HomeMy WebLinkAbout03 SB 821 04-04-94AG E N
NO. 3
Inter-Com
DATE:
APRIL 4, 1994
TO:
FROM:
SUBJECT:
WILLIAM A. HUSTON, CITY MANAGER
PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
SB 821 BICYCLE/PEDESTRIANFACILITIES, PROJECT APPLICATION FOR
FISCAL YEAR 1994-95
RECOMMENDATION
It is recommended that the Tustin City Council, at their meeting of
April 4, 1994 adopt a resolution approving the application for
Bicycle and/or Pedestrian Facility Funds under SB 821.
FISCAL IMPACT
None, the allocated funds will be placed on reserve for the City of
Tustin, in the County Local Transportation Funds (LTF).
BACKGROUND
An allocation of $17,598.00 will be available to the City in FY
1994-95, under SB 821 Program for Bicycle and/or Pedestrian
Facilities.
On February 22, 1994, the City Council awarded the construction
contract for sidewalks and access ramps, SB 821 Project, 1993-94 FY
in the amount of $9,587.50. This project which will be under
construction soon will provide continuous concrete sidewalk and
ramps on the west side of Myford Road north of Walnut Avenue .to
link with the existing sidewalk approximately 400' north of Walnut
Avenue.
The City this year, is proposing a new sidewalk in the industrial
area, on the south side of Walnut Avenue between Franklin Avenue
and Sinclair Circle. The proposed project will be ready for bid in
September, 1994, after the City receives project approval from the
Orange County Transportation Authority (OCTA) in May or June, 1994.
The Project Engineer's estimate of $17,981.09 will be funded from
the remaining 1993-94 FY funds in the amount of $383.09 and from
the 1994-95 FY available allocation in the amount of $17,598.00
under this year's application.
Robert S. Ledendecker
Director of Public Works/
City Engineer
Wisam Altowaij i
Associate Civil Engineer
RSL:WA:kIb:sb821.1
1
3
4
5
6
7,
8
9
10
11
RESOLUTION NO. 94-36'
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUSTIN, CALIFORNIA, APPROVING THE APPLICATION FOR
BICYCLE AND/OR PEDESTRIAN FACILITY FUNDS UNDER SB 821
WHEREAS, SB 821 provides that 2% of each County,s total
local Transportation Funds be annually set aside and used to
fund the development of Bicycle and Pedestrian Facilities; and
WHEREAS, the City of Tustin desires to provide ~idewalk
facilities for pedestrian use' throughout the entire community;
and
WHEREAS, the City of Tustin desires to construct the
sidewalk facilities within the City utilizing the funds
available under SB 821;
NOW, THEREFORE, the City Council of the City of Tustin
does resolve as follows:
12
13
14
15
16
17
18
·
·
To construct pedestrian facilities within this City
to the established standards.
To authorize Bob Ledendecker as the City's authorized
signature and designated contact person.
To apply for all' funds available to the City of
Tustin allocated for bikeways and pedestrian
facilities under SB 821.
PASSED AND ADOPTED at a regular meeting of the City
Council of the City of Tustin held on the 4th day of April,
1994.
19,
2O
21
Jim Potts, Mayor
ATTEST:
24
25
~ity Clerk
27
TDA Article 3 (SB 8,,21) Bicycle and Pedestrian Facilities Claim
OF:~NGE COUNTY SB 821 FUND PROGRAM
CHECKLIST OF ITEMS TO BE FILED
Agency: City of Tustin Date: March 28, 1994
Two copies of each of the items checked below are enclosed in the claim package filed '
(see instructions for completing forms):
_ X
1. ~Non-Transit Claim
x 2.
× 3.
x 4.
Rnancial Reporting Form: Funding Activity/Pending Proiect_-_-_
Financial Re ortin Form: Revenues &~
.Pro,iect Information Form
__
.
Government Body Authorization
_
Certified copy of a Resolution or a Minute Order supporting SB
821 fund claim. (See Sample Resolution)
X
Projects involving construction contracts for which payment
is requested: Documentation of contract award, e.g., copy
of a governing body Resolution or a Minute Order.
6. Other - Optional
_Regional Bikeway Program Application Form (Attachment
Necessary to submit if requesting regional funds.
Amendment Reques_t ForK
Request(s) to reallocate/transfer funds or other changes
invoMng your agency's SB 821 program. An optional form to
submit throughout the fiscal year for expediting funding
requests.
11
ORANGE ( NTY TRANSPORTATION
LTF art,~,e 3 (SB 821) Non-Transi~ Clsim Form
AGENCW:
City of Tustin...
COIN I-A(JI' PERSON*."
_ Wisam Altowaij i
ADDRESS- PAYMENT:
City of Tustin
DAT-~
March 28,
1994
PHO~B:
(714) 573-3175
ADDRESS - CORRESPOnds:
300 Centennial
Tustin, CA. 92680
A'I-i'E:N-I'ION: ATT=_N-i"ION:
Bob Ledendecker, Director of Public Works/City Engineer Same
Naznc ~.nd ~-Stlc Naznc ~md Tiflc
[x] Request for Rese.'we
Ix] Re~esz for Pa.vmen: ·
$ 17,598.00 ~ _1994-~5
CONDITIONS OF APPROVAL:
$ 9,~87.50 ~-Y 1993-94
S FY
S FY
[x ] Docamenmtion ved'.ayin~ awed of
co~u"uc'Jon con:rat-, is ~nctosed.
I certify that the' amounts stated above will be expended in accordance with the policies
outlined in the OCTA SB 821 Bicycle and Pedestrian Facilities Procedures Manual.
Public Works/Engineering:
Robert Ledendecker
Director of Public Works/City Engineer
I certify that SB 821 funds received and interest earned on those funds will be accounted
for in such a manner that an audit can be conducted as required by P.U.C. 99245.
Finance-
--
Kon Nau±t, Director of ~inance ----
OCTA USE ONLY
DAi~_ APPROVe-D:
SIGN-ED:
· Ready to enc"oamber funds, e.£, awarded con~zrucdon conz.-zc-,. Until such time, funds
be p/ac=d on re~erve for ~rur-e payment. '
12
Z
Z
Z
Z
F~
0
Z
Z
· ,,
,,
~ ' ' ' 0
~ =~1=~ =~ =~I ~~
~ ~ ~ 0 ~ 0 ~ O i
m 0 0 O~ O~ O~ ~
0 0 0 0 0 0 O0 ~
~ 0 ~ 0 ~ 0 ~0 g ~
~ 0 ~ 0 ~ 0 ~ 0 ~ ~
0 ~ 0 ~ 0 ~ 0 ~
·
o
Agency:
TDA Article 3 (SB 821) Bicycle and Pedestrian Facilities Claim
FINANCIAL REPORTING FORM: REVENUES & EXPENSES
City of Tustin
, Orange County
Date: 3/28/94
_TTDA Article 3 (SB 821 Funds
Revenues:
FY 1993-94
Estimate
FY 1994-95
.
.
.
Beginning of Year
Article 3 (SB 821) Funds (in treasury)
Interest
4. Total Revenues
.Expenditures:
($21,093.50)
$21,093.50
($ 9,587.50)
$27,568.59
-0- $17,981.09
5.
.
.
Balance:
Construction/Maintenance
Refunds (Funds returned to LTF-')
Total Expenditures
$~_, 587.50)$ (_17,981. Op
( -0- ) ( -0- )
~(9,587.50) $(~7,981.09)
.
'Excess (Deficiency) of Revenue
over-Expenditures
_Fund Balance:
__
($9,587.50) -0-
9. End of Year ($9,587.50) -0-
I verify that the information on this Financiai Reporting Form is true and accurate to the
best of my knowledge.
Signed:
Title:
Wisam Altowa'i'j i -
Associated Civil Engineer
14
T'DA Article 3 (SB 821) Bicycle and Pedestrian Facilities Claim
R. INT RMATI ' F
Agency: Cit oy_R~__Tustin
_, Orange County Date: 3/28/94
Project Name/IJrnJts: Construction of Sidewalk & Handicap ramps at various locations
Project Type:
Bicycle Facilhie~
( ) Bike Lane (Class II) Pede:;trlan
( ) Bike Path (Class I) (30 Sidev.-alk
( ) Other (specify) (X) Handicapped Sidewalk Ramps
( ) Omer
--
Project Description (Continue on another page, if necessary): Construction/reconstruction of
sidewalks and handicap ramps on the south, side of Walnut Avenue, between Franklin-
Avenue and Sinclair Circle The Engineer's es
which will be funded from ~994-95 FY allocatedtimate for this project is $17,981.09
the 1993-94 FY as shown below, funds and the remaining funds f~o~-
Other Participating Agencies: N/A
1. Project Cos!
__
o Amount of SB 821 Funds Requested:
o Matching Funds:
(Any.ma~ching funds to be used on project)
Local
Regional'
(remaining from
383.09 1993-94FY)
17. 598.00 (New from 1994
95 FY)
-0-
2. P~roject Status
__
TOTAL PROJECT COST $__17,981.09
o Estimated Starting Date (month/year):
November, 1994
o Estimated Completion Date (month/year): December, 1~94
(If project will be constructed by a contractor and is ready to encumber funds, a copy of
a Minute Order or Resolution of contract award is necessary to receive payment.)
Projec! Location Map
Attach a map of the project.
Since regional funds are awarded on a competitive basis, remember to complele Regional J3. ikeway Program
Application Form for the necessary supplemental project information.
15
o'o~
zm
0
g~:Dd o~t)tg f~d
60-- t t~-~'El~
I, LLI, I.
o
90-- t
~ tL~' '
90-- ~
~tLt, t
c
¢