WILLIAM A. HUSTON, CITY MANAGER
PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
AUTHORIZATION TO ADVERTISE FOR BIDS - INSTALLATION OF TRAFFIC
SIGNAL AMD INTERCONNECT AT JAMBOREE ROAD AMD SECTOR 11 ACCESS
(A.D. 85-1) (CIP PROJECT NO. 800020)
RECOMMENDATIONS:
It is recommended that the City Council, at their meeting of August 15,
1994, adopt the attached resolution approving the plans and
specifications for the installation of a traffic signal and interconnect
at the intersection of Jamboree Road and Sector 11 access south of
Irvine Boulevard.
FISCAL IMPACT:
The Engineer's estimate for this project is
funded with Assessment District 85-1 funds.
$135,000.00 and will be
DISCUSSION:
This project will provide for the installation of a traffic signal and
interconnect at the Jamboree Road/Sector 11 access, which is the main
access to the Tustin Ranch Plaza development located at the southwest
corner of Jamboree Road and Irvine Boulevard. The work will include all
labor, material, tools, equipment, appurtenances and incidentals for the
installation of a traffic signal and interconnect as detailed on the
plans and specifications for this project.
The tentative schedule for this project is as follows:
Authorization to advertise
First legal advertisement .................
Second legal advertisement ................
Open bids ................................
Award contract ...........
Commence
Complete construction ....................
for bids ...........
8-15-94
8-18-94
8-25-94
9-12-94
9-19-94
10-03-94
· 11-30-94
Robert S. Ledendecker
Acting Director of Public Works/
City Engineer
RSL:DR.a.:ccg:TRSIGJI
R.' Anderson
Transportation Engineer
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19'
2O
21
24
25
26
27
28
RESOLUTION NO. 94-103
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR
INSTALLATION OF TRAFFIC SIGNAL AND INTERCONNECT AT
JAMBOREE ROAD AND SECTOR 11 ACCESS (A.D. 85-1)
WHEREAS, it is the intention of the City Council of the
city of Tustin, California to install a traffic signal and
interconnect at the intersection of Jamboree Road and Sector
11 access; and
WHEREAS, the City Engineer has presented plans and
specifications for the construction of said works;
NOW, THEREFORE, BE IT RESOLVED that the plans and
specifications presented by the City Engineer be and are
hereby approved as the plans and specifications for;
Installation of Traffic Signal and Interconnect
at Jamboree Road and Sector 11 Access
BE IT FURTHER RESOLVED that the City Clerk is hereby
authorized and directed to advertise as required by law for
the receipt and sealed bids or proposals for the doing of the
work specified in the aforesaid plans and specifications;
BE IT FURTHER RESOLVED that this project is categorically
exempt from the requirements of the California Environmental
Quality Act; Class I: Existing Facilities.
PASSED AND ADOPTED at a regular meeting of the City
Council of the City of Tustin held on the 15th day of August
1994.
Thomas R. Saltarelli, Mayor
ATTEST: