Loading...
HomeMy WebLinkAbout11 T SPTS PK CONSULT 09-19-94AGENDA NO. 11 9-19-94 Int e r- C o rn DATE: SEPTE~/BER 19, 1994 TO: FROM: SUBJECT: WILLIA/~ A. HUSTON, CITY 143~NAGER CO~qlTNITY DE%rELOPMENT TUSTIN SPORTS PAP~KAMENI)MENTS TO CONSULTING SERVICES AGREEMENT WITH ANTHONY & LANGFORD ARCHITECTS RECOMMENDATION: Staff recommends that the City Council approve the following amendments to the Consulting Services Agreement with knthony & Langford Architects: · Reinfoursement for soils engineer $ 4,853.80 · Irrigation Pump System revision 3,180.41 · Roller Hockey Study 2,566.43 Subtotal $10,600.64 FISCAL IMPACT: There would be no fiscal impact to the current budget appropriation for this project. There is an adequate contingency within the current appropriation to cover the cost of these amendments. BACKGROUND: The project manager requested additional services for foundation investigation (soils engineering) from the architect due to a lack of current data of soils conditions when the construction documents were being developed. Such services are excluded from the scope of work in the Consulting Services Agreement. During the construction phase, the Irvine Ranch Water District suggested a revision to the irrigation plans which would change the design from two irrigation pumps, to a large single irrigation pump with larger mains. The suggestion came at a time when the irrigation work was about to start, and would provide significant benefits to the City such as lower operational costs, lower maintenance costs, and a reduction of the construction cost of the irrigation system. In order to take advantage of this benefit, the project manager requested immediate re-design of the irrigation system so that the contractor would not be delayed. The contractor is coordinating the installation of the irrigation system mains. CITY OF TUSTIN REQUEST FOR SUPPLEMENTAL APPROPRIATION * REQUESTING DEPARTMENT: Community Development PROJECT DESCRIPTION: Tustin Sports Park PROJECT'OR OPERATING ACCOUNT NITMBER: 401-9999-9535-400022 FUND: General Fund AMOUNT CURRENTLY APPROPRIATED: FISCAL YEAR: 1993-94 A/E Contract $273,150 ~/E Change Orders $]5.000 PONDING ALTER_NATIVES: Construction Cont~nEpnny B,,HE~ = ~lql:OD0 Soils Engr. $4,853.80 Irr. Pump 3,180.41 SUPPLEMENTAL APPROPRIATION AMOUNT: Roller ll~k=~ 2,566.43 REASON FOR i~EQUEST: Approval of Amendments No. 3, 4 and 5. Supplemental appropriation is an internal budget adjustment. No chan~e to thm c~rrent $3,197,124 appropriation. DEPARTMENT HEAD SIGNATURE/DATE: CITY MANAGER: APPROVED DENIED CITY ~.NAGER SIGNATURE/DATE CITY COUNCIL ACTION (if required)/DATE: APPROVED DENIED * A supplemental appropriation includes a capital improvement project change order (for any amount that exceeds the contract and/or budgeted amount); where there is no appropriation in the authorized budget, or any capital or operating expense that exceeds the authorized budget. ANTHONY AND LANGFORD AIA ARCHITECTURE · ENGINEERING - PLANNING May 31, 1994 Ed Elowe, Project Manager TUSTIN COMMUNITY REDEVELOPMENT AGENCY 300 Centennial Way Tustin, CA 92680 SUBJECT: CONTRACT AMENDMENT NO. 3 TUSTIN SPORTS PARK, GEOTECHNICAL ENGINEERING Dear Ed: According to our January 11, 1993 proposal, that was an amendment to our original agreement dated August 3, 1992, Page 3 indicates that one of the services specifically excluded from our contract was that of foundation investigation. Per our agreement, we have provided this additional service as permitted in Paragraph 8, Subparagraph A3 on Page 4. A&L paid the May 22, 1993 invoice for Associated Soils and are therefore submitting this bill for reimbursement along with some reproduction costs incurred for agency processing during the 12/93 and 1/94 periods. Please sign below to indicate approval and return a copy to our office. Sincerely, ANTHONY AND LANGFORD/ARCHITECTS Principal Edward Bledowski, A1A Project Architect ACCEPTED AND APPROVED CITY OF TUSTIN Print Name Date: ksh 16152 Beach Blvd. Suite 201, Huntington Beach, California 92647 (714)848-1818 ANTHONY AND LANGFORD AIA ARCHITECTURE · ENGINEERING · PLANNING June 14, 1994 Mr. Ed EIowe, Project Manager CITY OF TUSTIN 300 Centennial Way Tustin, CA 92680 SUBJECT: CONTRACT AMENDMENT NO. 4 TUSTIN SPORT PARK, IRRIGATION BOOSTER PUMP MODIFICATION Dear Ed: The actual pressure available on site for the reclaimed water service is substantially higher than originally indicated by the Irvine Ranch Water District. We have determined that this will allow the deletion of one of the two irrigation booster pumps· The new scheme will provide for one pump, located along Robinson Drive, between Ballfields I and 2, utilizing the existing 4" p.o.c, on site. This scheme will also alleviate unnecessary cutting of the street. Irrigation drawings will be modified to provide one system, and the required Irvine Ranch Water District approvals will be obtained. Landscape drawings will reflect the changes to screen the equipment. Electrical drawings will provide service to the new location. Per our original contract, we propose to provide changes as permitted in Paragraph 8, Subparagraph A 1, on Page 4. Our not-to-exceed fee for these services will be Three Thousand One Hundred Dollars ($3,100). Reimbursable expenses of reprographics and delivery cost to process this change will be billed at cost incurred plus 15 percent. If accepted and approved, please sign where indicated below and return a copy to our office. Sincerely, z~ ~-"%~'I~qcTH ~ND LANGFORD/ARCHITECTS Principal Edward Bledowski, AIA Project Architect ACCEPTED AND APPROVED CITY OF TUSTIN Print Name Date: ksh 16152 Beach Blvd., Suite 201, Huntington Beach, California 92647 (714)848-1818 ANTHONY AND LANGFORD AIA ARCHITECTURE · ENGINEERING · PLANNING September 12, 1994 Mr. Ed Elowe, Project Manager CITY OF TUSTIN 300 Centennial Way Tustin, CA 92680 SUBJECT: CONTRACT AMENDMENT NO. 5 TUSTIN SPORTS PARK, ROLLER HOCKEY RINK STUDY Dear Ed: Per your authorized notification of June 21, we have completed the roller hockey rink study requested by the Assistant City Manager. In order to meet the city's urgent time frame, this study was performed on a hourly basis. Our total fee including costs incurred for reprographics and deliveries is Two Thousand Five Hundred Sixty~Six Dollars and 43 Cents ($2,566.43). Per our original contract, we provided the requested changes as permitted in Paragraph 8, Subparagraph A3, on Page 4. Please sign below to indicate approval and return a copy to our office. Sincerely,  ECTS Principal Edward Bledowski, AIA Project Architect ACCEPTED AND APPROVED CITY OF TUSTIN Date: ksh 16152 Beach Blvd., Suite 201, Huntington Beach, California 92647 (714)848-1818