and to maintain the property.
_ However, the applicant is not anticipating that the facility will
have a high attendance rate in the later hours of the evening. A
single employee parking space has been provided in the southeast
corner of the project. A condition of approval has been included
in the provided Conditional Use Permit resolution requiring the
applicant to provide signs stating "employee parking only".
The applicant also proposes to provide a number of vending machines
which will dispense car care products. The proposed vending
machines are designed to be integral within the proposed car wash
building and will be serviced by an on-site employee through the
service room located in the center of the building. The applicant
is not proposing the installation of any food or drink vending
machines. Based on the concerns of loitering and vandalism, and
the limited locations available on the site, a condition of
approval has been recommended prohibiting the installation of any
freestanding vending machines.
Tile conceptual lighting plan for the project includes 14 -foot
decorative pole lights, building mounted wall-pac fixtures and
fluorescent light fixtures within the washing bays. The applicant
proposes to install timing devices on the light fixtures which will
turn off approximately 300 of the lights in the later hours c_` the
night, reducing the overall light generated on site. 7he
development plans illustrates two (2) wall-pac fixtures to he
located on the front facade of t -e building and a single wall-pac
fixture to be located on the east facade of the building. The City
of Tustin's Security Ordinance requires a minimum of one (_)
footcandle of light coverage anywhere on the site. In addition,
all exterior lighting shall be designed and arranged so not :o
direct light or glare onto adjacent properties and right -of -wars.
Planning Commission Report
Conditional Use Permit 92-038,
Zone Change 92-003, and Design Review 92-050
March 22, 1993
Page 9
There is concern that wall-pac fixtures will cause unwanted glare
to be emitted from the site onto the adjacent right-of-way. A
condition of approval has been included in the provided Conditional
Use Permit resolution requiring the applicant to replace the
proposed wall pac-fixtures with decorative pole lighting. A
condition of approval also has been included in the provided
Conditional Use Permit resolution requiring the applicant to
provide a photometric study showing the location and anticipated
distribution pattern of light of all proposed fixtures. As
previously stated, all exterior lighting shall be designed and
arranged so not to direct light or glare onto adjacent properties,
including the adjacent I-5 Freeway.
The applicant has illustrated on the elevations two proposed
locations for project signs: a primary wall sign to be located on
the north elevation of the car wash building and one (1) secondary
wall sign to be located on the east elevation of the proposed tower
element. Pursuant to the City of Tustin Sign Code, the project is
permitted one (1) primary wall sign, not to exceed 70 square feet
in sign face area and two secondary wall signs, not to exceed 25
square feet in sign face area each. The primary wall sign is
proposed to be only 50 square feet in size and the secondary wall
is proposed to be 15 square feet in size.
The conceptual landscape design for the site includes plantings of
perimeter shade trees and street trees with a combination of
evergreen shrubs, vines, groundcovers, flowering perennial, and
turf as a base. The landscape planting areas are primarily located
along the perimeter of the subject site with additional planting
areas located adjacent to the east and north elevations of the car
wash building. Conditions of approval have been included in the
provided Conditional Use Permit resolution requiring the applicant
to increase the landscape setback area along the E1 Camino Real
frontage to ten (10) feet in width and to provide vine planting
landscape areas adjacent to the north elevation of the building.
This landscape area is required to mitigate the visual impact of
paved areas and the structure. Pursuant to the City of Tustin
Landscape and Irrigation Guidelines, the applicant has provided a
Landscape Summery cn the site plan listing the quantity
requirements to be provided on the site. A final landscape plan is
required to be submitted at Building Plan Check.
The applicant is proposing to utilize a water recycling system for
the project's water reeds. The washing bay areas will surface
drain into catch basins which collect the wash water and transports
the "dirty" water to a tank located in the central portion of the
building. From this point, the water and dirt products are
Planning Commission Report
Conditional Use Permit 92-038,
Zone Change 92-003, and Design Review 92-050
March 22, 1993
Page 10
separated. A portion of the water is then recycled for uses in the
washing bays with the remainder of the water to be deposited into
the sanitary sewer system for treatment which is in compliance with
the Orange County Sanitation District recrsirements. The applicant
anticipates recycling approximately 25 percent of the daily water
usage of the project. Neither the City of Tustin Water Department,
the Regional Water Quality Control Board nor the Orange County
Sanitation District would currently require the applicant to
provide a water recycling system for the project. This feature of
the project is a voluntary action on the part of the applicant.
There currently exist four (4) soil/around water reclamation
projects within one mile of the subject site, being observed by the
Orange County Health Department, Environmental Division. The
closest soil reclamation site is a monitoring and vapor extraction
well located at the northeast corner of Newport Avenue and E1
-- Camino Real, northwest of the subject site. This site has an
existing free product plume which extends to the southwest of site.
Based on 4th Quarter monitoring reports conducted by Applied
Geosciences, Inc. for the Southern Counties Oil Company, monitoring
wells closest to the proposed car wash site indicate that neither
free product nor extensions of the existing plume have been
detected. Based on past historic records of the Orange County
Health Departments, the subject site has no records showing the
need for soil/ground water reclamation systems. A standard
condition of approval for new development is the required submittal
of a site specific soils report. This report must have been
conducted within 12 months prior to the issuance of any building
permit for the project. A condition of approval has been included
Conditional Use Permit resolution rec-iiring the applicant to
provide expanded information regarding the levels of hydrocarbons
and ground water contamination found on site in the submitted soils
reports.
Conditional Use Permit Findings
In determining whether to approve this Conditional Use Permit
request, the Planning Commission must deiermine whether or not the
establishment and operation of a self -serve, coin operated, car
wash will be detrimental to the health, safety, morals, comfort and
general welfare of persons residing or wcrking in the neighborhood
of the use; or whether the use will be injurious or detrimental to
property and improvements in the neighborhood or the general
welfare of the City.
Planning Commission Report
Conditional Use Permit 92-038,
Zone Change 92-003, and Design Review 92-050
March 22, 1993
Page 11
The following evidence supports granting of the requested
Conditional Use Permit:
The operation and installation of the proposed self -serve,
coin operated, car wash use will not be detrimental to the
health, safety, morals, comfort and general welfare of persons
residing or working within the neighborhood in that the site
will provide a water recycling system and shall comply with
the Orange County Sanitation District guidelines for discharge
produced on site. The site lighting will be designed to
provide adequate lighting for security purposes, and as well
as provide timing devices to reduce glare produced on site.
The vacuum pumps have been located to the rear of the site
permitting the noise produced by the pumps to be attenuated
across the site. The applicant proposes to install
landscaping adjacent to walls and to paint. the interior of the
washing bays with "anti -graffiti" coating to reduce the
opportunity for vandalism and graffiti. As conditioned, the
site will provide minimal vending machines to reduce the
opportunity for criminal element.
The operation and installation of the proposed self -serve,
coin operated, car wash use will not be injurious or
detrimental to property and improvements in the neighborhood
or the general welfare of the City in that, the proposed use
is similar and compatible with the surrounding existing uses.
The car wash use would not be expected to have any additional
impacts in terms of traffic, water and sanitation requirements
and utility usage than existing commercial zoned parcels
surrounding the site. As conditioned, any potential adverse
impacts related to noise, light, or water quality will be
mitigated through conditions of approval.
3. The operation and installation of the proposed self -serve,
coin operated, car wash use will not be detrimental to the
health and safety of persons residing or working within the
neighborhood nor will the proposed project be injurious or
detrimental to property and -improvements in the neighborhood
or the general welfare of the City in that the proposed car
wash building is in scale with the surrounding existing
structure and is proposed to be of a compatible architectural
design. The applicant is proposing the installation of
landscaped areas located at the perimeter of the site and
adjacent to the car wash building to soften the impact of the
proposed building's massing. The proposed landscaped areas
will also soften the impact of the expanses of paved areas
throughout the site.
Planning Commission Report
Conditional Use Permit 92-038,
Zone Change 92-003, and Design Review 92-050
March 22, 1993
Page 12
4. The operation and installation of the proposed self -serve,
coin operated, car wash use will not be injurious or
detrimental to property and improvements in the neighborhood
or the general welfare of the City, in that, the drive apron
servicing the site has been located in such a way as to not
reduce the existing street traffic patterns. The on-site
circulation and detailing spaces have been designed to reduce
the potential for traffic conflicts by providing adequate
drive aisle widths, and drying and detailing spaces.
CONCLUSION
Based on the analysis provided in this report, and review of the
conditions of the site and surrounding vicinity, it is recommended
that the Planning Commission take the following actions:
1. Approve the Environmental Determination for the project by
adopting Resolution No. 3130;
2. Recommend to the City Council approval of Zone Change 92-003
by adopting Resolution No. 3131, as submitted or revised;
3. Approve Conditional Use Permit 92-038 by adoption of
Resolution No. 3132, as submitted or revised; and
4. Recommend to the Redevelopment Agency approval of Design
Review 92-050 by adopting Resolution No. 3133, as submitted or
revised
Joann M.S. Perry
Associate Planner
CAS:JP:br/zup92-038.jp
Christine A. Shineton
Assistant City M_ ager
Community Development
Enclosures: Attachment
A
- Existing Zoning Districts
Attachment
B
- Surrounding and Freeway Corridor
Zoning Districts
Attachment
C
- Surrounding and Freeway Corridor
Land Use Designations
Attachment
D
- Proposed Zoning Districts
Attachment
E
- Site Plan and Elevations
Attachment
F
- Negative Declaration and Initial
Study
Resolution
No.s
3130, 3131, 3132, and 3133
\ \ C — /
u.tl r
I
I ,
I
O Q
I
•`� m � 109
zxoy 2t ! n
O G 2 Q W I z! z
__-1•Z ZJ /
ze
�67.f
ORANGE
PET HOSPIT
2 E u
� O P.Y. 90-33 BO'
\ MARCH 1983
C
FOR. L 33 Q
AVENUE � LT
3 BLK
y PAR. \
° 13 O
I 12
O
? sn .r•'
-,- /O Jc' nPi /cJ !) 38 ,c...aV
35 36
PAR
ug
AVEi:UE \ e
V
crf
\ a
6
2 W
i 13 o i4 c (IT
� V-
01747
42 ' a0�39 r
EXISTING ZONING DISTRICTS
NO SCALE
ATTACHMENT A
401-64
AVENUE
—
NEWPORT
o
MART 'S
_
a
-_
'0"
3 JACK
' IZZLERIN 71E BOX
Q
R
,3
-ley BL K. C-
Is
�
O
V
Q
\
O
Q
o M __ • �_ 9
I
O
PPP. LOT 3!
1 >
\ \ C — /
u.tl r
I
I ,
I
O Q
I
•`� m � 109
zxoy 2t ! n
O G 2 Q W I z! z
__-1•Z ZJ /
ze
�67.f
ORANGE
PET HOSPIT
2 E u
� O P.Y. 90-33 BO'
\ MARCH 1983
C
FOR. L 33 Q
AVENUE � LT
3 BLK
y PAR. \
° 13 O
I 12
O
? sn .r•'
-,- /O Jc' nPi /cJ !) 38 ,c...aV
35 36
PAR
ug
AVEi:UE \ e
V
crf
\ a
6
2 W
i 13 o i4 c (IT
� V-
01747
42 ' a0�39 r
EXISTING ZONING DISTRICTS
NO SCALE
ATTACHMENT A
Rtll :/R t• .
RTIrt 1I \R1kl`..
ti'-- T
R4 PD , P&I
Cl CG I NHP
o
C1 R� R6
Ra
cl 500 R3 4000 R
10 _ 2000
IFF2 I Ra RC PD
PC R 3 - 6000 —
2350 I ��
SURROUNDING AND FREEWAY CORRIDOR
ZONING DISTRICTS
CITY OF TUSTIN ZONING EXHIBIT NO SCALE
cEMt K � N��
ATTACHMENT B
SURROUNDING AND FREEWAY CORRIDOR
LAND USE DESIGNATIONS
CITY OF TUSTIN GENERA�,PLAN EXHIBIT NO SCALE
IN� MMISsID#J
ATTACHMENT C
C -2P
4o1-64
F -
r\ `? AVENUE
PG -Gomr,
NEWPORT
IZZLER
�
4
�
o
z
x
AVENUE
15
x,.Pf
/T
s
E
'
13
OL
p
1.31 i 12
rra' /E
PG -Gomr,
NEWPORT
IZZLER
P. 18-41
JACK
INT E BOX
yl
Q:
-
°s
15
a1-ouu�oc
BLK.
z v
roORJJJ*Tg
- ..'-
c
C
15
/T
s
E
POIe LOT JJ
I
OL
p
rra' /E
x
I u.rl
13 �
U
I
ZO
J 3-124
2 \
0
43
=
2 1 O J✓-_
no"
4
Zt
Q d)
V
m I /
v I
O
.•G � �
W
1 f ��_ zJ
2
PON. LOT
\
i \C
e 4.arc
xo
ORANGE
G \ PET
U
HOS7
L
\
MARCH 1.983
- POR.L
Q
41
Qz
t T
\
Gl
3 BL K.
I f.
I< c\Iti IS
r J
AVENUE
p
Lo
2
Q
^ 13 o IG a 15 16 ^ m
NC 747 c
NO SCALE
PR(lDrlQGtl 7nKllhl(, IIICTQIr`TC
ATTT'ACHIMENT o
1'
\
4o1-64
6
- ---
s
g'
NEWPORT
AVENUE
r
I
e
011- .oP
` SIZZLER JACK
v
) I ___ 14kQ
--p
\ IN THE BOX
Q:
•� ;,!3 D
O✓
17
I U �
•I+o'
__-------
�. BLK. C.
✓
Q
0
u M K 9
151—
s
I
w
O`
vae. for J3
I >
NO SCALE
PROPOSED CAR WASH SITE aTTACHMEl\TT E
\
I
I� cI
6
�
13�
I i9
I
e
IO
J 3
i
I U �
•I+o'
Q
f(1
P.M. M -M
B
J
u
J19 :S'D
1
z7 �,
n
G
_--r--------^r.
i
0-
\
. 9L
"M
ORANGE
n .eO
\
_
a
SPIT
AL
2 O< O o
V
�PET•H
.
PN. 94-33
�.
••.¢
\
�
Q
MARCh1983
re.•
POR.t 33
�
AVENUE
a
BL K
�
PAR.
\
m
1 vz
s 13 .e
064
s
,4 32
W 37
„
—
14
GRRZ
,
AVENUE
I
•
�
I° 16
o Z
41
v,
Z
.I �I NQ._ 247
:2w
. as oe' °/ rz' a0 39 •''°
NO SCALE
PROPOSED CAR WASH SITE aTTACHMEl\TT E
S
I I r
�-
��i
T 1 yLl
I
�� � � •.••,�; yk 7LLL �. If�TLL -iJ
� $�✓/�� �� .IMN FIJI—i! y3NN X�✓&�U— "�✓ J��.s�—' �
I;' v � ��.srn -� � �+� I � ddnar,++ x.✓u�,_L .s
t
It
R
va?Zb '-IJ ,,iL_J- ®53W�a :Obi �J>IG-.� 9hU-j-'li6t-b L i
^i
,
o, o� NEGATIVE DECLARATION
CITY OF TUSTIN
GS C� 300 CENTENNIAL WAY, TUSTIN, CA. 92680
Project Title: ZONE CHANGE 92-005, File No.
DESIGN REVIEW 92-050, AND CONDITIONAL USE PERMIT 92-038
Project Location: SOUTHERLY SIDE OF EL CAMINO REAL, EAST OF NEWPORT AVENUE
SEE.ATTACHED PUBLIC NOTICE FOR FURTHER INFORMATION
Project Description: REQUEST TO CHANGE THE ZONING DISTRICT CLASIFICATION
FROM C-2 TO CG; AND TO DEVELOP__AND OPERATE A SELF SERVE CAR WASH
Project Proponent: FRONTRUNNER HOMES
Contact Person:JOANN M.S. PERRY Telephone: 714/544-8890 Ext. 478
The Community Development Department has conducted an initial study for the
above project in accordance with the City of Tustin's procedures regarding
implementation of the California Environmental Quality Act, and on the basis of
that study hereby find:
That there is no substantial evidence that the project may have a
significant effect on the environment.
( 1 That potential significant affects were identified, but revisions have
X been included in the project plans and agreed to by the applicant that
would avoid or mitigatethe affects to a point where clearly no
significant effects would occur. Said revisions are attached to and
hereby made a part of this Negative Declaration.
Therefore, the preparation of an Environmental Impact Report is not required.
The initial study which provides the basis for this determination is on
file at the Community Development Department, City of Tustin. The public
is invited to comment on the appropriateness of this Negative Declaration
during the review period, which begins with the public notice of a
Negative Declaration and extends for seven calendar days. Upon review by
the Community Development Director, this review period may be extended if
deemed necessary.
REVIEW PERIOD ENDS 4:30 p.m. on MARCH 22, 1993
DATED: FEBRUARY 25> 1993
Community Development D - c
ATTAC�H� NST��'F
a
DISCUSSION OF ENVIRONMENTAL EVALUATION
ZONE CHANGE 92-005, CONDITIONAL USE PERMIT 92-038
AND DESIGN REVIEW 92-050
FEBRUARY 25, 1993
PROJECT DESCRIPTION
The proposed project is a request for Zone Change 92-005 from the
Central Commercial (C-2) District to the Commercial General (CG)
District. The applicant is also processing concurrently
Conditional Use Permit 92-038 to permit the construction and
operation of a self -serve car wash in the Commercial General (CG)
District; and Design Review 92-050 for the review of the physical
development related to the proposed self -serve car wash. The Zone
Change is subject to City Council review and approval. The
Conditional Use Permit is subject to Planning Commission approval
and the Design Review is subject to approval by the Community
Development Department.
The project site, a .40 acre parcel located on the southerly side
of E1 Camino Real, east of Newport Avenue (see location map).
_ The site is presently vacant. Surrounding uses to the site include
the Tustin Lanai Apartments and an small office complex across E1
Camino Real to the north, Tustin High School further east on E1
Camino Real, and the Tustana Pet Hospital to the east. Located
south of the subject site is the Interstate 5 Newport Avenue
northbound off ramp and vacant property zoned C-1 to the west.
Sizzler and Jack In The Box restaurants are located further to the
west adjacent Newport Avenue. A vacant parcel, zoned Commercial
General (CG), is located to the northwest across E1 Camino Real.
1. Earth - B "Yes" A C through G "NO" - The subject site is
currently vacant and is relatively flat in its topographical
features. Any development of the site would require minor
grading activity, compaction of the soil and the overcovering
of the soil to create building pads and parking areas.
Appropriate grading plans and soil reports would be required
as part of the City's review and Building Permit plan check
process.
Sources: Field Observations, Submitted Development Plans,
City of Tustin Community Development Department.
Mitigation/Monitoring: The applicant would be required to
submit a soils report completed within 12 months prior to
Building Permit Plan Check. The soils report shall provide
expanded information regarding the levels of hydrocarbons and
ground water contamination found on site. The applicant shall
also submit a letter stating hazardous material clearance of
the site from the Orange County Health Department. The
applicant would be required to submit grading plans
identifying the scope of work at Building Permit Plan Check.
All work shall be done in conformance with the Uniform
r
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 2
Building Code, Grading Code and Grading Manual as required by
the Building Official.
2. Air - A through C "No" - The proposed project would not result
in any long term degradation to the existing air quality.
However, with construction there will be short term air
quality pollutants as dust particles will be omitted into the
air. No significant impacts are expected.
Source: Submitted Development Plans, South Coast Air Quality
Management District, City of Tustin Community Development
Department
Mitigation/Monitoring: The site will be required to comply
with grading plan approvals with regard to dust control, which
requires the applicant to apply water to the site as specified
in the Grading Code and Grading Manual. This will be
monitored by the Building Division when construction
commences.
3. Wates B "Yes" E "Maybe" A C D 6 F through I- "NO" - The
proposed project would add impervious surfaces to the site
which would effect drainage and run off. As proposed, the
parking and vacuum areas of the project will surface drain
into the existing storm drain system. It is not anticipated
that this project will substantially contribute to the
drainage flow and is in compliance with the Drainage Area
Management Plan for the City of Tustin as designated by the
Regional Water Quality Control Board. The project is also
designed so that the washing bay areas surface will drain into
water recycling catch basis which recycle approximately 25
percent of the daily water usage of the project. The
remainder of. the water will be deposited into the sanitary
sewer system for treatment which is in compliance with the
Orange County Sanitation District requirements. Currently,
neither the City of Tustin Water Department, the Regional
Water Quality Control Board nor the Orange County Sanitation
District would require the applicant to provide a water
recycling system for the project, the feature of the project
is a voluntary action by the applicant. The subject site is
not located near any standing or moving bodies of water.
source: Field Observations, City of Tustin Community
Development Department, City of Tustin Public Works
Department, Orange County Sanitation District, Regional Water
Quality Control Board
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 3
Mitigation/Monitoring: The site will be designed so that all
parking and vacuum area surface run off is directed to and
picked up by the storm drain system. The site will be
designed so that all washing bay water be collected on site
and tied into the sanitary sewer system, either with or
without a water recycling system. All grading and drainage
plans shall be subject to review and approval by the City of
Tustin's Building Division and the Public Works Department to
confirm compliance with Drainage Area Management Plan prior to
construction. Alterations to the drainage would be subject to
further review and approval by the City of Tustin Community
Development.and Public Works Departments.
4. Plant Life - A through D - "No" - The project site is free
from any unique, rare or endangered species of plant life.
_ The proposed project would introduce landscape and specimen
trees on to the site in conformance with the requirements of
the City of Tustin's Landscape and Irrigation Guidelines.
Source: Field Observations, Proposed Development Plans
Mitigation/Monitoring: None Required.
5. Animal Life - A through D - "No" - The subject site is located
within an urban area and was previously developed with a
commercial uses. The site is not inhabited by any known
species of animals. Installation of the proposed project
would have no impacts on animal populations, diversity of
species or migratory patterns.
Source: Field Observations
Mitigation/Monitoring: None Required.
6. Noise - A "Yes", B - "No" - The proposed project would add new
noise sources into the area since the property is presently
Undeveloped. The development of the project will result in
short term construction noise impacts which will require
compliance with the City's Noise Ordinance. As designed, the
water recycling equipment and washing equipment pumps will be
housed within the car wash building in the central utility
_ room. The project proposes to locate the vacuum pumps to the
rear of the site, adjacent to the I-5 Newport Avenue off -ramp
wall. In this location, the noise emitted from the vacuums
will be attenuated over the full depth of the site. Given the
existing noise levels of 65 to 70 dBa in the area generated by
the I-5 Freeway and surrounding street system (E1 Camino Real
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 4
and Newport Avenue), the proposed project is not expected to
impact the ambient noise levels in the area. The proposed
project would be potentially operating 24 hours/day. The
equipment will be required to conform to the City's Noise
Ordinance, which applies to commercial zones at a standard
level of 60 dBA.
Source: Frontrunner Homes, Community Development Department,
Field Observations
Mitigation/Monitoring: All development related noise
generated shall be in accordance with the City of Tustin Noise
Ordinance which, in part, limits noise generation to a maximum
of 60 dBa and restricts construction hours, which would be
verified by the Community Development Department.
7. Light and Glare - "Yes" - Since the project site is vacant,
any development would add new lighting into the area. The
proposed project would be potentially operating 24 hours/day.
The applicant proposes to install timing devices on the light
fixtures which will turn off approximately 30% of the lights
in the later hours of the night, reducing the overall light
generated on site. Any exterior lighting that would be
provide would comply with the City of Tustin Security
ordinance.
Source: Field Observations, Proposed Development Plans
Mitigation/Monitoring: The applicant shall provide a
photometric study showing the location and anticipated
distribution pattern of light of all proposed fixtures. All
exterior lighting shall be designed and arranged so not to
direct light .or glare onto adjacent properties, including the
adjacent I-5 'Freeway. All lighting shall be developed to
provide a minimum of one (1) footcandle of light coverage, in
accordance with the City's Security Code.
8. Land Use - "No" - The subject site currentlly stradles two
zoning districts, Central Commercial (C-2) District and
Commercial General (CG) District. The proposed project is to
rezone the westerly portion of the site from Central
Commercial (C-2) District to Commercial General (CG) District
and to develop a self -serve coin operated car wash at the
site. Generally the zoning designation directly adjacent to
the I-5 Freeway fall within the Commercial, and Industrial
categories which includes the CG and C-1, C-2 and PM
Districts. Additionally, the General Commercial (CG) District
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. CarwaSh )
February 25, 1993
Page 5
is appropriate when adjacent to the freeway as it offers a
greater diversity of uses which generally can utilize the
freeway exposure such as, but not limited to, service stations
and other auto related uses.
Surrounding Zoning Districts to the subject site include
Retail Commercial (C-1) across E1 Camino Real to the north,
Public and Institutional (P&I) east on E1 Camino Real, and to
the west of the subject property is the Tustana Pet Hospital
which is zoned C-1. There are no uses on the south side of
the subject property as the property abuts the Santa Ana (I-5)
Freeway Newport Avenue off ramp. The vacant property to the
west of the subject site is zoned Retail Commercial (C-1)•
Sizzler and Jack In The Box restaurants, zoned Central
Commercial (C-2), are located further to the west adjacent to
Newport Avenue. The vacant parcel located to the northwest
across E1 Camino Real is zoned Commercial General (CG).
The development of the property would be in compliance with
the planned commercial use of the area as specified on the
General Plan Land Use Map.
Source: Proposed Development Plans, City of Tustin Community
Development Department
Mitigation/Monitoring: None Required.
9. Natural Resources - A and B - "No" - The proposed project
would result in construction use of materials that are non-
renewable. However, the usage will be minimal given the scale
of the project. The applicant proposes to install timing
devices on the light fixtures which will turn off
approximately 30% of the lights in the later hours of the
night, reducing the overall electrical energy consumption of
the project. The project will use a gas water heater.
Source: Proposed Development Plans, City of Tustin Community
Development and Public Works Departments
Mitigation/Monitoring: The applicant shall utilize recycled
materials where appropriate.
10. Risk of upset - "No" - The proposed project would not result
in any significant risk of upset (i.e. explosion, etc.) given
the scope and nature of the proposed use. All mechanical and
electrical equipment associated with the carwash would comply
with Uniform Building and Fire Codes.
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 6
Source: Orange County Fire Department, Proposed Development
Plans, City of Tustin Community Development Department
Mitigation/Monitoring: All construction shall be in
accordance with applicable Uniform Building and Fire Codes.
Such compliance shall be verified during the plan check
process prior to the issuance of any Building permits.
11. Population - "No" - The proposed project is a commercial
infill project and would not result in any direct increase in
population in that no addition dwelling units would be
created. This small scale project would be designed to meet
the needs of the existing residents and businesses of the
community. The project would have no impact of the location,
growth, distribution or density of the population in the
surrounding area.
Source: City of Tustin Community Development Department
Mitigation/Monitoring: None Required.
12. Housing - "No" - The proposed project is a commercial infill
project and would not result in any direct increase in
population in that no addition dwelling units would be
created. This small scale project would be designed to meet
the needs of the existing residents and businesses of the
community. The project would have nc impact of the location,
growth, distribution or density of the population in the
surrounding area.
Source: City of Tustin Community Development Department
Mitigation/Monitoring: None Required.
13. Transportation/Circulation - B "Yes",• A C, D, and F "Maybe":
E "No" - Since the site is vacant, any development would
generate additional vehicular trips to the site and the need
for additional parking facilities. The proposed project
provides for the needed parking on site.
Due to the site close proximity to the Orange Street
intersection, location of an existing driveway adjacent to the
easterly property line (Tustana Pet Hospital) and comments
provided by the City of Tustin Community Development and
Public Works Departments, the applicant has proposed that a
single, 30 foot wide, driveway apron be located adjacent to
the westerly property line. At this location traffic entering
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 7
and existing the site will not reduce the efficiency of the
existing left turning movements from E1 Camino Real onto
Orange Street or Newport Avenue. Along the project frontage,
E1 Camino Real has a straight roadway section with no
horizontal or vertical curvature, therefore the proposed
driveway will not be subject to reduced sight visibility. The
westerly location also provides the opportunity for a joint
driveway in the event of future development on the adjacent
vacant property. A potential of a joint driveway between the
subject site and adjacent future development may potentially
reduce the impact of future traffic.
Based on the submitted development plans and the .1993
Institute of Traffic Engineering (ITE) Trip Generation Manual,
it is anticipated that the peak traffic generation times
(greatest traffic activity generated) for the project will
occur Saturday and Sunday with approximately 212 trips per day
(106 inbound and 106 outbound). It is anticipated that the
project will generate approximately 48 trips per day (24
inbound and 24 outbound) during the weekday P.M. peak -hours of
4:00-6:00 pm. The critical impact periods (worse case
scenario times) for the El Camino Real and Newport Avenue
intersection occur at 7:00 to 9:00 AM and 4:00 to 6:00 PM.
The peak traffic generation times for the proposed project
occur outside of the normal weekday AM -PM peak -hour window and
therefore the project will not have a significant impact the
AM and PM peak -hour weekday traffic operation.
In conjunction with the Caltrans, Santa Ana (I-5) Freeway
widening project in this area, additional travel lanes (an
eastbound and westbound travel lane) were added to E1 Camino
Real. This improvement implemented the master planned status
of the street to a secondary arterial highway, thus increasing
the carrying capacity of El Camino Real from 11,300 ACT to
22,500 ACT at a level of service D. El Camino Real is
currently operating at a level of service A (11,720 ACT)
between .Red Hill Avenue and Newport based on the City of
Tustin Public Works Department November 20,1992 traffic
counts.
Based on the above information, it is determined that the
proposed project will not have significant traffic impacts
upon the circulation system and will not have a significant
impact to the area in the form of cumulative negative
circulation impacts.
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 8
Source: City of Tustin Community Development and Public. works
Departments, Field Observations, proposed Development Plans
Mitigation/Monitoring: The driveway apron shall be designed
at a 30 foot width at the westerly property line to provide
the potential for a joint driveway arrangement with future
adjacent development. The proposed landscape adjacent to the
driveway shall comply with sight visibility requirements.
14. Public Services - A throu h C "Ma be" D through F - -240-- -
Since the project site is vacant, any development would
require the services of the Fire and Police Departments. The
City of Tustin Police Department has identified the need for
visibility into the site for security measures and the need to
reduce the opportunities for graffiti and vandalism. The
applicant has sited the car wash building with the washing
bays open to the public right-of-way to increase the ability
for surveillance to the rear portion of the site. The
applicant has also proposed to paint the wall surfaces with an
"anti -graffiti" coating and to provided landscape planting
areas adjacent to exposed wall areas to reduce the
opportunities for graffiti and vandalism. It is not expected
that the project would create demands for additional service
on schools, parks, maintenance of public facilities or other
governmental service.
Source: orange County Fire Department, City of Tustin Police
Department, Community Development and Public Works Departments
Mitigation/Monitoring: The project landscape and grading
shall be designed to provide security surveillance into the
project. The development plans shall be verified for
compliance at Building Permit plar. check. The applicant shall
be required to pay school district fees to Tustin Unified
School District.
15. Enemy - A and B - "No" - The proposed project would not
result in any "significant" change in the current use of
energy given the scale of new development but will require new
services as is customary with new construction. The applicant
proposes to install timing devices on the light fixtures which
will turn off approximately 30% of the lights in the later
hours of the night, thus reducing the overall electrical
energy consumption. Any exterior lighting that would be
provide would comply with the City of Tustin
Sfcrrity
Ordinance. Electrical and Gas capacities req
project are existing and have been designed to accommodate
Discussion of Environmental Evaluation
Zone Change 93-005, Design Reviei: 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 9
future commercial projects on this parcel and are therefore
adequate to serve the proposed project.
Source: Southern California Edison, Southern California Gas,
Public Works Department, proposed Development Plans.
Mitigation/Monitoring: The applicant shall comply with Title
24 in regard to energy conservation. This shall be verified
for compliance at Building Permit plan check. The applicant
shall research the possibility of reduce energy lamps for all
light fixtures.
16. Utilities - A through F - "No" - The project site is located
within an existing commercial area with all utilities
available to the site from E1 Camino Real. Sanitary sewer,
storm drain and water capacities required for the project are
existing and have been designed to accommodate future
commercial projects, such as a self -serve car wash, on this
parcel and are therefore adequate to serve the proposed
project. The proposed project would not required the need for
additional utilities to serve the site. The County of Orange
has established goals to conserve water, the applicant has
voluntarily proposed to install a water recycling system in
conjunction with the car wash operation system. It is
anticipated that the system will recycle approximately 25
percent of the daily water consumption for the project.
Source: City of Tustin Public Works Department
Mitigation/Monitoring: The applicant shall utilize a water
reclamation system. It shall be identified on the -
construction plans prior to issuance of building permits.
17. Human Health - A and B - "No" - The proposed project would not
result in any effect on human health. The proposed use as a
self -serve car wash would not create conditions that
negatively effect human health. Currently there exist four
soil/ground water reclamation projects within one mile of the
subject site, being observed by the Orange County Health
Department, Environmental Division. The closest soil
_ reclamation site is a monitoring and vapor extraction well is
located at the northeast corner of Newport Avenue and El
Camino Real, northwest of the subject site. This site has an
existing free product plume which extends to the southwest of
site. Based on 4th Quarter monitoring reports conducted by
Applied Geosciences, Inc. for the Southern Counties oil
Company, monitoring wells closest to the proposed car wash
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 10
site indicate that neither free product nor extensions of the
existing plume have been detected. Based on past historic
records of the Orange County Health Departments, the subject
site has no records showing the need for soil/ground water
reclamation systems.
Source: Proposed Development Plans, City of Tustin Community
Development Department, Orange County Health Department
Mitigation/Monitoring: The applicant would be required to
submit a soils report completed within 12 months prior to
Building Permit Plan Check. The soils report shall provide
expanded information regarding the levels of hydrocarbons and
ground water contamination found on site.
18. Solid Waste - "Maybe" - Since .the site is vacant, any
development would generate additional solid waste requiring
disposal by the City. The applicant proposes to provide trash
receptacle of sufficient capacity to accommodate the proposed
carwash use. Pursuant to the City of Tustin Municipal Code,
the applicant is required to contract for trash removal
services with the City's contracted hauler. The solid waste
product is transported by the hauler to the Material Recovery
Facility (MRF). Once at the MRF, the waste is manually and
mechanically separated and the recyclable materials are
recovered. This program has been implemented by the City in
effort to meet the States requirements identified in the
Source Reduction and Recycling Element related to the 25 and
50 percent diversion requirements.
Due to the size and the type of use of the proposed project,
it is anticipated that the amount of solid waste will be
accommodated within the City's existing solid waste handling
programs and will not have a significant impact on the City's
Solid Waste Handling services. The City's existing solid waste
handling program and contracts have been established to
accommodate the development and expansion of new businesses
within the City.
Source: Proposed Development Plans, City of Tustin Public
Works Department, Great Western Reclamation, Inc.
Mitigation/Monitoring: The applicant will be required to
contract for a fee with the City' contracted solid waste
hauler. The applicant shall provide a trash receptacle which
comply with the requirements of the City of Tustin's contract
hauler's specifications. Compliance shall be verified at
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 11
Building Permit plan check.
19. Aesthetics - "Maybe" - The City of Tustin Community
Development Department has identified that the orientation of
the washing bays to the E1 Camino Real frontage does not
comply with the City of Tustin Handbook for Planning, Zoning
and Development Guidelines, which requires service bays to be
oriented so as not to be visible from public right-of-way
view. As proposed, the orientation of the open bays are
identified as a negative impact to the public view. The
applicant has stated that a site design which orients the
washing bay openings away from the street frontage and public
right-of-way view would not only reduce the economic viability
of facility but also would restrict the views into the
interior of the site and compromise the feeling of security
and safety. The applicant has proposed to provide a
combination of solid wall and decorative metal fence with
decorative masonry columns along the easterly property line.
The solid wall will be located in the front portion of the
site to mitigate the visual impact of the proposed structure.
The decorative metal fencing will be located to the rear
portion of the site to permit visual survaillance of the rear
portion of the site. The applicant is also proposing to
increase the planting at the westerly line to limit the public
right-of-way views to the immediate project frontage. The
landscape along the immediate frontage will consist of canopy
trees and earth berming designed to limit the visual impact of
the structure and paving areas but at the same time providing
a unobstructed window into the project for surveillance and
security. Vine planting pockets are proposed to be located
adjacent to the columns of the structure to further provide
planting to soften the expanse of the structure.
Source: Proposed Development Plans, Field observations
Monitoring: The site will be designed to provide landscape
and hardscape screening along the easterly and westerly
property lines as described above. A visual buffer consisting
of landscaping and earth berms shall be provided along the E1
Camino Real Frontage in accordance with the City of Tustin
Landscape and Irrigation Guidelines. Such compliance shall be
verified during the plan check process prior to the issuance
of any building permits.
20. Recreation - "No" - The project is non-residential in nature
and is not located in proximity to recreational facilities.
It will have no impact on quality of recreation opportunities
Discussion of Environmental Evaluation
Zone change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 12
in the community.
Source: City of Tustin Community Services Department, City of
Tustin General Plan Land Use Element
Mitigation/Monitoring: None Required.
21. Cultural Resources - A Through D "No" - The subject property
is not located within the City's Cultural Resources overlay
District, nor are there any identified cultural, historic or
archaeological resources identified on or around the site.
The project will would have no impacts on cultural resources
Source: City of Tustin Historical Resources Survey, City of
Tustin General Plan, City of Tustin Community Development
Department
Mitigation/Monitoring: None Required.
22. Mandatory Findings of Significance - As discussed above, the
proposed project involves the construction and operation of a
self-service, coin-operated car wash. The construction of the
proposed project could result in potential impacts to the
environment in the areas of water, noise, light and glare,
transportation and circulation, and aesthetics. However, due
to the project design and conditions imposed, the potential
impacts would be reduced to a level of insignificant.
Item a - "No": Based upon the responses to Items 1 - 21 in
this Initial Study, the review of City files, records and
documents and the nature of the project, the project is not
anticipated to significantly impact wildlife, fish, flora,
fauna or cultural resources.
Item b - "Maybe": Without the mitagation measures and
monitoring provided herein, the project may achieve short-term
goals to the disadvantage of long term, evironmertal goals,
specifically with regard to traffic and circulation, water and
light and glare. However, due to the project design and
conditions imposed, such as relocation of the driveway apron,
water recycling system and the potential impacts would be
reduced to a level of insignificant. Therefore, as designed
and with the imposed mitagation measures, the project does not
achieve short-term goal, to the disadvantage of long-term,
environmental goals.
Discussion of Environmental Evaluation
Zone Change 93-005, Design Review 93-050 and
Conditional Use Permit 92-038 (Mayell/King's Hwy. Carwash)
February 25, 1993
Page 13
Item c - "No:" In reference to the project background
discussion provided herein, the project will not contribute to
the demand individually and will have limited impacts
cumulatively.
Item d - "No": As a result of the preparation of and as
discussed in this Initial Study, mitigation measures have been
identified and have either been implemented in the project's
design or will become Conditions of Approval. Any possible
impacts associated with this project have been mitigated to a
level of insignificance.
Sources: All sources listed in items 1 - 21 of this Initial
Study, Submitted development plans, Applicable City and State
Codes.
Mitigation/Monitoring: As stated above, mitigation measures
have been identifed in Items 1 - 21 of this Inital Study and
have either been implemented in the project's design or will
become Conditions of Approval.
JP:br/cup92-038.env
CITY OF TUSTIN
Community Development Department
ENVIRONMENTAL INITIAL STUDY FORM
I. Background
1. Name of Proponent Mr. L. Vincent Mayell representing Frontrunner Homes
2. Address and Phone Number of Proponent
1200 Quail Street, Suite 100
Newport Beach CA 92660 (714) 833-3340
3. Date of Checklist Submitted February 25, 1993
4. Agency Requiring Checklist City of Tustin Planning Commission
5. Name of Proposal, if applicable Zone Change 93-005, Design Review 93-05(
and Conditional Use Permit 93-038
II. Environmental Impacts
(Explanations of all "yes" and "maybe" answers are required on
attached sheets.)
Yes Maybe No
1. Earth. Will the proposal result in:
a. Unstable earth conditions or in
changes in geologic substructures? X
b. Disruptions, displacements, compaction
or overcovering of the soil? X
C. Change in topography or ground surface
relief features? X
d. The destruction, covering or
modification of any unique geologic
or physical features? X
e. Any increase in wind or water erosion
of soils, either on or off the site? X
f. Changes in deposition or erosion of
beach sands, or changes in siltation,
deposition or erosion which may modify
the channel of a river or stream or the
bed of the ocean or any ban, inlet or
lake? R
Yes Maybe No
g.
Exposure of people or property to
geologic hazards such as earthquakes,
landslides, mudslides, ground failure,
or similar hazards?
X
2. Air.
Will the proposal result in:
a.
Substantial air emission or
deterioration of ambient air quality? _ _
X
b.
The creation of objectionable odors? _ _
X
C.
Alteration of air movement, moisture,
or temperatures, or any change in
climate, either locally or regionally? _ _
X
3. Water. Will the proposal result in:
a.
Changes in currents, or the course
of direction of water movements,
in either marine or fresh water?
X
b.
Changes in absorption rates,
drainage patterns, or the rate and
amount of surface runoff? X
C.
Alterations to the course or flow
of flood waters?
X
d.
Change in the amount of surface
water in any water body?
X
e.
Discharge into surface waters,
or in any alteration of surface water
quality, including but not limited
to temperature, dissolved oxygen or
turbidity? X
f.
Alteration of the direction or rate
of flow of ground waters?
a
g.
Change in the quantity of ground
waters, either through direct additions
or withdrawals, or through interception
of an aquifer by cuts or excavations?
X
h.
Substantial reduction in the amount of
water otherwise available for public
water supplies?
X
4.
5.
C
r]
Yes Maybe No
i.
Exposure of people or property to
water related hazards such as flooding
or tidal waves?
X
Plant Life. Will.the proposal result in:
a.
Change in the diversity of species, or
number of any species of plants (including
trees, shrubs, grass; crops, and aquatic
plants)? —.
X
b.
Reduction of the numbers of any unique,
rare or endangered species of plants? — —
X
C.
Introduction of new species of plants
into an area, or in a barrier to the
normal replenishment of existing
species? — —
%
d.
Reduction in acreage of any
agricultural crop? — —
a
Animal Life. Will the proposal result in:
a.
Change in the diversity of species, or
numbers of any species of animals (birds,
land animals including reptiles, fish and
shellfish, benthic organisms or insects)?
X
b.
Reduction of the numbers of any unique,
rare or endangered species of animals?
X—
C.
Introduction of new species of animals
into an area, or result in a barrier to
the migration or movement of animals?
X
d.
Deterioration to existing fish or
wildlife habitat?
h
Noise. Will the proposal result in:
a.
increases in existing noise levels? X
b.
Exposure of people to severe noise
X
levels?
Light and Glare. Will the proposal produce
new
X
light or glare?
—
Yes Maybe No
8. Land Use. Will the proposal result in
a substantial alteration of the present
or planned land use of an area? X
9. Natural Resources. Will the proposal
result in:
a. Increase in the rate of use of any
natural resources?
X
b. Substantial depletion of any
nonrenewable natural resource?
X
10.
Risk of Upset. Will the proposal involve:
a. A risk of an explosion or the release
of hazardous substances (including, but
not limited to, oil, pesticides, chemicals
or radiation) in the event of an accident
or upset conditions?
X
b. Possible interference with an
emergency response plan or an
emergency evacuation plan?
X
11.
Population. Will the proposal alter
the location, distribution, density, or
growth rate of the human population of
an area?
X
12.
Housing. Will the proposal affect
existing housing, or create a demand
for additional housing?
X
13.
Transportation/Circulation. Will the
proposal result in:
a. Generation of substantial additional
vehicular movement? a
b. Effects on existing parking facilities,
or demand for new parking? X
C. Substantial impact upon existing
transportation systems? X
d. Alterations to present patterns of
circulation or movement of people
and/or goods? X
—
Yes Maybe No
e.
Alterations to waterborne, rail or
air traffic?
X
f.
Increase in traffic hazards to motor
vehicles, bicyclists or pedestrians?
X
14. Public Services. Will the proposal have
an
effect upon, or result in a need for new
or
altered governmental services in any of
the
following areas:
a.
Fire protection?
X
b.
Police protection?
X
C.
Schools?
X
d.
Parks or other recreational facilities?
X
e.
Maintenance of public facilities,
including roads?
X
f.
Other governmental services?
X
15. Energy.
Will the proposal result in:
a.
Use of substantial -amounts of fuel or
energy?
X
b.
Substantial increase in demand upon
existing sources of energy, or require
the development of new sources of
energy?
X
16. Utilities.
Will the proposal result in a
need for new systems, or substantial
alterations
to the following utilities:
a.
Power-cr natural gas?
X
b.
Communications systems?
a
C.
Water?
X
d.
Sewer or septic tanks?
X
e.
Storm water drainage?
X
f.
Solid waste and disposal?
X
17. Human Health.
result in:
Will the proposal
Yes Maybe No
a. Creation of any health hazard or
potential health hazard (excluding
mental health)? X
b. Exposure 'of people to potential
health hazards? X
18. Solid Waste. Will the proposal create
additional solid waste requiring disposal
by the City? X
19. Aesthetics. Will the proposal result in
the obstruction of any scenic vista or view
open to the public, or will the proposal
result in the creation of an aesthetically
offensive site open to public view? X
20. Recreation. Will the proposal result in an
impact upon the quality or quantity of
existing recreational opportunities? X
21. Cultural Resources
a. Will the proposal result in the
alteration of or the destruction of
a prehistoric or historic archaeological
site? X
b. Will the proposal result in adverse
physical or aesthetic effects to a
prehistoric or historic building,
structure, or object? X
C. Does the proposal have the potential
to cause a physical change which
would affect unique ethnic cultural
values? X
d. Will the proposal restrict existing
religious or sacred uses within the
potential impact area? X
Yes Maybe
22. Mandatory Findings of Significance.
a. Does the project have the potential to
degrade the quality of the environment
substantially reduce the habitat of a
fish or wildlife species, cause a fish or
wildlife population to drop below self
sustaining levels, threaten to eliminate
a plant or animal community, reduce the
number or restrict the range of a rare or
endangered plant or animal or eliminate
important examples of the major periods
of California history or prehistory? —
b. Does the project have the potential to
achieve short-term, to the disadvantage of
long-term, environmental goals? (A short-
term impact on the environment is one
which occurs in a relatively brief, definitive
period of time while long-term impacts will X
endure well into the future). — —
C. Does the project have impacts which are
individually limited, but cumulatively con-
siderable? (A project may impact on two
or more'separate resources where the impact
on each resource is relatively small, but
where the effect of the total of those
impacts on the environment is significant.) .
d. Does the project have environmental effects
which will cause substantial adverse effects
on human beings, either directly or
indirectly? —
III. Discussion of Environmental Evaluation
IV. Determination -
(To be completed by the Lead Agency)
on the basis of this initial evaluation:
I find that the proposed project COULD NOT have a
significant effect on the environment, and a
NEGATIVE DECLARATION will be prepared.
No
X
X
X
I find that although the proposed project could have
a significant effect on the environment, there will
not be a significant effect in this case because the
mitigation measure described on an attached sheet have
been added to the project. A NEGATIVE DECLARATION WILL
BE PREPARED %
I find the proposed project MAY have a significant effect
on the environment, and an ENVIRONMENTAL IMPACT REPORT
is required. C
FEBRUARY 25. 1993
Date Signature
1
2 RESOLUTION NO. 3131 FILE Copy
3 AN RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF TUSTIN, CALIFORNIA, RECOMMENDING TO THE
4 CITY COUNCIL APPROVAL OF ZONE CHANGE 92-003, A
REQUEST TO AUTHORIZE A ZONE CHANGE OF PROPERTY
5 GENERALLY LOCATED AT THE SOUTHERLY SIDE OF EL
CAMINO REAL APPROXIMATELY 450 FEET EAST OF NEWPORT
6 AVENUE FROM CENTRAL COMMERCIAL (C-2) DISTRICT TO
COMMERCIAL GENERAL (CG) DISTRICT.
7 The Planning Commission of the City of Tustin does hereby
8 resolve as follows:
9 I. The Planning Commission, finds and determines as follows:
10 A. That Zone Change 92-003 was submitted to the
Planning Commission by Frontrunner Homes on behalf
11 of the property owner for consideration.
12 B. That a public hearing was duly noticed, called and
held on said application by the Planning Commission
13 on March 22, 1993.
14 C. That the project will not have a significant effect
on the environment and a Negative Declaration has
15 been prepared pursuant to the provisions of the
California Environmental Quality Act.
16
D. That the proposed Zone Change to Commercial General
17 (CG) District is consistent with all elements of
the Tustin Area General Plan, and in particular the
18 Land Use Element which designates this property
Commercial (C), which would accommodate a broad
19 range of commercial uses and development.
20 E. That the proposed Zone Change to CG is in the best
interest of the public health, safety and welfare
21 of the surrounding area in that the proposed zoning
district designation of CG is compatible with
22II commercial uses surrounding the development.
23 F. 'rhat the proposed Zone Change to CG is in the best
interest of the public health, safety and welfare
24 of the surrounding area in that the proposed zoning
district designation of CG is compatible with
25 commercial uses situated adjacent to the freeway.
26 G. That the proposed Zone Change to CG would eliminate
a small single parcel C-2 zoning designation island
27 thereby creating a larger, more logical and
cohesive CG zoning designation.
28
ATTACHMENT H
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24II
25
26
27
28
Resolution No. 3131
Page 2
11. The Planning Commission hereby recommends to the City
Council approval of Zone Change 92-003 changing the
zoning designation of the property located at the
southerly side of E1 Camino Real approximately 450 feet
east of Newport Avenue, from Central Commercial (C-2)
District to General Commercial (CG) District as shown on
Exhibit A, attached hereto.
P?.SSED AND ADOPTED by the Planning Commission of the City of
Tustin at a regular meeting held on the 22nd day of March,
1993.
P.THLEEN C CY
Secretary
MAR,�OWr�ASALn If
Chairpe'r-8on
1
2
3
4
5
G
7
8
9
10
11
12
13
14
15
1G
17
18
19
20
21
22
23
24
25
26
27
28
Resolution No. 3131
Page 3
STATE OF CALIFORNIA )
COUNTY OF ORANGE )
CITY OF TUSTIN )
I, KATHLEEN.CLANCY, zhe undersigned-, hereby certify that I am
the Recording Secretary of the Planning Commission of the City
of Tustin, California; that Resolution No. 3131 was duly
passed and adopted at a regular meeting of the Tustin Planning
Commission, held on the 22nd day of March, 1993.
KATHLEEN CLANCY
Recording Secretary
_ 4oI.64
AVENUE
PC -00m0
AVENUE
o
—
MART STI -
NEWPORT
0
064
\\�IZZLER
JACK
O -
SUB
114 TLE BOX
a
3
- -------
- SLK.
A
c O
Q
2
Z
Q
S
PPP. LOT J3
I
O"
\
I
e
,
I
J
1O
3—I$
Z \
2-
��
O�
I
n 6 i
PLW.(PT JJ
-_ f �_
_T1.
ET
HOSPf
LMARCH
18LORANGE
1983
�
L
a
O
o
0
064
O -
SUB
J
Q
z
PO'
Q
Q
W
Z
Q
N
NO SCALE
PROPOSED ZONING DISTRICTS
EXHIBIT A
21
2
o�
2
2
2;
21
i
FILE Copy
RESOLUTION NO. 3132
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF TUSTIN APPROVING CONDITIONAL USE
PERMIT 92-038, AUTHORIZING THE ESTABLISHMENT
AND OPERATION OF A SELF -SERVE, COIN-OPERATED
CAR WASH USE WITHIN THE COMMERCIAL GENERAL
(CG) DISTRICT, AT THE PROPERTY LOCATED AT THE
SOUTHERLY SIDE OF EL CAMINO REAL APPROXIMATELY
450 FEET EAST TO NEWPORT AVENUE, TUSTIN, CA.
The Planning Commission of the City of Tustin does hereby
resolve as follows:
I. The Planning Commission finds and determines as
follows:
A. That a proper application, Conditional Use
Permit 92-038, has been filed by Frontrunner
Homes to establish and operated a self -serve,
coin-operated car wash at the property located
at the southerly side of El Camino Real
approximately 450 feet east of Newport Avenue,
Tustin, California.
B. A public hearing was duly called, poticed and
held for said application on March 22, 1993 by
the Planning Commission.
C. That the establishment, maintenance, and
operation of the use applied for will not,
under the circumstances of this case, be
detrimental to the health, safety, morals,
comfort, or general welfare of the persons
residing or working in the neighborhood of
such proposed use nor be a detriment to the
property and improvements in the neighborhood
of the subject property, nor to the general
welfare of the City of Tustin as evidenced by
the following findings:
The operation and installation of the
proposed self -serve, coin operated, car
wash use will not be detrimental to the
health, safety, morals, comfort and
general welfare of persons residing or
working within the neighborhood in that
the site will provide a water recycling
system and shall comply with the Orange
County Sanitation District guidelines for
discharge produced on site. The site
lighting will be designed to provide
adequate lighting for security purposes,
and as well as provide timing devices to
10
]7
12
13
14
15
10
17
18
19
20
21
22
23
24
25'
20
27
28
Resolution No. 3132
Page 2
reduce glare produced on site. The
vacuum pumps have been located to the
rear of the site permitting the noise
produced by the pumps to be attenuated
across the site. The applicant proposes
to install landscaping adjacent to walls
and to paint the interior of the washing
bays with "anti -graffiti" coating to
reduce the opportunity for vandalism and
graffiti. As conditioned, the site will
provide minimal vending machines to
reduce the opportunity for criminal
element.
The operation and installation of the
proposed self -serve, coin operated, car
wash use will not be injurious or
detrimental to property and improvements
in the neighborhood or the general
welfare of the City in that, the proposed
use is similar and compatible with the
surrounding existing uses. The car wash
use would not be expected to have any
additional impacts in terms of traffic,
water and sanitation requirements and
utility usage than existing commercial
zoned parcels surrounding the site. As
conditioned, any potential adverse
impacts related to noise, light, or water
quality will be mitigated.
The operation and installation of the
proposed self -serve, coin operated, car
wash use will not be detrimental to the
health and safety of persons residing or
working within the neighborhood nor will
the proposed project be injurious or
detrimental to property and improvements
in the neighborhood or the general
welfare of the City in that the proposed
car wash building is in scale with the
surrounding existing structure and is
proposed to be of a compatible
architectural design. The applicant is
proposing the installation of landscaped
areas located at the perimeter of the
site and adjacent to the car wash
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Resolution No. 3132
Page 3
building to soften the impact of the
proposed building's massing. The
proposed landscaped areas will also
soften the impact of the expanses of
paved areas throughout the site.
4. The operation and installation of the
proposed self -serve, coin operated, car
wash use will not be injurious or
detrimental to property and improvements
in the neighborhood or the general
welfare of the City, in that, the drive
apron servicing the site has been located
in such a way as to not reduce the
existing street traffic patterns. The
or. -site circulation and detailing spaces
have been designed to reduce the
potential for traffic conflicts by
providing adequate drive aisle widths,
and drying and detailing spaces.
D. A Negative Declaration has been prepared and
certified for this project in accordance with
provisions of the California Environmental
Quality Act.
II. The Planning Commission hereby approves Conditional
Use Permit No. 92-038 to authorize the
establishment and operation of a self -serve, coin-
operated car wash within the Commercial General
(CG) District at the property located at the
southerly side of El Camino Real approximately 450
feet east of Newport Avenue, subject to the
conditions contained in Exhibit A, attached hereto.
PASSED AND ADOPTED at a regular meeting of the Tustin
Planning Commission, held on the 22nd day of March, 1993.
MARJ IKASAL
Chairpe son
KAT�CLANC
Secretary
1(
l]
1�
13
14
15
16
17
18
19
20
21
2^
23
24
25
26
27
28
Resolution No. 3132
Page 4
STATE OF CALIFORNIA )
COUNTY OF ORANGE )
CITY OF TUSTIN )
I, KATHLEEN CLANCY, the undersigned, hereby certify that
I am the Recording Secretary of the Planning Commission
of the City of Tustin, California; that Resolution No.
3132 was duly passed and adopted at a regular meeting of
the Tustin Planning Commission, held on the 22nd day of
March, 1993.
=/_.rte
KATHLEEN
Recording Secretary
EXHIBIT A
CONDITIONAL USE PERMIT 92-038
CONDITIONS OF APPROVAL
RESOLUTION NO. 3132
GENERAL
(1) 1.1 The proposed project shall substantially conform with the
submitted plans for the project date stamped March 22,
1993, on file with the Community Development Department,
as herein modified, or as modified by the Director of
Community Development Department in accordance with this
Exhibit. The Director of Community Development may also
approve subsequent minor modifications to plans during
plan check if such modifications are to be consistent
with provisions of the Tustin City Code.
(1) 1.2 Unless otherwise specified, the conditions contained in
this Exhibit shall be complied with prior to the issuance
of any building permits for the project, subject to
review and approval by the Community Development
Department. In addition, all Conditions of Approval of
Design Review 92-050 shall also be complied with as shown
in Resolution No. 3132.
(1) 1.3 Conditional Use Permit approval shall become null and
void if Zone Change 92-005 is not approved by the City
Council and shall also become unless all permits are
issued within twelve (12) months of the date of this
Exhibit and substantial construction is underway. Time
extensions may be granted by the Planning Commission if
a written request is received by the Community
Development Department within thirty (30) days prior to
expiration.
(1) 1.4 Approval of Conditional Use Permit 92-038 is contingent
upon the applicant signing and returning an "Agreement to
Conditions Imposed" form as established by the Director
of Community Development_
*** 1.5 Prior to issuance of any building permit, a lot line
adjustment or parcel map for the subject site shall be
recorded. The applicant_ shall submit a conformed copy to
the Community Development Department.
SOURCE CODES
(1) STANDARD CONDITION (5) RESPONSIBLE AGENCY REQUIREMENT
(2) CEQA MITIGATION (6) LANDSCAPING GUIDELINES
(3) UNIFORM BUILDING CODE/S (7) PC/CC POLICY
(4) DESIGN REVIEW
*** EXCEPTION
Exhibit A - Conditions of Approval
Resolution No. 3132
Conditional Use Permit 92-038
Page 2
(1) 1.6 The applicant shall hold and defend the City of Tustin
harmless for all claims and liabilities arising out of
City's approval of the entitlement process for this
project.
OPERATIONS
(2) 2.1 The applicant shall obtain all required approvals and
permits from the Orange County Fire Department prior to
issuance of a Building Permit.
(1) 2.2 The car wash facility and vacuum pumps shall be subject
to the provisions of the City of Tustin Noise ordinance.
(1) 2.3 All construction operations, including engine warm up,
(9) shall be subject to the provisions of the City of Tustin
Noise Ordinance and shall take place only during the
hours of 7:00 a.m. until 6:00 p.m., Monday through
Friday; or other times that the Building official
determines will be in conformance with the Noise
ordinance and the public health and safety will not be
impaired, subject to application being made at the time
the permit for the work is awarded or during progress of
the work.
*** 2.4 The future installation of any freestanding vending
machines, such as but not limited, to drink or soda
machines, candy, magazine racks, and any other retail
product is prohibited.
2.5 The products .sold from the proposed built in vending
machines shall be limited to auto related products and
shall not be modified to sell food or drink products.
PLAN SUBMITTAL
(3) 3.1 At building plan check submittal the following shall be
provided:
(3) A. Construction plans, structural calculations, and
Title 24 energy calculations. Requirements of the
Uniform Building Codes, State Handicap and Energy
Requirements shall be complied with as approved by
the Building Official.
(2) B. Preliminary technical detail and plans for all
(3) utility i.;stallations including cable TV,
telephone, gas, water and electricity.
Additionally, a note on plans shall be included
Exhibit A - Conditions of Approval
Resolution No. 3132
Conditional Use Permit 92-038
Page 3
stating that no field changes shall be made without
corrections submitted to and approved by the
Building Official.
(2) C. Final grading and specifications consistent with the
(3) site plan and landscaping plans and prepared by a
registered civil engineer for approval of the
Community Development Department.
(2) D. A precise soils engineering report provided by a
(3) soils engineer within the previous twelve (12)
*** months. Expanded information regarding the levels
of hydrocarbons and ground water contamination
found on site shall be provided in the submitted
soils report.
(9) E. A photometric study of the proposed lighting design
(4) indicating locations of all exterior lights and
types of fixtures.
(1) F. Information, plans and/or specifications to ensure
(5) satisfaction of all Public Works Department
requirements.
(5) G. Information to ensure compliance with requirements
(1) of the Orange County Fire Chief including required
fireflow and installation, where required, of fire
hydrants subject to approval of the Fire
Department, City of Tustin Public Works Department
and East Orange County Water District.
(5) H. Information to ensure compliance with the
requirements of the Orange County Sanitation
District No. 7.
(4) 3.2 Information shall be included in the final working
drawings showing exact details and exterior door types
and treatments. (i.e., framing color, etc.)
(1) 3.3 All exterior colors to be used shall be subject to review
(4) and approval of the Director of the Community Development
Department. All exterior treatments must be coordinated
with regard to color, materials and detailing as noted on
submitted construction plans and elevations shall
indicate all colors and materials to be used.
Exhibit A - Conditions of Approval
Resolution No. 3132
Conditional Use Permit 92-038
Page 4
(1) 3.4 Exterior elevations of the building(s) shall indicate any
(4) fixtures or equipment to be located on the roof of the
building, equipment heights and type of screening. All
roof mounted equipment shall be located in the existing
mechanical well and shall be a minimum of six inches
below the parapet.
(1) 3.5 Indicate lighting scheme for project to comply with
(4) conditions 3.1E and 3.6G, note locations of all exterior
*** lights and types of fixtures, lights to be installed on
buildings shall be a decorative design. No lights shall
be permitted which may create any glare or have a
negative impact on adjoining properties. The location
and types of lighting shall be subject to the approval of
the Director of Community Development.
(1) 3.6 The site plan and structure details for the proposed
(6) project shall include the following:
(7) A. A stucco finished block wall with columns shall be
(2) provided along the westerly property line located
to north of the proposed car wash building. The
architectural detailing, colors and materials shall
be compatible with the proposed structures on site
and subject to final approval as to design by the
Community Development Department Director. The
proposed wall shall not encroach into the visual
setback as dictated by Orange County G.M.A.
Standard No. 1117. The block wall shall be a
maximum of 6'-8" in height.
B. A combination of stucco finished columns and
decorative metal fencing shall be provided along
the westerly property line located to the south of
the proposed car wash building. The architectural
detailing, colors and materials shall be compatible
with the proposed structures on site and subject to
final approval as to design by the Community
Development Department Director. The block wall
shall be a maximum of 6'-8" in height.
C. The landscape setback area along the E1 Camino Real
frontage shall be increased to a minimum of ten
(10) feet in width. This area shall be landscaped
and irrigated in accordance with the City of Tustin
Landscape and Irrigation Guidelines.
Exhibit A - Conditions of Approval
Resolution No. 3132
Conditional Use Permit 92-038
Page 5
D. Landscape areas shall be provided along the north
elevation of the proposed car wash building. These
landscape areas shall be located at the base of
each washing bay column. The areas shall be a
minimum of twelve (12) inches in depth and fully
irrigated. A minimum of one (1), five (5) gallon,
climbing variety vine shall be planted in each
provided landscape area.
E. An increased amount of landscape materials and
earth berming shall be provided at the northeast
corner of the project site. The materials shall
include additional specimen size trees, and shrubs.
Earth berming shall have a minimum height of 36
inches. The landscape materials shall not conflict
with the visual requirements of the adjacent
property's drive approach.
F. The proposed width of the one (1) driveway apron
along E1 Camino Real shall be reduced from thirty-
five (35) feet in width to thirty (30) feet in
width.
G. The wall-pac lighting fixtures located on the north
elevations of the car wash building shall be
removed. The proposed wall-pac located on the east.
elevation shall be modified so as to be
architecturally compatible with the proposed
building, subject to Condition 3.5. Additional
decorative pole lights shall be provided in the
perimeter landscape areas. The overall lighting
for the project shall comply with the City of
Tustin Security Ordinance and shall provide a
minimum of one (1) footcandle of lighting
illumination throughout the site.
H. Specifications at Building Permit plan check
submittal shall reflect materials call -outs on all
elevations and applicable details and notes added
indicating that all wall surfaces in the bays shall
be coated and protected with a graffiti resistant
finish and/or material. On all other wall surfaces
the applicant shall be responsible for removal of
all graffiti or tagging within 48 hours of
notification of the on-site manager at the
applicants expense.
Exhibit A - Conditions of Approval
Resolution No. 3132
Conditional Use Permit 92-038
Page 6
(1) 3.7 Note shall be provided on final plans that a six (6)
foot -high chain linked fence shall be installed around
the site prior to building construction stages. A nylon
fabric or mesh shall be attached to the temporary
construction fencing. Gated entrances shall be permitted
along the perimeter of the site for construction
vehicles.
(1) 3.8 Any roof -top equipment, including vents and exhausts
shall comply with the City of Tustin's Noise Ordinance.
(1) 3.9 A 24" x 36" street improvement plan, as prepared by a
California Registered Civil Engineer, will be required
for all construction within the public right-of-way. In
conjunction with the above, a 24" x 36" traffic control
plan, as prepared by a California Registered Traffic
Engineer, will be required.
(1) 3.10 Construction or replacement of any missing or damaged
public improvement along the frontage of the subject
parcel will be required, which shall include, but not
limited to the following:
a. Curb and gutter;
b. Sidewalk;
C. Drive apron;
d. Street paving; and
e. Street light on marbelite pole.
*** 3.11 The existing drive apron located at the eastern edge of
the subject site shall be removed and replace with
sidewalk, curb and gutter in compliance with the City of
Tustin public improvement standards.
LANDSCAPING, GRQUNDS AND HARDSCAPE ELEMENTS
(1) 4.1 Prior to issuance of any building or grading permits,
(7) submit at plan check complete detailed landscaping and
irrigation plans for all landscaping areas, as modified
by this Exhibit, consistent with adopted City of Tustin
Landscaping and Irrigation Submittal Requirements.
Provide summary table applying indexing identification to
plant materials. The plant table shall list botanical
and common names, sizes, spacing, location and quantity
of the plant materials proposed. Show planting and
berming details, soil preparation, staking, etc. The
irrigation plan shall show location and control of
backflow prevention devices, pipe size, sprinkler type,
spacing and coverage. Details for all equipment must be
Exhibit A - Conditions of Approval
Resolution No. 3132
Conditional Use Permit 92-038
Page 7
provided. Show all property lines on the landscaping and
irrigation plan, public right-of-way areas, sidewalk
widths, parkway areas, and wall locations. The
Department of community Development may request minor
substitutions of plant materials or request additional
sizing or quantity materials during plan check. Note on
landscaping plan that coverage of landscaping and
irrigation materials is subject to field inspection at
project completion by the Department of Community
Development.
(7) 4.2 The submitted landscaping plans at plan check shall
reflect the following requirements:
A. Turf is unacceptable for grades over 25%. A
combination of planting materials must be used,
ground cover on large areas along is not
acceptable.
B. Provide a minimum of the following plant materials:
1. 1 tree for every 30' street frontage
6 shrubs for every 25' street frontage
1 tree for every 30' perimeter property line
.5 shrubs for every 30' perimeter property line
1 tree for every 250 -square fee landscape area
5 shrubs for every 25 -lineal feet landscape
1 tree for every five parking stalls
1 tree for every 30 -lineal feet of exterior
building wall
2. A minimum of five percent of parking area must
be landscaped.
C. Shrubs shall be a minimum of 5 -gallon size and
shall be spaced a maximum of five feet on center..
D. Ground cover shall be planted between a maximum of
eight to 12 inches on center, with eight inches on
center preferred.
E. Fences, walls and equipment areas, shall be
screened with shrubs and/or vines and trees.
F. All plant materials shall be installed in a healthy
vigorous condition typical to the species and must
be maintained in a neat and healthy condition.
Maintenance includes but is not limited to
trimming, mowing, weeding, removal of litter,
Exhibit A - Conditions of Approval
Resolution No. 3132
Conditional Use Permit 92-038
Page 8
fertilizing, regular watering, and replacement of
diseased or dead plants.
G. Buffer driveway and parking areas with landscaping
berms when possible.
H. Earth mounding is essential and must be provided to
applicable heights whenever it is possible in
conjunction with the submitted landscaping plan.
I. Perimeter walls should be treated with vines in
.order to relieve large expanses of walls with
adding greenery and color. Vines should be
informally grouped with training devices installed.
J. Six (6) inch raised concrete curbs shall be placed
on-site adjacent to all landscape planting areas.
(1) 4.3 Screening adjacent to roadways, whenever possible, shall
(7) compliment the architecture, color and construction
(4) material of primary buildings on the site.
(1) 4.4 All walls, fences or landscaping adjacent to streets
(7) should be designed to provide adequate sight distance for
(4) vehicles exiting the project. All walls shall be
designed in accordance with height standards and sight
distances as identified in the City Code where
applicable.
FEES
(1) 5.1 Payment of the following fees prior to the issuance of
any building permits shall be required.
a. Major thoroughfare and bridge fees to Tustin Public
Works Department.
b. Any additional Orange County Sanitation District
No. 7 sewer connection fees to the Community
Development Department.
C. All applicable building and grading plan check and
permit fees to the Community Development
Department.
d. Orange County Fire Department fees to the Community
Development Department.
Exhibit A - Conditions of Approval
Resolution No. 3132
Conditional Use Permit 92-038
Page 9
e. School facilities fee to the Tustin Unified School
District, as applicable.
f. East Orange. County Water District fees to the
Community Development Department.
*** 5.1 Within forty-eight (48) hours of approval of the subject
(5) project, the applicant shall deliver to the Community
Development Department, a cashier's check payable to the
COUNTY CLERK in the amount of $25.00 (twenty five
dollars) pursuant to AB 3158, Chapter 1706, Statues of
1990, to enable the City to file the Notice of
Determination required under Public Resources Code
Section 21152 and 14 Cal. Code of Regulations 15075. If
within such forty-eight (48) hour period that applicant
has not delivered to the Community Development Department
the above -noted check,, the approval for the project
granted herein shall be considered automatically null and
void.
In addition, should the Department of Fish and Game
reject the Certificate of Fee Exemption filed with the
Notice of Determination and require payment of fees, the
applicant shall deliver to the Community Development
Department, within forty-eight (48) hour of notification,
a cashier's check payable to the COUNTY CLERK in the
amount of $1,250 (one thousand, two hundred fifty
dollars) pursuant to AB 3158, Chapter 1706, Statues of
1990. If this fee is imposed, the subject project shall
not be operative, vested or final unless and until the
fee is paid.
JV:br
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 93-35
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUSTIN, CERTIFYING THE NEGATIVE DECLARATION AS
ADEQUATE FOR ZONE CHANGE 92-003, INCLUDING REQUIRED
FINDINGS PURSUANT TO THE CALIFORNIA ENVIRONMENTAL
QUALITY ACT.
The City Council of the City of Tustin does hereby resolve as
follows:
I. The City Council finds and determines as follows:
A. The request to approve Zone Change 92-003 is
considered a "project" pursuant to the terms of the
California Environmental Quality Act.
B. A Negative Declaration has been prepared for this
project and has been established for public review.
C. Whereby, the City Council of the City of Tustin has
considered evidence presented by the Community
Development Department and other interested parties
with respect to the subject Negative Declaration.
D. The City Council has evaluated the proposed
Negative Declaration and determined it to be
adequate and complete.
II. A Negative Declaration has been completed in compliance
with CEQA and State guidelines. The City Council, having
approving authority over Zone Change 92-003 has received
and considered the information contained in the Negative
Declaration prior to approving the proposed project and
have found that it adequately discussed the environmental
effects of the proposed project. On the basis of the
initial study, the City Council has found that the
project involves no potential for any adverse effect,
either individually or cumulatively, on wildlife
resources and therefore makes a De Minimis Impact Finding
related to AB 3158, Chapter 1706, Statutes of 1990. In
addition, there will not be a significant effect on the
environment as mitigation measures have been incorporated
into the project's approval which mitigate any potential
significant environmental effects. These mitigation
measures are identified in Exhibit A attached to the
Negative Declaration and initial study and are adopted as
findings and conditions of ordinance 1105, incorporated
herein by reference.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Resolution No. 93-35
Page 2
PASSED AND ADOPTED at a regular meeting of the Tustin City
Council, held on the 5th day of April, 1993.
LESLIE ANNE PONTIOUS
Mayor
MARY E. WYNN
City Clerk
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss
CITY OF TUSTIN )
CERTIFICATION FOR RESOLUTION NO. 93-35
MARY E. WYNN, City clerk and ex -officio Clerk of the City
Council of the City of Tustin, California, does hereby certify
that the whole number of the members of the City Council of
the City of Tustin is 5; that the above and foregoing
Resolution No. 93-35 was duly and regularly introduced,
passed, and adopted at a regular meeting of the Tustin City
Council, held on the 5th day of April, 1993.
COUNCILMEMBER AYES:
COUNCILMEMBER NOES:
COUNCILMEMBER ABSTAINED:
COUNCILMEMBER:ABSENT:
JSL: br
MARY E. WYNN
City Clerk
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15'
16
17
18
19
20
21
22
23
24
25
26
27
28
ORDINANCE NO. 1105
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
TUSTIN, CALIFORNIA, APPROVING ZONE CHANGE 92-003, A
REQUEST TO AUTHORIZE A ZONE CHANGE OF PROPERTY
GENERALLY LOCATED AT THE SOUTHERLY SIDE OF EL
CAMINO REAL APPROXIMATELY 450 FEET EAST OF NEWPORT
AVENUE FROM CENTRAL COMMERCIAL (C-2) DISTRICT TO
COMMERCIAL GENERAL (CG) DISTRICT.
The City Council of the City of Tustin does hereby ordain as
follows:
I. The City Council finds and determines as follows:
A. That Zone Change 92-003 was submitted to the City
Council by Frontrunner Homes on behalf of the
property owner for consideration.
B. That a public hearing was duly noticed, called and
held on said application by the Planning Commission
on March 22, 1993, and by the City Council on April
5, 1993.
C. That the project will not have a significant effect
on the environment and a Negative Declaration has
been prepared pursuant to the provisions of the
California Environmental Quality Act.
D. That the proposed Zone Change to Commercial General
(CG) District is consistent with all elements of
the Tustin Area General Plan, and in particular the
Land Use Element which designates this property
Commercial (C), which would accommodate a broad
range of commercial uses and development.
E. That the proposed Zone Change to CG is in the best
interest of the public health, safety and welfare
of the surrounding area in that the proposed zoning
district designation of CG is compatible with
commercial uses surrounding the development.
F. That the proposed Zone Change to CG is in the best
interest of the public health, safety and welfare
of the surrounding area in that the proposed zoning
district designation of CG is compatible with
commercial uses situated adjacent to the freeway.
G. That the proposed Zone Change to CG would eliminate
a small single parcel C-2 zoning designation island
thereby creating a larger, more logical and
cohesive CG zoning designation.
1
2
3
4
5
6
g
9
10
11
12
13
14
15
16
17
18
19
20
21''
22
23
24
25
26
27
28
Ordinance No. 1105
Page 2
II. The City Council hereby approves Zone Change 92-003
changing the zoning designation of the property located
at the southerly side of E1 Camino Real approximately 450
feet east of Newport Avenue, from Central Commercial (C-
2) District to General Commercial (CG) District as shown
on Exhibit A, attached hereto.
PASSED AND ADOPTED by the City Council of the City of Tustin
at a regular meeting held on the 5th day of April, 1993.
Mayor
Mary E. Wynn,
City Clerk
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
CERTIFICATION FOR ORDINANCE NO. 1105
MARY E. WYNN, City Clerk and ex -officio Clerk of the City
Council of the City of Tustin, California, does hereby certify
that the whole number of the members of the City Council of
the City of Tustin is five; that the above and foregoing
Ordinance No. 1105 was duly and regularly introduced and read
at an adjourned regular meeting of the City Council held on
the 5th day of April, 1993, and was given its second reading
and duly passed and adopted at a regular meeting of the City
Council held on the 19th day of April, 1993, by the following
vote:
COUNCILMEMBER AYES:
COUNCILMEMBER NOES:
COUNCILMEMBER ABSTAINED:
COUNCILMEMBER ABSENT:
Mary E. Wynn,
Published:
Tustin News
ty